Zublin Precast Factory Malaysia Facts Project Description Construction of precast factory comprising 1 unit 2 storey office building, 1 unit canteen, 1 unit praying room, 2 unit guard houses at Jalan Lukut 4, Lukut Industrial Area, Kota Tinggi, Johor, Malaysia. Altogether 200 piles are installed to support the steel structure of the 10 m x 80m factory building. The factory will have three production lines: one for Jacking Pipes and two for other precast elements including tunnel segments. The facilities are located only 45 km away from Singapore and were constructed on a land area of 50,000 m². The factory has 11,00 m² of covered space for the production activities in three production bays. The production facility has a state-of-the-art equipment such as automatic cage welding machines, automatic stirrup bending machine, vacuum segment handling System, steam curing facilities and a 50 m³/h capacity batching plant as well as high-tech materials laboratory. The projected annual production will be 4,000 tunnel rings and 2,000 pipes. City/Country Kota Tinggi / Malaysia Client Zublin Precast Industries Sdn Bhd, Kota Tinggi Architect Walter & Jo Architect Associates Contract Value € 8,00 Mio. Construction Period 04/2014 - 11/2014 (8 Months) .
1

Zublin Precast Factory Malaysia - dywidag.dedywidag.de/databases/internet/_public/content.nsf...unit praying room, 2 unit guard houses at Jalan Lukut 4, Lukut Industrial Area, Kota

Jan 28, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Zublin Precast Factory Malaysia

    Facts Project DescriptionConstruction of precast factory comprising 1 unit 2 storey office building, 1 unit canteen, 1unit praying room, 2 unit guard houses at Jalan Lukut 4, Lukut Industrial Area, Kota Tinggi,Johor, Malaysia.Altogether 200 piles are installed to support the steel structure of the 10 m x 80m factorybuilding. The factory will have three production lines: one for Jacking Pipes and two forother precast elements including tunnel segments.The facilities are located only 45 km away from Singapore and were constructed on a landarea of 50,000 m². The factory has 11,00 m² of covered space for the production activitiesin three production bays. The production facility has a state-of-the-art equipment such asautomatic cage welding machines, automatic stirrup bending machine, vacuum segmenthandling System, steam curing facilities and a 50 m³/h capacity batching plant as well ashigh-tech materials laboratory.The projected annual production will be 4,000 tunnel rings and 2,000 pipes.

    City/Country

    Kota Tinggi / Malaysia

    Client

    Zublin Precast Industries Sdn Bhd, KotaTinggi

    Architect

    Walter & Jo Architect Associates

    Contract Value

    € 8,00 Mio.

    Construction Period

    04/2014 - 11/2014 (8 Months)

    .