Slide 1 SPES Project Selective Production of Exotic Spe Selective Production of Exotic Species Gianfranco Prete LNL-INFN On behalf of the SPES Collaboration Slide 2 A second…
Slide 1 1 M. Vretenar for the HF-RFQ Working Group V.A. Dimov, M. Garlasché, A. Grudiev, A. Lombardi, D. Mazur, S. Mathot, E. Montesinos, M. Timmins, M. Vretenar Office…
Slide 1 IR Beamline and Sync Radiation Takashi Maruyama Slide 2 Collimation No beam loss within 400 m of IP Muon background can be acceptable. No sync radiations directly…
Slide 1 Status of BDSIM Developments at RHUL L. Nevay, S. Boogert, H. Garcia-Morales, S. Gibson, R. Kwee-Hinzmann, J. Snuverink Acknowledgments: R. Bruce, S. Redaelli 20…
Slide 1 1 Archiving Workshop (Soleil, May 2010) Archiving System Status Slide 2 2 Archiving Workshop (Soleil, May 2010) Plan Archiving Systems Overview HDB / TDB…
Slide 1 Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009 Slide 2 The Front End Test Stand (FETS) aims to demonstrate key technologies…
Slide 1 Beam instabilities (II) Giovanni Rumolo in CERN Accelerator School, Advanced Level, Trondheim Thursday 22.08.2013 Big thanks to H. Bartosik, G. Iadarola, K. Li, N.…