DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents Beam commissioning strategy 09-12-09 Global machine checkout Essential 450 GeV commissioning...

Slide 1 Beam commissioning strategy 09-12-09 Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning 2 3.5 TeV…

Documents SPES Project Selective Production of Exotic Spe Selective Production of Exotic Species Gianfranco...

Slide 1 SPES Project Selective Production of Exotic Spe Selective Production of Exotic Species Gianfranco Prete LNL-INFN On behalf of the SPES Collaboration Slide 2 A second…

Documents 1 M. Vretenar for the HF-RFQ Working Group V.A. Dimov, M. Garlasché, A. Grudiev, A. Lombardi, D....

Slide 1 1 M. Vretenar for the HF-RFQ Working Group V.A. Dimov, M. Garlasché, A. Grudiev, A. Lombardi, D. Mazur, S. Mathot, E. Montesinos, M. Timmins, M. Vretenar Office…

Documents CLIC Drive Beam Injector Design Update Shahin Sanaye Hajari 1.Institute For Research in Fundamental....

Slide 1 CLIC Drive Beam Injector Design Update Shahin Sanaye Hajari 1.Institute For Research in Fundamental Sciences (IPM), Tehran, Iran 2.CERN, Geneva, Switzerland Slide…

Documents IR Beamline and Sync Radiation Takashi Maruyama. Collimation No beam loss within 400 m of IP Muon...

Slide 1 IR Beamline and Sync Radiation Takashi Maruyama Slide 2 Collimation No beam loss within 400 m of IP Muon background can be acceptable. No sync radiations directly…

Documents Status of BDSIM Developments at RHUL L. Nevay, S. Boogert, H. Garcia-Morales, S. Gibson, R....

Slide 1 Status of BDSIM Developments at RHUL L. Nevay, S. Boogert, H. Garcia-Morales, S. Gibson, R. Kwee-Hinzmann, J. Snuverink Acknowledgments: R. Bruce, S. Redaelli 20…

Documents 1 1.Motivations 2.Parameters, Architecture, Schedule, Organisation 3.Requirements for the ion...

Slide 1 1 1.Motivations 2.Parameters, Architecture, Schedule, Organisation 3.Requirements for the ion source Slide 2 Upgrading LHC Luminosity 2 (*) protons per bunch, in…

Documents 1 Archiving Workshop (Soleil, May 2010) Archiving System Status.

Slide 1 1 Archiving Workshop (Soleil, May 2010) Archiving System Status Slide 2 2 Archiving Workshop (Soleil, May 2010) Plan  Archiving Systems Overview  HDB / TDB…

Documents Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.

Slide 1 Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009 Slide 2 The Front End Test Stand (FETS) aims to demonstrate key technologies…

Documents Beam instabilities (II) Giovanni Rumolo in CERN Accelerator School, Advanced Level, Trondheim...

Slide 1 Beam instabilities (II) Giovanni Rumolo in CERN Accelerator School, Advanced Level, Trondheim Thursday 22.08.2013 Big thanks to H. Bartosik, G. Iadarola, K. Li, N.…