G4 (OSCAR_1_4_0) Validation of CMS HCal V. Daniel Elvira Fermilab V. Daniel Elvira General Description Simulate HCal test beam 2002 setup using OSCAR_1_4_0, physics list…
RPC project status 1st RPC General Meeting 29 March 2011 Pigi Paolucci RPC project status RPC General Meeting 29/03/11 1th RPC General Meeting - Pigi Paolucci 2 RPC General…
Status of Invisible Higgs Study Sunil Bansal, Prof. Kajari Mazumdar, Prof. Jasbir Singh Overview: Introduction First look using CMSSW Estimation of ttbar background. HLT…
Rack Safety System DSS Advisory Board 06.10.2003 Christoph Schäfer Introduction The Rack Safety System is a proposal of CMS and was discussed during the September CMS…
All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule All CMS 30 May07 TSV News on the Machine Update on Triplets http://user.web.cern.ch/User/QuickLinks/Announcements/2007/LHCInnerTriplet_4.html…
An Inter-Regional Center for High Energy Physics Research and Educational Outreach (CHEPREO) at Florida International University Heidi Alvarez, FIU CIARA/AMPATH Paul Avery,…
Summary of the Persistency RTAG Report (heavily based on David Malon’s slides) - and some personal remarks Dirk Düllmann [email protected] CCS Meeting, April 18th…
Status of PQC Florence, Strasbourg, Vienna Carlo Civinini INFN-Firenze Introduction Status of hw + sw Status of DataBase Batch qualifications STM HPK Open points rAlu VFB…
Reminder (of what we were planning up until Friday Sep 19, 2008) Physics Coordination Meeting P. Sphicas Physics (status and plans) Making a physics plan Main characteristics…
Trigger Base Personnel Trigger Upgrade Wesley H. Smith University of Wisconsin Darin Acosta University of Florida Sergo Jindariani Fermilab US CMS PMG, January 16, 2013 Wesley…