20080401 ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov ontractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork E.O. 12907, signed by President Bush on March 31, 2008, states: “Beginning April 15, 2008, all federal geodatabases are required to have FGDC metadata for: each feature class, each feature data set, and the geodatabase….”
29

ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

Jan 05, 2016

Download

Documents

Briana Marshall
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

Contractors: Getting the CleanestGeospatial Data Possible

Urgent News from FoxNewsNetwork

E.O. 12907, signed by President Bush onMarch 31, 2008, states:

“Beginning April 15, 2008, all federal geodatabases are required to have FGDC metadata for:

each feature class, each feature data set, and the geodatabase….”

Page 2: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

Contractors: Getting the CleanestGeospatial Data Possible

The Goal:

Deliverables that I don’t have to edit

That upload into Park’s Geospatial Library

That upload to NPS Data Store

Page 3: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

• Background Example

• The Issues

• The Solutions

• The Tools

• The Results

Summary

Page 4: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

• No Involvement by Park with Contract

• Multi-Year Project, Same Contractor

• Many Field Data Collectors

• Miscommunication of Requirements

Background Project Example

Page 5: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

Too Many Shape Files with Attribute Errors

Too Many Metadata Records by Contractor

Approx. 2 weeks Park spent editing data

Example Results:

Page 6: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

• Background Example

• The Issues

• The Solutions

• The Tools

• The Results

Summary

Page 7: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

Different Data Dictionaries

Inconsistent Field Values/Attributes

Misspelled Attributes

Unnecessary Data

Multi-Year Project Problems

The Issues

Page 8: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

Leading Space(s)

Capital “O” for Zero

One too many digits in date field

How was data created?

Spelling Errors

Missing Values

Issues: Common Results

Page 9: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

• Background Example

• The Issues

• The Solutions

• The Tools

• The Results

Summary

Page 10: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

NPS National Standards &

Park-Specific Standards

Trimble Export Routine (if applicable)

Ask for Documentation of Protocols before contract signed

******************************************* “No Good Data, No Good Pay”

The Solution: Written Contract

Page 11: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

Provide Supporting Park Data & Metadata to Contractor

Set the Example

Assist w/ GPS Data Dictionaries

Provide Data Schemae.g., List of Required Fields

The Solution: Assistance

Page 12: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

Provide Example DeliverablesGeodatabase, Metadata Record

Review Data periodically before end of project (write into contract)

The Solution: Assistance

Page 13: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

Define Your Preferred Data Format:

File GeodatabasePersonal Geodatabase

Shape FileCoverages

Projection/Datum

Solution: Preferred Data Format

Page 14: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

ALL CAPS/Initial Caps/Does It Matter?

Solution: Define Field Value Rules

Page 15: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

Ex: “Surveyor” Format:

Solution: Define Field Value Rules

Page 16: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

Ex: Date Format: YYYYMMDD

Date or String or Numeric?

Solution: Define Field Value Rules

Page 17: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

Solution: Define Field Value Rules

Ex: Date in MetadataDate Format: YYYMMDD

Page 18: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

Did you know that “Process Step”

is not an FGDC Requirement?

Therefore, do you know how

the data was created then?

Solution

Page 19: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

The Solution: Process Step

Require “Process Step” (Metadata) in the Contract:Data Quality Process Description/Software_Version/Date/Contact

Page 20: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

• Separate or Combined Data?Who will do that

• Same Data Dictionary? What IF it changes How will it append/merge

Contract needs written instructions addressing multi-year project

Solution: Multi-Year Project

Page 21: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

• Background Example

• The Issues

• The Solutions

• The Tools

• The Results

Summary

Page 22: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

Review with Contractors:

• Contract Standards

• Define/Provide Data Dictionary

• Data Schema:Values/Attributes Format

Domains/Ranges

Provide The Tools

Page 23: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

Review with Contractors:

• ArcToolBox Frequency Tool: unique ID spelling inconsistenciesmissing valuesleading spaces, etc. other ways?

(Access, Excel, SQL, Oracle, scripts?)

Provide The Tools

Page 24: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

NPS Metadata Tools & Editor

Provide Tools Linkhttp://science.nature.nps.gov/nrdata/tools/index.cfm

Review with Contractor: Spell Check MetadataParse MetaFind and Replace, etc.

Provide the Tools

Page 25: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

Solution & Tools Summary

• Get it In the Contract

• Write the GPS Data Dictionary

• Define the Schema

• Provide the Tools

• Work w/ During Project

• Review the Data Before You Pay

Page 26: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

• Have a Party!

• Present to Park Management/Employees

• Thank them officially for a job well done

End of Project

Page 27: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

• Background Example

• The Issues

• The Solutions

• The Tools

• The Results

Summary

Page 28: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

Contractors: Getting the CleanestGeospatial Data Possible

The Results:

Deliverables that I don’t have to edit

That upload into Park’s Geospatial Library

That upload to NPS Data Store

Page 29: ZION: Elena Robisch @ nps.gov NCPN: Aneth Wight @nps.gov 20080401 Contractors: Getting the Cleanest Geospatial Data Possible Urgent News from FoxNewsNetwork.

20080401 ZION: Elena Robisch @ nps.govNCPN: Aneth Wight @nps.gov

Discussion/Questions?

Elena RobischGIS Program ManagerZion National Park435-772-0213

Aneth WightGIS SpecialistNCPN435-719-2348