Top Banner
1 E D C 2 3 4 B A 1 2 3 4 UNIVERSITY OF SOUTH CAROLINA MECHANICAL RENOVATIONS SOUTH TOWER 5 6 7 E SHEET: SHEET TITLE: DRAWN BY: D REV. DRAWING: DESCRIPTION 03/15/12 DATE: PROJECT TITLE: C CHECKED BY: DATE ORIG. BY DRAWN BY 5 6 Facsimile: (803) 791-0830 B SEAL SEAL Swygert & Associates C O N S U L T I N G E N G I N E E R S Post Office Box 11686 DBA Swygert & Assoc. Ltd. A Telephone: (803) 791-9300 Columbia, S.C. 29211 [email protected] 7 STATE PROJECT NUMBER H27-6082-NA THIS DRAWING AND THE DESIGN THEREON ARE THE PROPERTY OF SWYGERT & ASSOCIATES, LTD. THE REPRODUCTION, COPYING, OR USE OF THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SWYGERT & ASSOCIATES IS PROHIBITED AND ANY INFRINGEMENT WILL BE SUBJECT TO LEGAL ACTION. BID DOCUMENTS UP BASEMENT S101 ELEV EV03 CONSTRUCTION PHASING LINE. PHASE B CONSTRUCTION AREA AREA NOT TO BE DISTURBED BY CONSTRUCTION PHASE A CONSTRUCTION AREA, LIMITED SCOPE IN PHASE B, SEE ALL NOTES DEMOLITION - TO BE NOTED ON DEMO PLANS ONLY EXISTING TEXTURE CEILING (ASBESTOS) INSTALL NEW VCT AND RUBBER BASE IN TYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, SEE FINISH SCHEDULE. INSTALL NEW SHAFT WALLS. SEE PARTITION TYPES AND MECHANICAL FOR ADDITIONAL SCOPE AND DETAILS. SEE FINISH SCHEDULE. INSTALL NEW DRYER VENTS. SEE MECHANICAL FOR ADDITIONAL DETAILS. NOT USED. COORDINATE WITH MECHANICAL, ELECTRICAL, AND PLUMBING FOR FULL SCOPE OF DEMOLITION/CONSTRUCTION IN ELECTRICAL ROOMS, PIPE CHASES AND MECHANICAL CHASE. SEE DEMOLITION RELECTED CEILING PLANS AND REFLECTED CEILINGS PLANS FOR PHASE A WORK TO OCCUR IN THIS AREA. PAINT TYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2- 18, SEE FINISH SCHEDULE AND PLANS. 1 2 3 4 5 6 7 1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BE DISTURBED DURING PHASE A TO PREVENT HAZARDOUS MATERIALS IN WALLS FROM BEING DISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOT TO BE DISTURBED DURING PHASE A. 2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BE REMOVED OR ALTERED WITHIN THE PROJECT SCOPE. 3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB- CONTRACTORS ARE TO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION. 4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TO COMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE- CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OF PHOTOGRAPHS AND VIDEO. 5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ON THIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR REQUIRED UTILITY ROUTING. 6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL ITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK. 7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION ARE IDENTIFIED WITHIN THE SPECIFICATIONS. 8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED IN DEMOLITION OR CONSTRUCTION SCOPE, INCLUDING BUT NOT LIMITED TO WALLS, FLOORING, CEILINGS, CASEWORK, AND DOORS. REPAIR OR REPLACE AREAS DAMAGED DURING DEMOLITION OR CONSTRUCTION WITHIN THE PROJECT SCOPE, WITH NO ADDITIONAL COST TO THE OWNER. 9. SEE MECHANICAL, PLUMBING AND ELECTRICAL FOR SCOPE AND COORDINATION OF NEW SYSTEMS. 10. SEE PHASE B - FLOOR PLAN KEY NOTES FOR WORK TO OCCUR IN TYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, DURING PHASE B OF CONSTRUCTION. 11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURING THE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BE PROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WERE FOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS. 12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES. KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION. 1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BE DISTURBED DURING PHASE A TO PREVENT HAZARDOUS MATERIALS IN WALLS FROM BEING DISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOT TO BE DISTURBED DURING PHASE A. 2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BE REMOVED OR ALTERED WITHIN THE PROJECT SCOPE. 3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB- CONTRACTORS ARE TO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION. 4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TO COMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE- CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OF PHOTOGRAPHS AND VIDEO. 5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ON THIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR REQUIRED UTILITY ROUTING. 6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL ITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK. 7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION ARE IDENTIFIED WITHIN THE SPECIFICATIONS. 8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED IN DEMOLITION OR CONSTRUCTION SCOPE, INCLUDING BUT NOT LIMITED TO WALLS, FLOORING, CEILINGS, CASEWORK, AND DOORS. REPAIR OR REPLACE AREAS DAMAGED DURING DEMOLITION OR CONSTRUCTION WITHIN THE PROJECT SCOPE, WITH NO ADDITIONAL COST TO THE OWNER. 9. SEE MECHANICAL, PLUMBING AND ELECTRICAL FOR SCOPE AND COORDINATION OF NEW SYSTEMS. 10. SEE PHASE B - FLOOR PLAN KEY NOTES FOR WORK TO OCCUR IN TYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, DURING PHASE B OF CONSTRUCTION. 11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURING THE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BE PROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WERE FOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS. 12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES. KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION. INSTALL NEW CARPET AND RUBBER BASE. SEE FINISH SCHEDULE AND FINISH PLAN. INSTALL INFILL WALL WHERE EXISTING FAN COIL UNIT WAS REMOVED. SEE DETAILS 1-4/A3.2. INSTALL NEW VCT AND BASE AROUND EXISTING RESIDENT ROOM FAN COIL UNITS AND VANITIES TO NEAREST FULL TILE, 2''-4" MIN. SEE FINISH SCHEDULE AND PLANS. INSTALL NEW FLOORING. SEE FINISH SCHEDULE AND PLANS. INSTALL NEW WALL, SEE PARTITION TYPES AND FINISH SCHEDULE. PAINT TYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18. SEE FINISH SCHEDULE AND FINISH PLANS. NOT USED. PROTECT EDGE OF CASEWORK THROUGHOUT DEMOLITION/CONSTRUCTION. INSTALL NEW FINISHED CASEWORK EDGE WHERE VANITIES HAVE BEEN REMOVED AS SHOWN IN DETAIL 6/A3.1. INSTALL PEM ALL EXTINGUISHING SYSTEM IN EXISTING CABINET, SEE MECHANICAL. PROVIDE AND INSTALL NEW LOCK ON EXISTING OVERHEAD CABINET, SEE SPECS. PAINT TYPICAL RESIDENCE AND COMMUNITY ROOMS. SEE FINISH SCHEDULE AND FINISH PLANS. A B C D E F G H J K N PHASE B WORK - NOTE TO CONTRACTORS: 1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHER MATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THE PARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THE CEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTS ASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING. 2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEW PARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILL BE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR. PHASE A WORK - NOTE TO CONTRACTORS: 1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR. 2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTER THE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHER PARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THE GYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTS ASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING. REFERENCED ON: 1/4" = 1'-0" A1.00 1 BASEMENT FLOOR PLAN LEGEND PHASE A - FLOOR PLAN KEYNOTES PHASE A - GENERAL FLOOR PLAN NOTES PHASE B - GENERAL FLOOR PLAN NOTES PHASE B - FLOOR PLAN KEYNOTES A1.00 BASEMENT FLOOR PLAN RMB SAL
16

Z:U290.11CAD 29003 12 12 Lighting layoutsSouth …purchasing.sc.edu/solicitations/H27-6082-NA Architectural drawing.pdf · 1 ed c 234 ba 1234 south tower mechanical renovations university

Aug 12, 2018

Download

Documents

lamdang
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth …purchasing.sc.edu/solicitations/H27-6082-NA Architectural drawing.pdf · 1 ed c 234 ba 1234 south tower mechanical renovations university

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

UP

BASEMENTS101

ELEVEV03

CONSTRUCTION PHASING LINE.

PHASE B CONSTRUCTION AREA

AREA NOT TO BE DISTURBED BYCONSTRUCTION

PHASE A CONSTRUCTION AREA, LIMITEDSCOPE IN PHASE B, SEE ALL NOTES

DEMOLITION - TO BE NOTED ONDEMO PLANS ONLY

EXISTING TEXTURE CEILING(ASBESTOS)

INSTALL NEW VCT AND RUBBER BASE IN TYPICAL CORRIDORS HFL#01,HFL#02, AND HFL#03, FLOORS 2-18, SEE FINISH SCHEDULE.

INSTALL NEW SHAFT WALLS. SEE PARTITION TYPES AND MECHANICALFOR ADDITIONAL SCOPE AND DETAILS. SEE FINISH SCHEDULE.

INSTALL NEW DRYER VENTS. SEE MECHANICAL FOR ADDITIONALDETAILS.

NOT USED.

COORDINATE WITH MECHANICAL, ELECTRICAL, AND PLUMBING FORFULL SCOPE OF DEMOLITION/CONSTRUCTION IN ELECTRICAL ROOMS,PIPE CHASES AND MECHANICAL CHASE.

SEE DEMOLITION RELECTED CEILING PLANS AND REFLECTEDCEILINGS PLANS FOR PHASE A WORK TO OCCUR IN THIS AREA.

PAINT TYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, SEE FINISH SCHEDULE AND PLANS.

1

2

3

4

5

6

7

1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BE DISTURBEDDURING PHASE A TO PREVENT HAZARDOUS MATERIALS IN WALLS FROM BEINGDISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOT TOBE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAININGMATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BEREMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OFDEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTINGDRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIORTO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIESOF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FORREQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONALITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION,INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED IN DEMOLITION ORCONSTRUCTION SCOPE, INCLUDING BUT NOT LIMITED TO WALLS, FLOORING,CEILINGS, CASEWORK, AND DOORS. REPAIR OR REPLACE AREAS DAMAGEDDURING DEMOLITION OR CONSTRUCTION WITHIN THE PROJECT SCOPE, WITH NOADDITIONAL COST TO THE OWNER.9. SEE MECHANICAL, PLUMBING AND ELECTRICAL FOR SCOPE AND COORDINATIONOF NEW SYSTEMS.10. SEE PHASE B - FLOOR PLAN KEY NOTES FOR WORK TO OCCUR IN TYPICALCORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, DURING PHASE B OFCONSTRUCTION.11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USEDDURING THE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BEPROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WEREFOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.

1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BE DISTURBEDDURING PHASE A TO PREVENT HAZARDOUS MATERIALS IN WALLS FROM BEINGDISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOT TOBE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAININGMATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BEREMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OFDEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTINGDRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIORTO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIESOF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FORREQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONALITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION,INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED IN DEMOLITION ORCONSTRUCTION SCOPE, INCLUDING BUT NOT LIMITED TO WALLS, FLOORING,CEILINGS, CASEWORK, AND DOORS. REPAIR OR REPLACE AREAS DAMAGEDDURING DEMOLITION OR CONSTRUCTION WITHIN THE PROJECT SCOPE, WITH NOADDITIONAL COST TO THE OWNER.9. SEE MECHANICAL, PLUMBING AND ELECTRICAL FOR SCOPE AND COORDINATIONOF NEW SYSTEMS.10. SEE PHASE B - FLOOR PLAN KEY NOTES FOR WORK TO OCCUR IN TYPICALCORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, DURING PHASE B OFCONSTRUCTION.11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USEDDURING THE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BEPROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WEREFOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.

INSTALL NEW CARPET AND RUBBER BASE. SEE FINISH SCHEDULEAND FINISH PLAN.

INSTALL INFILL WALL WHERE EXISTING FAN COIL UNIT WASREMOVED. SEE DETAILS 1-4/A3.2.

INSTALL NEW VCT AND BASE AROUND EXISTING RESIDENT ROOMFAN COIL UNITS AND VANITIES TO NEAREST FULL TILE, 2''-4" MIN.SEE FINISH SCHEDULE AND PLANS.

INSTALL NEW FLOORING. SEE FINISH SCHEDULE AND PLANS.

INSTALL NEW WALL, SEE PARTITION TYPES AND FINISH SCHEDULE.

PAINT TYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS2-18. SEE FINISH SCHEDULE AND FINISH PLANS.

NOT USED.

PROTECT EDGE OF CASEWORK THROUGHOUTDEMOLITION/CONSTRUCTION. INSTALL NEW FINISHED CASEWORKEDGE WHERE VANITIES HAVE BEEN REMOVED AS SHOWN IN DETAIL6/A3.1.

INSTALL PEM ALL EXTINGUISHING SYSTEM IN EXISTING CABINET,SEE MECHANICAL. PROVIDE AND INSTALL NEW LOCK ON EXISTINGOVERHEAD CABINET, SEE SPECS.

PAINT TYPICAL RESIDENCE AND COMMUNITY ROOMS. SEE FINISHSCHEDULE AND FINISH PLANS.

A

B

C

D

E

F

G

H

J

K

N

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

REFERENCED ON: 1/4" = 1'-0"A1.001 BASEMENT FLOOR PLAN

LEGEND

PHASE A - FLOOR PLAN KEYNOTESPHASE A - GENERAL FLOOR PLAN NOTES

PHASE B - GENERAL FLOOR PLAN NOTES PHASE B - FLOOR PLAN KEYNOTES

A1.00

BASE

MENT

FLO

ORPL

AN

RMB

SAL

Page 2: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth …purchasing.sc.edu/solicitations/H27-6082-NA Architectural drawing.pdf · 1 ed c 234 ba 1234 south tower mechanical renovations university

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

D W

UP

REF.

DN

UP

TRASH002A

TRASH002

VENDING001

OFFICE012A

CUST.012

STORAGE011

CUST.009

LAUNDRY007

TLT008

TLT006

LAUNDRY007A

BEDROOM005

LIVING003

CHASE004

HALLH004

HALLH003

HALLH002

HALLH005

HALLH001

ELEC010

STAIRST01

OPENTOBELOW

PANTRY003B

MECH003A

ELEVEV01

ELEVEV02

2

3

S2C

EVEV03

5

5

5

J

CONSTRUCTION PHASING LINE.

PHASE B CONSTRUCTION AREA

AREA NOT TO BE DISTURBED BYCONSTRUCTION

PHASE A CONSTRUCTION AREA, LIMITEDSCOPE IN PHASE B, SEE ALL NOTES

DEMOLITION - TO BE NOTED ONDEMO PLANS ONLY

EXISTING TEXTURE CEILING(ASBESTOS)

INSTALL NEW VCT AND RUBBER BASE IN TYPICAL CORRIDORS HFL#01,HFL#02, AND HFL#03, FLOORS 2-18, SEE FINISH SCHEDULE.

INSTALL NEW SHAFT WALLS. SEE PARTITION TYPES AND MECHANICALFOR ADDITIONAL SCOPE AND DETAILS. SEE FINISH SCHEDULE.

INSTALL NEW DRYER VENTS. SEE MECHANICAL FOR ADDITIONALDETAILS.

NOT USED.

COORDINATE WITH MECHANICAL, ELECTRICAL, AND PLUMBING FORFULL SCOPE OF DEMOLITION/CONSTRUCTION IN ELECTRICAL ROOMS,PIPE CHASES AND MECHANICAL CHASE.

SEE DEMOLITION RELECTED CEILING PLANS AND REFLECTEDCEILINGS PLANS FOR PHASE A WORK TO OCCUR IN THIS AREA.

PAINT TYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, SEE FINISH SCHEDULE AND PLANS.

1

2

3

4

5

6

7

1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BE DISTURBEDDURING PHASE A TO PREVENT HAZARDOUS MATERIALS IN WALLS FROM BEINGDISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOT TOBE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAININGMATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BEREMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OFDEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTINGDRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIORTO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIESOF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FORREQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONALITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION,INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED IN DEMOLITION ORCONSTRUCTION SCOPE, INCLUDING BUT NOT LIMITED TO WALLS, FLOORING,CEILINGS, CASEWORK, AND DOORS. REPAIR OR REPLACE AREAS DAMAGEDDURING DEMOLITION OR CONSTRUCTION WITHIN THE PROJECT SCOPE, WITH NOADDITIONAL COST TO THE OWNER.9. SEE MECHANICAL, PLUMBING AND ELECTRICAL FOR SCOPE AND COORDINATIONOF NEW SYSTEMS.10. SEE PHASE B - FLOOR PLAN KEY NOTES FOR WORK TO OCCUR IN TYPICALCORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, DURING PHASE B OFCONSTRUCTION.11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USEDDURING THE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BEPROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WEREFOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.

INSTALL NEW CARPET AND RUBBER BASE. SEE FINISH SCHEDULEAND FINISH PLAN.

INSTALL INFILL WALL WHERE EXISTING FAN COIL UNIT WASREMOVED. SEE DETAILS 1-4/A3.2.

INSTALL NEW VCT AND BASE AROUND EXISTING RESIDENT ROOMFAN COIL UNITS AND VANITIES TO NEAREST FULL TILE, 2''-4" MIN.SEE FINISH SCHEDULE AND PLANS.

INSTALL NEW FLOORING. SEE FINISH SCHEDULE AND PLANS.

INSTALL NEW WALL, SEE PARTITION TYPES AND FINISH SCHEDULE.

PAINT TYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS2-18. SEE FINISH SCHEDULE AND FINISH PLANS.

NOT USED.

PROTECT EDGE OF CASEWORK THROUGHOUTDEMOLITION/CONSTRUCTION. INSTALL NEW FINISHED CASEWORKEDGE WHERE VANITIES HAVE BEEN REMOVED AS SHOWN IN DETAIL6/A3.1.

INSTALL PEM ALL EXTINGUISHING SYSTEM IN EXISTING CABINET,SEE MECHANICAL. PROVIDE AND INSTALL NEW LOCK ON EXISTINGOVERHEAD CABINET, SEE SPECS.

PAINT TYPICAL RESIDENCE AND COMMUNITY ROOMS. SEE FINISHSCHEDULE AND FINISH PLANS.

A

B

C

D

E

F

G

H

J

K

1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BE DISTURBEDDURING PHASE A TO PREVENT HAZARDOUS MATERIALS IN WALLS FROM BEINGDISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOT TOBE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAININGMATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BEREMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OFDEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTINGDRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIORTO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIESOF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FORREQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONALITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION,INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED IN DEMOLITION ORCONSTRUCTION SCOPE, INCLUDING BUT NOT LIMITED TO WALLS, FLOORING,CEILINGS, CASEWORK, AND DOORS. REPAIR OR REPLACE AREAS DAMAGEDDURING DEMOLITION OR CONSTRUCTION WITHIN THE PROJECT SCOPE, WITH NOADDITIONAL COST TO THE OWNER.9. SEE MECHANICAL, PLUMBING AND ELECTRICAL FOR SCOPE AND COORDINATIONOF NEW SYSTEMS.10. SEE PHASE B - FLOOR PLAN KEY NOTES FOR WORK TO OCCUR IN TYPICALCORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, DURING PHASE B OFCONSTRUCTION.11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USEDDURING THE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BEPROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WEREFOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.

N

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

REFERENCED ON: 1/4" = 1'-0"A1.011 GROUND LEVEL FLOOR PLAN

LEGEND

PHASE A - FLOOR PLAN KEYNOTES

PHASE B - GENERAL FLOOR PLAN NOTES PHASE B - FLOOR PLAN KEYNOTES

PHASE A - GENERAL FLOOR PLAN NOTES

A1.01

GROU

ND LE

VEL F

LOOR

PLAN

RMB

SAL

Page 3: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth …purchasing.sc.edu/solicitations/H27-6082-NA Architectural drawing.pdf · 1 ed c 234 ba 1234 south tower mechanical renovations university

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

DN

UP

UP

DN

REF

.

VESTIBULEV101

VESTIBULEV102

HALLH101

RA KITCHEN103D

RA LIVING103

RA BEDROOM103A

OFFICE102

CLST103C

TLT103B

MEN105CUST

104

CHASE104A

ELEC106

STUDY107

COVEREDENTRY

2

5

5

5

5

S2C

J

LOBBY101

LOBBY A101A

CONSTRUCTION PHASING LINE.

PHASE B CONSTRUCTION AREA

AREA NOT TO BE DISTURBED BYCONSTRUCTION

PHASE A CONSTRUCTION AREA, LIMITEDSCOPE IN PHASE B, SEE ALL NOTES

DEMOLITION - TO BE NOTED ONDEMO PLANS ONLY

EXISTING TEXTURE CEILING(ASBESTOS)

INSTALL NEW VCT AND RUBBER BASE IN TYPICAL CORRIDORS HFL#01,HFL#02, AND HFL#03, FLOORS 2-18, SEE FINISH SCHEDULE.

INSTALL NEW SHAFT WALLS. SEE PARTITION TYPES AND MECHANICALFOR ADDITIONAL SCOPE AND DETAILS. SEE FINISH SCHEDULE.

INSTALL NEW DRYER VENTS. SEE MECHANICAL FOR ADDITIONALDETAILS.

NOT USED.

COORDINATE WITH MECHANICAL, ELECTRICAL, AND PLUMBING FORFULL SCOPE OF DEMOLITION/CONSTRUCTION IN ELECTRICAL ROOMS,PIPE CHASES AND MECHANICAL CHASE.

SEE DEMOLITION RELECTED CEILING PLANS AND REFLECTEDCEILINGS PLANS FOR PHASE A WORK TO OCCUR IN THIS AREA.

PAINT TYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, SEE FINISH SCHEDULE AND PLANS.

1

2

3

4

5

6

7

1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BE DISTURBEDDURING PHASE A TO PREVENT HAZARDOUS MATERIALS IN WALLS FROM BEINGDISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOT TOBE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAININGMATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BEREMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OFDEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTINGDRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIORTO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIESOF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FORREQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONALITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION,INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED IN DEMOLITION ORCONSTRUCTION SCOPE, INCLUDING BUT NOT LIMITED TO WALLS, FLOORING,CEILINGS, CASEWORK, AND DOORS. REPAIR OR REPLACE AREAS DAMAGEDDURING DEMOLITION OR CONSTRUCTION WITHIN THE PROJECT SCOPE, WITH NOADDITIONAL COST TO THE OWNER.9. SEE MECHANICAL, PLUMBING AND ELECTRICAL FOR SCOPE AND COORDINATIONOF NEW SYSTEMS.10. SEE PHASE B - FLOOR PLAN KEY NOTES FOR WORK TO OCCUR IN TYPICALCORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, DURING PHASE B OFCONSTRUCTION.11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USEDDURING THE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BEPROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WEREFOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.

1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BE DISTURBEDDURING PHASE A TO PREVENT HAZARDOUS MATERIALS IN WALLS FROM BEINGDISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOT TOBE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAININGMATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BEREMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OFDEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTINGDRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIORTO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIESOF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FORREQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONALITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION,INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED IN DEMOLITION ORCONSTRUCTION SCOPE, INCLUDING BUT NOT LIMITED TO WALLS, FLOORING,CEILINGS, CASEWORK, AND DOORS. REPAIR OR REPLACE AREAS DAMAGEDDURING DEMOLITION OR CONSTRUCTION WITHIN THE PROJECT SCOPE, WITH NOADDITIONAL COST TO THE OWNER.9. SEE MECHANICAL, PLUMBING AND ELECTRICAL FOR SCOPE AND COORDINATIONOF NEW SYSTEMS.10. SEE PHASE B - FLOOR PLAN KEY NOTES FOR WORK TO OCCUR IN TYPICALCORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, DURING PHASE B OFCONSTRUCTION.11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USEDDURING THE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BEPROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WEREFOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.

INSTALL NEW CARPET AND RUBBER BASE. SEE FINISH SCHEDULEAND FINISH PLAN.

INSTALL INFILL WALL WHERE EXISTING FAN COIL UNIT WASREMOVED. SEE DETAILS 1-4/A3.2.

INSTALL NEW VCT AND BASE AROUND EXISTING RESIDENT ROOMFAN COIL UNITS AND VANITIES TO NEAREST FULL TILE, 2''-4" MIN.SEE FINISH SCHEDULE AND PLANS.

INSTALL NEW FLOORING. SEE FINISH SCHEDULE AND PLANS.

INSTALL NEW WALL, SEE PARTITION TYPES AND FINISH SCHEDULE.

PAINT TYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS2-18. SEE FINISH SCHEDULE AND FINISH PLANS.

NOT USED.

PROTECT EDGE OF CASEWORK THROUGHOUTDEMOLITION/CONSTRUCTION. INSTALL NEW FINISHED CASEWORKEDGE WHERE VANITIES HAVE BEEN REMOVED AS SHOWN IN DETAIL6/A3.1.

INSTALL PEM ALL EXTINGUISHING SYSTEM IN EXISTING CABINET,SEE MECHANICAL. PROVIDE AND INSTALL NEW LOCK ON EXISTINGOVERHEAD CABINET, SEE SPECS.

PAINT TYPICAL RESIDENCE AND COMMUNITY ROOMS. SEE FINISHSCHEDULE AND FINISH PLANS.

A

B

C

D

E

F

G

H

J

K

N

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

REFERENCED ON: 1/4" = 1'-0"A1.11 FIRST FLOOR PLAN

LEGEND

PHASE A - FLOOR PLAN KEYNOTESPHASE A - GENERAL FLOOR PLAN NOTES

PHASE B - GENERAL FLOOR PLAN NOTES PHASE B - FLOOR PLAN KEYNOTES

A1.1

FIRS

T FL

OOR

PLAN

RMB

SAL

Page 4: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth …purchasing.sc.edu/solicitations/H27-6082-NA Architectural drawing.pdf · 1 ed c 234 ba 1234 south tower mechanical renovations university

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

UP

UPDN

DN

2

A3.2

7 A

7 A

1 A

5

5

B

C

B

C

B

C

B

C

B

C

B

D

B

C

B

C

B

C

B

C

B

C

B

C

B

C

B

C

E E

E E

E

E

F

F

F J

H H H H H

H H H H H

A3.16

A3.14

A3.24

RESIDENTFL#00

RESIDENTFL#01

RESIDENTFL#02

RESIDENTFL#03

RESIDENTFL#04

RESIDENTFL#05

RESIDENTFL#06

RESIDENTFL#07

RESIDENTFL#08

RESIDENTFL#09

RESIDENTFL#10

RESIDENTFL#11

RESIDENTFL#12

COMMUNITYFL#13CUST

FL#14

WOMENFL#15

ELECFL#16

CHASEFL#17

HALLHFL#01

HALLHFL#03

HALLHLF#02

A3.11

A3.12

M3D

M3A

S2CS2C

M3D

M3A

M3A M3A

7

1

1

KKKK

K

K

K K K K K

K

K

K

CONSTRUCTION PHASING LINE.

PHASE B CONSTRUCTION AREA

AREA NOT TO BE DISTURBED BYCONSTRUCTION

PHASE A CONSTRUCTION AREA, LIMITEDSCOPE IN PHASE B, SEE ALL NOTES

DEMOLITION - TO BE NOTED ONDEMO PLANS ONLY

EXISTING TEXTURE CEILING(ASBESTOS)

INSTALL NEW VCT AND RUBBER BASE IN TYPICAL CORRIDORS HFL#01,HFL#02, AND HFL#03, FLOORS 2-18, SEE FINISH SCHEDULE.

INSTALL NEW SHAFT WALLS. SEE PARTITION TYPES AND MECHANICALFOR ADDITIONAL SCOPE AND DETAILS. SEE FINISH SCHEDULE.

INSTALL NEW DRYER VENTS. SEE MECHANICAL FOR ADDITIONALDETAILS.

NOT USED.

COORDINATE WITH MECHANICAL, ELECTRICAL, AND PLUMBING FORFULL SCOPE OF DEMOLITION/CONSTRUCTION IN ELECTRICAL ROOMS,PIPE CHASES AND MECHANICAL CHASE.

SEE DEMOLITION RELECTED CEILING PLANS AND REFLECTEDCEILINGS PLANS FOR PHASE A WORK TO OCCUR IN THIS AREA.

PAINT TYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, SEE FINISH SCHEDULE AND PLANS.

1

2

3

4

5

6

7

1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BE DISTURBEDDURING PHASE A TO PREVENT HAZARDOUS MATERIALS IN WALLS FROM BEINGDISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOT TOBE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAININGMATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BEREMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OFDEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTINGDRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIORTO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIESOF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FORREQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONALITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION,INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED IN DEMOLITION ORCONSTRUCTION SCOPE, INCLUDING BUT NOT LIMITED TO WALLS, FLOORING,CEILINGS, CASEWORK, AND DOORS. REPAIR OR REPLACE AREAS DAMAGEDDURING DEMOLITION OR CONSTRUCTION WITHIN THE PROJECT SCOPE, WITH NOADDITIONAL COST TO THE OWNER.9. SEE MECHANICAL, PLUMBING AND ELECTRICAL FOR SCOPE AND COORDINATIONOF NEW SYSTEMS.10. SEE PHASE B - FLOOR PLAN KEY NOTES FOR WORK TO OCCUR IN TYPICALCORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, DURING PHASE B OFCONSTRUCTION.11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USEDDURING THE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BEPROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WEREFOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.

1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BE DISTURBEDDURING PHASE A TO PREVENT HAZARDOUS MATERIALS IN WALLS FROM BEINGDISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOT TOBE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAININGMATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BEREMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OFDEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTINGDRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIORTO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIESOF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FORREQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONALITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION,INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED IN DEMOLITION ORCONSTRUCTION SCOPE, INCLUDING BUT NOT LIMITED TO WALLS, FLOORING,CEILINGS, CASEWORK, AND DOORS. REPAIR OR REPLACE AREAS DAMAGEDDURING DEMOLITION OR CONSTRUCTION WITHIN THE PROJECT SCOPE, WITH NOADDITIONAL COST TO THE OWNER.9. SEE MECHANICAL, PLUMBING AND ELECTRICAL FOR SCOPE AND COORDINATIONOF NEW SYSTEMS.10. SEE PHASE B - FLOOR PLAN KEY NOTES FOR WORK TO OCCUR IN TYPICALCORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, DURING PHASE B OFCONSTRUCTION.11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USEDDURING THE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BEPROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WEREFOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.

INSTALL NEW CARPET AND RUBBER BASE. SEE FINISH SCHEDULEAND FINISH PLAN.

INSTALL INFILL WALL WHERE EXISTING FAN COIL UNIT WASREMOVED. SEE DETAILS 1-4/A3.2.

INSTALL NEW VCT AND BASE AROUND EXISTING RESIDENT ROOMFAN COIL UNITS AND VANITIES TO NEAREST FULL TILE, 2''-4" MIN.SEE FINISH SCHEDULE AND PLANS.

INSTALL NEW FLOORING. SEE FINISH SCHEDULE AND PLANS.

INSTALL NEW WALL, SEE PARTITION TYPES AND FINISH SCHEDULE.

PAINT TYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS2-18. SEE FINISH SCHEDULE AND FINISH PLANS.

NOT USED.

PROTECT EDGE OF CASEWORK THROUGHOUTDEMOLITION/CONSTRUCTION. INSTALL NEW FINISHED CASEWORKEDGE WHERE VANITIES HAVE BEEN REMOVED AS SHOWN IN DETAIL6/A3.1.

INSTALL PEM ALL EXTINGUISHING SYSTEM IN EXISTING CABINET,SEE MECHANICAL. PROVIDE AND INSTALL NEW LOCK ON EXISTINGOVERHEAD CABINET, SEE SPECS.

PAINT TYPICAL RESIDENCE AND COMMUNITY ROOMS. SEE FINISHSCHEDULE AND FINISH PLANS.

A

B

C

D

E

F

G

H

J

K

N

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

REFERENCED ON: 1/4" = 1'-0"A1.21 TYPICAL FLOOR PLAN - LEVEL 2-17

LEGEND

PHASE A - FLOOR PLAN KEYNOTESPHASE A - GENERAL FLOOR PLAN NOTES

PHASE B - GENERAL FLOOR PLAN NOTES PHASE B - FLOOR PLAN KEYNOTES

A1.2

TYPI

CAL F

LOOR

PLA

N -

LEVE

LS 2-

17

RMB

SAL

Page 5: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth …purchasing.sc.edu/solicitations/H27-6082-NA Architectural drawing.pdf · 1 ed c 234 ba 1234 south tower mechanical renovations university

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

DN

DN

UP

RESIDENT1808

RESIDENT1809

RESIDENT1810

RESIDENT1811

RESIDENT1812

COMMUNITY1813

RESIDENT1801

RESIDENT1802

RESIDENT1803

RESIDENT1804RESIDENT

1805

RESIDENT1806

RESIDENT1807

HALLH1803

HALLH1801

HALLH1802

WOMEN1815

CHASE1817

ELEC1816

CUST1814

7 A

7 A

7 A

5

5

B

C

B

C

B

C

B

C

B

C

B

D

B

C

B

C

B

C

B

C

B

C

B

C

B

C

B

C

E E

E E

E

E

F

F

F J

H H H H H

H H H H

RESIDENT1800

6

A3.16

A3.14

A3.24

2

A3.2

A3.11

M3A

M3DM3D

S2CS2C

M3A

M3A M3A

K K K

K

K

KKKKK

K

K

K K

1

1

1

H

CONSTRUCTION PHASING LINE.

PHASE B CONSTRUCTION AREA

AREA NOT TO BE DISTURBED BYCONSTRUCTION

PHASE A CONSTRUCTION AREA, LIMITEDSCOPE IN PHASE B, SEE ALL NOTES

DEMOLITION - TO BE NOTED ONDEMO PLANS ONLY

EXISTING TEXTURE CEILING(ASBESTOS)

INSTALL NEW VCT AND RUBBER BASE IN TYPICAL CORRIDORS HFL#01,HFL#02, AND HFL#03, FLOORS 2-18, SEE FINISH SCHEDULE.

INSTALL NEW SHAFT WALLS. SEE PARTITION TYPES AND MECHANICALFOR ADDITIONAL SCOPE AND DETAILS. SEE FINISH SCHEDULE.

INSTALL NEW DRYER VENTS. SEE MECHANICAL FOR ADDITIONALDETAILS.

NOT USED.

COORDINATE WITH MECHANICAL, ELECTRICAL, AND PLUMBING FORFULL SCOPE OF DEMOLITION/CONSTRUCTION IN ELECTRICAL ROOMS,PIPE CHASES AND MECHANICAL CHASE.

SEE DEMOLITION RELECTED CEILING PLANS AND REFLECTEDCEILINGS PLANS FOR PHASE A WORK TO OCCUR IN THIS AREA.

PAINT TYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, SEE FINISH SCHEDULE AND PLANS.

1

2

3

4

5

6

7

INSTALL NEW CARPET AND RUBBER BASE. SEE FINISH SCHEDULEAND FINISH PLAN.

INSTALL INFILL WALL WHERE EXISTING FAN COIL UNIT WASREMOVED. SEE DETAILS 1-4/A3.2.

INSTALL NEW VCT AND BASE AROUND EXISTING RESIDENT ROOMFAN COIL UNITS AND VANITIES TO NEAREST FULL TILE, 2''-4" MIN.SEE FINISH SCHEDULE AND PLANS.

INSTALL NEW FLOORING. SEE FINISH SCHEDULE AND PLANS.

INSTALL NEW WALL, SEE PARTITION TYPES AND FINISH SCHEDULE.

PAINT TYPICAL CORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS2-18. SEE FINISH SCHEDULE AND FINISH PLANS.

NOT USED.

PROTECT EDGE OF CASEWORK THROUGHOUTDEMOLITION/CONSTRUCTION. INSTALL NEW FINISHED CASEWORKEDGE WHERE VANITIES HAVE BEEN REMOVED AS SHOWN IN DETAIL6/A3.1.

INSTALL PEM ALL EXTINGUISHING SYSTEM IN EXISTING CABINET,SEE MECHANICAL. PROVIDE AND INSTALL NEW LOCK ON EXISTINGOVERHEAD CABINET, SEE SPECS.

PAINT TYPICAL RESIDENCE AND COMMUNITY ROOMS. SEE FINISHSCHEDULE AND FINISH PLANS.

A

B

C

D

E

F

G

H

J

K

1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BE DISTURBEDDURING PHASE A TO PREVENT HAZARDOUS MATERIALS IN WALLS FROM BEINGDISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOT TOBE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAININGMATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BEREMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OFDEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTINGDRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIORTO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIESOF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FORREQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONALITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION,INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED IN DEMOLITION ORCONSTRUCTION SCOPE, INCLUDING BUT NOT LIMITED TO WALLS, FLOORING,CEILINGS, CASEWORK, AND DOORS. REPAIR OR REPLACE AREAS DAMAGEDDURING DEMOLITION OR CONSTRUCTION WITHIN THE PROJECT SCOPE, WITH NOADDITIONAL COST TO THE OWNER.9. SEE MECHANICAL, PLUMBING AND ELECTRICAL FOR SCOPE AND COORDINATIONOF NEW SYSTEMS.10. SEE PHASE B - FLOOR PLAN KEY NOTES FOR WORK TO OCCUR IN TYPICALCORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, DURING PHASE B OFCONSTRUCTION.11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USEDDURING THE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BEPROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WEREFOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.

1. SEE LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BE DISTURBEDDURING PHASE A TO PREVENT HAZARDOUS MATERIALS IN WALLS FROM BEINGDISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOT TOBE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAININGMATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOWN TO BEREMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OFDEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTINGDRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TO VERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIORTO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIESOF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FORREQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONALITEMS TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION,INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED IN DEMOLITION ORCONSTRUCTION SCOPE, INCLUDING BUT NOT LIMITED TO WALLS, FLOORING,CEILINGS, CASEWORK, AND DOORS. REPAIR OR REPLACE AREAS DAMAGEDDURING DEMOLITION OR CONSTRUCTION WITHIN THE PROJECT SCOPE, WITH NOADDITIONAL COST TO THE OWNER.9. SEE MECHANICAL, PLUMBING AND ELECTRICAL FOR SCOPE AND COORDINATIONOF NEW SYSTEMS.10. SEE PHASE B - FLOOR PLAN KEY NOTES FOR WORK TO OCCUR IN TYPICALCORRIDORS HFL#01, HFL#02, AND HFL#03, FLOORS 2-18, DURING PHASE B OFCONSTRUCTION.11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USEDDURING THE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BEPROTECTED, CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WEREFOUND AT THE END OF EACH JOB PHASE. SEE SPECIFICATIONS.12. SEE FINISH SCHEDULE AND FINISH PLANS FOR FULL SCOPE OF FINISHES.KEYNOTES REFERRING TO FINISHES ARE FOR PHASING CLARIFICATION.

N

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

REFERENCED ON: 1/4" = 1'-0"A1.31 18TH FLOOR PLAN

LEGEND

PHASE A - FLOOR PLAN KEYNOTES

PHASE B - FLOOR PLAN KEYNOTESPHASE B - GENERAL FLOOR PLAN NOTES

PHASE A - GENERAL FLOOR PLAN NOTES

A1.3

18TH

FLO

OR P

LAN

RMB

SAL

Page 6: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth …purchasing.sc.edu/solicitations/H27-6082-NA Architectural drawing.pdf · 1 ed c 234 ba 1234 south tower mechanical renovations university

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

DN

UP

DN

COMM.1901

ELEV SHAFT1902

RD RD

RDRD

SLO

PE

RIDGERIDGE

SLO

PE SLO

PESL

OPE

SLO

PE

SLO

PESL

OPE

SLO

PE

SLO

PE

SLO

PE

SLO

PE

SLO

PE

SLO

PE

SLO

PE

SLO

PE

SLO

PE

SLO

PE

SLO

PE

SLO

PE

SLO

PE

SLO

PE

SLO

PESL

OPE

SLO

PESL

OPE

SLO

PE

SLO

PE

SLO

PE

SLO

PE

SLO

PESL

OPE

SLO

PESL

OPE

SLOPE

SLOPE

+3"

+7.35"

+3"

+7.35"

+6.78"

+4.26"

+3.76"

+7.82"

1

1

1

1

2

2

2

2

3

4 4

4

4

5

6

7

67

67

67

9

9 9

9

10

A

12

A3.2

14

A3.2

A 13

A3.2

11

12

SLO

PE

SLOPESLOPE

SLO

PE

10

A3.2

9

9

9

9

8

8

8

8

ELEV EQUIP1903

1. SEE LEGEND FOR GENERAL PHASING INDICATIONS. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BE DISTURBED DURING PHASE A TOPREVENT PHASE B HAZARDOUS MATERIALS FROM BEING DISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOT TO BEDISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALS OR OTHER SUSPECTED HAZARDOUS MATERIALS NOTSHOWN TO BE REMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITION AND NEW WORK. INFORMATION SHOWN IS BASED ON THEEXISTING DRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TO VERIFY EXISTING CONDITIONSPRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TO COMMENCEMENT OF DEMOLITION/RENOVATION/NEW WORK TODOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OF PHOTOGRAPHS AND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ON THIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICALDRAWINGS FOR REQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL ITEMS TO REMAIN AND BE PROTECTED THROUGHOUTCONSTRUCTION, INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION ARE IDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED IN DEMOLITION/CONSTRUCTION WORK. REPAIR OR REPLACEMENT OF DAMAGEDAREAS NOT IN THE SCOPE OF WORK, SHALL BE INCLUDED IN THE WORK , WITH NO ADDITIONAL COST TO THE OWNER.9. PROVIDE AND INSTALL ALL SHORING AND SUPPORT SYSTEMS NECESSARY TO ENSURE EXISTING STRUCTURE TO REMAIN IS STABLETHROUGHOUT DEMOLITION AND CONSTRUCTION.10. ALL DEMOLITION REQUIRED FOR FUTURE INSTALLATION OF MECHANICAL CHASES TO BE COORDINATED WITH MECHANICAL DRAWINGS,EQUIPMENT SPECIFICATIONS, AND STRUCTURAL DRAWINGS.11. PROTECT EXISTING CONCRETE STRUCTURE TO REMAIN THROUGHOUT DEMOLITION/CONSTRUCTION.12. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION REGARDING THE AREAS OF THE EXISTING CONCRETE ROOF STRUCTUREAND CONSTRUCTION TO BE REMOVED.13. 4" FIBER CANTS ALONG PARAPET AND VERTICAL WALL PERIMETER, TYP.14. PRESLOPED RIGID INSULATION AT CRICKETS TO DRAIN WITH SLOPE OF 1/2" PER FOOT MINIMUM. MEASURED AT VALLEY CONDITIONS -SLOPE OF INSULATION BETWEEN ROOF DRAIN AND SCUPPER 1/4" PER FOOT MIN. UNLESS NOTED OTHERWISE.15. INSTALL NEW ROOFING SYSTEM, SEE SPECS.16. SEE PHASE B - GENERAL DEMOLITION ROOF NOTES AND SHEET A1.4 FOR PHASE B ROOF SCOPE.17. GENERAL CONTRACTOR, ROOFING SUBCONTRACTOR AND ASBESTOS ABATEMENT SUBCONTRACTOR SHALL COORDINATE TO ENSUREROOF IS WATERTIGHT THROUGHOUT DEMOLITION AND CONSTRUCTION, INCLUDING ANY TEMPORARY MEASURES REQUIRED TO MAINTAINIMPERMEABILITY THROUGHOUT SCOPE OF WORK.

NEW ROOFING SYSTEM INCLUDING FLASHING, AND ALL OTHER ROOFINGMATERIALS. SEE ROOF DETAILS AND SPECIFICATIONS FOR INFORMATION.

NEW ROOF DRAIN, SEE PLUMBING.

REINSTALL METAL STAIR AT COMPLETION OF ROOF INSTALLATION.

CONC. SPLASH BLOCK, TYP.

REMOVE PARTIAL ROOF DECK FOR INSTALLATION OF NEW MECHANICAL CHASES.COORDINATE WITH MECHANICAL, EQUIPMENT SPEC., AND STRUCTURAL.

NEW OVERFLOW SCUPPER, SEE DETAILS 14/A3.2 & 15/A3.2.

REINSTALL EXISTING PARAPET WALL LOVERS AT COMPLETION OF OVERFLOWSCUPPER INSTALLATION.

CONTINUOUS 4"X4" GUTTER - SEE SPECS AND DETAIL 10/A3.2.

3X4 DOWNLEADER, EXTEND FROM GUTTER TO ROOF BELOW, SEE SPECS.

DISCONNECT AND TEMPORARILY RELOCATE EXISTING MECHANICAL UNIT TOALLOW FOR INSTALLATION OF ROOFING. REINSTALL AFTER ROOFING, SEEMECHANICAL.

NEW STRUCTURAL BRACE, SEE STRUCTURAL.

NEW ROOF CURB, SEE MECHANICAL.

1

2

3

4

5

6

7

8

9

10

11

12

1. SEE LEGEND FOR GENERAL PHASING INDICATIONS. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BE DISTURBEDDURING PHASE A TO PREVENT PHASE B HAZARDOUS MATERIALS FROM BEING DISTURBED. THE BOUNDARY WALL SEPARATINGPHASE A AND PHASE B IS NOT TO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALS OR OTHER SUSPECTED HAZARDOUSMATERIALS NOT SHOWN TO BE REMOVED OR ALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITION AND NEW WORK. INFORMATION SHOWN ISBASED ON THE EXISTING DRAWINGS PROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TOVERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TO COMMENCEMENT OF DEMOLITION/RENOVATION/NEWWORK TO DOCUMENT PRE-CONSTRUCTION CONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OF PHOTOGRAPHSAND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ON THIS PLAN. SEE MECHANICAL, PLUMBING,AND ELECTRICAL DRAWINGS FOR REQUIRED UTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL ITEMS TO REMAIN AND BE PROTECTEDTHROUGHOUT CONSTRUCTION, INCLUDING DATA AND POWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION ARE IDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED IN DEMOLITION/CONSTRUCTION WORK. REPAIR OR REPLACEMENT OFDAMAGED AREAS NOT IN THE SCOPE OF WORK, SHALL BE INCLUDED IN THE WORK , WITH NO ADDITIONAL COST TO THEOWNER.9. PROVIDE AND INSTALL ALL SHORING AND SUPPORT SYSTEMS NECESSARY TO ENSURE EXISTING STRUCTURE TO REMAIN ISSTABLE THROUGHOUT DEMOLITION AND CONSTRUCTION.10. ALL DEMOLITION REQUIRED FOR FUTURE INSTALLATION OF MECHANICAL CHASES TO BE COORDINATED WITH MECHANICALDRAWINGS, EQUIPMENT SPECIFICATIONS, AND STRUCTURAL DRAWINGS.11. PROTECT EXISTING CONCRETE STRUCTURE TO REMAIN THROUGHOUT DEMOLITION/CONSTRUCTION.12. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION REGARDING THE AREAS OF THE EXISTING CONCRETE ROOFSTRUCTURE AND CONSTRUCTION TO BE REMOVED.13. 4" FIBER CANTS ALONG PARAPET AND VERTICAL WALL PERIMETER, TYP.14. PRESLOPED RIGID INSULATION AT CRICKETS TO DRAIN WITH SLOPE OF 1/2" PER FOOT MINIMUM. MEASURED AT VALLEYCONDITIONS - SLOPE OF INSULATION BETWEEN ROOF DRAIN AND SCUPPER 1/4" PER FOOT MIN. UNLESS NOTED OTHERWISE.15. INSTALL NEW ROOFING SYSTEM, SEE SPECS.16. ALL WORK PERFORMED IN PHASE A TO REMAIN. PROTECT THROUGHOUT PHASE B.

LIMITED SCOPE B INCLUDES INSTALLATION OF NEW MECHANICALUNIT AND ASSOCIATED DUCTWORK ON EXISTING CURB ALTEREDIN PHASE A AND ROOF PENETRATION CREATED AND CAPPED INPHASE A. SEE MECHANICAL, ELECTRICAL AND PLUMBING FORADDITIONAL SCOPE RELATED TO PHASE B.

A

N

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

REFERENCED ON: 1/4" = 1'-0"A1.41 ROOF PLAN

REFERENCED ON: 1/4" = 1'-0"A1.42 PENTHOUSE ROOF PLAN

REFERENCED ON: 1/4" = 1'-0"A1.43 PENTHOUSE FLOOR PLAN

PHASE A - GENERAL ROOF PLAN NOTES PHASE A - TYPICAL ROOF PLAN KEYNOTES PHASE A - GENERAL DEMOLITION ROOF NOTES

A1.4

ROOF

PLA

NRM

BSA

L

PHASE B - ROOF PLAN KEYNOTES

Page 7: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth …purchasing.sc.edu/solicitations/H27-6082-NA Architectural drawing.pdf · 1 ed c 234 ba 1234 south tower mechanical renovations university

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

EXPOSED STRUCTURE

OPEN TO ABOVE

OPEN TO ABOVE

OPEN TO ABOVE

SLOPED

OPEN TO ABOVE

EXPOSED STRUCTURE

EXPOSED STRUCTURE

16' - 8"

16' - 8"

EXPOSED STRUCTURE

16' - 8"

16' - 8"

CONSTRUCTION PHASING LINE.

PHASE B CONSTRUCTION AREA

AREA NOT TO BE DISTURBED BYCONSTRUCTION

PHASE A CONSTRUCTION AREA, LIMITEDSCOPE IN PHASE B, SEE ALL NOTES

DEMOLITION - TO BE NOTED ONDEMO PLANS ONLY

EXISTING TEXTURE CEILING(ASBESTOS)

INSTALL NEW SOFFIT. SEE MECHANICAL AND DETAIL 6/A3.2 FOR FULLCOORDINATION AND EXTENT OF SCOPE.

REINSTALL EXISTING LIGHT FIXTURE. SEE ELECTRICAL FOR FULLSCOPE AND COORDINATION OF LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.

SEE ELECTRICAL DRAWINGS FOR FULL SCOPE AND COORDINATIONOF ALL LIGTHING DEMOLLITION/CONSTRUCTION FOR BASE BID ANDALTERNATE NO. 1.

NEW FAN COIL UNIT. SEE MECHANICAL.

EXISTING LIGHT TO REMAIN. G.C. TO VERIFY EXISTING LOCATIONSARE NOT IN CONFLICT WITH NEW MECHANICAL SYSTEMS PRIOR TOEND OF ASBESTOS ABATEMENT DEMOLITION, TYP. G.C. TORELOCATE AND COORDINATE NEW LOCATION WITH ARCHITECT INFIELD, IF IN CONFLICT WITH NEW MECHANICAL. SEE ELECTRICAL FORFULL SCOPE AND COORDINATION OF LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.

NEW METAL PIPE ENCLOSURE. FIELD VERIFY AND COORDINATEDIMENSIONS AND LAYOUT WITH MECHANICAL PIPING ANDELECTRICAL. SEE DETAIL 8/A3.2.

APPLY SPRAY TEXTURE FINISH TO MATCH EXISTING ADJACENTCEILING WHERE EXISTING METAL SOFFIT HAS BEEN DECREASED INSIZE AND UNDERSIDE OF DECK /CEILING HAS BEEN EXPOSED. SEESPEC.

INSTALL NEW STEEL SUPPORT ANGLE AND NEW METAL SOFFIT. SEEDETAIL 7/A3.2 FOR FULL COORDINATION AND EXTENT OF SCOPE.

SELECTIVE REMOVAL OF APC CEILING TILE ONLY INSTALLED INPHASE A TO ALLOW FOR REQUIRED MECHANICAL, ELECTRICAL ANDPLUMBING CONNECTIONS AND/OR REMOVAL OF PIPING. SEEMECHANICAL, ELECRICAL, AND PLUMBING. PROTECT EXISTINGCEILING TILE, GRID AND AND ADJACENT CEILING MATERIALS ANDREINSTALL CEILING TILE AFTER REMOVAL OF PHASE B PLUMBINGSCOPE IS COMPLETE.

A

B

C

D

E

F

G

H

J

INSTALL GRID AND 2'X2' ACT CEILING, SEE FINISHSCHEDULE. SEE ELECTRICAL FOR NEW LIGHTS. (EXISTINGAPC WALL ANGLE TO REMAIN, SEE DEMOLITION KEYNOTES.)

PAINT EXISTING METAL PERIMETER SOFFIT ENTIREPERIMETER OF BUILDING.

INSTALL NEW GWB CEILING TO MATCH EXISTING. NEWLIGHTS, SEE ELECTRICAL.

EXISTING GRILL TO BE REMOVED AND GWB BOARD TO BEPATCHED BY OWNERS. G.C. TO PAINT AT EXPOSED AREAS.

OPENING IN CONCRETE ROOF DECK TO BE CUT ANDCAPPED IN PHASE A. PROVIDE SHEET ROCK SOFFIT INPHASE A TO CONCEAL ROOF OPENING. EXISTING CHASEWALL TO REMAIN DURING PHASE A. SEE DETAIL 2/A2.3 FORPHASE A SOFFIT PLAN.

1

2

3

4

5

1. SEE PHASING LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BEDISTURBED DURING PHASE A TO PREVENT PHASE B HAZARDOUS MATERIALS FROMBEING DISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOTTO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALSOR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOW TO BE REMOVED ORALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITIONAND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGSPROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TOVERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTIONCONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OF PHOTOGRAPHSAND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR REQUIREDUTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL ITEMSTO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDING DATA ANDPOWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION SCOPE. REPAIR OR REPLACEMENT DAMAGED AREASNOT IN THIS SCOPE SHALL BE INCLUDED IN THE WORK, WITH NO ADDITIONAL COST TOTHE OWNER.9. ELECTRICAL CONTRACTOR IS TO VERIFY ALL CEILING MOUNTED ELECTRICALDEVICES ARE IN WORKING CONDITION AT COMMENCEMENT OFDEMOLITION/CONSTRUCTION. SEE ELECTRICAL DRAWINGS AND SPECS FOR ALLSCOPE RELATED TO CEILING MOUNTED DEVICES PRIOR TO COMMENCEMENT OFDEMOLITION/CONSTRUCTION.10. SEE ELECTRICAL FOR FULL SCOPE AND COORDINATION OF ALL LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURINGTHE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BE PROTECTED,CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WERE FOUND AT THEEND OF EACH JOB PHASE. SEE SPECIFICATIONS.

1. SEE PHASING LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BEDISTURBED DURING PHASE A TO PREVENT PHASE B HAZARDOUS MATERIALS FROMBEING DISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOTTO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALSOR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOW TO BE REMOVED ORALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITIONAND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGSPROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TOVERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTIONCONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OF PHOTOGRAPHSAND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR REQUIREDUTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL ITEMSTO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDING DATA ANDPOWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION SCOPE. REPAIR OR REPLACEMENT DAMAGED AREASNOT IN THIS SCOPE SHALL BE INCLUDED IN THE WORK, WITH NO ADDITIONAL COST TOTHE OWNER.9. ELECTRICAL CONTRACTOR IS TO VERIFY ALL CEILING MOUNTED ELECTRICALDEVICES ARE IN WORKING CONDITION AT COMMENCEMENT OFDEMOLITION/CONSTRUCTION. SEE ELECTRICAL DRAWINGS AND SPECS FOR ALLSCOPE RELATED TO CEILING MOUNTED DEVICES PRIOR TO COMMENCEMENT OFDEMOLITION/CONSTRUCTION.10. SEE ELECTRICAL FOR FULL SCOPE AND COORDINATION OF LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURINGTHE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BE PROTECTED,CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WERE FOUND AT THEEND OF EACH JOB PHASE. SEE SPECIFICATIONS.

N

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

REFERENCED ON: 1/4" = 1'-0"A2.001 BASEMENT REFLECTED CEILING PLAN

LEGEND

PHASE B - TYPICAL RCP KEYNOTES

PHASE A - TYPICAL RCP KEYNOTESPHASE A - GENERAL RCP NOTES

PHASE B - GENERAL RCP NOTES

A2.00

BASE

MENT

REFL

ECTE

D CE

ILING

PLA

N

RMB

SAL

Page 8: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth …purchasing.sc.edu/solicitations/H27-6082-NA Architectural drawing.pdf · 1 ed c 234 ba 1234 south tower mechanical renovations university

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

9' - 11"

8' - 5"

8' - 4"

8' - 11 1/2"8' - 11 1/2"

9' - 11"

OPEN TO ABOVE

OPEN TO ABOVE

OPEN TO ABOVE

EXPOSED STRUCTURE

EXPOSEDSTRUCTURE

EXPOSED STRUCTURE

EXPOSEDSTRUCTURE

EXPOSED STRUCTURE

8' - 2"

8' - 0" 8' - 5 3/4"

8' - 0"

OPEN TO ABOVE

NO ACCESSTO FIELD VERIFY

EXPOSED STRUCTURE

13' - 8"

13' - 8"

EXPOSED STRUCTURE

13' - 8"

13' - 8"

13' - 8"

13' - 8"

13' - 8"EXPOSEDSTRUCTURE

13' - 8"

OFFICE012A

CUST.012

STORAGE011

CUST.009

HALLH005

LAUNDRY007

TLT008

ELEC010

STAIRST01

CHASE004

TLT006

LAUNDRY007A

HALLH004

BEDROOM005

MECH003A

PANTRY003B

LIVING003

HALLH002

HALLH001

TRASH002

TRASH002A

VENDING001

HALLH003

ELEVEV01

ELEVEV02

11

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

CONSTRUCTION PHASING LINE.

PHASE B CONSTRUCTION AREA

AREA NOT TO BE DISTURBED BYCONSTRUCTION

PHASE A CONSTRUCTION AREA, LIMITEDSCOPE IN PHASE B, SEE ALL NOTES

DEMOLITION - TO BE NOTED ONDEMO PLANS ONLY

EXISTING TEXTURE CEILING(ASBESTOS)

INSTALL GRID AND 2'X2' ACT CEILING, SEE FINISHSCHEDULE. SEE ELECTRICAL FOR NEW LIGHTS. (EXISTINGAPC WALL ANGLE TO REMAIN, SEE DEMOLITION KEYNOTES.)

PAINT EXISTING METAL PERIMETER SOFFIT ENTIREPERIMETER OF BUILDING.

INSTALL NEW GWB CEILING TO MATCH EXISTING. NEWLIGHTS, SEE ELECTRICAL.

EXISTING GRILL TO BE REMOVED AND GWB BOARD TO BEPATCHED BY OWNERS. G.C. TO PAINT AT EXPOSED AREAS.

OPENING IN CONCRETE ROOF DECK TO BE CUT ANDCAPPED IN PHASE A. PROVIDE SHEET ROCK SOFFIT INPHASE A TO CONCEAL ROOF OPENING. EXISTING CHASEWALL TO REMAIN DURING PHASE A. SEE DETAIL 2/A2.3 FORPHASE A SOFFIT PLAN.

1

2

3

4

5

1. SEE PHASING LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BEDISTURBED DURING PHASE A TO PREVENT PHASE B HAZARDOUS MATERIALS FROMBEING DISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOTTO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALSOR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOW TO BE REMOVED ORALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITIONAND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGSPROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TOVERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTIONCONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OF PHOTOGRAPHSAND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR REQUIREDUTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL ITEMSTO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDING DATA ANDPOWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION SCOPE. REPAIR OR REPLACEMENT DAMAGED AREASNOT IN THIS SCOPE SHALL BE INCLUDED IN THE WORK, WITH NO ADDITIONAL COST TOTHE OWNER.9. ELECTRICAL CONTRACTOR IS TO VERIFY ALL CEILING MOUNTED ELECTRICALDEVICES ARE IN WORKING CONDITION AT COMMENCEMENT OFDEMOLITION/CONSTRUCTION. SEE ELECTRICAL DRAWINGS AND SPECS FOR ALLSCOPE RELATED TO CEILING MOUNTED DEVICES PRIOR TO COMMENCEMENT OFDEMOLITION/CONSTRUCTION.10. SEE ELECTRICAL FOR FULL SCOPE AND COORDINATION OF ALL LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURINGTHE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BE PROTECTED,CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WERE FOUND AT THEEND OF EACH JOB PHASE. SEE SPECIFICATIONS.

INSTALL NEW SOFFIT. SEE MECHANICAL AND DETAIL 6/A3.2 FOR FULLCOORDINATION AND EXTENT OF SCOPE.

REINSTALL EXISTING LIGHT FIXTURE. SEE ELECTRICAL FOR FULLSCOPE AND COORDINATION OF LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.

SEE ELECTRICAL DRAWINGS FOR FULL SCOPE AND COORDINATIONOF ALL LIGTHING DEMOLLITION/CONSTRUCTION FOR BASE BID ANDALTERNATE NO. 1.

NEW FAN COIL UNIT. SEE MECHANICAL.

EXISTING LIGHT TO REMAIN. G.C. TO VERIFY EXISTING LOCATIONSARE NOT IN CONFLICT WITH NEW MECHANICAL SYSTEMS PRIOR TOEND OF ASBESTOS ABATEMENT DEMOLITION, TYP. G.C. TORELOCATE AND COORDINATE NEW LOCATION WITH ARCHITECT INFIELD, IF IN CONFLICT WITH NEW MECHANICAL. SEE ELECTRICAL FORFULL SCOPE AND COORDINATION OF LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.

NEW METAL PIPE ENCLOSURE. FIELD VERIFY AND COORDINATEDIMENSIONS AND LAYOUT WITH MECHANICAL PIPING ANDELECTRICAL. SEE DETAIL 8/A3.2.

APPLY SPRAY TEXTURE FINISH TO MATCH EXISTING ADJACENTCEILING WHERE EXISTING METAL SOFFIT HAS BEEN DECREASED INSIZE AND UNDERSIDE OF DECK /CEILING HAS BEEN EXPOSED. SEESPEC.

INSTALL NEW STEEL SUPPORT ANGLE AND NEW METAL SOFFIT. SEEDETAIL 7/A3.2 FOR FULL COORDINATION AND EXTENT OF SCOPE.

SELECTIVE REMOVAL OF APC CEILING TILE ONLY INSTALLED INPHASE A TO ALLOW FOR REQUIRED MECHANICAL, ELECTRICAL ANDPLUMBING CONNECTIONS AND/OR REMOVAL OF PIPING. SEEMECHANICAL, ELECRICAL, AND PLUMBING. PROTECT EXISTINGCEILING TILE, GRID AND AND ADJACENT CEILING MATERIALS ANDREINSTALL CEILING TILE AFTER REMOVAL OF PHASE B PLUMBINGSCOPE IS COMPLETE.

A

B

C

D

E

F

G

H

J

1. SEE PHASING LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BEDISTURBED DURING PHASE A TO PREVENT PHASE B HAZARDOUS MATERIALS FROMBEING DISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOTTO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALSOR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOW TO BE REMOVED ORALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITIONAND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGSPROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TOVERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTIONCONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OF PHOTOGRAPHSAND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR REQUIREDUTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL ITEMSTO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDING DATA ANDPOWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION SCOPE. REPAIR OR REPLACEMENT DAMAGED AREASNOT IN THIS SCOPE SHALL BE INCLUDED IN THE WORK, WITH NO ADDITIONAL COST TOTHE OWNER.9. ELECTRICAL CONTRACTOR IS TO VERIFY ALL CEILING MOUNTED ELECTRICALDEVICES ARE IN WORKING CONDITION AT COMMENCEMENT OFDEMOLITION/CONSTRUCTION. SEE ELECTRICAL DRAWINGS AND SPECS FOR ALLSCOPE RELATED TO CEILING MOUNTED DEVICES PRIOR TO COMMENCEMENT OFDEMOLITION/CONSTRUCTION.10. SEE ELECTRICAL FOR FULL SCOPE AND COORDINATION OF LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURINGTHE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BE PROTECTED,CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WERE FOUND AT THEEND OF EACH JOB PHASE. SEE SPECIFICATIONS.

N

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

REFERENCED ON: 1/4" = 1'-0"A2.011 GROUND LEVEL REFLECTED CEILING PLAN

LEGEND

PHASE A - TYPICAL RCP KEYNOTESPHASE A - GENERAL RCP NOTES

PHASE B - TYPICAL RCP KEYNOTESPHASE B - GENERAL RCP NOTES

A2.01

GROU

ND LE

VEL R

EFLE

CTED

CEILI

NG P

LAN

RMB

SAL

Page 9: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth …purchasing.sc.edu/solicitations/H27-6082-NA Architectural drawing.pdf · 1 ed c 234 ba 1234 south tower mechanical renovations university

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

14'-5 1/2"EXPOSED

STRUCTURE

14' 5 1/2"EXPOSED

STRUCTURE

OPEN TO ABOVE

OPEN TO ABOVE

OPEN TO ABOVE

7'-1" CEILINGHEIGHT INELEVATOR CAB

11' - 0 3/4"

12' - 5 1/4"

11' - 11 1/4"

11' - 11 1/4"8' - 2"

8' - 8"

8' - 0"8' - 0"

EXP STRUCTURE

STUDY107

LOBBY101

VESTIBULEV101

HALLH101

VESTIBULEV102

LOBBY101

OFFICE102

RA BEDROOM103A

TLT103B

CLST103CRA LIVING

103RA KITCHEN

103D

MEN105

CHASE104A

ELEC106

CUST104

2 2 2 2 2

2

2

2

222

2

2

1

1 1

1

1

1

1

1

1

1

1

1

1

3

8' - 2"

11' - 11 1/4"

8' - 5 1/2"

12' - 0"

8' - 0"

11' - 11 1/4"

11' - 11 1/2"

8' - 2"8' - 5 1/2"

11' - 11"

11' - 11" 11' - 11"

7' - 11 1/2"

11' - 11 1/2"

11' - 11 1/4"

11' - 11 1/4"

J

J

J

J

J

3

CONSTRUCTION PHASING LINE.

PHASE B CONSTRUCTION AREA

AREA NOT TO BE DISTURBED BYCONSTRUCTION

PHASE A CONSTRUCTION AREA, LIMITEDSCOPE IN PHASE B, SEE ALL NOTES

DEMOLITION - TO BE NOTED ONDEMO PLANS ONLY

EXISTING TEXTURE CEILING(ASBESTOS)

1. SEE PHASING LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BEDISTURBED DURING PHASE A TO PREVENT PHASE B HAZARDOUS MATERIALS FROMBEING DISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOTTO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALSOR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOW TO BE REMOVED ORALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITIONAND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGSPROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TOVERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTIONCONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OF PHOTOGRAPHSAND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR REQUIREDUTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL ITEMSTO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDING DATA ANDPOWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION SCOPE. REPAIR OR REPLACEMENT DAMAGED AREASNOT IN THIS SCOPE SHALL BE INCLUDED IN THE WORK, WITH NO ADDITIONAL COST TOTHE OWNER.9. ELECTRICAL CONTRACTOR IS TO VERIFY ALL CEILING MOUNTED ELECTRICALDEVICES ARE IN WORKING CONDITION AT COMMENCEMENT OFDEMOLITION/CONSTRUCTION. SEE ELECTRICAL DRAWINGS AND SPECS FOR ALLSCOPE RELATED TO CEILING MOUNTED DEVICES PRIOR TO COMMENCEMENT OFDEMOLITION/CONSTRUCTION.10. SEE ELECTRICAL FOR FULL SCOPE AND COORDINATION OF ALL LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURINGTHE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BE PROTECTED,CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WERE FOUND AT THEEND OF EACH JOB PHASE. SEE SPECIFICATIONS.

1. SEE PHASING LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BEDISTURBED DURING PHASE A TO PREVENT PHASE B HAZARDOUS MATERIALS FROMBEING DISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOTTO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALSOR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOW TO BE REMOVED ORALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITIONAND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGSPROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TOVERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTIONCONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OF PHOTOGRAPHSAND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR REQUIREDUTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL ITEMSTO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDING DATA ANDPOWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION SCOPE. REPAIR OR REPLACEMENT DAMAGED AREASNOT IN THIS SCOPE SHALL BE INCLUDED IN THE WORK, WITH NO ADDITIONAL COST TOTHE OWNER.9. ELECTRICAL CONTRACTOR IS TO VERIFY ALL CEILING MOUNTED ELECTRICALDEVICES ARE IN WORKING CONDITION AT COMMENCEMENT OFDEMOLITION/CONSTRUCTION. SEE ELECTRICAL DRAWINGS AND SPECS FOR ALLSCOPE RELATED TO CEILING MOUNTED DEVICES PRIOR TO COMMENCEMENT OFDEMOLITION/CONSTRUCTION.10. SEE ELECTRICAL FOR FULL SCOPE AND COORDINATION OF LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURINGTHE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BE PROTECTED,CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WERE FOUND AT THEEND OF EACH JOB PHASE. SEE SPECIFICATIONS.

INSTALL NEW SOFFIT. SEE MECHANICAL AND DETAIL 6/A3.2 FOR FULLCOORDINATION AND EXTENT OF SCOPE.

REINSTALL EXISTING LIGHT FIXTURE. SEE ELECTRICAL FOR FULLSCOPE AND COORDINATION OF LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.

SEE ELECTRICAL DRAWINGS FOR FULL SCOPE AND COORDINATIONOF ALL LIGTHING DEMOLLITION/CONSTRUCTION FOR BASE BID ANDALTERNATE NO. 1.

NEW FAN COIL UNIT. SEE MECHANICAL.

EXISTING LIGHT TO REMAIN. G.C. TO VERIFY EXISTING LOCATIONSARE NOT IN CONFLICT WITH NEW MECHANICAL SYSTEMS PRIOR TOEND OF ASBESTOS ABATEMENT DEMOLITION, TYP. G.C. TORELOCATE AND COORDINATE NEW LOCATION WITH ARCHITECT INFIELD, IF IN CONFLICT WITH NEW MECHANICAL. SEE ELECTRICAL FORFULL SCOPE AND COORDINATION OF LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.

NEW METAL PIPE ENCLOSURE. FIELD VERIFY AND COORDINATEDIMENSIONS AND LAYOUT WITH MECHANICAL PIPING ANDELECTRICAL. SEE DETAIL 8/A3.2.

APPLY SPRAY TEXTURE FINISH TO MATCH EXISTING ADJACENTCEILING WHERE EXISTING METAL SOFFIT HAS BEEN DECREASED INSIZE AND UNDERSIDE OF DECK /CEILING HAS BEEN EXPOSED. SEESPEC.

INSTALL NEW STEEL SUPPORT ANGLE AND NEW METAL SOFFIT. SEEDETAIL 7/A3.2 FOR FULL COORDINATION AND EXTENT OF SCOPE.

SELECTIVE REMOVAL OF APC CEILING TILE ONLY INSTALLED INPHASE A TO ALLOW FOR REQUIRED MECHANICAL, ELECTRICAL ANDPLUMBING CONNECTIONS AND/OR REMOVAL OF PIPING. SEEMECHANICAL, ELECRICAL, AND PLUMBING. PROTECT EXISTINGCEILING TILE, GRID AND AND ADJACENT CEILING MATERIALS ANDREINSTALL CEILING TILE AFTER REMOVAL OF PHASE B PLUMBINGSCOPE IS COMPLETE.

A

B

C

D

E

F

G

H

J

INSTALL GRID AND 2'X2' ACT CEILING, SEE FINISHSCHEDULE. SEE ELECTRICAL FOR NEW LIGHTS. (EXISTINGAPC WALL ANGLE TO REMAIN, SEE DEMOLITION KEYNOTES.)

PAINT EXISTING METAL PERIMETER SOFFIT ENTIREPERIMETER OF BUILDING.

INSTALL NEW GWB CEILING TO MATCH EXISTING. NEWLIGHTS, SEE ELECTRICAL.

EXISTING GRILL TO BE REMOVED AND GWB BOARD TO BEPATCHED BY OWNERS. G.C. TO PAINT AT EXPOSED AREAS.

OPENING IN CONCRETE ROOF DECK TO BE CUT ANDCAPPED IN PHASE A. PROVIDE SHEET ROCK SOFFIT INPHASE A TO CONCEAL ROOF OPENING. EXISTING CHASEWALL TO REMAIN DURING PHASE A. SEE DETAIL 2/A2.3 FORPHASE A SOFFIT PLAN.

1

2

3

4

5

N

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

REFERENCED ON: 1/4" = 1'-0"A2.11 FIRST FLOOR REFLECTED CEILING PLAN

LEGEND

PHASE A - GENERAL RCP NOTES

PHASE B - GENERAL RCP NOTES PHASE B - TYPICAL RCP KEYNOTES

PHASE A - TYPICAL RCP KEYNOTES

A2.1

FIRS

T FL

OOR

REFL

ECTE

D CE

ILING

PLA

N

RMB

SAL

Page 10: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth …purchasing.sc.edu/solicitations/H27-6082-NA Architectural drawing.pdf · 1 ed c 234 ba 1234 south tower mechanical renovations university

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

8' - 6"

8' - 6" 8' - 6" 8' - 6" 8' - 6"

8' - 6"

8' - 6"8' - 6"8' - 6"8' - 6"8' - 6"

8' - 6"

8' - 6"

7' - 2 5/8"

7' - 2 5/8"

7' - 2 5/8"

7' - 4"

8'-6"EXPOSED

STRUCTURE

8'-6"EXPOSED

STRUCTURE

OPEN TO ABOVE

OPEN TO ABOVE

OPEN TO ABOVE

SLOPED SLOPED

SLOPED SLOPED

EXPOSEDSTRUCTURE

EXPOSEDSTRUCTURE

1

1

1

7' - 2 5/8"7' - 2 5/8"

7' - 2

5/8"

7' - 2 5/8" 7' - 2 5/8" 7' - 2 5/8" 7' - 2 5/8" 7' - 2 5/8"

7' - 2

5/8"

7' - 2 5/8"

6

A3.2

AA

H

H

H

H

A A A A A

H

H

H

AAABB B BB

BB B BB

CC C CC

CC C CC

EE E E E

EEEEE

E

E

RESIDENTFL#08 RESIDENT

FL#09RESIDENT

FL#10RESIDENT

FL#11RESIDENT

FL#12

COMMUNITYFL#13

CUSTFL#14

WOMENFL#15

ELECFL#16

RESIDENTFL#00

RESIDENTFL#01

RESIDENTFL#02

RESIDENTFL#03

RESIDENTFL#04

RESIDENTFL#05

RESIDENTFL#06

RESIDENTFL#07

HALLHFL#03

HALLHFL#01

HALLHLF#02

CHASEFL#17

F.V.

2' - 0

1/4"

1' - 4"

F.V.

1' - 9

3/4"

ALIGN

7' - 2 5/8" 7' - 2 5/8"

ALIGN ALIGN ALIGN

ALIGN ALIGN ALIGN ALIGN ALIGN

ALIGN

F.V.12' - 9 1/2"

F.V.12' - 7 1/4"

F.V.12' - 7 1/8"

F.V.12' - 7 1/8"

F.V.12' - 9 5/8"

F.V.

16' -

3 3/4"

F.V.

17' -

8 3/8"

F.V.

12' -

3 7/8"

F.V.

16' -

1 3/4"

F.V.12' - 9 1/2"

F.V.12' - 7 1/4"

F.V.12' - 7 1/8"

F.V.12' - 7 1/8"

F.V.12' - 9 5/8"

F.V.

16' -

1 3/4"

F.V.

17' -

9 7/8"

F.V.

16' -

3 3/4"

7' - 0"

MIN.8"

MIN.4"

MIN.4"

MIN.8"

MIN.4"

MIN.8"

8' - 1

"

8' - 1

"

8' - 1

"

8' - 1

"

8' - 1"

8' - 1"

8' - 1"

8' - 1"

8' - 1

"

8' - 1

"

8' - 1

"

8' - 1"

8' - 1"

7' - 6"7' - 6"

7' - 6"7' - 6"7' - 6"7' - 6"7' - 6"

7' - 6"

7' - 6"

7' - 6"

7' - 6" 7' - 6" 7' - 6"7' - 6"

7' - 6"

DDDDD

D

D

D

D D D D

D

FFFFF

F

F

F

F F F

F

F

8

A3.2

G

8' - 1"

1' - 4

"4'

- 5"

7

A3.2

5' - 0"

8' - 2 7/8"

A3.11

J

J

J

C

C

C

C

INSTALL GRID AND 2'X2' ACT CEILING, SEE FINISHSCHEDULE. SEE ELECTRICAL FOR NEW LIGHTS. (EXISTINGAPC WALL ANGLE TO REMAIN, SEE DEMOLITION KEYNOTES.)

PAINT EXISTING METAL PERIMETER SOFFIT ENTIREPERIMETER OF BUILDING.

INSTALL NEW GWB CEILING TO MATCH EXISTING. NEWLIGHTS, SEE ELECTRICAL.

EXISTING GRILL TO BE REMOVED AND GWB BOARD TO BEPATCHED BY OWNERS. G.C. TO PAINT AT EXPOSED AREAS.

OPENING IN CONCRETE ROOF DECK TO BE CUT ANDCAPPED IN PHASE A. PROVIDE SHEET ROCK SOFFIT INPHASE A TO CONCEAL ROOF OPENING. EXISTING CHASEWALL TO REMAIN DURING PHASE A. SEE DETAIL 2/A2.3 FORPHASE A SOFFIT PLAN.

1

2

3

4

5

CONSTRUCTION PHASING LINE.

PHASE B CONSTRUCTION AREA

AREA NOT TO BE DISTURBED BYCONSTRUCTION

PHASE A CONSTRUCTION AREA, LIMITEDSCOPE IN PHASE B, SEE ALL NOTES

DEMOLITION - TO BE NOTED ONDEMO PLANS ONLY

EXISTING TEXTURE CEILING(ASBESTOS)

INSTALL NEW SOFFIT. SEE MECHANICAL AND DETAIL 6/A3.2 FOR FULLCOORDINATION AND EXTENT OF SCOPE.

REINSTALL EXISTING LIGHT FIXTURE. SEE ELECTRICAL FOR FULLSCOPE AND COORDINATION OF LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.

SEE ELECTRICAL DRAWINGS FOR FULL SCOPE AND COORDINATIONOF ALL LIGTHING DEMOLLITION/CONSTRUCTION FOR BASE BID ANDALTERNATE NO. 1.

NEW FAN COIL UNIT. SEE MECHANICAL.

EXISTING LIGHT TO REMAIN. G.C. TO VERIFY EXISTING LOCATIONSARE NOT IN CONFLICT WITH NEW MECHANICAL SYSTEMS PRIOR TOEND OF ASBESTOS ABATEMENT DEMOLITION, TYP. G.C. TORELOCATE AND COORDINATE NEW LOCATION WITH ARCHITECT INFIELD, IF IN CONFLICT WITH NEW MECHANICAL. SEE ELECTRICAL FORFULL SCOPE AND COORDINATION OF LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.

NEW METAL PIPE ENCLOSURE. FIELD VERIFY AND COORDINATEDIMENSIONS AND LAYOUT WITH MECHANICAL PIPING ANDELECTRICAL. SEE DETAIL 8/A3.2.

APPLY SPRAY TEXTURE FINISH TO MATCH EXISTING ADJACENTCEILING WHERE EXISTING METAL SOFFIT HAS BEEN DECREASED INSIZE AND UNDERSIDE OF DECK /CEILING HAS BEEN EXPOSED. SEESPEC.

INSTALL NEW STEEL SUPPORT ANGLE AND NEW METAL SOFFIT. SEEDETAIL 7/A3.2 FOR FULL COORDINATION AND EXTENT OF SCOPE.

SELECTIVE REMOVAL OF APC CEILING TILE ONLY INSTALLED INPHASE A TO ALLOW FOR REQUIRED MECHANICAL, ELECTRICAL ANDPLUMBING CONNECTIONS AND/OR REMOVAL OF PIPING. SEEMECHANICAL, ELECRICAL, AND PLUMBING. PROTECT EXISTINGCEILING TILE, GRID AND AND ADJACENT CEILING MATERIALS ANDREINSTALL CEILING TILE AFTER REMOVAL OF PHASE B PLUMBINGSCOPE IS COMPLETE.

A

B

C

D

E

F

G

H

J

1. SEE PHASING LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BEDISTURBED DURING PHASE A TO PREVENT PHASE B HAZARDOUS MATERIALS FROMBEING DISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOTTO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALSOR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOW TO BE REMOVED ORALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITIONAND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGSPROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TOVERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTIONCONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OF PHOTOGRAPHSAND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR REQUIREDUTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL ITEMSTO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDING DATA ANDPOWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION SCOPE. REPAIR OR REPLACEMENT DAMAGED AREASNOT IN THIS SCOPE SHALL BE INCLUDED IN THE WORK, WITH NO ADDITIONAL COST TOTHE OWNER.9. ELECTRICAL CONTRACTOR IS TO VERIFY ALL CEILING MOUNTED ELECTRICALDEVICES ARE IN WORKING CONDITION AT COMMENCEMENT OFDEMOLITION/CONSTRUCTION. SEE ELECTRICAL DRAWINGS AND SPECS FOR ALLSCOPE RELATED TO CEILING MOUNTED DEVICES PRIOR TO COMMENCEMENT OFDEMOLITION/CONSTRUCTION.10. SEE ELECTRICAL FOR FULL SCOPE AND COORDINATION OF LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURINGTHE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BE PROTECTED,CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WERE FOUND AT THEEND OF EACH JOB PHASE. SEE SPECIFICATIONS.

1. SEE PHASING LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BEDISTURBED DURING PHASE A TO PREVENT PHASE B HAZARDOUS MATERIALS FROMBEING DISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOTTO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALSOR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOW TO BE REMOVED ORALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITIONAND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGSPROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TOVERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTIONCONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OF PHOTOGRAPHSAND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR REQUIREDUTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL ITEMSTO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDING DATA ANDPOWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION SCOPE. REPAIR OR REPLACEMENT DAMAGED AREASNOT IN THIS SCOPE SHALL BE INCLUDED IN THE WORK, WITH NO ADDITIONAL COST TOTHE OWNER.9. ELECTRICAL CONTRACTOR IS TO VERIFY ALL CEILING MOUNTED ELECTRICALDEVICES ARE IN WORKING CONDITION AT COMMENCEMENT OFDEMOLITION/CONSTRUCTION. SEE ELECTRICAL DRAWINGS AND SPECS FOR ALLSCOPE RELATED TO CEILING MOUNTED DEVICES PRIOR TO COMMENCEMENT OFDEMOLITION/CONSTRUCTION.10. SEE ELECTRICAL FOR FULL SCOPE AND COORDINATION OF ALL LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURINGTHE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BE PROTECTED,CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WERE FOUND AT THEEND OF EACH JOB PHASE. SEE SPECIFICATIONS.

N

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

REFERENCED ON: 1/4" = 1'-0"A2.21 TYPICAL REFLECTED CEILING PLAN - LEVELS 2-17

PHASE A - TYPICAL RCP KEYNOTES

LEGEND

PHASE B - TYPICAL RCP KEYNOTESPHASE B - GENERAL RCP NOTES

PHASE A - GENERAL RCP NOTES

A2.2

TYPI

CAL R

EFLE

CTED

CEILI

NG P

LAN,

LEVE

LS 2-

17

RMB

SAL

Page 11: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth …purchasing.sc.edu/solicitations/H27-6082-NA Architectural drawing.pdf · 1 ed c 234 ba 1234 south tower mechanical renovations university

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

8'-7"EXPOSED

STRUCTURE

8'-7"EXPOSED

STRUCTURE

OPEN TO ABOVE

OPEN TO ABOVE

OPEN TO ABOVE

7'-1" CEILINGHEIGHT INELEVATOR CAB

8' - 6"8' - 6"8' - 6"8' - 6"8' - 6"

8' - 6"

8' - 6"

8' - 6" 8' - 6" 8' - 6" 8' - 6" 8' - 6"

8' - 6"

7' - 2 5/8"

EXPOSEDSTRUCTURE

EXPOSEDSTRUCTURE

SLOPED

SLOPED

7' - 3"

7' - 2 1/4"

RESIDENT1808

1

1

1

HALLH1802

HALLH1801

HALLH1803

RESIDENT1809

RESIDENT1810

RESIDENT1811

RESIDENT1812

COMMUNITY1813

RESIDENT1801

RESIDENT1802

RESIDENT1803

RESIDENT1804

RESIDENT1805

RESIDENT1806

RESIDENT1807

AA

H

H

H

H

A A A A A

H

H

H

AAABB B BB

BB B BB

CC C CC

CC C CC

EE E E E

EEEEE

E

E

WOMEN1815

CUST1814

ELEC1816

CHASE1817

RESIDENT1800

ALIGN ALIGN ALIGN ALIGN

ALIGN ALIGN ALIGN ALIGN ALIGN

ALIGN

MIN.4"

MIN.8"

MIN.8"

MIN.4"

1' - 4" 1' - 4"

MIN.4"

MIN.8"

F.V.

2' - 0

1/4"

F.V.

1' - 9

3/4"

F.V.12' - 9 5/8"

F.V.12' - 7 1/4"

F.V.12' - 7 1/8"

F.V.12' - 7 1/8"

F.V.12' - 9 5/8"

F.V.

16' -

3 3/4"

F.V.

17' -

8 3/8"

F.V.

12' -

5 7/8"

F.V.

16' -

1 3/4"

7' - 3"

7' - 3"

F.V.12' - 9 5/8"

F.V.12' - 7 1/4"

F.V.12' - 7 1/8"

F.V.12' - 7 1/8"

F.V.12' - 9 5/8"

F.V.

16' -

1 3/4"

F.V.

17' -

9 7/8"

F.V.

16' -

3 3/4"

D D D

F F F

DDDDD

D

D

D D

D

FFFFF

F

F

FF

F

G

8' - 5"

7' - 6"7' - 6"

7' - 6"7' - 6"7' - 6"

7' - 6"

7' - 6"

7' - 6" 7' - 6" 7' - 6" 7' - 6" 7' - 6"

7' - 6"

1' - 4

"

8' - 1

"

8' - 1

"

8' - 1

"

8' - 1

"

8' - 1"

8' - 1"

8' - 1"

8' - 1"

8' - 1

"

8' - 1

"

8' - 1

"

8' - 1"

8' - 1"

7' - 2 5/8"

7' - 2

5/8"

7' - 2

5/8"

7' - 2

5/8"

7' - 2 5/8" 7' - 2 5/8" 7' - 2 5/8" 7' - 2 5/8"

7' - 2

5/8"

7' - 2 5/8"7' - 2 5/8"7' - 2 5/8"7' - 2 5/8"

7

A3.2

TYP.

8

A3.2

TYP.

6

A3.2

A3.11

J

J

J

C

C

8'-1"

5

A2.32

PHASE ASOFFIT

C

C

CONSTRUCTION PHASING LINE.

PHASE B CONSTRUCTION AREA

AREA NOT TO BE DISTURBED BYCONSTRUCTION

PHASE A CONSTRUCTION AREA, LIMITEDSCOPE IN PHASE B, SEE ALL NOTES

DEMOLITION - TO BE NOTED ONDEMO PLANS ONLY

EXISTING TEXTURE CEILING(ASBESTOS)

1. SEE PHASING LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BEDISTURBED DURING PHASE A TO PREVENT PHASE B HAZARDOUS MATERIALS FROMBEING DISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOTTO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALSOR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOW TO BE REMOVED ORALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITIONAND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGSPROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TOVERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTIONCONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OF PHOTOGRAPHSAND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR REQUIREDUTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL ITEMSTO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDING DATA ANDPOWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION SCOPE. REPAIR OR REPLACEMENT DAMAGED AREASNOT IN THIS SCOPE SHALL BE INCLUDED IN THE WORK, WITH NO ADDITIONAL COST TOTHE OWNER.9. ELECTRICAL CONTRACTOR IS TO VERIFY ALL CEILING MOUNTED ELECTRICALDEVICES ARE IN WORKING CONDITION AT COMMENCEMENT OFDEMOLITION/CONSTRUCTION. SEE ELECTRICAL DRAWINGS AND SPECS FOR ALLSCOPE RELATED TO CEILING MOUNTED DEVICES PRIOR TO COMMENCEMENT OFDEMOLITION/CONSTRUCTION.10. SEE ELECTRICAL FOR FULL SCOPE AND COORDINATION OF LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURINGTHE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BE PROTECTED,CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WERE FOUND AT THEEND OF EACH JOB PHASE. SEE SPECIFICATIONS.

1. SEE PHASING LEGEND. PHASE B AREA AND ADJACENT WALLS ARE NOT TO BEDISTURBED DURING PHASE A TO PREVENT PHASE B HAZARDOUS MATERIALS FROMBEING DISTURBED. THE BOUNDARY WALL SEPARATING PHASE A AND PHASE B IS NOTTO BE DISTURBED DURING PHASE A.2. CONTACT OWNER UPON DISCOVERY OF ANY ASBESTOS-CONTAINING MATERIALSOR OTHER SUSPECTED HAZARDOUS MATERIALS NOT SHOW TO BE REMOVED ORALTERED WITHIN THE PROJECT SCOPE.3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITIONAND NEW WORK. INFORMATION SHOWN IS BASED ON THE EXISTING DRAWINGSPROVIDED BY THE OWNER. GENERAL CONTRACTOR AND SUB-CONTRACTORS ARE TOVERIFY EXISTING CONDITIONS PRIOR TO BID AND PRIOR TO CONSTRUCTION.4. CONTRACTOR SHALL PHOTOGRAPH AND VIDEO ALL SPACES PRIOR TOCOMMENCEMENT OF RENOVATION/NEW WORK TO DOCUMENT PRE-CONSTRUCTIONCONDITIONS. PROVIDE ARCHITECT WITH ELECTRONIC COPIES OF PHOTOGRAPHSAND VIDEO.5. CORE DRILLING IN EXISTING SLAB FOR NEW UTILITY SERVICE IS NOT SHOWN ONTHIS PLAN. SEE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR REQUIREDUTILITY ROUTING.6. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL ITEMSTO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION, INCLUDING DATA ANDPOWER CONDUITS, LIGHTS, PIPES AND DUCTWORK.7. ITEMS TO BE SALVAGED AND REMOVED BY OWNER PRIOR TO DEMOLITION AREIDENTIFIED WITHIN THE SPECIFICATIONS.8. PROTECT EXISTING BUILDING SCOPE NOT INCLUDED INDEMOLITION/CONSTRUCTION SCOPE. REPAIR OR REPLACEMENT DAMAGED AREASNOT IN THIS SCOPE SHALL BE INCLUDED IN THE WORK, WITH NO ADDITIONAL COST TOTHE OWNER.9. ELECTRICAL CONTRACTOR IS TO VERIFY ALL CEILING MOUNTED ELECTRICALDEVICES ARE IN WORKING CONDITION AT COMMENCEMENT OFDEMOLITION/CONSTRUCTION. SEE ELECTRICAL DRAWINGS AND SPECS FOR ALLSCOPE RELATED TO CEILING MOUNTED DEVICES PRIOR TO COMMENCEMENT OFDEMOLITION/CONSTRUCTION.10. SEE ELECTRICAL FOR FULL SCOPE AND COORDINATION OF ALL LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.11. ELEVATORS ARE NOT PART OF THE PROJECT SCOPE BUT MAY BE USED DURINGTHE DEMOLITION AND CONSTRUCTION PERIOD. ELEVATORS SHOULD BE PROTECTED,CLEANED AND RETURNED TO THE CONDITION IN WHICH THEY WERE FOUND AT THEEND OF EACH JOB PHASE. SEE SPECIFICATIONS.

INSTALL GRID AND 2'X2' ACT CEILING, SEE FINISHSCHEDULE. SEE ELECTRICAL FOR NEW LIGHTS. (EXISTINGAPC WALL ANGLE TO REMAIN, SEE DEMOLITION KEYNOTES.)

PAINT EXISTING METAL PERIMETER SOFFIT ENTIREPERIMETER OF BUILDING.

INSTALL NEW GWB CEILING TO MATCH EXISTING. NEWLIGHTS, SEE ELECTRICAL.

EXISTING GRILL TO BE REMOVED AND GWB BOARD TO BEPATCHED BY OWNERS. G.C. TO PAINT AT EXPOSED AREAS.

OPENING IN CONCRETE ROOF DECK TO BE CUT ANDCAPPED IN PHASE A. PROVIDE SHEET ROCK SOFFIT INPHASE A TO CONCEAL ROOF OPENING. EXISTING CHASEWALL TO REMAIN DURING PHASE A. SEE DETAIL 2/A2.3 FORPHASE A SOFFIT PLAN.

1

2

3

4

5

INSTALL NEW SOFFIT. SEE MECHANICAL AND DETAIL 6/A3.2 FOR FULLCOORDINATION AND EXTENT OF SCOPE.

REINSTALL EXISTING LIGHT FIXTURE. SEE ELECTRICAL FOR FULLSCOPE AND COORDINATION OF LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.

SEE ELECTRICAL DRAWINGS FOR FULL SCOPE AND COORDINATIONOF ALL LIGTHING DEMOLLITION/CONSTRUCTION FOR BASE BID ANDALTERNATE NO. 1.

NEW FAN COIL UNIT. SEE MECHANICAL.

EXISTING LIGHT TO REMAIN. G.C. TO VERIFY EXISTING LOCATIONSARE NOT IN CONFLICT WITH NEW MECHANICAL SYSTEMS PRIOR TOEND OF ASBESTOS ABATEMENT DEMOLITION, TYP. G.C. TORELOCATE AND COORDINATE NEW LOCATION WITH ARCHITECT INFIELD, IF IN CONFLICT WITH NEW MECHANICAL. SEE ELECTRICAL FORFULL SCOPE AND COORDINATION OF LIGHTINGDEMOLITION/CONSTRUCTION FOR BASE BID AND ALTERNATE NO. 1.

NEW METAL PIPE ENCLOSURE. FIELD VERIFY AND COORDINATEDIMENSIONS AND LAYOUT WITH MECHANICAL PIPING ANDELECTRICAL. SEE DETAIL 8/A3.2.

APPLY SPRAY TEXTURE FINISH TO MATCH EXISTING ADJACENTCEILING WHERE EXISTING METAL SOFFIT HAS BEEN DECREASED INSIZE AND UNDERSIDE OF DECK /CEILING HAS BEEN EXPOSED. SEESPEC.

INSTALL NEW STEEL SUPPORT ANGLE AND NEW METAL SOFFIT. SEEDETAIL 7/A3.2 FOR FULL COORDINATION AND EXTENT OF SCOPE.

SELECTIVE REMOVAL OF APC CEILING TILE ONLY INSTALLED INPHASE A TO ALLOW FOR REQUIRED MECHANICAL, ELECTRICAL ANDPLUMBING CONNECTIONS AND/OR REMOVAL OF PIPING. SEEMECHANICAL, ELECRICAL, AND PLUMBING. PROTECT EXISTINGCEILING TILE, GRID AND AND ADJACENT CEILING MATERIALS ANDREINSTALL CEILING TILE AFTER REMOVAL OF PHASE B PLUMBINGSCOPE IS COMPLETE.

A

B

C

D

E

F

G

H

J

N

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

8'-0"

EXISTING TO REMAIN

EXISTING SPRAY ONTEXTURED CEILINGOUTSIDE OF SOFFIT AREATO REMAIN DURING PHASEA. SEE NOTES FOR PHASE BSCOPE.

SHEET ROCK SOFFIT ON METALSTUD FRAMING TO BE INSTALLEDDURING PHASE A ANDDEMOLISHED TO ALLOW FORNEW CHASE CONSTRUCTIONDURING PHASE B.

EXISTING CHASE WALL TOREMAIN DURING PHASE A,DEMOLISHED DURING PHASE B.

REMOVE/ABATE PARITAL EXISTINGASBESTOS CONTAINING SPRAY TEXTURECEILING TO ALLOW FOR PHASE A SHEETROCK SOFFIT. FULL REMOVAL OF SPRAYTEXTURED CEILING TO OCCUR DURINGPHASE B.

V.I.F.3' - 0"

ALIGN

3A2.3

2"2' - 9"1"

EXISTING CHASE WALL TO REMAINTHRU PHASE A, DEMOLISH DURINGPHASE B

8'-0" (HEIGHT)SHEETROCKSOFFIT ON 3 5/8" METALFRAMING INSTALLEDDURING PHASE A TOCONCEAL ROOM OPENING.DEMOLISH DURING PHASE B.

SEE MECHANICAL FOR ROOFCURB DETAILS

NEW OPENING IN CONCRETEROOF DECK, COORDINATEWITH STRUCTURAL ANDMECHANICAL

EXISTIN EXTERIOR CONCRETEWALL

REFERENCED ON: 1/4" = 1'-0"A2.31 18TH FLOOR REFLECTED CEILING PLAN

LEGEND

PHASE B - GENERAL RCP NOTES

PHASE A - GENERAL RCP NOTES PHASE A - TYPICAL RCP KEYNOTES

A2.3

18TH

FLO

OR R

EFLE

CTED

CEILI

NG P

LAN

RMB

SAL

PHASE B - TYPICAL RCP KEYNOTES

REFERENCED ON: 1/2" = 1'-0"A2.3 A2.32 ROOM 1813 PHASE A SOFFIT PLAN

REFERENCED ON: 1/2" = 1'-0"A2.3 A2.33 ROOM 1813 PHASE A SOFFIT SECTION

Page 12: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth …purchasing.sc.edu/solicitations/H27-6082-NA Architectural drawing.pdf · 1 ed c 234 ba 1234 south tower mechanical renovations university

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

REMOVE EXISTING CHEST OF DRAWERS

EXISTING WARDROBE. PROTECTTHROUGHOUT CONSTRUCTION

EXISTING FLOORING TO BEREMOVEDSEE DEMOLITION, FLOOR, ANDFINISH PLAN

EXISTING WALL PANEL TO BE PROTECTED ANDNOT DISTURBED THROUGHOUT CONSTRUCTION.WALL PANEL FACE CONTAINS ASBESTOS ANDMAY NOT BE DISTURBED

REMOVE ALL EXISTINGUTILITES THIS AREA,SEE MECHANICAL,ELECTRICAL AND

PLUMBING.

REMOVE EXISTING WOOD PARTITIONS

FILL HOLE(S) IN EXISTING FLOORSLAB THIS AREA. SEE STRUCTURAL

DRAWINGS FOR DETAILS.

EXISTING WARDROBE. PROTECTTHROUGHOUT CONSTRUCTION

NEW 3-5/8" METAL STUD WALL WITH5/8" GYPSUM WALL BOARD EACH SIDE.EXTEND WALL TO SOFFIT/CEILING ABOVE

5/8" GYPSUM WALL BOARD ON 1-5/8" METAL STUD FURRING. HOLD

OFF OF EXIST. WALL PANEL.

CAULK JOINT

NEW 1X3 WOOD TRIM PIECE. STAIN TOMATCH EXISTING WARDROBE.

EXISTING WALL PANEL TO BE PROTECTED ANDNOT DISTURBED THROUGHOUT CONSTRUCTION.WALL PANEL FACE CONTAINS ASBESTOS ANDMAY NOT BE DISTURBED

NEW WOOD TRIM AND 1/4" PLYWOOD PANEL.STAIN TO MATCH EXISTING WARDROBE.

DEMO EXISTING WALL

EXISTING SLAB OPENING

PROTECT EXISTING WALL

SECURE METAL DECKING TO BOTTOM SIDEOF SLAB AND FILL EXISTING HOLE IN SLABWITH CONCRETE. FINISH FLUSH WITHEXISTING SLAB LEVEL.

NEW 3-5/8" METAL STUD WALL, 5/8"GYPSUM WALL BOARD, ONE SIDE, SEEPARTITION TYPES.

CAULK JOINT

DO NOT DISTURB EXISTING ASBESTOSCONTAINING WALL

CAULK JOINT

OPENING

2 1/2" USG STEEL C-H STUDAT 24" O.C. MAX

USG STEEL J RUNNER

2 LAYERS 1/2" GYPSUMWALL BOARD 1" GYPSUM

LINER PANEL

PROTECT EXISTING ASBESTOS WALL

USG CORNER REINFORCEMENT

USG STEEL J RUNNER

USG STEEL J RUNNER

ALIGN GWB WITH EDGE OFCONCRETE COLUMN.CAULK JOINT

FACE

OF

EXIS

TING

WAL

LTO

C-H

STU

D

1" DIMENSIONS OF OPENING VARIES BY FLOOR 2"

EQ.

3' - 7

"EQ

.DI

MENS

IONS

OF

OPEN

ING

VARI

ES B

Y FL

OOR

CONS

ISTE

NT O

NEV

ERY

FLOO

R

13"17"21"23"27"29"31"33"

CAULK JOINT

FLOOR 3FLOORS 4, 5, 6, 7FLOORS 8, 9FLOORS 10, 11FLOORS 12, 13FLOORS 14, 15FLOORS 16, 17FLOORS 18, ROOF

INSIDE FACE OF SHAFT WALLTO EDGE OF OPENING

FLOO

R 3

FLOO

R 4

FLOO

R 5

FLOO

R 6

FLOO

RS 7-

18, R

OOF

23"

25"

31"

39"

45"

4 7/8"

3' - 1

0"5 1

/4"3'

- 10 1

/2"4 1

/2"4 1

/2"

FACE OF CONCRETE WALLTO EDGE OF OPENING

1" GYPSUMLINER PANEL

2 LAYERS 1/2" GYPSUMWALL BOARD

USG STEEL J RUNNER

TWO HOUR FIRE RATED CONSTRUCTION

2 1/2" USG STEEL C-H STUDAT 24" O.C. MAX

4' - 3

"

PIPE DRAIN

PREFINISHED .080 GAUGE ALUM.BREAK METAL SHROUD. SEE

SPECS

2-SIDEDGLAZING TAPE

EXISTING CONCRETECOLUMN

PROTECT EXISTINGASBESTOS CONTAINING

STUD WALL

6"

6"

CAULK JOINT

CAULK JOINT

1 LAYER 5/8" GYPSUM WALLBOARD EACH SIDE

CONCRETE SLAB AT ROOF ORFLOOR ABOVE

WALL FINISH, SEE FINISHSCHEDULE

STEEL RUNNER ATTACHED TOCONCRETE SLAB AT 12" O.C. MAX.@ TOP AND BOTTOM OF WALL

CONCRETE SLABFINISH FLOOR MATERIAL,SEE FINISH SCHEDULE

CEILING WHERE INDICATED ONREFLECTED CEILING PLANSWHERE OCCURS

BASE, SEE FINISH SCHEDULE

AT FIRE-RATED WALLSEXTENDING TO DECK, EXTENDGYPSUM BOARD TIGHT TODECK AND SEAL WITH FIRECAULKING. PACK ALL VOIDSWITH FIRE-SAFING MATERIAL

1-HOUR RATED WALL.BASIS FOR DESIGN:UL DESIGN U465

STEEL STUDS @ 16" O.C. MAX.(SEE SPECIFIC PARTITIONTYPE FOR SIZE)

ACOUSTICAL BATTINSULATION @ * CONDITION(SEE LEGEND FOR SIZE)

2 LAYERS 1/2" GYPSUM WALLBOARD

STEEL DECK OR CONCRETE SLABAT ROOF OR FLOOR ABOVE

WALL FINISH, SEE FINISHSCHEDULE

STEEL J RUNNER ATTACHED TOCONCRETE SLAB AT 12" O.C. MAX.@ TOP AND BOTTOM OF WALL

CONCRETE SLAB

FINISH FLOOR MATERIAL,SEE FINISH SCHEDULE

CEILING WHERE INDICATED ONREFLECTED CEILING PLANSWHERE OCCURS

BASE, SEE FINISH SCHEDULE

STEEL C-H STUDS @ 16" O.C.MAX. (SEE SPECIFIC PARTITIONTYPE FOR SIZE)

AT FIRE-RATED WALLSEXTENDING TO DECK, EXTENDGYPSUM BOARD TIGHT TODECK AND SEAL WITH FIRECAULKING. PACK ALL VOIDSWITH FIRE-SAFING MATERIAL

2-HOUR RATED SHAFT WALL.BASIS FOR DESIGN:UL DESIGN U415, SYSTEM B

LAYER 5/8" GYPSUM WALLBOARD

STEEL DECK OR CONCRETE SLABAT ROOF OR FLOOR ABOVE

WALL FINISH, SEE FINISHSCHEDULE

STEEL J RUNNER ATTACHED TOCONCRETE SLAB AT 12" O.C. MAX.@ TOP AND BOTTOM OF WALL

CONCRETE SLAB

FINISH FLOOR MATERIAL,SEE FINISH SCHEDULE

CEILING WHERE INDICATED ONREFLECTED CEILING PLANSWHERE OCCURS

BASE, SEE FINISH SCHEDULE

STEEL C-H STUDS @ 16" O.C.MAX. (SEE SPECIFIC PARTITIONTYPE FOR SIZE)

AT FIRE-RATED WALLSEXTENDING TO DECK, EXTENDGYPSUM BOARD TIGHT TODECK AND SEAL WITH FIRECAULKING. PACK ALL VOIDSWITH FIRE-SAFING MATERIAL

1-HOUR RATED SHAFT WALL.BASIS FOR DESIGN:UL DESIGN U415, SYSTEM A

M1M2M3M4M6M8

M2A*

MATERIAL FINISHCONSTRUCTION

SIZE

SEE CHART BELOW

SEE CHART BELOW

SEE PARTITIONSECTION

1-1/2" METAL STUD2-1/2" METAL STUD3-5/8" METAL STUD4" METAL STUD6" METAL STUD8" METAL STUD

INSULATIONDESIGNATION

S2 2-1/2" C-H STUD (SHAFT WALL)

1 LAYER 5/8" GYPSUM WALLBOARD

STEEL DECK OR CONCRETE SLABAT ROOF OR FLOOR ABOVE

WALL FINISH, SEE FINISHSCHEDULE

STEEL RUNNER ATTACHED TOCONCRETE SLAB AT 12" O.C. MAX.@ TOP AND BOTTOM OF WALL

CONCRETE SLAB

FINISH FLOOR MATERIAL,SEE FINISH SCHEDULE

CEILING WHERE INDICATED ONREFLECTED CEILING PLANSWHERE OCCURS

BASE, SEE FINISH SCHEDULE

STEEL STUDS @ 16" O.C. MAX.(SEE SPECIFIC PARTITION TYPEFOR SIZE)

ACOUSTICAL BATTINSULATION @ * CONDITION(SEE LEGEND FOR SIZE)

REFERENCED ON: 1 1/2" = 1'-0"A3.1 D1.25 CHASE 1 DETAIL - DEMO

REFERENCED ON: 1 1/2" = 1'-0"A3.1 A1.26 CHASE 1 DETAIL

REFERENCED ON: 1 1/2" = 1'-0"A3.1 D1.23 CHASE 2 DETAIL - DEMO

REFERENCED ON: 1 1/2" = 1'-0"A3.1 A1.24 CHASE 2 DETAIL

REFERENCED ON: 3" = 1'-0"A3.1 A1.21 SHAFT WALL DETAILS - UL DESIGN U415, SYSTEM B

REFERENCED ON: 1 1/2" = 1'-0"A3.1 A1.22 TYP PIPE DRAIN ENCLOSURE

A3.1

DETA

ILSRM

BSA

L

INTERIOR PARTITION 1 1/2" = 1'-0"M#A INTERIOR PARTITION

1 1/2" = 1'-0"S#CINTERIOR PARTITION 1 1/2" = 1'-0"S#B

PARTITION TYPE LEGEND

INTERIOR PARTITION 1 1/2" = 1'-0"M#D

Page 13: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth …purchasing.sc.edu/solicitations/H27-6082-NA Architectural drawing.pdf · 1 ed c 234 ba 1234 south tower mechanical renovations university

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

NEW 5/8" GYP BOARD ON 1-5/8" METAL STUD FURRING

CAULK JOINT

WOOD TRIM. ABOVE -STAINED TO MATCHEXISTING WOOD

CAULK JOINT

1/2 " RIGID INSULATION

EQEQ

EQEQ

REMOVE EXISTING FAN COIL UNIT ANDWOOD TRIM & BLOCKING BELOW

EXISTING RIGID INSULATION

EXISTING ALUM. LOUVER

NEW 5/8" GWB ON 1-5/8" METAL STUDFURRING, PTD. SEEFINISH SCHEDULE.

BASE, SEE FINISH SCHEDULE

3' - 3

3/4"

1X WOOD TRIM STAINEDTO MATCH EXISTINGWOOD

3"

1-5/8" STEEL RUNNER

1-5/8" STEEL RUNNER

1/2" RIGID INSULATION

REMOVE EXISTING FAN COIL UNIT

REMOVE EXISTING WOODTRIM AND BLOCKING

EXISTING RIGID INSULATION

EXISTING ALUM. LOUVER

THREADED ROD & UNISTRUT - SEE MECH DWGS

NEW HVAC DUCT - SEE MECH DWGS

FLUSH MOUNT LIGHT FIXTURE -SEE ELEC DWGS

NEW SPRINKLER SYSTEM -SEE FIRE PROTECTION DWGSELECTRICAL CONDUIT - SEE ELEC DWGS

EXISTING STEEL ANGLE. INSTALL NEWSTEEL ANGLE ON 18TH FLOOR.

EXISTINGCONCRETE

SPANDREL BEAM

NEW PREFINISHED .080 GAUGE ALUMINUM SOFFIT -ANCHOR TO EXISTING STEEL ANGLES. SEE SPECS

NEW SUPPLY GRILL -SEE MECH. DWGS

1' - 9" F.V.

10 3/

4" F

.V.

4 1/2"

1' - 3

3/8"

2 1/2"

SEE MECH SPECS FOR THROUGH WALLDUCT PENETRATION INFORMATION

*** PRIOR TO CUTTING PENTRATIONS IN EXISTING WALLS, COORDINATEALL UTILITY PENETRATION MINIMUM DIMENSIONS AND ONLY CUT MINIMUMEXTENT OF EXISTING WALL REQUIRED. SEE MECH AND ELEC DWGS ANDSPECS FOR ADDITIONAL INFORMATION ON PENETRATION DETAILS.

EXISTING STEELANGLE. INSTALLNEW STEEL ANGLEON 18TH FLOOR.

REMOVE EXISTING METALSOFFIT, SEE DEMOLITION PLANS

EXISTINGCONCRETE

SPANDREL BEAM

DO NOT DISTURB EXISTINGSPRAY TEXTURED CEILING

EXISTING STEEL ANGLESTO REMAIN

*** PRIOR TO CUTTING PENTRATIONS IN EXISTING WALLS, COORDINATEALL UTILITY PENETRATION MINIMUM DIMENSIONS AND ONLY CUT MINIMUMEXTENT OF EXISTING WALL REQUIRED. SEE MECH AND ELEC DWGS ANDSPECS FOR ADDITIONAL INFORMATION ON PENETRATION DETAILS.

REMOVE EXISTINGUTLITIES, SEEMECHANICAL,

ELECTRICAL ANDPLUMBING

WELD 4" PIECE OF ALUM. BREAK METALTOTHE INSIDE FACE OF SOFFIT PANEL TOALLOW FOR ADJOINING PANEL ATTACHMENT

TAMPER RESISTANTSCREWS, TYP.

TAMPER RESISTANT SCREWS, TYP.

2X2X1/8 STEEL ANGLE

UNISTRUT SECURED TO CONCRETE ABOVE

.080 GAUGE ALUM. SOFFIT -ANCHOR TO STEEL ANGLES

5"

1' - 5"

FAN COIL UNITBEYOND

ELECTRICALCONDUIT. SEEELECTRICAL.

SEE DEMOLITIONPLANS ANDCOORDINATE SELECTDEMOLITION OFSPRAY TEXTUREDCEILING FOR HANGINGSUPPORTS. ETC.

THREADED ROD & UNISTRUT - SEE MECH DWGS

NEW HVAC DUCT - SEE MECH DWGS

FLUSH MOUNT LIGHT FIXTURE -SEE ELEC DWGS

NEW SPRINKLER SYSTEM -SEE FIRE PROTECTION DWGSELECTRICAL CONDUIT - SEE ELEC DWGS

NEW STEEL ANGLE

EXISTINGCONCRETE

SPANDREL BEAM

NEW PREFINISHED .080 GAUGE ALUMINUM SOFFIT -ANCHOR TO EXISTING STEEL ANGLES. SEE SPECS

NEW SUPPLY GRILL -SEE MECH. DWGS

1' - 4"

10 3/

4" F

.V.

DRAIN TUBE FROM FAN COIL UNIT

4 1/2"

1' - 3

3/8"

2 1/2" 9"

REMOVE EXISTING STEEL ANGLE & APPLYSPRAY TEXTURE ON EXISTING SMOOTH CEILING.ROOMS FL#06 ONLY. SEE NOTE 'G' ON A2.2

PROTECT EXISTING CEILING TEXTURE

WHERE DUCT PENETRATES EXISTING WALLS,ONLY CUT SHEETROCK TO EXTENTS OF DUCTAND SEAL WITH CAULK ON BOTH SIDES

*** PRIOR TO CUTTING PENTRATIONS IN EXISTING WALLS, COORDINATEALL UTILITY PENETRATION MINIMUM DIMENSIONS AND ONLY CUT MINIMUMEXTENT OF EXISTING WALL REQUIRED. SEE MECH AND ELEC DWGS ANDSPECS FOR ADDITIONAL INFORMATION ON PENETRATION DETAILS.

NEW STEEL ANGLE

REMOVE ALL EXISTING ROOF MATERIALS.FLASHING, INSULATION, MEMBRANE, ETC.

CUT OPENING 8" WIDE IN EXISTINGCONCRETE PARAPET FROM BOTTOM OFLOUVER TO 5-1/2" ABOVE ROOF SLAB.TYP. ONLY AT OVERFLOW SCUPPERS. SEEROOF DEMO PLAN ON D1.4 FOR LOCATIONS.

5 1/2"

SLOPE TOP OF OPENING TOMATCH EXISTING SLOPE

5 1/2"

8"3"

TERMINATION BAR

METAL FLASHING

CAULK TOP OF TERMINATION BAR

CANT

TAPERED RIGID INSULATION

MULTI-PLY ROOFING MEMBRANE

EXISTING CONCRETE ROOF SLAB

VARI

ES

TYP. ROOF DETAIL AROUNDENTIRE PERIMETER OF BUILDING

5 1/2"

8"3"

TERMINATION BAR

METAL FLASHING

CAULK TOP OF TERMINATION BAR

CANT

MULTI-PLY ROOFING MEMBRANE

VARI

ES

TYP. ROOF DETAIL AROUNDENTIRE PERIMETER OF PENTHOUSE

TERMINATION BAR

METAL FLASHING

TAPERED RIGID INSULATION

MULTI-PLY ROOFING MEMBRANE

EXISTING CONCRETE ROOF SLAB

CANT

BREAK METAL THROUGH WALLOVERFLOW SCUPPER, SET IN MASTIC

DRIP EDGE

REMOVE/STORE/PROTECT/AND REINSTALLEXISTING PARAPET WALL LOVERS TO ALLOWACCESS TO EXTERIOR SIDE OF WALL FOROVERFLOW SCUPPER INSTALLATION.

WRAP ROOFING MEMBRANE UPPARAPET, BEYOND

CAULK TOP OF TERMINATION BAR

MULTI-PLY ROOFING MEMBRANE

METAL FLASHING

DRIP EDGE

NEW GUTTER

TERMINATION BAR

METAL FLASHING

REMOVE/STORE/PROTECT/AND REINSTALLEXISTING PARAPET WALL LOVERS TO ALLOWACCESS TO EXTERIOR SIDE OF WALL FOROVERFLOW SCUPPER INSTALLATION.

BREAK METALTHROUGH WALL OVERFLOW SCUPPERSET IN MASTIC. PROVIDE 4" MIN. OVERLAP ON SIDESAND 8" MIN. OVERLAP AT BOTTOM AS SHOWN.

CANT

TAPERED RIGID INSULATION

MULTI-PLY ROOFING MEMBRANE

EXISTING CONCRETE ROOF SLAB

8"CAULK TOP OF TERMINATION BAR

MIN.4"

MIN.4"

REFERENCED ON: 1 1/2" = 1'-0"A3.2 A1.24 FAN COIL CALLOUT

REFERENCED ON: 1 1/2" = 1'-0"A3.2 D1.23 FAN COIL CALLOUT - DEMO

REFERENCED ON: 1 1/2" = 1'-0"A3.2 A1.22 FAN COIL SECTION

REFERENCED ON: 1 1/2" = 1'-0"A3.2 D1.21 FAN COIL SECTION - DEMO

REFERENCED ON: 1 1/2" = 1'-0"A3.2 A2.26 TYPE "B" SOFFIT SECTION

REFERENCED ON: 1 1/2" = 1'-0"A3.2 D1.25 SOFFIT - DEMO

A3.2

DETA

ILSRM

BSA

L

REFERENCED ON:A3.29 TYP. SOFFIT PANEL JOINT DETAIL

REFERENCED ON: 1 1/2" = 1'-0"A3.2 A2.28 TYPICAL PIPE ENLCOSURE DETAIL

REFERENCED ON: 1 1/2" = 1'-0"A3.2 A2.27 TYPE "A" SOFFIT SECTION

REFERENCED ON: 1 1/2" = 1'-0"A3.2 D1.411 ROOF SECTION DETAIL - DEMO

REFERENCED ON: 1 1/2" = 1'-0"A3.2 A1.412 PARAPET SECTION DETAIL

REFERENCED ON: 1 1/2" = 1'-0"A3.2 A1.413 PENTHOUSE WALL SECTION

REFERENCED ON: 1 1/2" = 1'-0"A3.2 A1.414 TYP SCUPPER SECTION DETAIL

REFERENCED ON: 1 1/2" = 1'-0"A3.2 A1.410 PENTHOUSE ROOF SECTION

REFERENCED ON:A3.215 SHEET SCUPPER AXON

REMOVE ALLEXISTING UTILITIES

Page 14: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth …purchasing.sc.edu/solicitations/H27-6082-NA Architectural drawing.pdf · 1 ed c 234 ba 1234 south tower mechanical renovations university

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

BASE

RB-1

RB-2

FLOORS

CPT-1

VCT-1

VCT-2

WALLS

P-1

P-2

P-3

P-4

GL

WD

ABBREVIATION DESCRIPTION MANUFACTURER, COLOR, STYLE

4" RUBBER BASE @ ROOMS

6" RUBBER BASE @ CORRIDORS

COVE BASE WITH TOE, BLACK OR LT. GREY TO MATCH EXISTING-- SEE SPEC.

COVE BASE WITH TOE, BLACK -- SEE SPEC.

CARPET TILE

VINYL COMPOSITION TILE -- ROOMS

VINYL COMPOSITION TILE -- CORRIDORS

PAINT - EGGSHELL (WALLS, TYP.)

PAINT - SEMI-GLOSS (METAL SOFFITS FLOORS 1-18)

PAINT - EGGSHELL (ACCENT COLOR)

PAINT - EGGSHELL (ACCENT COLOR)

EXISTING GLAZING

EXISTING WOOD PANELS, TO REMAIN

CEILINGS

APC-1 ACCOUSTICAL PANEL CEILING

096513

096513

096813

096519

096519

099123

099123

099123

099123

EXISTING

EXISTING

SPEC. REF.

BASIS OF DESIGN FOR PATTERN SCALE AND TEXTURE: LEES, BEAUTIFUL ABANDON, CHARACTER LINES, COLOR: TBS

12"X12", COLOR TO BE SELECTED FROM MFR. FULL RANGE, SEE SPEC.

12"X12", BASIS OF DESIGN: ARMSTRONG, EXCELON #51805 CAMEL BEIGE, OR APP'D EQ., SEE SPEC.

TO MATCH SHERWIN WILLIAMS #7626 ZURICH WHITE

TO MATCH SHERWIN WILLIAMS #7626 ZURICH WHITE

TO MATCH SHERWIN WILLIAMS #7575 CHOP STICKS OR SIMILAR VALUE, VERIFY IN FIELD

TO MATCH SHERWIN WILLIAMS #7546 PRAIRIE GRASS OR SIMILAR VALUE, VERIFY IN FIELD

N.I.C.

N.I.C.

09511 2X2 ANGLED TEGULAR, WHITE--SEE SPEC.

1. INSTALL PARTIAL RUBBER BASE AND VCT FLOORING WHERE EXISTING FLOORINGWAS DEMOLISHED AT EXISTING FAN COIL UNIT, AND WHERE BUILT IN CASEWORKREMOVED. SEE FINISH PLAN FOR EXTENT.

2. SEE REFLECTED CEILING PLANS FOR SHEET METAL SOFFITS IN RESIDENT ANDCOMMUNITY ROOMS. SHEET METAL SOFFITS TO BE PAINTED P-2. SEE SPECS.

3. SEE DEMOLITION PLANS AND FLOOR PLANS FOR PHASING AND SCOPE OF WORKIN HALL HFL#01, HFL#02, AND HFL#03. RUBBER BASE AND VCT INSTALLED IN PHASE ATO BE DEMOLISHED IN PHASE B. NEW RUBBER BASE AND CARPET TO BE INSTALLEDIN PHASE B. SEE SCHEDULE, PER PHASE.

4. ONE COAT OF PAINT TO BE APPLIED IN PHASE A. REPAINT IN PHASE B TO ACHIEVEFINISH PAINT QUALIFICATIONS, PER SPECIFICATION. RETOUCH DAMAGEDAREAS, AS NECESSARY, PRIOR TO FINAL COAT.

5. SEE DEMOLITION PLANS AND FLOOR PLANS FOR REFERENCE TO EXISTING WALLGRID ANGLES TO REMAIN. NEW GRID AND APC CEILING TO BE INSTALLED AND SETAT HEIGHT COMPATIBLE WITH EXISTING WALL ANGLES.

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

FINISH SCHEDULE COMMENTS

Finish ScheduleFLR LEVEL Number Name Base Finish Floor Finish NORTH EAST SOUTH WEST Ceiling Finish Comments

-- EV03 EV -- -- -- -- -- -- ---- EV01 ELEV -- -- -- -- -- -- ---- EV02 ELEV -- -- -- -- -- -- ---- EV03 ELEV -- -- -- -- -- -- ---- ST01 STAIR -- -- -- -- -- -- --BASEMENT S101 BASEMENT -- -- -- -- -- -- --GROUNDLEVEL

001 VENDING -- -- P-1 P-1 P-1 P-1 APC-1 5

GROUNDLEVEL

002 TRASH -- -- -- -- -- -- --

GROUNDLEVEL

002A TRASH -- -- -- -- -- -- --

GROUNDLEVEL

003 LIVING -- -- P-1 P-1 P-1 P-1 APC-1 5

GROUNDLEVEL

003A MECH -- -- P-1 P-1 P-1 P-1 APC-1 5

GROUNDLEVEL

003B PANTRY -- -- P-1 P-1 P-1 P-1 APC-1 5

GROUNDLEVEL

004 CHASE -- -- -- -- -- -- --

GROUNDLEVEL

005 BEDROOM -- -- P-1 P-1 P-1 P-1 APC-1 5

GROUNDLEVEL

006 TLT -- -- P-1 P-1 P-1 EXIST CT APC-1 5

GROUNDLEVEL

007 LAUNDRY -- -- P-1 P-1 P-1 P-1 APC-1 5

GROUNDLEVEL

007A LAUNDRY -- -- P-1 P-1 P-1 P-1 APC-1 5

GROUNDLEVEL

008 TLT -- -- P-1 P-1 P-1 P-1/EXIST CT APC-1 5

GROUNDLEVEL

009 CUST. -- -- -- -- -- -- --

GROUNDLEVEL

010 ELEC -- -- -- -- -- -- --

GROUNDLEVEL

011 STORAGE -- -- P-1 P-1 P-1 P-1 APC-1 5

GROUNDLEVEL

012 CUST. -- -- P-1 P-1 P-1 P-1 APC-1 5

GROUNDLEVEL

012A OFFICE -- -- P-1 P-1 P-1 P-1 APC-1 5

GROUNDLEVEL

H001 HALL -- -- P-1 P-1 P-1 P-1 APC-1 5

GROUNDLEVEL

H002 HALL -- -- P-1 P-1 P-1 P-1 APC-1 5

GROUNDLEVEL

H003 HALL -- -- P-1 P-1 P-1 P-1 APC-1 5

GROUNDLEVEL

H004 HALL -- -- P-1 P-1 P-1 P-1 APC-1 5

GROUNDLEVEL

H005 HALL -- -- P-1 P-1 P-1 P-1 APC-1 5

1 101 LOBBY -- -- P-3,GL P-3,GL P-4 WD, P-3, GL APC-1 51 101A LOBBY A -- -- P-3 P-3, GL P-3 P-4 APC-1 51 102 OFFICE -- -- P-3 P-3,GL P-3/GL P-3 APC-1 51 103 RA LIVING -- -- P-3 P-3 P-3/GL P-3 APC-1 51 103A RA BEDROOM -- -- P-3 P-3 P-3/GL P-3 APC-1 51 103B TLT -- -- P-3 P-3 P-3 P-3 EXIST1 103C CLST -- -- P-3 P-3 P-3 P-3 EXIST1 103D RA KITCHEN -- -- P-3 P-3 P-3/GL P-3 APC-1 51 104 CUST -- -- -- -- -- -- --1 104A CHASE -- -- -- -- -- -- --1 105 MEN -- --1 106 ELEC -- -- -- -- -- -- --1 107 STUDY -- -- P-3/GL P-3/GL P-3 P-3 APC-1 51 H101 HALL -- -- P-4 P-3 P-3 P-3 EXIST1 V101 VESTIBULE -- -- P-3/GL P-3 P-3/GL P-3/GL APC-1 51 V102 VESTIBULE -- -- -- P-4 -- P-3,GL EXIST2-17 FL#00 RESIDENT RB-1 VCT-1 P-1 P-1/GL P-1 P-1 EXIST, MTL 1,22-17 FL#01 RESIDENT RB-1 VCT-1 P-1 P-1/GL P-1/GL P-1 EXIST, MTL 1,22-17 FL#02 RESIDENT RB-1 VCT-1 P-1 P-1 P-1/GL P-1 EXIST, MTL 1,22-17 FL#03 RESIDENT RB-1 VCT-1 P-1 P-1 P-1/GL P-1 EXIST, MTL 1,22-17 FL#04 RESIDENT RB-1 VCT-1 P-1 P-1 P-1/GL P-1 EXIST, MTL 1,22-17 FL#05 RESIDENT RB-1 VCT-1 P-1 P-1 P-1/GL P-1/GL EXIST, MTL 1,22-17 FL#06 RESIDENT RB-1 VCT-1 P-1 P-1 P-1 P-1/GL EXIST, MTL 1,22-17 FL#07 RESIDENT RB-1 VCT-1 P-1 P-1 P-1 P-1/GL EXIST, MTL 1,22-17 FL#08 RESIDENT RB-1 VCT-1 P-1/GL P-1 P-1 P-1/GL EXIST, MTL 1,22-17 FL#09 RESIDENT RB-1 VCT-1 P-1/GL P-1 P-1 P-1 EXIST, MTL 1,22-17 FL#10 RESIDENT RB-1 VCT-1 P-1/GL P-1 P-1 P-1 EXIST, MTL 1,22-17 FL#11 RESIDENT RB-1 VCT-1 P-1/GL P-1 P-1 P-1 EXIST, MTL 1,22-17 FL#12 RESIDENT RB-1 VCT-1 P-1/GL P-1/GL P-1 P-1 EXIST, MTL 1,22-17 FL#13 COMMUNITY RB-1 VCT-1 P-1 P-1/GL P-1 P-1 EXIST, MTL 1,22-17 FL#14 CUST -- -- -- -- -- -- --2-17 FL#15 WOMEN -- -- -- -- -- -- --2-17 FL#16 ELEC -- -- -- -- -- -- --2-17 FL#17 CHASE -- -- -- -- -- -- --2-17 HFL#01 HALL RB-2(A) /RB-2(B) VCT-2 (A)/CPT-1 (B) P-1 (A)/ P-1 (B) P-1 (A)/P-1 (B) P-1 (A)/P-1 (B) P-1 (A)/ P-1,4 (B) APC-1 3,4,52-17 HFL#03 HALL RB-2(A) /RB-2(B) VCT-2 (A)/CPT-1 (B) P-1 (A)/ P-1 (B) P-1 (A)/P-1 (B) P-1 (A)/P-1 (B) P-1 (A)/ P-1 (B) APC-1 3,4,52-17 HLF#02 HALL RB-2(A) /RB-2(B) VCT-2(A)/CPT-1 (B) P-1 (A)/ P-1 (B) P-1 (A)/P-1 (B) P-1 (A)/P-1 (B) P-1 (A)/ P-1 (B) APC-1 3,4,518 1800 RESIDENT RB-1 VCT-1 P-1 P-1/GL P-1/GL P-1 EXIST, MTL 1,218 1801 RESIDENT RB-1 VCT-1 P-1 P-1 P-1/GL P-1 EXIST, MTL 1,218 1802 RESIDENT RB-1 VCT-1 P-1 P-1 P-1/GL P-1 EXIST, MTL 1,218 1803 RESIDENT RB-1 VCT-1 P-1 P-1 P-1/GL P-1 EXIST, MTL 1,218 1804 RESIDENT RB-1 VCT-1 P-1 P-1 P-1/GL P-1 EXIST, MTL 1,218 1805 RESIDENT RB-1 VCT-1 P-1 P-1 P-1/GL P-1/GL EXIST, MTL 1,218 1806 RESIDENT RB-1 VCT-1 P-1 P-1 P-1 P-1/GL EXIST, MTL 1,218 1807 RESIDENT RB-1 VCT-1 P-1 P-1 P-1 P-1/GL EXIST, MTL 1,218 1808 RESIDENT RB-1 VCT-1 P-1/GL P-1 P-1 P-1/GL EXIST, MTL 1,218 1809 RESIDENT RB-1 VCT-1 P-1/GL P-1 P-1 P-1 EXIST, MTL 1,218 1810 RESIDENT RB-1 VCT-1 P-1/GL P-1 P-1 P-1 EXIST, MTL 1,218 1811 RESIDENT RB-1 VCT-1 P-1/GL P-1 P-1 P-1 EXIST, MTL 1,218 1812 RESIDENT RB-1 VCT-1 P-1/GL P-1/GL P-1 P-1 EXIST, MTL 1,218 1813 COMMUNITY RB-1 VCT-1 P-1 P-1/GL P-1 P-1 PLAS, MTL 1,218 1814 CUST -- -- -- -- -- -- --18 1815 WOMEN -- -- -- -- -- -- --18 1816 ELEC -- -- -- -- -- -- --18 1817 CHASE -- -- -- -- -- -- --18 1820 RESIDENT RB-1 VCT-1 P-1 P-1 P-1/GL P-1/GL EXIST, MTL 1,218 H1801 HALL RB-2(A) /RB-2(B) VCT-2 (A)/CPT-1 (B) P-1 (A)/ P-1 (B) P-1 (A)/P-1 (B) P-1 (A)/P-1 (B) P-1 (A)/ P-4(B) APC-1 3,4,518 H1802 HALL RB-2(A) /RB-2(B) VCT-2 (A)/CPT-1 (B) P-1 (A)/ P-1 (B) P-1 (A)/P-1 (B) P-1 (A)/P-1 (B) P-1 (A)/ P-1 (B) APC-1 3,4,518 H1803 HALL RB-2(A) /RB-2(B) VCT-2(A)/CPT-1 (B) P-1 (A)/ P-1 (B) P-1 (A)/P-1 (B) P-1 (A)/P-1 (B) P-1 (A)/ P-1 (B) APC-1 3,4,5PH 1901 COMM. -- -- -- -- -- -- --PH 1902 ELEV SHAFT -- -- -- -- -- -- --PH 1903 ELEV EQUIP -- -- -- -- -- -- --

A8.0

FINI

SH S

CHED

ULE

RMB

SAL

Page 15: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth …purchasing.sc.edu/solicitations/H27-6082-NA Architectural drawing.pdf · 1 ed c 234 ba 1234 south tower mechanical renovations university

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

DN

UP

UP

DN

VESTIBULEV101

VESTIBULEV102

HALLH101

RA KITCHEN103D

RA LIVING103

RA BEDROOM103A

OFFICE102

CLST103C

TLT103B

MEN105CUST

104

CHASE104A

ELEC106

STUDY107

LOBBY101

COVEREDENTRY

5

5

5

5

P-4

P-4

LOBBY A101A

N

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

REFERENCED ON: 1/4" = 1'-0"A8.11 FIRST FLOOR FINISH PLAN

A8.1

FIRS

T FL

OOR

FINI

SH P

LAN

RMB

SAL

Page 16: Z:U290.11CAD 29003 12 12 Lighting layoutsSouth …purchasing.sc.edu/solicitations/H27-6082-NA Architectural drawing.pdf · 1 ed c 234 ba 1234 south tower mechanical renovations university

1

ED

C

2 3 4

BA

1 2 3 4

UNIV

ERSI

TY O

F SO

UTH

CARO

LINA

MECH

ANIC

AL R

ENOV

ATIO

NSSO

UTH

TOW

ER

5 6 7

E

SHEET:

SHEE

T TI

TLE:

DRAW

N BY

:

D

REV.

DRAW

ING:

DESC

RIPT

ION

03/15

/12DA

TE:

PROJ

ECT

TITL

E:

C

CHEC

KED

BY:

DATE

ORIG

. BY

DRAW

N BY

5 6

Facsimile: (803) 791-0830

B

SEAL

SEAL

Swyg

ert &

Ass

ocia

tes

C O

N S

U L

T I

N G

E

N G

I N

E E

R S

Post Office Box 11686

DBA Swygert & Assoc. Ltd.

A

Telephone: (803) 791-9300

Columbia, S.C. 29211

mail@

swygert-associates.com

7

STAT

E PR

OJEC

T NU

MBER

H27

-608

2-NA

THIS DRAWING AND THE

DESIGN THEREON ARE THE

PROPERTY OF SW

YGERT &

ASSOCIATES, LTD. THE

REPRODUC

TION

, COPYING, OR

USE OF THIS DRAWING

WITHOU

T THE WRITTEN

CON

SENT OF SW

YGERT &

ASSOCIATES IS PROHIBITED

AND ANY INFRINGEMENT WILL

BE SUBJECT TO LEGAL ACTION

.

BID

DOCU

MENT

S

UP

UPDN

DNUP

UPDN

DN

A8.23

NEW CPT, RUBBER BASE

P-4

RESIDENTFL#08

RESIDENTFL#09

RESIDENTFL#10

RESIDENTFL#11

HALLHFL#03

HALLHFL#01

RESIDENTFL#06

RESIDENTFL#05

RESIDENTFL#04

RESIDENTFL#03

RESIDENTFL#02 RESIDENT

FL#01

RESIDENTFL#00

HALLHLF#02

COMMUNITYFL#13

RESIDENTFL#12

RESIDENTFL#07

WOMENFL#15

CUSTFL#14

VCT-1

LVT - 1

CPT-1

NEW VCT, RUBBER BASE

RESIDENTFL#08

RESIDENTFL#09

RESIDENTFL#10

RESIDENTFL#11

RESIDENTFL#12

COMMUNITYFL#13

RESIDENTFL#00

RESIDENTFL#01

RESIDENTFL#02

RESIDENTFL#03

RESIDENTFL#04

RESIDENTFL#05

RESIDENTFL#06

RESIDENTFL#07

HALLHFL#01

HALLHFL#03

HALLHLF#02

WOMENFL#15

CUSTFL#14

CHASEFL#17

ELECFL#16

EXTENT OF RUBBER BASE

NEW VCT

N

PHASE B WORK - NOTE TO CONTRACTORS:

1. DURING THE PROCESS OF INSTALLING HANGERS, SOFFITS, FAN COILS, METAL PAN COVERS, NEW PARTITIONS OR ANY OTHERMATERIAL OR EQUIPMENT AT THE CEILINGS OF THE EXISTING RESIDENT ROOMS ON FLOORS 2 THRU 18, THE CONTRACTORSHALL NOT COME IN CONTACT WITH THE SPRAY APPLIED TEXTURED CEILING MATERIAL THAT IS TO REMAIN IN PLACE AFTER THEPARTIAL ABATEMENT OF ASBESTOS FROM THE CEILINGS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THECEILING MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

2. DURING THE PROCESS OF INSTALLING UL RATED RACEWAYS AT CORRIDOR WALL PENETRATION, INSTALLATION OF NEWPARTITIONS, THE CONTRACTOR SHALL NOT DISTURB THE EXISTING GYPSUM BOARD IN ANY FASHION. NO PENETRATIONS WILLBE ALLOWED ONCE THE ASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

PHASE A WORK - NOTE TO CONTRACTORS:

1. NO PENETRATIONS OR ATTACHMENTS TO THE EXISTING GYPSUM BOARD PARTITIONS WILL BE ALLOWED ONCE THEASBESTOS ABATEMENT HAS BEEN COMPLETED BY THE ABATEMENT CONTRACTOR.

2. THE CONTRACTOR SHALL NOT COME IN CONTACT WITH THE GYPSUM BOARD MATERIAL THAT IS TO REMAIN IN PLACE AFTERTHE PARTIAL ABATEMENT OF ASBESTOS FROM THE CORRIDOR PARTITIONS ON THE EXISTING FLOORS 2 THRU 18 AND OTHERPARTITIONS ON THE BASEMENT AND GROUND LEVELS. CONTAMINATION OF THESE SPACES CAUSED BY DAMAGE TO THEGYPSUM BOARD MATERIAL SHALL BE CLEANED UP AT THE CONTRACTOR'S EXPENSE, INCLUDING BUT NOT LIMITED TO, COSTSASSOCIATED WITH CLEARING THESE SPACES FOR RE-ACCESS, I.E. AIR SAMPLING.

REFERENCED ON: 1/4" = 1'-0"A8.21 TYPICAL FINISH PLAN - LEVEL 2-18

FINISH LEGEND

A8.2

TYPI

CAL F

INIS

H PL

AN,

LEVE

LS 2-

18

RMB

SAL

REFERENCED ON: 1/4" = 1'-0"A8.22 TYPICAL FINISH PLAN - LEVEL 2-18

PHASE A PHASE B

REFERENCED ON: 3/8" = 1'-0"A8.2 A8.23 TYPICAL ROOM FINISH PLAN