Top Banner
1 E D C 2 3 4 B A 1 2 3 4 UNIVERSITY OF SOUTH CAROLINA MECHANICAL RENOVATIONS SOUTH TOWER 5 6 7 E SHEET: SHEET TITLE: DRAWN BY: D REV. DRAWING: DESCRIPTION 03/15/12 DATE: PROJECT TITLE: C CHECKED BY: DATE ORIG. BY DRAWN BY 5 6 Facsimile: (803) 791-0830 B SEAL SEAL Swygert & Associates C O N S U L T I N G E N G I N E E R S Post Office Box 11686 DBA Swygert & Assoc. Ltd. A Telephone: (803) 791-9300 Columbia, S.C. 29211 [email protected] 7 STATE PROJECT NUMBER H27-6082-NA THIS DRAWING AND THE DESIGN THEREON ARE THE PROPERTY OF SWYGERT & ASSOCIATES, LTD. THE REPRODUCTION, COPYING, OR USE OF THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SWYGERT & ASSOCIATES IS PROHIBITED AND ANY INFRINGEMENT WILL BE SUBJECT TO LEGAL ACTION. BID DOCUMENTS UP BASEMENT S101 ELEV EV03 1 1 1 2 8 8 CONSTRUCTION PHASING LINE. PHASE B CONSTRUCTION AREA AREA NOT TO BE DISTURBED BY CONSTRUCTION PHASE A CONSTRUCTION AREA, LIMITED SCOPE IN PHASE B, SEE ALL NOTES DEMOLITION - TO BE NOTED ON DEMO PLANS ONLY EXISTING TEXTURE CEILING (ASBESTOS) REMOVE EXISTING WALL. REMOVE EXISTING DOOR AND FRAME. REMOVE EXISTING PARTIAL CHASE WALL AS INDICATED TO ALLOW FOR REMOVAL OF EXISTING DUCTWORK AND INSTALLATION OF NEW MECHANICAL SYSTEMS. SEE MECHANICAL FOR ADDITIONAL SCOPE AND DETAILS. REMOVE EXISTING DRYER VENT CONSTRUCTION AND PREPARE FOR NEW DRYER VENT/WALL INFILL CONSTRUCTION. SEE MECHANICAL DRAWINGS FOR SCOPE AND DETAILS. COORDINATE WITH MEP FOR FULL SCOPE OF DEMOLITION/CONSTRUCTION IN ELECTRICAL ROOMS AND PIPE CHASES AND MECHANICAL CHASE. REMOVE ALL FLOORING AND BASE TO CONCRETE SLAB IN TYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03 ON FLOORS 2-18. SEE SPEC SECTION 010000 - SPECIAL CONDITIONS AND REQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD -BASED PAINT INVESTIGATION REPORT. SAND AND PREPARE ALL WALLS FOR PAINT/PRIMER IN TYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03 ON FLOORS 2-18. SEE SPEC SECTION 010000 - SPECIAL CONDITIONS AND REQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASED PAINT INVESTIGATION REPORT. REMOVE EXISTING CHAIN LINK FENCE AND GATE COMPLETELY. SEE REFLECTED CEILING DEMOLITION PLANS AND RELFECTED CEILING PLANS FOR PHASE A SCOPE IN THIS AREA. 1 2 3 4 5 6 7 8 9 REMOVE EXISTING RUBBER BASE AND VCT INSTALLED IN PHASE A IN TYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18. PREPARE CONCRETE FOR CARPET INSTALLATION REMOVE EXISTING FAN COIL UNITS AND WOODEN BASE, SEE MEP FOR FULL SCOPE OF DETAILS. REMOVE SELECTIVE BASE AND FLOORING TO CONCRETE DECK AROUND EXISTING RESIDENT ROOM FAN COIL UNITS AND VANITIES TO NEAREST FULL TILE, 2'-4" MIN. PREPARE CONCRETE FOR NEW FLOORING INSTALLATION. SEE FINISH SCHEDULE AND PLANS FOR EXTENT. REMOVE BASE AND FLOORING TO CONCRETE DECK AND PREPARE CONCRETE FOR NEW FLOORING INSTALLATION. EXISTING VCT TO REMAIN UNDER EXISTING CABINETS, CUT AT PERIMETER OF BASE CABINETS. REMOVE EXISTING DRAWER BANK, MIRROR, BACK WOOD WALL PARTITION AND ASSOCIATED CHASE UTILITIES AS NOTED ON MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS. PROTECT ADJACENT CASEWORK AND TRANSITE CURTAINWALL PANEL. SEE SPEC. SECTION 010000 - SPECIAL CONDITIONS AND REQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASED PAINT INVESTIGATION REPORT. REMOVE PARTIAL EXISTING CONCRETE SLAB. SEE MECHANICAL AND STRUCTURAL FOR FULL SCOPE OF DEMOLITION AND DETAILS. REMOVE EXISTING WALL. A B C D E F G 1. SEE LEGEND FOR GENERAL PHASING INDICATIONS. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BE DISTURBED DURING PHASE A TO PREVENT PHASE B HAZARDOUS MATERIALS FROM BEING DISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOT TO BE DISTURBED DURING PHASE A. 2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BE REMOVED OR ALTERED WITHIN THE PROJECT SCOPE. 3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION. 4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TO COMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TO DOCUMENT PRE- CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OF PHOTOGRAPHS AND VIDEO. 5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ON THIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR REQUIRED UTILITY ROUTING. 6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL ITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK. 7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION ARE IDENTIFIED WITHIN THE SPECIFICATIONS. 8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED IN DEMOLITION/CONSTRUCTION WORK. REPAIR OR REPLACEMENT OF DAMAGED AREAS NOT IN THE SCOPE OF WORK, SHALL BE INCLUDED IN THE WORK , WITH NO ADDITIONAL COST TO THE OWNER. 9. PROTECT ALL FLOORING TO REMAIN, INCLUDING BUT NOT LIMITED TO CARPET ON FIRST FLOOR AND BASEMENT. SEE SPEC SECTION -17300 - SELECTIVE DEMOLITION. 10. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURING THE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BE PROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WERE FOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS. 11. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES. KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION. 12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES. KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION. 1. SEE LEGEND FOR GENERAL PHASING INDICATIONS. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BE DISTURBED DURING PHASE A TO PREVENT PHASE B HAZARDOUS MATERIALS FROM BEING DISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOT TO BE DISTURBED DURING PHASE A. 2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BE REMOVED OR ALTERED WITHIN THE PROJECT SCOPE. 3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION. 4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TO COMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TO DOCUMENT PRE- CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OF PHOTOGRAPHS AND VIDEO. 5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ON THIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR REQUIRED UTILITY ROUTING. 6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL ITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK. 7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION ARE IDENTIFIED WITHIN THE SPECIFICATIONS. 8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED IN DEMOLITION/CONSTRUCTION WORK. REPAIR OR REPLACEMENT OF DAMAGED AREAS NOT IN THE SCOPE OF WORK, SHALL BE INCLUDED IN THE WORK , WITH NO ADDITIONAL COST TO THE OWNER. 9. PROTECT ALL FLOORING TO REMAIN, INCLUDING BUT NOT LIMITED TO CARPET ON FIRST FLOOR AND BASEMENT. SEE SPEC SECTION -17300 - SELECTIVE DEMOLITION. 10. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURING THE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BE PROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WERE FOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS. 11. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES. KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION. 12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES. KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION. N PHASE A WORK - NOTE TO CONTRACTORS: 1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR. 2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTER THE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHER PARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THE GYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTS ASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING. PHASE B WORK - NOTE TO CONTRACTORS: 1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHER MATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THE PARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THE CEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTS ASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING. 2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEW PARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILL BE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR. REFERENCED ON: 1/4" = 1'-0" D1.00 1 BASEMENT DEMOLITION PLAN LEGEND PHASE A - TYPICAL DEMOLITION PLAN KEYNOTES PHASE B - TYPICAL DEMOLITION PLAN KEYNOTES PHASE A - GENERAL DEMOLITION PLAN NOTES PHASE B - GENERAL DEMOLITION PLAN NOTES D1.00 BASEMENT DEMOLITION PLAN RMB SAL
11

Z:U290.11CAD 29003 12 12 Lighting layoutsSouth Tower 290 Beckypurchasing.sc.edu/solicitations/H27-6082-NA Demolition drawing.pdf · south tower mechanical renovations university of

Jul 13, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth Tower 290 Beckypurchasing.sc.edu/solicitations/H27-6082-NA Demolition drawing.pdf · south tower mechanical renovations university of

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

UP

BASEMENTS101

ELEVEV03

11

1

2

8

8

CONSTRUCTION PHASING LINE.

PHASE B CONSTRUCTION AREA

AREA NOT TO BE DISTURBED BYCONSTRUCTION

PHASE A CONSTRUCTION AREA, LIMITEDSCOPE IN PHASE B, SEE ALL NOTES

DEMOLITION - TO BE NOTED ONDEMO PLANS ONLY

EXISTING TEXTURE CEILING(ASBESTOS)

REMOVE EXISTING WALL.

REMOVE EXISTING DOOR AND FRAME.

REMOVE EXISTING PARTIAL CHASE WALL AS INDICATED TO ALLOW FORREMOVAL OF EXISTING DUCTWORK AND INSTALLATION OF NEW MECHANICALSYSTEMS. SEE MECHANICAL FOR ADDITIONAL SCOPE AND DETAILS.

REMOVE EXISTING DRYER VENT CONSTRUCTION AND PREPARE FOR NEWDRYER VENT/WALL INFILL CONSTRUCTION. SEE MECHANICAL DRAWINGS FORSCOPE AND DETAILS.

COORDINATE WITH MEP FOR FULL SCOPE OF DEMOLITION/CONSTRUCTION INELECTRICAL ROOMS AND PIPE CHASES AND MECHANICAL CHASE.

REMOVE ALL FLOORING AND BASE TO CONCRETE SLAB IN TYPICALCORRIDORS HFL#01, HFL#02, AND HFL#03 ON FLOORS 2-18. SEE SPEC SECTION010000 - SPECIAL CONDITIONS AND REQUIREMENTS/ASBESTOSINVESTIGATION REPORT/LEAD -BASED PAINT INVESTIGATION REPORT.

SAND AND PREPARE ALL WALLS FOR PAINT/PRIMER IN TYPICAL CORRIDORSHFL#01, HFL#02, AND HFL#03 ON FLOORS 2-18. SEE SPEC SECTION 010000 -SPECIAL CONDITIONS AND REQUIREMENTS/ASBESTOS INVESTIGATIONREPORT/LEAD-BASED PAINT INVESTIGATION REPORT.

REMOVE EXISTING CHAIN LINK FENCE AND GATE COMPLETELY.

SEE REFLECTED CEILING DEMOLITION PLANS AND RELFECTED CEILING PLANSFOR PHASE A SCOPE IN THIS AREA.

1

2

3

4

5

6

7

8

9

REMOVE EXISTING RUBBER BASE AND VCT INSTALLED IN PHASE A INTYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18.PREPARE CONCRETE FOR CARPET INSTALLATION

REMOVE EXISTING FAN COIL UNITS AND WOODEN BASE, SEE MEP FORFULL SCOPE OF DETAILS.

REMOVE SELECTIVE BASE AND FLOORING TO CONCRETE DECKAROUND EXISTING RESIDENT ROOM FAN COIL UNITS AND VANITIES TONEAREST FULL TILE, 2'-4" MIN. PREPARE CONCRETE FOR NEWFLOORING INSTALLATION. SEE FINISH SCHEDULE AND PLANS FOREXTENT.

REMOVE BASE AND FLOORING TO CONCRETE DECK AND PREPARECONCRETE FOR NEW FLOORING INSTALLATION. EXISTING VCT TOREMAIN UNDER EXISTING CABINETS, CUT AT PERIMETER OF BASECABINETS.

REMOVE EXISTING DRAWER BANK, MIRROR, BACK WOOD WALLPARTITION AND ASSOCIATED CHASE UTILITIES AS NOTED ONMECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS. PROTECTADJACENT CASEWORK AND TRANSITE CURTAINWALL PANEL. SEESPEC. SECTION 010000 - SPECIAL CONDITIONS ANDREQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASEDPAINT INVESTIGATION REPORT.

REMOVE PARTIAL EXISTING CONCRETE SLAB. SEE MECHANICAL ANDSTRUCTURAL FOR FULL SCOPE OF DEMOLITION AND DETAILS.

REMOVE EXISTING WALL.

A

B

C

D

E

F

G

1. SEE LEGEND FOR GENERAL PHASING INDICATIONS. PHASE B AREA AND ADJACENTWALLS ARE NOT TO BE DISTURBED DURING PHASE A TO PREVENT PHASE BHAZARDOUS MATERIALS FROM BEING DISTURBED. THE BOUNDARY WALLSEPARATING PHASE A AND PHASE B IS NOT TO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALSOR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BE REMOVED ORALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITIONAND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGSPROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARETO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OFPHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FORREQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONALITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDINGDATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION WORK. REPAIR OR REPLACEMENT OF DAMAGEDAREAS NOT IN THE SCOPE OF WORK, SHALL BE INCLUDED IN THE WORK , WITH NOADDITIONAL COST TO THE OWNER.9. PROTECT ALL FLOORING TO REMAIN, INCLUDING BUT NOT LIMITED TO CARPETON FIRST FLOOR AND BASEMENT. SEE SPEC SECTION -17300 - SELECTIVEDEMOLITION.10. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURINGTHE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BEPROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WEREFOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.11. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.

1. SEE LEGEND FOR GENERAL PHASING INDICATIONS. PHASE B AREA AND ADJACENTWALLS ARE NOT TO BE DISTURBED DURING PHASE A TO PREVENT PHASE BHAZARDOUS MATERIALS FROM BEING DISTURBED. THE BOUNDARY WALLSEPARATING PHASE A AND PHASE B IS NOT TO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALSOR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BE REMOVED ORALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITIONAND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGSPROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARETO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OFPHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FORREQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONALITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDINGDATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION WORK. REPAIR OR REPLACEMENT OF DAMAGEDAREAS NOT IN THE SCOPE OF WORK, SHALL BE INCLUDED IN THE WORK , WITH NOADDITIONAL COST TO THE OWNER.9. PROTECT ALL FLOORING TO REMAIN, INCLUDING BUT NOT LIMITED TO CARPETON FIRST FLOOR AND BASEMENT. SEE SPEC SECTION -17300 - SELECTIVEDEMOLITION.10. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURINGTHE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BEPROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WEREFOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.11. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.

N

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

REFERENCED ON: 1/4" = 1'-0"D1.001 BASEMENT DEMOLITION PLAN

LEGEND

PHASE A - TYPICAL DEMOLITION PLAN KEYNOTES

PHASE B - TYPICAL DEMOLITION PLAN KEYNOTES

PHASE A - GENERAL DEMOLITION PLAN NOTES

PHASE B - GENERAL DEMOLITION PLAN NOTES

D1.00

BASE

MENT

DEMO

LITIO

N PL

AN

RMB

SAL

Page 2: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth Tower 290 Beckypurchasing.sc.edu/solicitations/H27-6082-NA Demolition drawing.pdf · south tower mechanical renovations university of

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

UP

DN

UP

TRASH002A

TRASH002

VENDING001

OFFICE012A

CUST.012

STORAGE011

CUST.009

LAUNDRY007

TLT008

TLT006

LAUNDRY007A

BEDROOM005

LIVING003

CHASE004

HALLH004

HALLH003

HALLH002

HALLH005

HALLH001

ELEC010

STAIRST01

OPENTOBELOW

PANTRY003B

MECH003A

ELEVEV01

ELEVEV02

3

4

5

5

5

EVEV03

CONSTRUCTION PHASING LINE.

PHASE B CONSTRUCTION AREA

AREA NOT TO BE DISTURBED BYCONSTRUCTION

PHASE A CONSTRUCTION AREA, LIMITEDSCOPE IN PHASE B, SEE ALL NOTES

DEMOLITION - TO BE NOTED ONDEMO PLANS ONLY

EXISTING TEXTURE CEILING(ASBESTOS)

REMOVE EXISTING RUBBER BASE AND VCT INSTALLED IN PHASE A INTYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18.PREPARE CONCRETE FOR CARPET INSTALLATION

REMOVE EXISTING FAN COIL UNITS AND WOODEN BASE, SEE MEP FORFULL SCOPE OF DETAILS.

REMOVE SELECTIVE BASE AND FLOORING TO CONCRETE DECKAROUND EXISTING RESIDENT ROOM FAN COIL UNITS AND VANITIES TONEAREST FULL TILE, 2'-4" MIN. PREPARE CONCRETE FOR NEWFLOORING INSTALLATION. SEE FINISH SCHEDULE AND PLANS FOREXTENT.

REMOVE BASE AND FLOORING TO CONCRETE DECK AND PREPARECONCRETE FOR NEW FLOORING INSTALLATION. EXISTING VCT TOREMAIN UNDER EXISTING CABINETS, CUT AT PERIMETER OF BASECABINETS.

REMOVE EXISTING DRAWER BANK, MIRROR, BACK WOOD WALLPARTITION AND ASSOCIATED CHASE UTILITIES AS NOTED ONMECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS. PROTECTADJACENT CASEWORK AND TRANSITE CURTAINWALL PANEL. SEESPEC. SECTION 010000 - SPECIAL CONDITIONS ANDREQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASEDPAINT INVESTIGATION REPORT.

REMOVE PARTIAL EXISTING CONCRETE SLAB. SEE MECHANICAL ANDSTRUCTURAL FOR FULL SCOPE OF DEMOLITION AND DETAILS.

REMOVE EXISTING WALL.

A

B

C

D

E

F

G

REMOVE EXISTING WALL.

REMOVE EXISTING DOOR AND FRAME.

REMOVE EXISTING PARTIAL CHASE WALL AS INDICATED TO ALLOW FORREMOVAL OF EXISTING DUCTWORK AND INSTALLATION OF NEW MECHANICALSYSTEMS. SEE MECHANICAL FOR ADDITIONAL SCOPE AND DETAILS.

REMOVE EXISTING DRYER VENT CONSTRUCTION AND PREPARE FOR NEWDRYER VENT/WALL INFILL CONSTRUCTION. SEE MECHANICAL DRAWINGS FORSCOPE AND DETAILS.

COORDINATE WITH MEP FOR FULL SCOPE OF DEMOLITION/CONSTRUCTION INELECTRICAL ROOMS AND PIPE CHASES AND MECHANICAL CHASE.

REMOVE ALL FLOORING AND BASE TO CONCRETE SLAB IN TYPICALCORRIDORS HFL#01, HFL#02, AND HFL#03 ON FLOORS 2-18. SEE SPEC SECTION010000 - SPECIAL CONDITIONS AND REQUIREMENTS/ASBESTOSINVESTIGATION REPORT/LEAD -BASED PAINT INVESTIGATION REPORT.

SAND AND PREPARE ALL WALLS FOR PAINT/PRIMER IN TYPICAL CORRIDORSHFL#01, HFL#02, AND HFL#03 ON FLOORS 2-18. SEE SPEC SECTION 010000 -SPECIAL CONDITIONS AND REQUIREMENTS/ASBESTOS INVESTIGATIONREPORT/LEAD-BASED PAINT INVESTIGATION REPORT.

REMOVE EXISTING CHAIN LINK FENCE AND GATE COMPLETELY.

SEE REFLECTED CEILING DEMOLITION PLANS AND RELFECTED CEILING PLANSFOR PHASE A SCOPE IN THIS AREA.

1

2

3

4

5

6

7

8

9

1. SEE LEGEND FOR GENERAL PHASING INDICATIONS. PHASE B AREA AND ADJACENTWALLS ARE NOT TO BE DISTURBED DURING PHASE A TO PREVENT PHASE BHAZARDOUS MATERIALS FROM BEING DISTURBED. THE BOUNDARY WALLSEPARATING PHASE A AND PHASE B IS NOT TO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALSOR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BE REMOVED ORALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITIONAND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGSPROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARETO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OFPHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FORREQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONALITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDINGDATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION WORK. REPAIR OR REPLACEMENT OF DAMAGEDAREAS NOT IN THE SCOPE OF WORK, SHALL BE INCLUDED IN THE WORK , WITH NOADDITIONAL COST TO THE OWNER.9. PROTECT ALL FLOORING TO REMAIN, INCLUDING BUT NOT LIMITED TO CARPETON FIRST FLOOR AND BASEMENT. SEE SPEC SECTION -17300 - SELECTIVEDEMOLITION.10. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURINGTHE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BEPROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WEREFOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.11. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.

1. SEE LEGEND FOR GENERAL PHASING INDICATIONS. PHASE B AREA AND ADJACENTWALLS ARE NOT TO BE DISTURBED DURING PHASE A TO PREVENT PHASE BHAZARDOUS MATERIALS FROM BEING DISTURBED. THE BOUNDARY WALLSEPARATING PHASE A AND PHASE B IS NOT TO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALSOR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BE REMOVED ORALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITIONAND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGSPROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARETO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OFPHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FORREQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONALITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDINGDATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION WORK. REPAIR OR REPLACEMENT OF DAMAGEDAREAS NOT IN THE SCOPE OF WORK, SHALL BE INCLUDED IN THE WORK , WITH NOADDITIONAL COST TO THE OWNER.9. PROTECT ALL FLOORING TO REMAIN, INCLUDING BUT NOT LIMITED TO CARPETON FIRST FLOOR AND BASEMENT. SEE SPEC SECTION -17300 - SELECTIVEDEMOLITION.10. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURINGTHE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BEPROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WEREFOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.11. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.

N

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

REFERENCED ON: 1/4" = 1'-0"D1.011 GROUND LEVEL DEMOLITION PLAN

LEGEND

PHASE B - TYPICAL DEMOLITION PLAN KEYNOTES

PHASE A - TYPICAL DEMOLITION PLAN KEYNOTESPHASE A - GENERAL DEMOLITION PLAN NOTES

PHASE B - GENERAL DEMOLITION PLAN NOTES

D1.01

GROU

ND LE

VEL

DEMO

LITIO

NPL

AN

RMB

SAL

Page 3: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth Tower 290 Beckypurchasing.sc.edu/solicitations/H27-6082-NA Demolition drawing.pdf · south tower mechanical renovations university of

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

DN

UP

UP

DN

VESTIBULEV101

VESTIBULEV102

HALLH101

RA KITCHEN103D

RA LIVING103

RA BEDROOM103A

OFFICE102

CLST103C

TLT103B

MEN105CUST

104

CHASE104A

ELEC106

STUDY107

LOBBY101

COVEREDENTRY

3

cpt

cptcpt

cptcpt

cpt

5

5

5

5

CONSTRUCTION PHASING LINE.

PHASE B CONSTRUCTION AREA

AREA NOT TO BE DISTURBED BYCONSTRUCTION

PHASE A CONSTRUCTION AREA, LIMITEDSCOPE IN PHASE B, SEE ALL NOTES

DEMOLITION - TO BE NOTED ONDEMO PLANS ONLY

EXISTING TEXTURE CEILING(ASBESTOS)

REMOVE EXISTING WALL.

REMOVE EXISTING DOOR AND FRAME.

REMOVE EXISTING PARTIAL CHASE WALL AS INDICATED TO ALLOW FORREMOVAL OF EXISTING DUCTWORK AND INSTALLATION OF NEW MECHANICALSYSTEMS. SEE MECHANICAL FOR ADDITIONAL SCOPE AND DETAILS.

REMOVE EXISTING DRYER VENT CONSTRUCTION AND PREPARE FOR NEWDRYER VENT/WALL INFILL CONSTRUCTION. SEE MECHANICAL DRAWINGS FORSCOPE AND DETAILS.

COORDINATE WITH MEP FOR FULL SCOPE OF DEMOLITION/CONSTRUCTION INELECTRICAL ROOMS AND PIPE CHASES AND MECHANICAL CHASE.

REMOVE ALL FLOORING AND BASE TO CONCRETE SLAB IN TYPICALCORRIDORS HFL#01, HFL#02, AND HFL#03 ON FLOORS 2-18. SEE SPEC SECTION010000 - SPECIAL CONDITIONS AND REQUIREMENTS/ASBESTOSINVESTIGATION REPORT/LEAD -BASED PAINT INVESTIGATION REPORT.

SAND AND PREPARE ALL WALLS FOR PAINT/PRIMER IN TYPICAL CORRIDORSHFL#01, HFL#02, AND HFL#03 ON FLOORS 2-18. SEE SPEC SECTION 010000 -SPECIAL CONDITIONS AND REQUIREMENTS/ASBESTOS INVESTIGATIONREPORT/LEAD-BASED PAINT INVESTIGATION REPORT.

REMOVE EXISTING CHAIN LINK FENCE AND GATE COMPLETELY.

SEE REFLECTED CEILING DEMOLITION PLANS AND RELFECTED CEILING PLANSFOR PHASE A SCOPE IN THIS AREA.

1

2

3

4

5

6

7

8

9

REMOVE EXISTING RUBBER BASE AND VCT INSTALLED IN PHASE A INTYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18.PREPARE CONCRETE FOR CARPET INSTALLATION

REMOVE EXISTING FAN COIL UNITS AND WOODEN BASE, SEE MEP FORFULL SCOPE OF DETAILS.

REMOVE SELECTIVE BASE AND FLOORING TO CONCRETE DECKAROUND EXISTING RESIDENT ROOM FAN COIL UNITS AND VANITIES TONEAREST FULL TILE, 2'-4" MIN. PREPARE CONCRETE FOR NEWFLOORING INSTALLATION. SEE FINISH SCHEDULE AND PLANS FOREXTENT.

REMOVE BASE AND FLOORING TO CONCRETE DECK AND PREPARECONCRETE FOR NEW FLOORING INSTALLATION. EXISTING VCT TOREMAIN UNDER EXISTING CABINETS, CUT AT PERIMETER OF BASECABINETS.

REMOVE EXISTING DRAWER BANK, MIRROR, BACK WOOD WALLPARTITION AND ASSOCIATED CHASE UTILITIES AS NOTED ONMECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS. PROTECTADJACENT CASEWORK AND TRANSITE CURTAINWALL PANEL. SEESPEC. SECTION 010000 - SPECIAL CONDITIONS ANDREQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASEDPAINT INVESTIGATION REPORT.

REMOVE PARTIAL EXISTING CONCRETE SLAB. SEE MECHANICAL ANDSTRUCTURAL FOR FULL SCOPE OF DEMOLITION AND DETAILS.

REMOVE EXISTING WALL.

A

B

C

D

E

F

G

1. SEE LEGEND FOR GENERAL PHASING INDICATIONS. PHASE B AREA AND ADJACENTWALLS ARE NOT TO BE DISTURBED DURING PHASE A TO PREVENT PHASE BHAZARDOUS MATERIALS FROM BEING DISTURBED. THE BOUNDARY WALLSEPARATING PHASE A AND PHASE B IS NOT TO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALSOR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BE REMOVED ORALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITIONAND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGSPROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARETO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OFPHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FORREQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONALITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDINGDATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION WORK. REPAIR OR REPLACEMENT OF DAMAGEDAREAS NOT IN THE SCOPE OF WORK, SHALL BE INCLUDED IN THE WORK , WITH NOADDITIONAL COST TO THE OWNER.9. PROTECT ALL FLOORING TO REMAIN, INCLUDING BUT NOT LIMITED TO CARPETON FIRST FLOOR AND BASEMENT. SEE SPEC SECTION -17300 - SELECTIVEDEMOLITION.10. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURINGTHE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BEPROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WEREFOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.11. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.

1. SEE LEGEND FOR GENERAL PHASING INDICATIONS. PHASE B AREA AND ADJACENTWALLS ARE NOT TO BE DISTURBED DURING PHASE A TO PREVENT PHASE BHAZARDOUS MATERIALS FROM BEING DISTURBED. THE BOUNDARY WALLSEPARATING PHASE A AND PHASE B IS NOT TO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALSOR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BE REMOVED ORALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITIONAND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGSPROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARETO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OFPHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FORREQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONALITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDINGDATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION WORK. REPAIR OR REPLACEMENT OF DAMAGEDAREAS NOT IN THE SCOPE OF WORK, SHALL BE INCLUDED IN THE WORK , WITH NOADDITIONAL COST TO THE OWNER.9. PROTECT ALL FLOORING TO REMAIN, INCLUDING BUT NOT LIMITED TO CARPETON FIRST FLOOR AND BASEMENT. SEE SPEC SECTION -17300 - SELECTIVEDEMOLITION.10. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURINGTHE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BEPROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WEREFOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.11. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.

N

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

REFERENCED ON: 1/4" = 1'-0"D1.11 FIRST FLOOR DEMOLITION PLAN

LEGEND

PHASE A - TYPICAL DEMOLITION PLAN KEYNOTES

PHASE B - TYPICAL DEMOLITION PLAN KEYNOTES

PHASE A - GENERAL DEMOLITION PLAN NOTES

PHASE B - GENERAL DEMOLITION PLAN NOTES

D1.1

FIRS

T FL

OOR

DEMO

LITIO

N PL

AN

RMB

SAL

Page 4: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth Tower 290 Beckypurchasing.sc.edu/solicitations/H27-6082-NA Demolition drawing.pdf · south tower mechanical renovations university of

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

UP

UPDN

DN

A3.13

1

A3.2

B

C

D

EE

EB

C

B

C

B

C

B

C

B

B

C

B

C

B

C

B

C

B

C

B

C

B

C

C

B

E E EE

E

E EE

E

EEE

E

F

G

F

6

6

6

5

5

7

7

7 A

A

A

5

A3.2

A3.23

A3.15

RESIDENTFL#08

RESIDENTFL#09

RESIDENTFL#10

RESIDENTFL#11

RESIDENTFL#12

COMMUNITYFL#13

RESIDENTFL#00

RESIDENTFL#01

RESIDENTFL#02

RESIDENTFL#03

RESIDENTFL#04

RESIDENTFL#05

RESIDENTFL#06

RESIDENTFL#07

HALLHFL#01

HALLHFL#03

HALLHLF#02

CHASEFL#17

WOMENFL#15

ELECFL#16

CUSTFL#14

CONSTRUCTION PHASING LINE.

PHASE B CONSTRUCTION AREA

AREA NOT TO BE DISTURBED BYCONSTRUCTION

PHASE A CONSTRUCTION AREA, LIMITEDSCOPE IN PHASE B, SEE ALL NOTES

DEMOLITION - TO BE NOTED ONDEMO PLANS ONLY

EXISTING TEXTURE CEILING(ASBESTOS)

REMOVE EXISTING WALL.

REMOVE EXISTING DOOR AND FRAME.

REMOVE EXISTING PARTIAL CHASE WALL AS INDICATED TO ALLOW FORREMOVAL OF EXISTING DUCTWORK AND INSTALLATION OF NEW MECHANICALSYSTEMS. SEE MECHANICAL FOR ADDITIONAL SCOPE AND DETAILS.

REMOVE EXISTING DRYER VENT CONSTRUCTION AND PREPARE FOR NEWDRYER VENT/WALL INFILL CONSTRUCTION. SEE MECHANICAL DRAWINGS FORSCOPE AND DETAILS.

COORDINATE WITH MEP FOR FULL SCOPE OF DEMOLITION/CONSTRUCTION INELECTRICAL ROOMS AND PIPE CHASES AND MECHANICAL CHASE.

REMOVE ALL FLOORING AND BASE TO CONCRETE SLAB IN TYPICALCORRIDORS HFL#01, HFL#02, AND HFL#03 ON FLOORS 2-18. SEE SPEC SECTION010000 - SPECIAL CONDITIONS AND REQUIREMENTS/ASBESTOSINVESTIGATION REPORT/LEAD -BASED PAINT INVESTIGATION REPORT.

SAND AND PREPARE ALL WALLS FOR PAINT/PRIMER IN TYPICAL CORRIDORSHFL#01, HFL#02, AND HFL#03 ON FLOORS 2-18. SEE SPEC SECTION 010000 -SPECIAL CONDITIONS AND REQUIREMENTS/ASBESTOS INVESTIGATIONREPORT/LEAD-BASED PAINT INVESTIGATION REPORT.

REMOVE EXISTING CHAIN LINK FENCE AND GATE COMPLETELY.

SEE REFLECTED CEILING DEMOLITION PLANS AND RELFECTED CEILING PLANSFOR PHASE A SCOPE IN THIS AREA.

1

2

3

4

5

6

7

8

9

REMOVE EXISTING RUBBER BASE AND VCT INSTALLED IN PHASE A INTYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18.PREPARE CONCRETE FOR CARPET INSTALLATION

REMOVE EXISTING FAN COIL UNITS AND WOODEN BASE, SEE MEP FORFULL SCOPE OF DETAILS.

REMOVE SELECTIVE BASE AND FLOORING TO CONCRETE DECKAROUND EXISTING RESIDENT ROOM FAN COIL UNITS AND VANITIES TONEAREST FULL TILE, 2'-4" MIN. PREPARE CONCRETE FOR NEWFLOORING INSTALLATION. SEE FINISH SCHEDULE AND PLANS FOREXTENT.

REMOVE BASE AND FLOORING TO CONCRETE DECK AND PREPARECONCRETE FOR NEW FLOORING INSTALLATION. EXISTING VCT TOREMAIN UNDER EXISTING CABINETS, CUT AT PERIMETER OF BASECABINETS.

REMOVE EXISTING DRAWER BANK, MIRROR, BACK WOOD WALLPARTITION AND ASSOCIATED CHASE UTILITIES AS NOTED ONMECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS. PROTECTADJACENT CASEWORK AND TRANSITE CURTAINWALL PANEL. SEESPEC. SECTION 010000 - SPECIAL CONDITIONS ANDREQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASEDPAINT INVESTIGATION REPORT.

REMOVE PARTIAL EXISTING CONCRETE SLAB. SEE MECHANICAL ANDSTRUCTURAL FOR FULL SCOPE OF DEMOLITION AND DETAILS.

REMOVE EXISTING WALL.

A

B

C

D

E

F

G

1. SEE LEGEND FOR GENERAL PHASING INDICATIONS. PHASE B AREA AND ADJACENTWALLS ARE NOT TO BE DISTURBED DURING PHASE A TO PREVENT PHASE BHAZARDOUS MATERIALS FROM BEING DISTURBED. THE BOUNDARY WALLSEPARATING PHASE A AND PHASE B IS NOT TO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALSOR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BE REMOVED ORALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITIONAND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGSPROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARETO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OFPHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FORREQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONALITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDINGDATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION WORK. REPAIR OR REPLACEMENT OF DAMAGEDAREAS NOT IN THE SCOPE OF WORK, SHALL BE INCLUDED IN THE WORK , WITH NOADDITIONAL COST TO THE OWNER.9. PROTECT ALL FLOORING TO REMAIN, INCLUDING BUT NOT LIMITED TO CARPETON FIRST FLOOR AND BASEMENT. SEE SPEC SECTION -17300 - SELECTIVEDEMOLITION.10. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURINGTHE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BEPROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WEREFOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.11. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.

1. SEE LEGEND FOR GENERAL PHASING INDICATIONS. PHASE B AREA AND ADJACENTWALLS ARE NOT TO BE DISTURBED DURING PHASE A TO PREVENT PHASE BHAZARDOUS MATERIALS FROM BEING DISTURBED. THE BOUNDARY WALLSEPARATING PHASE A AND PHASE B IS NOT TO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALSOR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BE REMOVED ORALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITIONAND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGSPROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARETO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OFPHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FORREQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONALITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDINGDATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION WORK. REPAIR OR REPLACEMENT OF DAMAGEDAREAS NOT IN THE SCOPE OF WORK, SHALL BE INCLUDED IN THE WORK , WITH NOADDITIONAL COST TO THE OWNER.9. PROTECT ALL FLOORING TO REMAIN, INCLUDING BUT NOT LIMITED TO CARPETON FIRST FLOOR AND BASEMENT. SEE SPEC SECTION -17300 - SELECTIVEDEMOLITION.10. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURINGTHE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BEPROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WEREFOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.11. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.

N

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

REFERENCED ON: 1/4" = 1'-0"D1.21 TYPICAL DEMOLITION PLAN - LEVEL 2-17

LEGEND

PHASE A - TYPICAL DEMOLITION PLAN KEYNOTES

PHASE B - TYPICAL DEMOLITION PLAN KEYNOTES

PHASE A - GENERAL DEMOLITION PLAN NOTES

PHASE B - GENERAL DEMOLITION PLAN NOTES

D1.2

TYPI

CAL D

EMOL

ITIO

N PL

AN,

LEVE

LS 2-

17

RMB

SAL

A NOTE TO CONTRACTORS

Page 5: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth Tower 290 Beckypurchasing.sc.edu/solicitations/H27-6082-NA Demolition drawing.pdf · south tower mechanical renovations university of

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

DN

DN

UP

RESIDENT1808

RESIDENT1809

RESIDENT1810

RESIDENT1811

RESIDENT1812

COMMUNITY1813

RESIDENT1801

RESIDENT1802

RESIDENT1803

RESIDENT1804

RESIDENT1805

RESIDENT1806

RESIDENT1807

HALLH1803

HALLH1801

HALLH1802

WOMEN1815

CHASE1817

ELEC1816

CUST1814

6

6

6

5

5

7

7

7 A

A

A

B

C

D

EE

EB

C

B

C

B

C

B

C

B

B

C

B

C

B

C

B

C

B

C

B

C

B

C

C

B

E E EE

E

E EE

E

EEE

E

G

G

RESIDENT1800

A3.13

1

A3.2

A3.23

A3.15

F

9

CONSTRUCTION PHASING LINE.

PHASE B CONSTRUCTION AREA

AREA NOT TO BE DISTURBED BYCONSTRUCTION

PHASE A CONSTRUCTION AREA, LIMITEDSCOPE IN PHASE B, SEE ALL NOTES

DEMOLITION - TO BE NOTED ONDEMO PLANS ONLY

EXISTING TEXTURE CEILING(ASBESTOS)

REMOVE EXISTING RUBBER BASE AND VCT INSTALLED IN PHASE A INTYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18.PREPARE CONCRETE FOR CARPET INSTALLATION

REMOVE EXISTING FAN COIL UNITS AND WOODEN BASE, SEE MEP FORFULL SCOPE OF DETAILS.

REMOVE SELECTIVE BASE AND FLOORING TO CONCRETE DECKAROUND EXISTING RESIDENT ROOM FAN COIL UNITS AND VANITIES TONEAREST FULL TILE, 2'-4" MIN. PREPARE CONCRETE FOR NEWFLOORING INSTALLATION. SEE FINISH SCHEDULE AND PLANS FOREXTENT.

REMOVE BASE AND FLOORING TO CONCRETE DECK AND PREPARECONCRETE FOR NEW FLOORING INSTALLATION. EXISTING VCT TOREMAIN UNDER EXISTING CABINETS, CUT AT PERIMETER OF BASECABINETS.

REMOVE EXISTING DRAWER BANK, MIRROR, BACK WOOD WALLPARTITION AND ASSOCIATED CHASE UTILITIES AS NOTED ONMECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS. PROTECTADJACENT CASEWORK AND TRANSITE CURTAINWALL PANEL. SEESPEC. SECTION 010000 - SPECIAL CONDITIONS ANDREQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASEDPAINT INVESTIGATION REPORT.

REMOVE PARTIAL EXISTING CONCRETE SLAB. SEE MECHANICAL ANDSTRUCTURAL FOR FULL SCOPE OF DEMOLITION AND DETAILS.

REMOVE EXISTING WALL.

A

B

C

D

E

F

G

REMOVE EXISTING WALL.

REMOVE EXISTING DOOR AND FRAME.

REMOVE EXISTING PARTIAL CHASE WALL AS INDICATED TO ALLOW FORREMOVAL OF EXISTING DUCTWORK AND INSTALLATION OF NEW MECHANICALSYSTEMS. SEE MECHANICAL FOR ADDITIONAL SCOPE AND DETAILS.

REMOVE EXISTING DRYER VENT CONSTRUCTION AND PREPARE FOR NEWDRYER VENT/WALL INFILL CONSTRUCTION. SEE MECHANICAL DRAWINGS FORSCOPE AND DETAILS.

COORDINATE WITH MEP FOR FULL SCOPE OF DEMOLITION/CONSTRUCTION INELECTRICAL ROOMS AND PIPE CHASES AND MECHANICAL CHASE.

REMOVE ALL FLOORING AND BASE TO CONCRETE SLAB IN TYPICALCORRIDORS HFL#01, HFL#02, AND HFL#03 ON FLOORS 2-18. SEE SPEC SECTION010000 - SPECIAL CONDITIONS AND REQUIREMENTS/ASBESTOSINVESTIGATION REPORT/LEAD -BASED PAINT INVESTIGATION REPORT.

SAND AND PREPARE ALL WALLS FOR PAINT/PRIMER IN TYPICAL CORRIDORSHFL#01, HFL#02, AND HFL#03 ON FLOORS 2-18. SEE SPEC SECTION 010000 -SPECIAL CONDITIONS AND REQUIREMENTS/ASBESTOS INVESTIGATIONREPORT/LEAD-BASED PAINT INVESTIGATION REPORT.

REMOVE EXISTING CHAIN LINK FENCE AND GATE COMPLETELY.

SEE REFLECTED CEILING DEMOLITION PLANS AND RELFECTED CEILING PLANSFOR PHASE A SCOPE IN THIS AREA.

1

2

3

4

5

6

7

8

9

1. SEE LEGEND FOR GENERAL PHASING INDICATIONS. PHASE B AREA AND ADJACENTWALLS ARE NOT TO BE DISTURBED DURING PHASE A TO PREVENT PHASE BHAZARDOUS MATERIALS FROM BEING DISTURBED. THE BOUNDARY WALLSEPARATING PHASE A AND PHASE B IS NOT TO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALSOR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BE REMOVED ORALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITIONAND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGSPROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARETO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OFPHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FORREQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONALITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDINGDATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION WORK. REPAIR OR REPLACEMENT OF DAMAGEDAREAS NOT IN THE SCOPE OF WORK, SHALL BE INCLUDED IN THE WORK , WITH NOADDITIONAL COST TO THE OWNER.9. PROTECT ALL FLOORING TO REMAIN, INCLUDING BUT NOT LIMITED TO CARPETON FIRST FLOOR AND BASEMENT. SEE SPEC SECTION -17300 - SELECTIVEDEMOLITION.10. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURINGTHE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BEPROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WEREFOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.11. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.

1. SEE LEGEND FOR GENERAL PHASING INDICATIONS. PHASE B AREA AND ADJACENTWALLS ARE NOT TO BE DISTURBED DURING PHASE A TO PREVENT PHASE BHAZARDOUS MATERIALS FROM BEING DISTURBED. THE BOUNDARY WALLSEPARATING PHASE A AND PHASE B IS NOT TO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALSOR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BE REMOVED ORALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITIONAND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGSPROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARETO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OFPHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FORREQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONALITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDINGDATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION WORK. REPAIR OR REPLACEMENT OF DAMAGEDAREAS NOT IN THE SCOPE OF WORK, SHALL BE INCLUDED IN THE WORK , WITH NOADDITIONAL COST TO THE OWNER.9. PROTECT ALL FLOORING TO REMAIN, INCLUDING BUT NOT LIMITED TO CARPETON FIRST FLOOR AND BASEMENT. SEE SPEC SECTION -17300 - SELECTIVEDEMOLITION.10. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURINGTHE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BEPROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WEREFOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.11. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.

N

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

REFERENCED ON: 1/4" = 1'-0"D1.31 18TH FLOOR DEMOLITION PLAN

LEGEND

PHASE B - TYPICAL DEMOLITION PLAN KEYNOTES

PHASE A - TYPICAL DEMOLITION PLAN KEYNOTESPHASE A - GENERAL DEMOLITION PLAN NOTES

PHASE B - GENERAL DEMOLITION PLAN NOTES

D1.3

18TH

FLO

ORDE

MOLIT

ION

PLAN

RMB

SAL

Page 6: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth Tower 290 Beckypurchasing.sc.edu/solicitations/H27-6082-NA Demolition drawing.pdf · south tower mechanical renovations university of

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

DN

UP

DN

2

2

2

2

COMM.1901

ELEV SHAFT1902

1

1

1

1

3

4

5

5

5

5

6

6

7

7

8

10

11

10

11

10

11

1011

13 1314

15

15

16

17

1818 18

18181818

18

11

A3.2

3' - 0

"

19 19

9A

12

12

12

12

1

ELEV EQUIP1903

1. SEE LEGEND FOR GENERAL PHASING INDICATIONS. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BE DISTURBED DURING PHASE A TOPREVENT PHASE B HAZARDOUS MATERIALS FROM BEING DISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOT TO BEDISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOTSHOWN TO BE REMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THEEXISTING DRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TO VERIFY EXISTING CONDITIONSPRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TO COMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TODOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ON THIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICALDRAWINGS FOR REQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL ITEMS TO REMAIN AND BE PROTECTED THROUGHOUTCONSTRUCTION, INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION ARE IDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED IN DEMOLITION/CONSTRUCTION WORK. REPAIR OR REPLACEMENT OF DAMAGEDAREAS NOT IN THE SCOPE OF WORK, SHALL BE INCLUDED IN THE WORK , WITH NO ADDITIONAL COST TO THE OWNER.9. PROVIDE AND INSTALL ALL SHORING AND SUPPORT SYSTEMS NECESSARY TO ENSURE EXISTING STRUCTURE TO REMAIN IS STABLETHROUGHOUT DEMOLITION AND CONSTRUCTION.10. ALL DEMOLITION REQUIRED FOR FUTURE INSTALLATION OF MECHANICAL CHASES TO BE COORDINATED WITH MECHANICAL DRAWINGS,EQUIPMENT SPECIFICATIONS, AND STRUCTURAL DRAWINGS.11. PROTECT EXISTING CONCRETE STRUCTURE TO REMAIN THROUGHOUT DEMOLITION/CONSTRUCTION.12. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION REGARDING THE AREAS OF THE EXISTING CONCRETE ROOF STRUCTUREAND CONSTRUCTION TO BE REMOVED.13.CONTRACTOR TO MARK IN FIELD ALL CONCRETE STRUCTURAL ELEMENTS TO BE DEMOLISHED AND REVIEW WITH ARCHITECT PRIOR TOCOMMENCEMENT OF WORK.14. EXISTING ROOF SYSTEM INCLUDING FLASHING, COPING, AND ALL OTHER ROOFING MATERIALS TO BE REMOVED DOWN TO THE CONCRETEFRAME. PREPARE EXISTING ROOF SLAB FOR INSTALLATION OF NEW ROOF SYSTEM - SEE ROOF DETAILS FOR ADDITIONAL INFORMATION.15. SEE PHASE B - GENERAL DEMOLITION ROOF NOTES AND SHEET A1.4 FOR PHASE B ROOF SCOPE.16. SEE MECHANICAL, PLUMBING, ELECTRICAL AND STRUCTURAL FOR EXTENT OF ROOF DEMOLITION IN PHASE B.

EXISTING ROOF SYSTEM INCLUDING FLASHING, COPING, AND ALL OTHERROOFING MATERIALS TO BE REMOVED DOWN TO THE CONCRETE FRAME.PREPARE EXISTING ROOF SLAB FOR INSTALLATION OF NEW ROOF. SEE ROOFDETAILS FOR ADDITIONAL INFORMATION.

REMOVE EXISTING ROOF DRAINS. MAINTAIN/PROTECT EXISTING ROOF DRAINPIPING TO BE CONNECTED TO NEW ROOF DRAINS. SEE PLUMBING DRAWINGSFOR NEW ROOF DRAIN DETAILS.

TEMPORARILY DISCONNECT AND RELOCATE EXISTING MECHANICAL UNIT FORINSTALLATION OF NEW ROOF. SEE MECHANICAL FOR DETAILS.

REMOVE/PROTECT/STORE PARTIAL METAL STAIR TO ALLOW FOR NEW ROOFWORK.

REMOVE EXISTING PLASTIC DOWNSPOUT SPLASHBLOCK.

CUT AND CAP FLUSH WITH CONCRETE ROOF DECK MISC. ABANDONED ROOFPENETRATIONS TO BE ROOFED OVER. COORDINATE ALL LOCATIONS WITHMECHANICAL, ELECTRICAL, AND PLUMBING.

REMOVE EXISTING CONCRETE ROOF CURBS, SEE STRUCTURAL.

REMOVE PARTIAL EXISTING CONCRETE PARAPET WALL BRACE. SEESTRUCTURAL.

REMOVE PARTIAL ROOF DECK FOR INSTALLATION OF NEW MECHANICAL CHASES.COORDINATE WITH MECHANICAL, EQUIPMENT SPEC., AND STRUCTURAL.

CORE DRILL EXISTING CONCRETE WALL BASE AND INSTALL NEW OVERFLOWSCUPPER. SEE DETAILS 14/A3.2 & 15/A3.2.

1

2

3

4

5

6

7

8

9

10

REMOVE/STORE/PROTECT/AND REINSTALL EXISTING PARAPET WALL LOVERS TOALLOW ACCESS TO EXTERIOR SIDE OF WALL FOR OVERFLOW SCUPPERINSTALLATION.

REMOVE EXISTING GUTTER AND ASSOCIATED DOWNSPOUTS.

EXISTING CONCRETE CURBS TO REMAIN.

EXISTING SPIGOT TO REMAIN.

EXISTING PIPE SLEEVES TO REMAIN, SEE MECHANICAL.

EXISTING PLUMBING VENTS TO REMAIN.

EXISTING EXHAUST FAN CURB TO REMAIN. EXHAUST FAN TO REMAIN IN SERVICEAFTER PHASE A, SEE MECHANICAL.

EXISTING CONCRETE COLUMN AND OVERHEAD BRACE TO REMAIN.

REMOVE 3'-0" OF EXISTING CONCRETE ROOF CURB AND REMOVE ENTIRE METALCOPING, SEE STRUCTURAL. RECAP ENTIRE CURB WITH METAL COPING TOMATCH EXISTING THAT WAS REMOVED.

11

12

13

14

15

16

17

18

19

1. SEE LEGEND FOR GENERAL PHASING INDICATIONS. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BE DISTURBEDDURING PHASE A TO PREVENT PHASE B HAZARDOUS MATERIALS FROM BEING DISTURBED. THE BOUNDARY WALLSEPARATING PHASE A AND PHASE B IS NOT TO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALS OR OTHER SUSPECTED HAZARDOUSMATERIALS NOT SHOWN TO BE REMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITION AND NEW WORK. INFORMATION SHOWN ISBASED ON THE EXISTING DRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TOVERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TO COMMENCEMENT OF DEMOLITION/RENOVATION/NEWWORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OF PHOTOGRAPHSAND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ON THIS PLAN. SEE MECHANICAL, PLUMBING,AND ELECTRICAL DRAWINGS FOR REQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL ITEMS TO REMAIN AND BE PROTECTEDTHROUGHOUT CONSTRUCTION, INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION ARE IDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED IN DEMOLITION/CONSTRUCTION WORK. REPAIR OR REPLACEMENT OFDAMAGED AREAS NOT IN THE SCOPE OF WORK, SHALL BE INCLUDED IN THE WORK , WITH NO ADDITIONAL COST TO THEOWNER.9. PROTECT NEW ROOF SYSTEM INSTALLED IN PHASE A THROUGHOUT PHASE B. COORDINATE WITH MECHANICAL FORADDITIONAL PHASE B ROOF SCOPE.10. SEE MECHANICAL, PLUMBING, ELECTRICAL AND STRUCTURAL FOR EXTENT OF ROOF DEMOLITION IN PHASE B.

N

REMOVE EXHAUST FAN COMPLETE. ROOF CURB AND EXHASUTDUCT TO REMAIN. SEE MECHANICAL

A

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

REFERENCED ON: 1/4" = 1'-0"D1.41 ROOF DEMOLITION PLAN

REFERENCED ON: 1/4" = 1'-0"D1.43 PENTHOUSE DEMOLITION ROOF PLAN

REFERENCED ON: 1/4" = 1'-0"D1.42 PENTHOUSE DEMOLITION FLOOR PLAN

PHASE A - GENERAL DEMOLITION ROOF NOTES PHASE A - DEMOLITION ROOF PLAN KEYNOTES PHASE B - GENERAL DEMOLITION ROOF NOTES

D1.4

ROOF

DEM

OLIT

ION

PLAN

RMB

SAL

PHASE B - DEMOLITION ROOF PLAN KEYNOTES

Page 7: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth Tower 290 Beckypurchasing.sc.edu/solicitations/H27-6082-NA Demolition drawing.pdf · south tower mechanical renovations university of

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

EXPOSED STRUCTURE

OPEN TO ABOVE

OPEN TO ABOVE

OPEN TO ABOVE

SLOPED

OPEN TO ABOVE

EXPOSED STRUCTURE

EXPOSED STRUCTURE

EXPOSED STRUCTURE

16' - 8"

CONSTRUCTION PHASING LINE.

PHASE B CONSTRUCTION AREA

AREA NOT TO BE DISTURBED BYCONSTRUCTION

PHASE A CONSTRUCTION AREA, LIMITEDSCOPE IN PHASE B, SEE ALL NOTES

DEMOLITION - TO BE NOTED ONDEMO PLANS ONLY

EXISTING TEXTURE CEILING(ASBESTOS)

REMOVE EXISTING CEILING TILE,CEILING GRID AND LIGHTS. EXISTINGCEILING GRID ANGLES AT GWB, PLASTER, AND METAL EDGE SOFFITSTO REMAIN, AND TO BE REUSED FOR NEW CEILING INSTALLATION.SEE ELECTRICAL FOR ADDITIONAL DETAILS.

METAL EDGE SOFFIT TO REMAIN. PROTECT DURING DEMOLITION ANDCONSTRUCTION. SAND AND REMOVE RUST AND SCALING. PREPAREFOR NEW PAINT.

REMOVE EXISTING CEILING GRID AND LIGHTS. SEE ELECTRICAL FORADDITIONAL DETAILS. CEILING GRID WALL ANGLE TO REMAIN ATTYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, TOBE REUSED FOR FUTURE NEW CEILING INSTALLATION.

REMOVE/ABATE SPRAY-ON TEXTURED CEILING ABOVE EXISTING LAY-IN CEILING. SEE SPECS SECTION 010000 - SPECIAL CONDITIONS ANDREQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASEDPAINT INVESTIGATION REPORT.

REMOVE EXISTING GWB CEILING AND LIGHTS. SEE ELECTRICAL FORADDITIONAL DETAILS.

CUT OPENING IN EXISTING ROOF DECK AS PART OF PHASE A. SEEA2.3 KEYNOTES FOR SOFFIT TO BE BUILT IN PHASE A TO ENCLOSEROOF DECK OPENING. PARTIALLY SCRAPE/ABATE EXISTINGASBESTOS CONTAINING SPRAY TEXTURE CEILING TO ALLOW FORTEMORARY SOFFIT ENCLOSURE. EXISTING CHASE WALL TO REMAINDURING PHASE A.

REMOVAL OF EXISTING GRILL, WHERE OCCURS, AND PATCHING OFSHEETROCK TO BE COMPLETED BY OTHERS. G.C. TO PAINT.

1

2

4

3

5

6

7

SELECTIVE REMOVAL OF TEXTURED CEILING IN ORDER TO ALLOWFOR INSTALLATION OF STEEL ANGLES,DUCTWORK, PIPING, ANDASSOCIATED HANGING DEVICES. SEE MECHANICAL, ELECTRICAL,PLUMBING AND SPEC. SECTION 010000 - SPECIAL CONDITIONSAND REQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASED PAINT INVESTIGATION REPORT.

REMOVE EXISTING METAL SOFFIT. SEE MECHANICAL, ELECTRICAL,PLUMBING FOR ADDITIONAL SCOPE TO BE REMOVED. MAINTAINEXISTING SOFFIT CEILING ANGLE CONNECTION TO BE REUSED.SEE SPEC. SECTION 010000 - SPECIAL CONDITIONS ANDREQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASEDPAINT INVESTIGATION REPORT.

EXISTING LIGHT TO BE REMOVED AND STORED FOR REINSTALLIONDURING THIS SCOPE OF WORK. CONTRACTOR TO VERIFY ALLLIGHTS ARE WORKING PRIOR TO REMOVAL AND REPORT TOOWNER/ARCHITECT ANY FIXTURES THAT ARE NOT WORKING. SEEELECTRICAL FOR FULL SCOPE OF WORK AND COORDIATION OFLIGHTING DEMOLITION/CONSTRUCTION FOR BASE BID ANDALTERNATE NO. 1.

REMOVE EXISTING METAL SOFFIT. SEE MECHANICAL, ELECTRICAL,PLUMBING FOR ADDITIONAL SCOPE TO BE REMOVED. REMOVEEXISTING SOFFIT CEILING ANGLE AND PREPARE CEILING TO BEEXPOSED FOR NEW TEXTURED SPRAY MATERIAL. SEE REFLECTEDCEILING PLAN AND SPEC. SECTION 010000 - SPECIAL CONDITIONSAND REQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASED PAINT INVESTIGATION REPORT.

REMOVE EXISTING METAL SOFFIT AND CEILING ANGLECOMPLETELY.

REMOVE EXISTING LIGHT. SEE ELECTRICAL FOR FULL SCOPE OFLIGHTING DEMOLITION/CONSTRUCTION FOR BASE BID ANDALTERNATE NO. 1.

REMOVE /ABATE SPRAY-ON TEXTURED CEILING COMPLETELY ANDPREPARE FOR NEW SKIM COAT CEILING FINISH AS SHOWN ONREFLECTED CEILNG PLAN, SEE SPECS. SEE SPEC SECTION010000 SPECIAL CONDITIONS AND REQUIREMENTS/ASBESTOSINVESTIGATION REPORT/LEAD-BASED PAINT INVESTIGATIONREPORT.

SELECTIVE REMOVAL OF APC CEILING TILE ONLY INSTALLED INPHASE A TO ALLOW FOR REMOVAL OF PIPING, SEE PLUMBING.PROTECT EXISTING CEILING TILE, GRID AND AND ADJACENTCEILING MATERIALS AND REINSTALL CEILING TILE AFTERREMOVAL OF PHASE B PLUMBING SCOPE IS COMPLETE.

SELECTIVE PATCHING OF EXISTING GWB BY OTHERS, SEEMECHANICAL.

SELECTIVE REMOVAL OF APC CEILING TILE ONLY INSTALLED INPHASE A TO ALLOW FOR REQUIRED MECHANICAL, ELECTRICALAND PLUMBING CONNECTIONS. PROTECT EXISTING CEILING TILE,GRID AND AND ADJACENT CEILING MATERIALS AND REINSTALLCEILING TILE AFTER REMOVAL OF PHASE B PLUMBING SCOPE ISCOMPLETE.

A

B

C

D

E

F

G

H

J

K

1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BEDISTURBED DURING PHASE A TO PREVENT PHASE B HAZARDOUSMATERIALS FROM BEING DISTURBED. THE BOUNDARY WALLSEPARATING PHASE A AND PHASE B IS NOT TO BE DISTURBED DURINGPHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAININGMATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOTSHOWN TO BE REMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OFDEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THEEXISTING DRAWINGS PROVIDED BY THE OWNER. GENERALCONTRACTOR AND SUB-CONTRACTORS ARE TO VERIFY EXISTINGCONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TODOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECTWITH ELECTRONIC COPIES OF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOTSHOWN ON THIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICALDRAWINGS FOR REQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FORADDITIONAL ITEMS TO REMAIN AND BE PROTECTED THROUGHOUTCONSTRUCTION, INCLUDING DATA AND POWER CONDUITS, LIGHTS,PIPES AND DUCTWORK.7. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION SCOPE. REPAIR OR REPLACEMENT OFDAMAGED AREAS NOT IN THIS SCOPE SHALL BE INCLUDED IN THE WORK,WITH NO ADDITIONAL COST TO THE OWNER.8. ELECTRICAL CONTRACTOR IS TO VERIFY ALL CEILING MOUNTEDELECTRICAL DEVICES ARE IN WORKING CONDITION AT COMMENCEMENTOF DEMOLITION/CONSTRUCTION. SEE ELECTRICAL DRAWINGS ANDSPECS FOR ALL SCOPE RELATED TO CEILING MOUNTED DEVICES PRIORTO COMMENCEMENT OF DEMOLITION/CONSTRUCTION.9. ALL EXISTING WALL SCONCES/LIGHTING TO REMAIN UNLESS NOTEDOTHERWISE.10. ALL CEILING LIGHTING TO REMAIN UNLESS NOTED OTHERWISE.11. SEE ELECTRICAL FOR FULL SCOPE AND COORDINATION OF LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.12. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BEUSED DURING THE DEMOLITION AND CONSTRUCTION PERIOD.ELEVATORS SHOULD BE PROTECTED, CLEANED AND RETURNED TO THECONDITION IN WHICH THEY WERE FOUND AT THE END OF EACH JOBPHASE. SEE SPECIFICATIONS.13. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OFFINISHES. KEYNOTES REFERRING TO FINISHES ARE FOR PHASINGCLARIFICATION.

1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BEDISTURBED DURING PHASE A TO PREVENT PHASE B HAZARDOUSMATERIALS FROM BEING DISTURBED. THE BOUNDARY WALL SEPARATINGPHASE A AND PHASE B IS NOT TO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAININGMATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWNTO BE REMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OFDEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THEEXISTING DRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTORAND SUB-CONTRACTORS ARE TO VERIFY EXISTING CONDITIONS PRIOR TOBID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TODOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECTWITH ELECTRONIC COPIES OF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOTSHOWN ON THIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICALDRAWINGS FOR REQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FORADDITIONAL ITEMS TO REMAIN AND BE PROTECTED THROUGHOUTCONSTRUCTION, INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPESAND DUCTWORK.7. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION SCOPE. REPAIR OR REPLACEMENT OFDAMAGED AREAS NOT IN THIS SCOPE SHALL BE INCLUDED IN THE WORK,WITH NO ADDITIONAL COST TO THE OWNER.8. ELECTRICAL CONTRACTOR IS TO VERIFY ALL CEILING MOUNTEDELECTRICAL DEVICES ARE IN WORKING CONDITION AT COMMENCEMENTOF DEMOLITION/CONSTRUCTION. SEE ELECTRICAL DRAWINGS AND SPECSFOR ALL SCOPE RELATED TO CEILING MOUNTED DEVICES PRIOR TOCOMMENCEMENT OF DEMOLITION/CONSTRUCTION.9. ALL EXISTING WALL SCONCES/LIGHTING TO REMAIN UNLESS NOTEDOTHERWISE.10. ALL CEILING LIGHTING TO REMAIN UNLESS NOTED OTHERWISE. SEEELECTRICAL FOR FULL SCOPE OF LIGHTING DEMOLITION/CONSTRUCTION.11. COORDINATE PARTIAL/SELECTIVE REMOVAL OF APC CEILING TOALLOW FOR MECHANICAL, PLUMBING AND ELECTRICAL CONNECTIONSREQUIRED IN PHASE B SCOPE. PROTECT EXISTING CEILING TILE AND GRID(INSTALLED IN PHASE A) AND REINSTALL AFTER REQUIRED CONNECTIONSHAVE BEEN MADE. ALL CEILING TILES DAMAGED DURING CONSTRUCTIONSHALL BE REPLACE BY CONTRACTOR AT NO ADDITIONAL COST TOOWNER. SEE MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FORFULL SCOPE OF WORK.12. SEE ELECTRICAL DRAWINGS FOR FULL SCOPE AND COORDINATION OFLIGHTING DEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATENO. 1.13. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BEUSED DURING THE DEMOLITION AND CONSTRUCTION PERIOD.ELEVATORS SHOULD BE PROTECTED, CLEANED AND RETURNED TO THECONDITION IN WHICH THEY WERE FOUND AT THE END OF EACH JOBPHASE. SEE SPECIFICATIONS.14. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OFFINISHES. KEYNOTES REFERRING TO FINISHES ARE FOR PHASINGCLARIFICATION.

N

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

REFERENCED ON: 1/4" = 1'-0"D2.001 BASEMENT DEMOLITION REFLECTED CEILING PLAN

LEGEND

PHASE A - DEMO REFLECTED CEILING PLAN KEYNOTES

PHASE B - DEMO REFLECTED CEILING PLAN KEYNOTES

PHASE A - GENERAL DEMOLITION RCP NOTES

PHASE B- GENERAL DEMOLITION RCP NOTES

D2.00

BASE

MENT

DEMO

LITIO

N RE

FLEC

TED

CEILI

NG P

LAN

RMB

SAL

Page 8: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth Tower 290 Beckypurchasing.sc.edu/solicitations/H27-6082-NA Demolition drawing.pdf · south tower mechanical renovations university of

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

9' - 11"

8' - 5"

8' - 4"

8' - 11 1/2"8' - 11 1/2"

9' - 11"

OPEN TO ABOVE

OPEN TO ABOVE

OPEN TO ABOVE

EXPOSED STRUCTURE

EXPOSEDSTRUCTURE

EXPOSED STRUCTURE

EXPOSEDSTRUCTURE

EXPOSED STRUCTURE

8' - 2"

8' - 0"

8' - 5 3/4"

8' - 0"

OPEN TO ABOVE

NO ACCESSTO FIELD VERIFY

EXPOSED STRUCTURE

13' - 8"

13' - 8"

EXPOSED STRUCTURE

13' - 8"

13' - 8"

13' - 8"

13' - 8"

13' - 8"EXPOSEDSTRUCTURE

13' - 8"

OFFICE012A

CUST.012

STORAGE011

CUST.009

HALLH005

LAUNDRY007TLT

008

ELEC010

STAIRST01

CHASE004

TLT006

LAUNDRY007A

HALLH004

BEDROOM005

MECH003A

PANTRY003B

LIVING003

HALLH002

HALLH001

TRASH002

TRASH002A

VENDING001

HALLH003

ELEVEV01

ELEVEV02

11

1

1

1

1 1

1

1

1

1

1

1

1

CONSTRUCTION PHASING LINE.

PHASE B CONSTRUCTION AREA

AREA NOT TO BE DISTURBED BYCONSTRUCTION

PHASE A CONSTRUCTION AREA, LIMITEDSCOPE IN PHASE B, SEE ALL NOTES

DEMOLITION - TO BE NOTED ONDEMO PLANS ONLY

EXISTING TEXTURE CEILING(ASBESTOS)

SELECTIVE REMOVAL OF TEXTURED CEILING IN ORDER TO ALLOWFOR INSTALLATION OF STEEL ANGLES,DUCTWORK, PIPING, ANDASSOCIATED HANGING DEVICES. SEE MECHANICAL, ELECTRICAL,PLUMBING AND SPEC. SECTION 010000 - SPECIAL CONDITIONSAND REQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASED PAINT INVESTIGATION REPORT.

REMOVE EXISTING METAL SOFFIT. SEE MECHANICAL, ELECTRICAL,PLUMBING FOR ADDITIONAL SCOPE TO BE REMOVED. MAINTAINEXISTING SOFFIT CEILING ANGLE CONNECTION TO BE REUSED.SEE SPEC. SECTION 010000 - SPECIAL CONDITIONS ANDREQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASEDPAINT INVESTIGATION REPORT.

EXISTING LIGHT TO BE REMOVED AND STORED FOR REINSTALLIONDURING THIS SCOPE OF WORK. CONTRACTOR TO VERIFY ALLLIGHTS ARE WORKING PRIOR TO REMOVAL AND REPORT TOOWNER/ARCHITECT ANY FIXTURES THAT ARE NOT WORKING. SEEELECTRICAL FOR FULL SCOPE OF WORK AND COORDIATION OFLIGHTING DEMOLITION/CONSTRUCTION FOR BASE BID ANDALTERNATE NO. 1.

REMOVE EXISTING METAL SOFFIT. SEE MECHANICAL, ELECTRICAL,PLUMBING FOR ADDITIONAL SCOPE TO BE REMOVED. REMOVEEXISTING SOFFIT CEILING ANGLE AND PREPARE CEILING TO BEEXPOSED FOR NEW TEXTURED SPRAY MATERIAL. SEE REFLECTEDCEILING PLAN AND SPEC. SECTION 010000 - SPECIAL CONDITIONSAND REQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASED PAINT INVESTIGATION REPORT.

REMOVE EXISTING METAL SOFFIT AND CEILING ANGLECOMPLETELY.

REMOVE EXISTING LIGHT. SEE ELECTRICAL FOR FULL SCOPE OFLIGHTING DEMOLITION/CONSTRUCTION FOR BASE BID ANDALTERNATE NO. 1.

REMOVE /ABATE SPRAY-ON TEXTURED CEILING COMPLETELY ANDPREPARE FOR NEW SKIM COAT CEILING FINISH AS SHOWN ONREFLECTED CEILNG PLAN, SEE SPECS. SEE SPEC SECTION010000 SPECIAL CONDITIONS AND REQUIREMENTS/ASBESTOSINVESTIGATION REPORT/LEAD-BASED PAINT INVESTIGATIONREPORT.

SELECTIVE REMOVAL OF APC CEILING TILE ONLY INSTALLED INPHASE A TO ALLOW FOR REMOVAL OF PIPING, SEE PLUMBING.PROTECT EXISTING CEILING TILE, GRID AND AND ADJACENTCEILING MATERIALS AND REINSTALL CEILING TILE AFTERREMOVAL OF PHASE B PLUMBING SCOPE IS COMPLETE.

SELECTIVE PATCHING OF EXISTING GWB BY OTHERS, SEEMECHANICAL.

SELECTIVE REMOVAL OF APC CEILING TILE ONLY INSTALLED INPHASE A TO ALLOW FOR REQUIRED MECHANICAL, ELECTRICALAND PLUMBING CONNECTIONS. PROTECT EXISTING CEILING TILE,GRID AND AND ADJACENT CEILING MATERIALS AND REINSTALLCEILING TILE AFTER REMOVAL OF PHASE B PLUMBING SCOPE ISCOMPLETE.

A

B

C

D

E

F

G

H

J

K

REMOVE EXISTING CEILING TILE,CEILING GRID AND LIGHTS. EXISTINGCEILING GRID ANGLES AT GWB, PLASTER, AND METAL EDGE SOFFITSTO REMAIN, AND TO BE REUSED FOR NEW CEILING INSTALLATION.SEE ELECTRICAL FOR ADDITIONAL DETAILS.

METAL EDGE SOFFIT TO REMAIN. PROTECT DURING DEMOLITION ANDCONSTRUCTION. SAND AND REMOVE RUST AND SCALING. PREPAREFOR NEW PAINT.

REMOVE EXISTING CEILING GRID AND LIGHTS. SEE ELECTRICAL FORADDITIONAL DETAILS. CEILING GRID WALL ANGLE TO REMAIN ATTYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, TOBE REUSED FOR FUTURE NEW CEILING INSTALLATION.

REMOVE/ABATE SPRAY-ON TEXTURED CEILING ABOVE EXISTING LAY-IN CEILING. SEE SPECS SECTION 010000 - SPECIAL CONDITIONS ANDREQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASEDPAINT INVESTIGATION REPORT.

REMOVE EXISTING GWB CEILING AND LIGHTS. SEE ELECTRICAL FORADDITIONAL DETAILS.

CUT OPENING IN EXISTING ROOF DECK AS PART OF PHASE A. SEEA2.3 KEYNOTES FOR SOFFIT TO BE BUILT IN PHASE A TO ENCLOSEROOF DECK OPENING. PARTIALLY SCRAPE/ABATE EXISTINGASBESTOS CONTAINING SPRAY TEXTURE CEILING TO ALLOW FORTEMORARY SOFFIT ENCLOSURE. EXISTING CHASE WALL TO REMAINDURING PHASE A.

REMOVAL OF EXISTING GRILL, WHERE OCCURS, AND PATCHING OFSHEETROCK TO BE COMPLETED BY OTHERS. G.C. TO PAINT.

1

2

4

3

5

6

7

1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BEDISTURBED DURING PHASE A TO PREVENT PHASE B HAZARDOUSMATERIALS FROM BEING DISTURBED. THE BOUNDARY WALL SEPARATINGPHASE A AND PHASE B IS NOT TO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAININGMATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWNTO BE REMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OFDEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THEEXISTING DRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTORAND SUB-CONTRACTORS ARE TO VERIFY EXISTING CONDITIONS PRIOR TOBID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TODOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECTWITH ELECTRONIC COPIES OF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOTSHOWN ON THIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICALDRAWINGS FOR REQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FORADDITIONAL ITEMS TO REMAIN AND BE PROTECTED THROUGHOUTCONSTRUCTION, INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPESAND DUCTWORK.7. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION SCOPE. REPAIR OR REPLACEMENT OFDAMAGED AREAS NOT IN THIS SCOPE SHALL BE INCLUDED IN THE WORK,WITH NO ADDITIONAL COST TO THE OWNER.8. ELECTRICAL CONTRACTOR IS TO VERIFY ALL CEILING MOUNTEDELECTRICAL DEVICES ARE IN WORKING CONDITION AT COMMENCEMENTOF DEMOLITION/CONSTRUCTION. SEE ELECTRICAL DRAWINGS AND SPECSFOR ALL SCOPE RELATED TO CEILING MOUNTED DEVICES PRIOR TOCOMMENCEMENT OF DEMOLITION/CONSTRUCTION.9. ALL EXISTING WALL SCONCES/LIGHTING TO REMAIN UNLESS NOTEDOTHERWISE.10. ALL CEILING LIGHTING TO REMAIN UNLESS NOTED OTHERWISE. SEEELECTRICAL FOR FULL SCOPE OF LIGHTING DEMOLITION/CONSTRUCTION.11. COORDINATE PARTIAL/SELECTIVE REMOVAL OF APC CEILING TOALLOW FOR MECHANICAL, PLUMBING AND ELECTRICAL CONNECTIONSREQUIRED IN PHASE B SCOPE. PROTECT EXISTING CEILING TILE AND GRID(INSTALLED IN PHASE A) AND REINSTALL AFTER REQUIRED CONNECTIONSHAVE BEEN MADE. ALL CEILING TILES DAMAGED DURING CONSTRUCTIONSHALL BE REPLACE BY CONTRACTOR AT NO ADDITIONAL COST TOOWNER. SEE MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FORFULL SCOPE OF WORK.12. SEE ELECTRICAL DRAWINGS FOR FULL SCOPE AND COORDINATION OFLIGHTING DEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATENO. 1.13. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BEUSED DURING THE DEMOLITION AND CONSTRUCTION PERIOD.ELEVATORS SHOULD BE PROTECTED, CLEANED AND RETURNED TO THECONDITION IN WHICH THEY WERE FOUND AT THE END OF EACH JOBPHASE. SEE SPECIFICATIONS.14. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OFFINISHES. KEYNOTES REFERRING TO FINISHES ARE FOR PHASINGCLARIFICATION.

1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BEDISTURBED DURING PHASE A TO PREVENT PHASE B HAZARDOUSMATERIALS FROM BEING DISTURBED. THE BOUNDARY WALLSEPARATING PHASE A AND PHASE B IS NOT TO BE DISTURBED DURINGPHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAININGMATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOTSHOWN TO BE REMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OFDEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THEEXISTING DRAWINGS PROVIDED BY THE OWNER. GENERALCONTRACTOR AND SUB-CONTRACTORS ARE TO VERIFY EXISTINGCONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TODOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECTWITH ELECTRONIC COPIES OF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOTSHOWN ON THIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICALDRAWINGS FOR REQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FORADDITIONAL ITEMS TO REMAIN AND BE PROTECTED THROUGHOUTCONSTRUCTION, INCLUDING DATA AND POWER CONDUITS, LIGHTS,PIPES AND DUCTWORK.7. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION SCOPE. REPAIR OR REPLACEMENT OFDAMAGED AREAS NOT IN THIS SCOPE SHALL BE INCLUDED IN THE WORK,WITH NO ADDITIONAL COST TO THE OWNER.8. ELECTRICAL CONTRACTOR IS TO VERIFY ALL CEILING MOUNTEDELECTRICAL DEVICES ARE IN WORKING CONDITION AT COMMENCEMENTOF DEMOLITION/CONSTRUCTION. SEE ELECTRICAL DRAWINGS ANDSPECS FOR ALL SCOPE RELATED TO CEILING MOUNTED DEVICES PRIORTO COMMENCEMENT OF DEMOLITION/CONSTRUCTION.9. ALL EXISTING WALL SCONCES/LIGHTING TO REMAIN UNLESS NOTEDOTHERWISE.10. ALL CEILING LIGHTING TO REMAIN UNLESS NOTED OTHERWISE.11. SEE ELECTRICAL FOR FULL SCOPE AND COORDINATION OF LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.12. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BEUSED DURING THE DEMOLITION AND CONSTRUCTION PERIOD.ELEVATORS SHOULD BE PROTECTED, CLEANED AND RETURNED TO THECONDITION IN WHICH THEY WERE FOUND AT THE END OF EACH JOBPHASE. SEE SPECIFICATIONS.13. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OFFINISHES. KEYNOTES REFERRING TO FINISHES ARE FOR PHASINGCLARIFICATION.

N

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

REFERENCED ON: 1/4" = 1'-0"D2.011 GROUND LEVEL DEMOLITION REFLECTED CEILING PLAN

LEGEND

PHASE B - DEMO REFLECTED CEILING PLAN KEYNOTES

PHASE A - DEMO REFLECTED CEILING PLAN KEYNOTES

PHASE B- GENERAL DEMOLITION RCP NOTES

PHASE A - GENERAL DEMOLITION RCP NOTES

D2.01

GROU

ND LE

VEL

DEMO

LITIO

NRE

FLEC

TED

CEILI

NG P

LAN

RMB

SAL

Page 9: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth Tower 290 Beckypurchasing.sc.edu/solicitations/H27-6082-NA Demolition drawing.pdf · south tower mechanical renovations university of

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

14'-5 1/2"EXPOSED

STRUCTURE

14' 5 1/2"EXPOSED

STRUCTURE

OPEN TO ABOVE

OPEN TO ABOVE

OPEN TO ABOVE

7'-1" CEILINGHEIGHT INELEVATOR CAB

8' - 2"

11' - 0 3/4"

12' - 5 1/4"

11' - 11 1/4"

11' - 11 1/4"

11' - 11 1/4" 8' - 2"

8' - 5 1/2"

8' - 8"

7' - 11 1/2"

11' - 11 1/2"

11' - 11 1/2"

8' - 0"8' - 0"

11' - 11"

11' - 11"

11' - 11"

EXP STRUCTURE

STUDY107

LOBBY101

VESTIBULEV101

HALLH101

VESTIBULEV102

LOBBY101

OFFICE102

RA BEDROOM103A

TLT103B

CLST103CRA LIVING

103RA KITCHEN

103D

MEN105

CHASE104A

ELEC106

CUST104

8' - 2"

11' - 11 1/2"

11' - 11 1/2"8' - 5 1/2"

12' - 0"

1

1

1

1

1

1

1

1

1

1

1

15

1

1

2

2

22

2

2

22222

H

H

H

H

H

7 7

5

CONSTRUCTION PHASING LINE.

PHASE B CONSTRUCTION AREA

AREA NOT TO BE DISTURBED BYCONSTRUCTION

PHASE A CONSTRUCTION AREA, LIMITEDSCOPE IN PHASE B, SEE ALL NOTES

DEMOLITION - TO BE NOTED ONDEMO PLANS ONLY

EXISTING TEXTURE CEILING(ASBESTOS)

SELECTIVE REMOVAL OF TEXTURED CEILING IN ORDER TO ALLOWFOR INSTALLATION OF STEEL ANGLES,DUCTWORK, PIPING, ANDASSOCIATED HANGING DEVICES. SEE MECHANICAL, ELECTRICAL,PLUMBING AND SPEC. SECTION 010000 - SPECIAL CONDITIONSAND REQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASED PAINT INVESTIGATION REPORT.

REMOVE EXISTING METAL SOFFIT. SEE MECHANICAL, ELECTRICAL,PLUMBING FOR ADDITIONAL SCOPE TO BE REMOVED. MAINTAINEXISTING SOFFIT CEILING ANGLE CONNECTION TO BE REUSED.SEE SPEC. SECTION 010000 - SPECIAL CONDITIONS ANDREQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASEDPAINT INVESTIGATION REPORT.

EXISTING LIGHT TO BE REMOVED AND STORED FOR REINSTALLIONDURING THIS SCOPE OF WORK. CONTRACTOR TO VERIFY ALLLIGHTS ARE WORKING PRIOR TO REMOVAL AND REPORT TOOWNER/ARCHITECT ANY FIXTURES THAT ARE NOT WORKING. SEEELECTRICAL FOR FULL SCOPE OF WORK AND COORDIATION OFLIGHTING DEMOLITION/CONSTRUCTION FOR BASE BID ANDALTERNATE NO. 1.

REMOVE EXISTING METAL SOFFIT. SEE MECHANICAL, ELECTRICAL,PLUMBING FOR ADDITIONAL SCOPE TO BE REMOVED. REMOVEEXISTING SOFFIT CEILING ANGLE AND PREPARE CEILING TO BEEXPOSED FOR NEW TEXTURED SPRAY MATERIAL. SEE REFLECTEDCEILING PLAN AND SPEC. SECTION 010000 - SPECIAL CONDITIONSAND REQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASED PAINT INVESTIGATION REPORT.

REMOVE EXISTING METAL SOFFIT AND CEILING ANGLECOMPLETELY.

REMOVE EXISTING LIGHT. SEE ELECTRICAL FOR FULL SCOPE OFLIGHTING DEMOLITION/CONSTRUCTION FOR BASE BID ANDALTERNATE NO. 1.

REMOVE /ABATE SPRAY-ON TEXTURED CEILING COMPLETELY ANDPREPARE FOR NEW SKIM COAT CEILING FINISH AS SHOWN ONREFLECTED CEILNG PLAN, SEE SPECS. SEE SPEC SECTION010000 SPECIAL CONDITIONS AND REQUIREMENTS/ASBESTOSINVESTIGATION REPORT/LEAD-BASED PAINT INVESTIGATIONREPORT.

SELECTIVE REMOVAL OF APC CEILING TILE ONLY INSTALLED INPHASE A TO ALLOW FOR REMOVAL OF PIPING, SEE PLUMBING.PROTECT EXISTING CEILING TILE, GRID AND AND ADJACENTCEILING MATERIALS AND REINSTALL CEILING TILE AFTERREMOVAL OF PHASE B PLUMBING SCOPE IS COMPLETE.

SELECTIVE PATCHING OF EXISTING GWB BY OTHERS, SEEMECHANICAL.

SELECTIVE REMOVAL OF APC CEILING TILE ONLY INSTALLED INPHASE A TO ALLOW FOR REQUIRED MECHANICAL, ELECTRICALAND PLUMBING CONNECTIONS. PROTECT EXISTING CEILING TILE,GRID AND AND ADJACENT CEILING MATERIALS AND REINSTALLCEILING TILE AFTER REMOVAL OF PHASE B PLUMBING SCOPE ISCOMPLETE.

A

B

C

D

E

F

G

H

J

K

REMOVE EXISTING CEILING TILE,CEILING GRID AND LIGHTS. EXISTINGCEILING GRID ANGLES AT GWB, PLASTER, AND METAL EDGE SOFFITSTO REMAIN, AND TO BE REUSED FOR NEW CEILING INSTALLATION.SEE ELECTRICAL FOR ADDITIONAL DETAILS.

METAL EDGE SOFFIT TO REMAIN. PROTECT DURING DEMOLITION ANDCONSTRUCTION. SAND AND REMOVE RUST AND SCALING. PREPAREFOR NEW PAINT.

REMOVE EXISTING CEILING GRID AND LIGHTS. SEE ELECTRICAL FORADDITIONAL DETAILS. CEILING GRID WALL ANGLE TO REMAIN ATTYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, TOBE REUSED FOR FUTURE NEW CEILING INSTALLATION.

REMOVE/ABATE SPRAY-ON TEXTURED CEILING ABOVE EXISTING LAY-IN CEILING. SEE SPECS SECTION 010000 - SPECIAL CONDITIONS ANDREQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASEDPAINT INVESTIGATION REPORT.

REMOVE EXISTING GWB CEILING AND LIGHTS. SEE ELECTRICAL FORADDITIONAL DETAILS.

CUT OPENING IN EXISTING ROOF DECK AS PART OF PHASE A. SEEA2.3 KEYNOTES FOR SOFFIT TO BE BUILT IN PHASE A TO ENCLOSEROOF DECK OPENING. PARTIALLY SCRAPE/ABATE EXISTINGASBESTOS CONTAINING SPRAY TEXTURE CEILING TO ALLOW FORTEMORARY SOFFIT ENCLOSURE. EXISTING CHASE WALL TO REMAINDURING PHASE A.

REMOVAL OF EXISTING GRILL, WHERE OCCURS, AND PATCHING OFSHEETROCK TO BE COMPLETED BY OTHERS. G.C. TO PAINT.

1

2

4

3

5

6

7

1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BEDISTURBED DURING PHASE A TO PREVENT PHASE B HAZARDOUSMATERIALS FROM BEING DISTURBED. THE BOUNDARY WALL SEPARATINGPHASE A AND PHASE B IS NOT TO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAININGMATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWNTO BE REMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OFDEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THEEXISTING DRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTORAND SUB-CONTRACTORS ARE TO VERIFY EXISTING CONDITIONS PRIOR TOBID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TODOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECTWITH ELECTRONIC COPIES OF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOTSHOWN ON THIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICALDRAWINGS FOR REQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FORADDITIONAL ITEMS TO REMAIN AND BE PROTECTED THROUGHOUTCONSTRUCTION, INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPESAND DUCTWORK.7. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION SCOPE. REPAIR OR REPLACEMENT OFDAMAGED AREAS NOT IN THIS SCOPE SHALL BE INCLUDED IN THE WORK,WITH NO ADDITIONAL COST TO THE OWNER.8. ELECTRICAL CONTRACTOR IS TO VERIFY ALL CEILING MOUNTEDELECTRICAL DEVICES ARE IN WORKING CONDITION AT COMMENCEMENTOF DEMOLITION/CONSTRUCTION. SEE ELECTRICAL DRAWINGS AND SPECSFOR ALL SCOPE RELATED TO CEILING MOUNTED DEVICES PRIOR TOCOMMENCEMENT OF DEMOLITION/CONSTRUCTION.9. ALL EXISTING WALL SCONCES/LIGHTING TO REMAIN UNLESS NOTEDOTHERWISE.10. ALL CEILING LIGHTING TO REMAIN UNLESS NOTED OTHERWISE. SEEELECTRICAL FOR FULL SCOPE OF LIGHTING DEMOLITION/CONSTRUCTION.11. COORDINATE PARTIAL/SELECTIVE REMOVAL OF APC CEILING TOALLOW FOR MECHANICAL, PLUMBING AND ELECTRICAL CONNECTIONSREQUIRED IN PHASE B SCOPE. PROTECT EXISTING CEILING TILE AND GRID(INSTALLED IN PHASE A) AND REINSTALL AFTER REQUIRED CONNECTIONSHAVE BEEN MADE. ALL CEILING TILES DAMAGED DURING CONSTRUCTIONSHALL BE REPLACE BY CONTRACTOR AT NO ADDITIONAL COST TOOWNER. SEE MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FORFULL SCOPE OF WORK.12. SEE ELECTRICAL DRAWINGS FOR FULL SCOPE AND COORDINATION OFLIGHTING DEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATENO. 1.13. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BEUSED DURING THE DEMOLITION AND CONSTRUCTION PERIOD.ELEVATORS SHOULD BE PROTECTED, CLEANED AND RETURNED TO THECONDITION IN WHICH THEY WERE FOUND AT THE END OF EACH JOBPHASE. SEE SPECIFICATIONS.14. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OFFINISHES. KEYNOTES REFERRING TO FINISHES ARE FOR PHASINGCLARIFICATION.

1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BEDISTURBED DURING PHASE A TO PREVENT PHASE B HAZARDOUSMATERIALS FROM BEING DISTURBED. THE BOUNDARY WALLSEPARATING PHASE A AND PHASE B IS NOT TO BE DISTURBED DURINGPHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAININGMATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOTSHOWN TO BE REMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OFDEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THEEXISTING DRAWINGS PROVIDED BY THE OWNER. GENERALCONTRACTOR AND SUB-CONTRACTORS ARE TO VERIFY EXISTINGCONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TODOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECTWITH ELECTRONIC COPIES OF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOTSHOWN ON THIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICALDRAWINGS FOR REQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FORADDITIONAL ITEMS TO REMAIN AND BE PROTECTED THROUGHOUTCONSTRUCTION, INCLUDING DATA AND POWER CONDUITS, LIGHTS,PIPES AND DUCTWORK.7. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION SCOPE. REPAIR OR REPLACEMENT OFDAMAGED AREAS NOT IN THIS SCOPE SHALL BE INCLUDED IN THE WORK,WITH NO ADDITIONAL COST TO THE OWNER.8. ELECTRICAL CONTRACTOR IS TO VERIFY ALL CEILING MOUNTEDELECTRICAL DEVICES ARE IN WORKING CONDITION AT COMMENCEMENTOF DEMOLITION/CONSTRUCTION. SEE ELECTRICAL DRAWINGS ANDSPECS FOR ALL SCOPE RELATED TO CEILING MOUNTED DEVICES PRIORTO COMMENCEMENT OF DEMOLITION/CONSTRUCTION.9. ALL EXISTING WALL SCONCES/LIGHTING TO REMAIN UNLESS NOTEDOTHERWISE.10. ALL CEILING LIGHTING TO REMAIN UNLESS NOTED OTHERWISE.11. SEE ELECTRICAL FOR FULL SCOPE AND COORDINATION OF LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.12. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BEUSED DURING THE DEMOLITION AND CONSTRUCTION PERIOD.ELEVATORS SHOULD BE PROTECTED, CLEANED AND RETURNED TO THECONDITION IN WHICH THEY WERE FOUND AT THE END OF EACH JOBPHASE. SEE SPECIFICATIONS.13. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OFFINISHES. KEYNOTES REFERRING TO FINISHES ARE FOR PHASINGCLARIFICATION.

N

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

REFERENCED ON: 1/4" = 1'-0"D2.11 FIRST FLOOR DEMOLITION REFLECTED CEILING PLAN

LEGEND

PHASE B - DEMO REFLECTED CEILING PLAN KEYNOTES

PHASE A - DEMO REFLECTED CEILING PLAN KEYNOTES

PHASE B- GENERAL DEMOLITION RCP NOTES

PHASE A - GENERAL DEMOLITION RCP NOTES

D2.1

FIRS

T FL

OOR

DEMO

LITIO

N RE

FLEC

TED

CEILI

NG P

LAN

RMB

SAL

Page 10: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth Tower 290 Beckypurchasing.sc.edu/solicitations/H27-6082-NA Demolition drawing.pdf · south tower mechanical renovations university of

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

7' - 7 1/2"

8' - 6"

7' - 7 1/2"

8' - 6" 8' - 6" 8' - 6"

8' - 6"

7' - 7 1/2"7' - 7 1/2"7' - 7 1/2"

8' - 6"

8' - 6"

7' - 7 1/2"7' - 7 1/2"

8' - 6"8' - 6"

7' - 7 1/2"7' - 7 1/2"

8' - 6"

7' - 7 1/2"

8' - 6"

8' - 6"

7' - 7"

8' - 6"

7' - 2 5/8"

7' - 2 5/8"

7' - 4"

8'-6"EXPOSED

STRUCTURE

8'-6"EXPOSED

STRUCTURE

OPEN TO ABOVE

OPEN TO ABOVE

OPEN TO ABOVE

SLOPED SLOPED

7' - 7 1/2"

SLOPED SLOPED

EXPOSEDSTRUCTURE

EXPOSEDSTRUCTURE

7' - 8"

C

3

3

3

5

A3.2

A

4

4

4

BC

B B B B

E

BBBBB

A

D

A

A

A

A

C CC

C C C CC

F

RESIDENTFL#08 RESIDENT

FL#09RESIDENT

FL#10RESIDENT

FL#11

RESIDENTFL#12

COMMUNITYFL#13

RESIDENTFL#00

RESIDENTFL#01

RESIDENTFL#02

RESIDENTFL#03

RESIDENTFL#04

RESIDENTFL#05

RESIDENTFL#06

RESIDENTFL#07

HALLHFL#01

HALLHFL#03

HALLHLF#02

CHASEFL#17

WOMENFL#15

ELECFL#16

CUSTFL#14

G

A

AAAAA

A

AA A

A

A

A

A

A

A A A

A A

A

A

A

A

A

A

J

J

K

K

K

CONSTRUCTION PHASING LINE.

PHASE B CONSTRUCTION AREA

AREA NOT TO BE DISTURBED BYCONSTRUCTION

PHASE A CONSTRUCTION AREA, LIMITEDSCOPE IN PHASE B, SEE ALL NOTES

DEMOLITION - TO BE NOTED ONDEMO PLANS ONLY

EXISTING TEXTURE CEILING(ASBESTOS)

REMOVE EXISTING CEILING TILE,CEILING GRID AND LIGHTS. EXISTINGCEILING GRID ANGLES AT GWB, PLASTER, AND METAL EDGE SOFFITSTO REMAIN, AND TO BE REUSED FOR NEW CEILING INSTALLATION.SEE ELECTRICAL FOR ADDITIONAL DETAILS.

METAL EDGE SOFFIT TO REMAIN. PROTECT DURING DEMOLITION ANDCONSTRUCTION. SAND AND REMOVE RUST AND SCALING. PREPAREFOR NEW PAINT.

REMOVE EXISTING CEILING GRID AND LIGHTS. SEE ELECTRICAL FORADDITIONAL DETAILS. CEILING GRID WALL ANGLE TO REMAIN ATTYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, TOBE REUSED FOR FUTURE NEW CEILING INSTALLATION.

REMOVE/ABATE SPRAY-ON TEXTURED CEILING ABOVE EXISTING LAY-IN CEILING. SEE SPECS SECTION 010000 - SPECIAL CONDITIONS ANDREQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASEDPAINT INVESTIGATION REPORT.

REMOVE EXISTING GWB CEILING AND LIGHTS. SEE ELECTRICAL FORADDITIONAL DETAILS.

CUT OPENING IN EXISTING ROOF DECK AS PART OF PHASE A. SEEA2.3 KEYNOTES FOR SOFFIT TO BE BUILT IN PHASE A TO ENCLOSEROOF DECK OPENING. PARTIALLY SCRAPE/ABATE EXISTINGASBESTOS CONTAINING SPRAY TEXTURE CEILING TO ALLOW FORTEMORARY SOFFIT ENCLOSURE. EXISTING CHASE WALL TO REMAINDURING PHASE A.

REMOVAL OF EXISTING GRILL, WHERE OCCURS, AND PATCHING OFSHEETROCK TO BE COMPLETED BY OTHERS. G.C. TO PAINT.

1

2

4

3

5

6

7

OPEN TO ABOVE

OPEN TO ABOVE

OPEN TO ABOVE

SLOPED SLOPED

SLOPED SLOPED

EXPOSEDSTRUCTURE

EXPOSEDSTRUCTURE

8'-6"EXPOSED

STRUCTURE

8'-6"EXPOSED

STRUCTURE

8' - 6"

7' - 7 1/2" 7' - 7 1/2"

8' - 6" 8' - 6"

7' - 7 1/2" 7' - 7 1/2"

8' - 6" 8' - 6"

7' - 7 1/2"

7' - 7 1/2"

8' - 6"

8' - 6"

7' - 7 1/2"7' - 7 1/2"

8' - 6"8' - 6"

7' - 7 1/2"

8' - 6"

7' - 7 1/2"7' - 7 1/2"

8' - 6"

8' - 6"

7' - 7"

8' - 6"

7' - 2 1/4"

C

3

3

3

A

4

4

4

BC

B B B B

E

BBBBB

A

D

A

A

A

A

C CC

C C C CC

G

A

AAAAA

A

AA A

A

A

A

A

A

A A A

A A

A

A

A

A

A

A

F

8' - 6"

7' - 8"

7' - 8"

5

A3.2

J

J

K

K

K

1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BE DISTURBED DURING PHASE ATO PREVENT PHASE B HAZARDOUS MATERIALS FROM BEING DISTURBED. THE BOUNDARY WALLSEPARATING PHASE A AND PHASE B IS NOT TO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALS OR OTHERSUSPECTED HAZARDOUS MATERIALS NOT SHOW TO BE REMOVED OR ALTERED WITHIN THE PROJECTSCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITION AND NEW WORK.INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGS PROVIDED BY THE OWNER. GENERALCONTRACTOR AND SUB-CONTRACTORS ARE TO VERIFY EXISTING CONDITIONS PRIOR TO BID ANDPRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TO COMMENCEMENT OFDEMOLITION/RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDEARCHITECT WITH ELECTRONIC COPIES OF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ON THIS PLAN. SEEMECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR REQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL ITEMS TO REMAIN ANDBE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDING DATA AND POWER CONDUITS, LIGHTS,PIPES AND DUCTWORK.7. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED IN DEMOLITION/CONSTRUCTION SCOPE. REPAIROR REPLACEMENT OF DAMAGED AREAS NOT IN THIS SCOPE SHALL BE INCLUDED IN THE WORK, WITHNO ADDITIONAL COST TO THE OWNER.8. ELECTRICAL CONTRACTOR IS TO VERIFY ALL CEILING MOUNTED ELECTRICAL DEVICES ARE INWORKING CONDITION AT COMMENCEMENT OF DEMOLITION/CONSTRUCTION. SEE ELECTRICALDRAWINGS AND SPECS FOR ALL SCOPE RELATED TO CEILING MOUNTED DEVICES PRIOR TOCOMMENCEMENT OF DEMOLITION/CONSTRUCTION.9. ALL EXISTING WALL SCONCES/LIGHTING TO REMAIN UNLESS NOTED OTHERWISE.10. ALL CEILING LIGHTING TO REMAIN UNLESS NOTED OTHERWISE.11. SEE ELECTRICAL FOR FULL SCOPE AND COORDINATION OF LIGHTING DEMOLITION/CONSTRUCTIONFOR BASE BID AND ALTERNATE NO. 1.12. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURING THE DEMOLITIONAND CONSTRUCTION PERIOD. ELEVATORS SHOULD BE PROTECTED, CLEANED AND RETURNED TO THECONDITION IN WHICH THEY WERE FOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.13. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES. KEYNOTES REFERRINGTO FINISHES ARE FOR PHASING CLARIFICATION.

1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BE DISTURBED DURING PHASE A TO PREVENT PHASE BHAZARDOUS MATERIALS FROM BEING DISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOT TO BEDISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALS OR OTHER SUSPECTED HAZARDOUSMATERIALS NOT SHOW TO BE REMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITION AND NEW WORK. INFORMATIONSHOWN IS BASED ON THE EXISTING DRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TO COMMENCEMENT OFDEMOLITION/RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITHELECTRONIC COPIES OF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ON THIS PLAN. SEE MECHANICAL,PLUMBING, AND ELECTRICAL DRAWINGS FOR REQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL ITEMS TO REMAIN AND BE PROTECTEDTHROUGHOUT CONSTRUCTION, INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED IN DEMOLITION/CONSTRUCTION SCOPE. REPAIR OR REPLACEMENTOF DAMAGED AREAS NOT IN THIS SCOPE SHALL BE INCLUDED IN THE WORK, WITH NO ADDITIONAL COST TO THE OWNER.8. ELECTRICAL CONTRACTOR IS TO VERIFY ALL CEILING MOUNTED ELECTRICAL DEVICES ARE IN WORKING CONDITION ATCOMMENCEMENT OF DEMOLITION/CONSTRUCTION. SEE ELECTRICAL DRAWINGS AND SPECS FOR ALL SCOPE RELATED TOCEILING MOUNTED DEVICES PRIOR TO COMMENCEMENT OF DEMOLITION/CONSTRUCTION.9. ALL EXISTING WALL SCONCES/LIGHTING TO REMAIN UNLESS NOTED OTHERWISE.10. ALL CEILING LIGHTING TO REMAIN UNLESS NOTED OTHERWISE. SEE ELECTRICAL FOR FULL SCOPE OF LIGHTINGDEMOLITION/CONSTRUCTION.11. COORDINATE PARTIAL/SELECTIVE REMOVAL OF APC CEILING TO ALLOW FOR MECHANICAL, PLUMBING ANDELECTRICAL CONNECTIONS REQUIRED IN PHASE B SCOPE. PROTECT EXISTING CEILING TILE AND GRID (INSTALLED INPHASE A) AND REINSTALL AFTER REQUIRED CONNECTIONS HAVE BEEN MADE. ALL CEILING TILES DAMAGED DURINGCONSTRUCTION SHALL BE REPLACE BY CONTRACTOR AT NO ADDITIONAL COST TO OWNER. SEE MECHANICAL, ELECTRICALAND PLUMBING DRAWINGS FOR FULL SCOPE OF WORK.12. SEE ELECTRICAL DRAWINGS FOR FULL SCOPE AND COORDINATION OF LIGHITNG DEMOLITION/CONSTRUCTION FORBASE BID AND ALTERNATE NO. 1.13. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURING THE DEMOLITION AND CONSTRUCTIONPERIOD. ELEVATORS SHOULD BE PROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WERE FOUNDAT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.14. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES. KEYNOTES REFERRING TO FINISHES ARE FORPHASING CLARIFICATION.

SELECTIVE REMOVAL OF TEXTURED CEILING IN ORDER TO ALLOW FOR INSTALLATION OF DUCTWORK, PIPING, ANDASSOCIATED HANGING DEVICES. SEE MECHANICAL, ELECTRICAL, PLUMBING AND SPEC. SECTION 010000 - SPECIALCONDITIONS AND REQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASED PAINT INVESTIGATION REPORT.

REMOVE EXISTING METAL SOFFIT. SEE MECHANICAL, ELECTRICAL, PLUMBING FOR ADDITIONAL SCOPE TO BE REMOVED.MAINTAIN EXISTING SOFFIT CEILING ANGLE CONNECTION TO BE REUSED. SEE SPEC. SECTION 010000 - SPECIALCONDITIONS AND REQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASED PAINT INVESTIGATION REPORT.

EXISTING LIGHT TO BE REMOVED AND STORED FOR REINSTALLION DURING THIS SCOPE OF WORK. CONTRACTOR TOVERIFY ALL LIGHTS ARE WORKING PRIOR TO REMOVAL AND REPORT TO OWNER/ARCHITECT ANY FIXTURES THAT ARENOT WORKING. SEE ELECTRICAL FOR FULL SCOPE OF WORK AND COORDINATION OF LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.

REMOVE EXISTING METAL SOFFIT. SEE MECHANICAL, ELECTRICAL, PLUMBING FOR ADDITIONAL SCOPE TO BE REMOVED.REMOVE EXISTING SOFFIT CEILING ANGLE AND PREPARE CEILING TO BE EXPOSED FOR NEW TEXTURED SPRAYMATERIAL. SEE REFLECTED CEILING PLAN AND SPEC. SECTION 010000 - SPECIAL CONDITIONS ANDREQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASED PAINT INVESTIGATION REPORT.

REMOVE EXISTING METAL SOFFIT AND CEILING ANGLE COMPLETELY.

REMOVE EXISTING LIGHT. SEE ELECTRICAL FOR FULL SCOPE AND COORDINATION OF LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.

REMOVE /ABATE SPRAY-ON TEXTURED CEILING COMPLETELY AND PREPARE FOR NEW SKIM COAT CEILING FINISH ASSHOWN ON REFLECTED CEILNG PLAN, SEE SPECS. SEE SPEC SECTION 010000 SPECIAL CONDITIONS ANDREQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASED PAINT INVESTIGATION REPORT.

SELECTIVE REMOVAL OF APC CEILING TILE ONLY INSTALLED IN PHASE A TO ALLOW FOR REMOVAL OF PIPING, SEEPLUMBING. PROTECT EXISTING CEILING TILE, GRID AND AND ADJACENT CEILING MATERIALS AND REINSTALL CEILINGTILE AFTER REMOVAL OF PHASE B PLUMBING SCOPE IS COMPLETE.

SELECTIVE PATCHING OF EXISTING GWB BY OTHERS, SEE MECHANICAL.

SELECTIVE REMOVAL OF APC CEILING TILE ONLY INSTALLED IN PHASE A TO ALLOW FOR REQUIRED MECHANICAL,ELECTRICAL AND PLUMBING CONNECTIONS. PROTECT EXISTING CEILING TILE, GRID AND AND ADJACENT CEILINGMATERIALS AND REINSTALL CEILING TILE AFTER REMOVAL OF PHASE B PLUMBING SCOPE IS COMPLETE.

A

B

C

D

E

F

G

H

J

K

N

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

REFERENCED ON: 1/4" = 1'-0"D2.21 TYPICAL DEMOLITION REFLECTED CEILING PLAN - LEVELS 2-12

LEGEND PHASE A - DEMO REFLECTED CEILING PLAN KEYNOTES

REFERENCED ON: 1/4" = 1'-0"D2.22 TYPICAL DEMOLITION REFLECTED CEILING PLAN - LEVELS 13-17

D2.2

TYPI

CAL D

EMOL

ITIO

NRE

FLEC

TED

CEILI

NG P

LAN,

LEVE

LS 2-

17

RMB

SAL

PHASE A - GENERAL DEMOLITION RCP NOTES PHASE B- GENERAL DEMOLITION RCP NOTES PHASE B - DEMO REFLECTED CEILING PLAN KEYNOTES

Page 11: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth Tower 290 Beckypurchasing.sc.edu/solicitations/H27-6082-NA Demolition drawing.pdf · south tower mechanical renovations university of

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

8'-7"EXPOSED

STRUCTURE

8'-7"EXPOSED

STRUCTURE

OPEN TO ABOVE

OPEN TO ABOVE

OPEN TO ABOVE

7'-1" CEILINGHEIGHT INELEVATOR CAB

8' - 6"8' - 6"8' - 6"8' - 6"8' - 6"

8' - 6"

8' - 6"

8' - 6" 8' - 6" 8' - 6" 8' - 6" 8' - 6"

8' - 6"

7' - 3"

EXPOSEDSTRUCTURE

EXPOSEDSTRUCTURE

SLOPED

SLOPED

7' - 3"

7' - 3"

7' - 2 1/4"

RESIDENT1808

HALLH1802

HALLH1801

HALLH1803

C

3

3

3

A

AC

A A A A

AAAAA

A

A

A

A

A

A

C CC

C C C CC

RESIDENT1809

RESIDENT1810

RESIDENT1811

RESIDENT1812

COMMUNITY1813

RESIDENT1801

RESIDENT1802

RESIDENT1803

RESIDENT1804

RESIDENT1805

RESIDENT1806

RESIDENT1807

WOMEN1815

CUST1814

ELEC1816

CHASE1817

RESIDENT1800

FG

A

AAAAA

A

AA A

A

A

A

A

A

A A A

A A

A

A

A

A

A

A

6

5

A3.2

K

K

K

CONSTRUCTION PHASING LINE.

PHASE B CONSTRUCTION AREA

AREA NOT TO BE DISTURBED BYCONSTRUCTION

PHASE A CONSTRUCTION AREA, LIMITEDSCOPE IN PHASE B, SEE ALL NOTES

DEMOLITION - TO BE NOTED ONDEMO PLANS ONLY

EXISTING TEXTURE CEILING(ASBESTOS)

REMOVE EXISTING CEILING TILE,CEILING GRID AND LIGHTS. EXISTINGCEILING GRID ANGLES AT GWB, PLASTER, AND METAL EDGE SOFFITSTO REMAIN, AND TO BE REUSED FOR NEW CEILING INSTALLATION.SEE ELECTRICAL FOR ADDITIONAL DETAILS.

METAL EDGE SOFFIT TO REMAIN. PROTECT DURING DEMOLITION ANDCONSTRUCTION. SAND AND REMOVE RUST AND SCALING. PREPAREFOR NEW PAINT.

REMOVE EXISTING CEILING GRID AND LIGHTS. SEE ELECTRICAL FORADDITIONAL DETAILS. CEILING GRID WALL ANGLE TO REMAIN ATTYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, TOBE REUSED FOR FUTURE NEW CEILING INSTALLATION.

REMOVE/ABATE SPRAY-ON TEXTURED CEILING ABOVE EXISTING LAY-IN CEILING. SEE SPECS SECTION 010000 - SPECIAL CONDITIONS ANDREQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASEDPAINT INVESTIGATION REPORT.

REMOVE EXISTING GWB CEILING AND LIGHTS. SEE ELECTRICAL FORADDITIONAL DETAILS.

CUT OPENING IN EXISTING ROOF DECK AS PART OF PHASE A. SEEA2.3 KEYNOTES FOR SOFFIT TO BE BUILT IN PHASE A TO ENCLOSEROOF DECK OPENING. PARTIALLY SCRAPE/ABATE EXISTINGASBESTOS CONTAINING SPRAY TEXTURE CEILING TO ALLOW FORTEMORARY SOFFIT ENCLOSURE. EXISTING CHASE WALL TO REMAINDURING PHASE A.

REMOVAL OF EXISTING GRILL, WHERE OCCURS, AND PATCHING OFSHEETROCK TO BE COMPLETED BY OTHERS. G.C. TO PAINT.

1

2

4

3

5

6

7

SELECTIVE REMOVAL OF TEXTURED CEILING IN ORDER TO ALLOWFOR INSTALLATION OF STEEL ANGLES,DUCTWORK, PIPING, ANDASSOCIATED HANGING DEVICES. SEE MECHANICAL, ELECTRICAL,PLUMBING AND SPEC. SECTION 010000 - SPECIAL CONDITIONSAND REQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASED PAINT INVESTIGATION REPORT.

REMOVE EXISTING METAL SOFFIT. SEE MECHANICAL, ELECTRICAL,PLUMBING FOR ADDITIONAL SCOPE TO BE REMOVED. MAINTAINEXISTING SOFFIT CEILING ANGLE CONNECTION TO BE REUSED.SEE SPEC. SECTION 010000 - SPECIAL CONDITIONS ANDREQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASEDPAINT INVESTIGATION REPORT.

EXISTING LIGHT TO BE REMOVED AND STORED FOR REINSTALLIONDURING THIS SCOPE OF WORK. CONTRACTOR TO VERIFY ALLLIGHTS ARE WORKING PRIOR TO REMOVAL AND REPORT TOOWNER/ARCHITECT ANY FIXTURES THAT ARE NOT WORKING. SEEELECTRICAL FOR FULL SCOPE OF WORK AND COORDIATION OFLIGHTING DEMOLITION/CONSTRUCTION FOR BASE BID ANDALTERNATE NO. 1.

REMOVE EXISTING METAL SOFFIT. SEE MECHANICAL, ELECTRICAL,PLUMBING FOR ADDITIONAL SCOPE TO BE REMOVED. REMOVEEXISTING SOFFIT CEILING ANGLE AND PREPARE CEILING TO BEEXPOSED FOR NEW TEXTURED SPRAY MATERIAL. SEE REFLECTEDCEILING PLAN AND SPEC. SECTION 010000 - SPECIAL CONDITIONSAND REQUIREMENTS/ASBESTOS INVESTIGATION REPORT/LEAD-BASED PAINT INVESTIGATION REPORT.

REMOVE EXISTING METAL SOFFIT AND CEILING ANGLECOMPLETELY.

REMOVE EXISTING LIGHT. SEE ELECTRICAL FOR FULL SCOPE OFLIGHTING DEMOLITION/CONSTRUCTION FOR BASE BID ANDALTERNATE NO. 1.

REMOVE /ABATE SPRAY-ON TEXTURED CEILING COMPLETELY ANDPREPARE FOR NEW SKIM COAT CEILING FINISH AS SHOWN ONREFLECTED CEILNG PLAN, SEE SPECS. SEE SPEC SECTION010000 SPECIAL CONDITIONS AND REQUIREMENTS/ASBESTOSINVESTIGATION REPORT/LEAD-BASED PAINT INVESTIGATIONREPORT.

SELECTIVE REMOVAL OF APC CEILING TILE ONLY INSTALLED INPHASE A TO ALLOW FOR REMOVAL OF PIPING, SEE PLUMBING.PROTECT EXISTING CEILING TILE, GRID AND AND ADJACENTCEILING MATERIALS AND REINSTALL CEILING TILE AFTERREMOVAL OF PHASE B PLUMBING SCOPE IS COMPLETE.

SELECTIVE PATCHING OF EXISTING GWB BY OTHERS, SEEMECHANICAL.

SELECTIVE REMOVAL OF APC CEILING TILE ONLY INSTALLED INPHASE A TO ALLOW FOR REQUIRED MECHANICAL, ELECTRICALAND PLUMBING CONNECTIONS. PROTECT EXISTING CEILING TILE,GRID AND AND ADJACENT CEILING MATERIALS AND REINSTALLCEILING TILE AFTER REMOVAL OF PHASE B PLUMBING SCOPE ISCOMPLETE.

A

B

C

D

E

F

G

H

J

K

1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BEDISTURBED DURING PHASE A TO PREVENT PHASE B HAZARDOUSMATERIALS FROM BEING DISTURBED. THE BOUNDARY WALLSEPARATING PHASE A AND PHASE B IS NOT TO BE DISTURBED DURINGPHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAININGMATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOTSHOWN TO BE REMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OFDEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THEEXISTING DRAWINGS PROVIDED BY THE OWNER. GENERALCONTRACTOR AND SUB-CONTRACTORS ARE TO VERIFY EXISTINGCONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TODOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECTWITH ELECTRONIC COPIES OF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOTSHOWN ON THIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICALDRAWINGS FOR REQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FORADDITIONAL ITEMS TO REMAIN AND BE PROTECTED THROUGHOUTCONSTRUCTION, INCLUDING DATA AND POWER CONDUITS, LIGHTS,PIPES AND DUCTWORK.7. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION SCOPE. REPAIR OR REPLACEMENT OFDAMAGED AREAS NOT IN THIS SCOPE SHALL BE INCLUDED IN THE WORK,WITH NO ADDITIONAL COST TO THE OWNER.8. ELECTRICAL CONTRACTOR IS TO VERIFY ALL CEILING MOUNTEDELECTRICAL DEVICES ARE IN WORKING CONDITION AT COMMENCEMENTOF DEMOLITION/CONSTRUCTION. SEE ELECTRICAL DRAWINGS ANDSPECS FOR ALL SCOPE RELATED TO CEILING MOUNTED DEVICES PRIORTO COMMENCEMENT OF DEMOLITION/CONSTRUCTION.9. ALL EXISTING WALL SCONCES/LIGHTING TO REMAIN UNLESS NOTEDOTHERWISE.10. ALL CEILING LIGHTING TO REMAIN UNLESS NOTED OTHERWISE.11. SEE ELECTRICAL FOR FULL SCOPE AND COORDINATION OF LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.12. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BEUSED DURING THE DEMOLITION AND CONSTRUCTION PERIOD.ELEVATORS SHOULD BE PROTECTED, CLEANED AND RETURNED TO THECONDITION IN WHICH THEY WERE FOUND AT THE END OF EACH JOBPHASE. SEE SPECIFICATIONS.13. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OFFINISHES. KEYNOTES REFERRING TO FINISHES ARE FOR PHASINGCLARIFICATION.

1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BEDISTURBED DURING PHASE A TO PREVENT PHASE B HAZARDOUSMATERIALS FROM BEING DISTURBED. THE BOUNDARY WALL SEPARATINGPHASE A AND PHASE B IS NOT TO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAININGMATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWNTO BE REMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OFDEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THEEXISTING DRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTORAND SUB-CONTRACTORS ARE TO VERIFY EXISTING CONDITIONS PRIOR TOBID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TODOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECTWITH ELECTRONIC COPIES OF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOTSHOWN ON THIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICALDRAWINGS FOR REQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FORADDITIONAL ITEMS TO REMAIN AND BE PROTECTED THROUGHOUTCONSTRUCTION, INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPESAND DUCTWORK.7. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION SCOPE. REPAIR OR REPLACEMENT OFDAMAGED AREAS NOT IN THIS SCOPE SHALL BE INCLUDED IN THE WORK,WITH NO ADDITIONAL COST TO THE OWNER.8. ELECTRICAL CONTRACTOR IS TO VERIFY ALL CEILING MOUNTEDELECTRICAL DEVICES ARE IN WORKING CONDITION AT COMMENCEMENTOF DEMOLITION/CONSTRUCTION. SEE ELECTRICAL DRAWINGS AND SPECSFOR ALL SCOPE RELATED TO CEILING MOUNTED DEVICES PRIOR TOCOMMENCEMENT OF DEMOLITION/CONSTRUCTION.9. ALL EXISTING WALL SCONCES/LIGHTING TO REMAIN UNLESS NOTEDOTHERWISE.10. ALL CEILING LIGHTING TO REMAIN UNLESS NOTED OTHERWISE. SEEELECTRICAL FOR FULL SCOPE OF LIGHTING DEMOLITION/CONSTRUCTION.11. COORDINATE PARTIAL/SELECTIVE REMOVAL OF APC CEILING TOALLOW FOR MECHANICAL, PLUMBING AND ELECTRICAL CONNECTIONSREQUIRED IN PHASE B SCOPE. PROTECT EXISTING CEILING TILE AND GRID(INSTALLED IN PHASE A) AND REINSTALL AFTER REQUIRED CONNECTIONSHAVE BEEN MADE. ALL CEILING TILES DAMAGED DURING CONSTRUCTIONSHALL BE REPLACE BY CONTRACTOR AT NO ADDITIONAL COST TOOWNER. SEE MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FORFULL SCOPE OF WORK.12. SEE ELECTRICAL DRAWINGS FOR FULL SCOPE AND COORDINATION OFLIGHTING DEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATENO. 1.13. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BEUSED DURING THE DEMOLITION AND CONSTRUCTION PERIOD.ELEVATORS SHOULD BE PROTECTED, CLEANED AND RETURNED TO THECONDITION IN WHICH THEY WERE FOUND AT THE END OF EACH JOBPHASE. SEE SPECIFICATIONS.14. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OFFINISHES. KEYNOTES REFERRING TO FINISHES ARE FOR PHASINGCLARIFICATION.

N

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

REFERENCED ON: 1/4" = 1'-0"D2.31 18TH FLOOR DEMOLITION REFLECTED CEILING PLAN

LEGEND

PHASE A - DEMO REFLECTED CEILING PLAN KEYNOTES

PHASE B - DEMO REFLECTED CEILING PLAN KEYNOTES

PHASE A - GENERAL DEMOLITION RCP NOTES

PHASE B- GENERAL DEMOLITION RCP NOTES

D2.3

18TH

FLO

OR D

EMOL

ITIO

NRE

FLEC

TED

CEILI

NG P

LAN

RMB

SAL