DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents OUTLINE Two beam acceleration feasibility issue

Slide 1 Two-beam acceleration: two-beam prototype validation program G. Riddone in collaboration with N. Gazis, D. Gudkov, A. Solodko (input from CLIC Module WG members)…

Documents Optimizing Cost and Minimizing Energy Loss for Race-Track LHeC Design Jake Skrabacz University of...

About Me Optimizing Cost and Minimizing Energy Loss for Race-Track LHeC Design Jake Skrabacz University of Notre Dame Univ. of Michigan CERN REU 2008 CERN AB-department My…

Documents CD10 (11CDSD1.2CU) Mechanical design

CD10 Mechanical design CD10 (11CDSD1.2CU) Mechanical design Product elements Accelerating structure Cooling system Tuning system Accelerating elements mechanical design Extremity…

Documents SLAC Work Status for the CLIC High Gradient Accelerator Structure R&D Juwen Wang CLIC 09

SLAC Work Status for the CLIC High Gradient Accelerator Structure R&D Juwen Wang CLIC 09 October, 2009 Introduction 2. Work in the Past 3. Structure Fabrication Technology…

Documents High-gradient test at Nextef

High-gradient test at Nextef Shuji Matsumoto For KEK Nextef Group 2010.5.3 2010/5/3 * 44th X-band structure collaboration Meeting, CERN 44th X-band structure collaboration…

Documents Injector Commissioning Masanori Satoh (Accelerator Laboratory, KEK) for the Injector Linac...

Load Map of Linac Control Injector Commissioning Masanori Satoh (Accelerator Laboratory, KEK) for the Injector Linac Commissioning Group The 20th KEKB Accelerator Review…

Documents CLIC Instrumentation From CDR to TDR Conceptual Design Report Baseline solutions Alternative...

CLIC Instrumentation From CDR to TDR Conceptual Design Report Baseline solutions Alternative scenario(s) Next phase of R&D Perspectives & Conclusions * IWLC 2011…

Documents Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group 2010.5.5 2010/5/51 4th X-band...

Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group 2010.5.5 2010/5/5 * 4th X-band Structure Collaboration Meeting, CERN 4th X-band Structure Collaboration…

Documents 1 21-09-2012 «BE-RF-PM» CLIC prototype two-beam modules Thermal test planning G. Riddone, F. Rossi...

Thermal tests planning for CLIC prototype module type 0 CLIC prototype two-beam modules Thermal test planning G. Riddone, F. Rossi Introduction Thermal tests Environment…

Documents 5 th CLIC-ACE Structure production in laboratories and industries

Slide 1 5th CLIC-ACE Structure production in laboratories and industries G. Riddone, 02/02/2010 (contribution from KEK/SLAC colleagues) 1 1 Content Introduction to RF structures…