DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents South Arm FEE Performance Prior to Au run, all FEMs installed and working. Currently, 157 of 168...

Slide 1 South Arm FEE Performance Prior to Au run, all FEMs installed and working. Currently, 157 of 168 FEMs read out useful data. = 93.5% operational FEM losses: station…

Documents Laser beam parameter measurements at PITZ

Laser beam parameter measurements at PITZ J.Bähr Workshop on Laser Pulse Shaping DESY,Zeuthen, November 30, 2006 Workshop on Laser Pulse Shaping, Zeuthen J.Bähr, DESY,…

Documents Itzhak Tserruya RICH 2004, Playa del Carmen 1 RICH 2004 Playa del Carmen, Mexico Nov. 30 – Dec. 5,...

RICH 2004 Playa del Carmen, Mexico Nov. 30 – Dec. 5, 2004 Itzhak Tserruya Short report from RICH 2004 at Playa del Carmen RICH 2004, Playa del Carmen There are three experiments…

Documents Laser system at PITZ

Laser system at PITZ J.Bähr LCLS Injector Commissioning Workshop SLAC, October 9-11, 2006 ICW Workshop SLAC J.Bähr, DESY, PITZ Outline 1. Introduction 2. Photocathode Laser…

Documents IX th International Conference on Hypernuclear and Strange Particle Physics (HYP06) - Mainz,...

IXth International Conference on Hypernuclear and Strange Particle Physics (HYP06) - Mainz, Germany, 10 -14 October, 2006 Hall A Experimental setup modification The Septum…

Documents TPC Meeting

TPC Meeting Institute of Physics, Academia Sinica Jia-Ye Chen 2007.6.21 Outline Pile-up Pulse Decomposition Study Pulse Identification, Fitting (Well & Failure) Statistics,…

Documents Laser beam parameter measurements at PITZ J.Bähr Workshop on Laser Pulse Shaping DESY,Zeuthen,...

Laser beam parameter measurements at PITZ J.Bähr Workshop on Laser Pulse Shaping DESY,Zeuthen, November 30, 2006 Workshop on Laser Pulse Shaping, Zeuthen J.Bähr, DESY,…