DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents 1. a Smooth Hyperbolic Approximation to the Mohr-Coulomb Yield Criterion - Abbo and Sloan

0045-7949(94)00339-4 Computers & Slrucrures Vol. 54. No. 3.pp. 427-441. 1995 CopyrightQ 1995 Ekevier Science Ltd Printed in Great Britain. All rights reserved 0045-7949/95…

Environment A New Geotechnical Method for natural Slope Exploration and Analysis

1 23 Natural Hazards Journal of the International Society for the Prevention and Mitigation of Natural Hazards ISSN 0921-030X Volume 75 Number 2 Nat Hazards (2015) 75:1327-1348…

Engineering Roll crushers

ROLL CRUSHERS ROLL CRUSHERS SIZE REDUCTION SIZE REDUCTION INVOLVES REDUCING THE SIZE OF PARTICLES SO AS TO GET MORE PRODUCTS. LAWS INVOLVED IN SIZE REDUCTION ARE : RITTENEGERâS…

Engineering A New geotechnical method for Natural slope exploration and analysis

1. 1 23 Natural Hazards Journal of the International Society for the Prevention and Mitigation of Natural Hazards ISSN 0921-030X Volume 75 Number 2 Nat Hazards (2015) 75:1327-1348…

Education toppling

1. International Journal of Rock Mechanics & Mining Sciences 38 (2001) 421–435 A general analytical solution for the required anchor force in rock slopes with toppling…

Documents 10 1b Haiderregssegeseg

Int. J. of GEOMATE , Oct. 2011, Vol. 1, No.1 (Sl. No. 1), pp. 10-18 10  ABSTRACT: Experimental test results presented in this paper were from a series of triaxial compression…

Documents Recent Results of Triaxial Tests With Granular Materials

Powder Technology, 60 (1990) 99 - 119 Recent Results of Triaxial Tests with Granular Materials D KOLYMBAS and W WU Znstztute for Sozl Mechanzcs and Rock Mechanzcs, Unzverszty…

Documents Buffer blasting presentation BOHOGS 26 Nov 2014_DF.pptx

PowerPoint Presentation Targeted buffer blasting to control movement along bedding plane shears John Latilla – AMC Consultants Batdelger Tumur-Ochir – Energy Resources,…

Documents Report on Piled Foundations

Design report: Piled foundations Final Design Report Piled Foundations DESIGN REPORT: PILE FOUNDATIONS. TABLE OF CONTENTS 21 Overall soil conditions. 2 Soil parameters 2…

Documents 3 Slope Stability II( Indah)

Mam Tor Fieldclass • Sunday 12th March – depart from Department at 8.45am – Pick up Greenbank at 9am – return approx. 6pm (depending on traffic) • You will need:…