  • ZeTo RulesCOMMUNICATION PACK

    Briefing for DDR HSE Meeting 18th January 2011

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    INTRODUCTIONSCOPEACCOUNTABILITYZETO RULES

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    WHAT is ZeTo Rules?10 mandatory safety rules WHAT is ZeTo? Zero Tolerance: principle to ensure all activities are carried out in a safe mannerAny non-compliance is not tolerated.Why ZeTo Rules are introduced?To avoid any major accidents which may lead to fatalitiesTo ensure high risk work are carried out safely Aim to improve the safety performance of PETRONAS as a whole.

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    Fatalities by Incident Type from FY 2005/06 to FY 2009/10

    NoCauses of FatalitiesNo. of Fatalities1Road accident 242Fall from height 103Hit by object 74Electrocution 45Structural failure 46Explosion47Diving accident 48Fall overboard 39Exposure to chemical hazard 210Air crash 2

    Chart1

    24

    10

    7

    2

    4

    4

    4

    2

    4

    3

    Sales

    Fall from Height, 10

    Exposure to Chemical Hazard, 2

    Electrocution, 4

    Explosion, 4

    Air Crash, 2

    Sheet1

    Sales

    Road Accident24

    Fall from height10

    Hit by Object7

    Exposure to Chem Hazrd2

    Structural Failure4

    Electrocution4

    Explosion4

    Air Crash2

    Diving Accident4

    Fall Overboard3

    Total64

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    WHO subject to comply with the Zeto Rules? All PETRONAS employees & contractors personnelWHEN should Zeto Rules be applied? All times whenever they are in the companys premises or when carrying out company business.

    All times when operating companys owed/hired/leased vehicles whether inside of outside the companys premises.

    Including while traveling on business.

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    For cases of employees who do not follow ZeTo Rules:Cases of non-compliance will be investigated.Disciplinary action can be taken against any employee as per Code of Conduct and Discipline (COCD) including dismissal.

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    For cases of contractors personnel who do not follow ZeTo Rules: Case of non-compliance shall be investigated firstConfirmed case of non-compliance could result in any of the following:Written warningRemoval from site (temporary or permanent)Termination of contractAll incident investigations must state which ZeTo Rules have been violated.

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    10 ZETO RULES

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    What is valid PTW? Work permit that is approved & valid for specified period.Who approved the PTW? - Receiving Authority (RA) - Approving Authority (AA) When PTW is required? - all non routine - maintenance jobs.Work with a valid work permit (PTW) required by the jobReference: PTS 60.2001 Permit to Work (PTW) SystemThis document is available at GHSED Online (http://pww.ghsed.petronas.com.my)

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    Verification of energy isolation should be done by the workers doing the work.Types of energy that needs to be isolated includes mechanical, electrical, hydraulic, thermal, chemical, pneumatic, ionising and radiation.Verification of energy isolation is done by locking, tagging and testing the system for zero energy. LOTO system.

    Verify energy isolation before starting work Reference: PTS 60.2117 Energy Isolation Standard This document is available at GHSED Online

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    A safety critical equipment includes any device that prevent incidents and ensures effective control of the incident for the systems. Examples:- safety interlock protective system (SIPS),- pressure relieving devices,- vacuum relieving devices, detectors, alarms, emergency release systems, remote actuated emergency isolation valves, critical electrical equipment including uninterruptible power supply (UPS), turbine over speed trips, fire protection equipment and critical security devices.Overriding a function where an automated system is placed under manual control.Disabling means stopping the function of the system.To obtain authorization, you need to get the Safety System Bypass/Override (SSBO) certificate approved and issue the MOC as well.

    Obtain authorisation before overriding or disabling safety critical equipmentReference: PTS 60.2212 Bypassing of Safety Critical EquipmentThis document is available at GHSED Online (http://pww.ghsed.petronas.com.my)

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    This certificate needs to be endorsed and signed by the Receiving Authority (RA) and Approving Authority (AA)

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    Confined space is a space that is large enough for personnel to enter, has limited or restricted means of entry is not designed for normal or continuous occupancy.To obtain authorization, you need to get the confined space entry certificate and checklist approved.

    Obtain authorization before entering a confined spaceReference: PTS 60.2105 Entry Into Confined SpacesThis document is available at GHSED Online (http://pww.ghsed.petronas.com.my)This checklist needs to be signed by the:Receiving Authority (RA)/Work Leader, Approving Authority (AA) RepresentativeApproving Authority

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    This certificate needs to be signed by the Approving Authority (AA)M Ahmad JaafarOperationsAJaafarWork Supervisor4/6/2010

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    Working at height means working above 2 meters.Comply with working at height requirements in the PTW :- Full body harness with double lanyards- Safety net- Hard barriers, etc.

    Protect yourself against a fall when working at height

    Reference: PTS 60.2104 Working at HeightThis document is available at GHSED Online (http://pww.ghsed.petronas.com.my)

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    Full body harnessSafety NetHard Barriers

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    Hazardous chemicals chemicals with the properties of being explosive, oxidizing, extremely flammable, highly flammable, flammable, very toxic, toxic, harmful, corrosive, irritant, carcinogenic, teratogenic and mutagenic. includes hydrocarbons and catalysts.Handling of hazardous chemicals includes operations of receiving, storing, discharging, transporting and disposing chemicals including while working on process equipment containing chemicals or hydrocarbons.PPE specified in the PTW for the job:

    Use the correct personal protective equipment (PPE) when handling hazardous chemicalsReference: PTS 60.1502 Chemical Management ProgramThis document is available at GHSED Online (http://pww.ghsed.petronas.com.my)

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    Excavation work that involves a man-made cut, cavity, trench or depression in the earths surface formed by earth removal. Trench is a narrow excavation made below the surface of the ground.To obtain authorization: You need to get the excavation certificate approved.Buried services underground services including pipelines, electrical/instrument/earthing cables, sewer pipes and underground tanks.

    Obtain authorization before excavation or entering a trenchReference: PTS 60.2116 ExcavationThis document is available at GHSED Online (http://pww.ghsed.petronas.com.my)

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    Suspended load is any weight hung from a lifting equipment.Ensure the area is barricaded before lifting operations begin to prevent people from walking under the suspended load.Critical lifting includes heavy lifting and simultaneous lifting.Heavy lifting lifting a single load of weight which is more than 90% of the rated capacity of the lifting equipment at specific working radius and boom angle as per the crane load chart or lifting a single load of more than 10 tons.Simultaneous lifting multiple lifting at the same location and time.Do not position yourself under a suspended loadReference: PTS 60.2103 Lifting OperationsThis document is available at GHSED Online (http://pww.ghsed.petronas.com.my)

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    Lifting Sign Tag LineBarricade TapeSignal man

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    Designated areas for smoking are areas or rooms which are approved for smoking and bears the signage.Potential ignition sources: - mechanical sparks - fire - hot surfaces - auto ignition - pyrophoric materials - mechanical impact - friction -electrical equipment - electrostatic.Process areas are designated areas where process facilities are located.Obtain the approved hot work permit before starting the the job or bring in potential ignition source into process areas.

    Do not smoke outside designated areas or bring potential ignition sources into process areas without authorizationReference: PTS 60.2123 Ignition Source ControlThis document is available at GHSED Online (http://pww.ghsed.petronas.com.my)

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    This rule includes the usage of hands-free mobile phone or walkietalkieYou can leave your mobile phone or walkie-talkie on while driving but you are not allowed to use them.The use of seat belts is mandatory for all passengers.This rule applies when you are a driver or a passenger in a company owned/leased/hired vehicles, i.e. road tanker, bus, lorry, pick-up truck, car, forklift, helicopter or when driving in company premises. It is also applicable to those who are travelling on business.Do not use your mobile phone/walkie-talkie while driving, follow the speed limit and use your seat beltReference: PTS 60.2401 Land Transportation Safety Guiding Principles, Minimum Standards and Key Performance Indicators. This document is available at GHSED Online (http://pww.ghsed.petronas.com.my)

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    Mobile phone distraction causes 2,600 deaths and 330,000 injuries in the United States each year.Drivers talking on mobile phones were 18 percent slower to react to brake lights.They also took 17 percent longer to regain the speed they lost when they braked. Source: Winter Issue, Human Factors Journal, Human Factors and Ergonomics Society

    Do not use your mobile phone/walkie-talkie while driving, follow the speed limit and use your seat belt

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project

    Drive for World-Class Project Delivery Every Project is an Exemplary ProjectEvery Project is an Exemplary Project