US Army Corps of Engineers Sacramento District Yuba River Ecosystem Restoration Section 905(b) Analysis October 2014 Source: J.D. Richey
59

Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

Jul 03, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

 

US Army Corps of Engineers Sacramento District

  

Yuba River Ecosystem Restoration Section 905(b) Analysis

 

       

               

October 2014

Source: J.D. Richey

Page 2: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

 

     

 Thispageleftblankintentionally.

   

Page 3: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

1   

October2014SacramentoDistrict

 

 

SECTION905(b)(WRDA86)ANALYSISYUBARIVERECOSYSTEMRESTORATION

 

  Introduction  TheYubaRiverisoneofCalifornia’ssignaturerivers.SincetheGoldRush,priortoCaliforniastatehood,theYubaRiverhasbeenasourceoflife‐sustainingwaterfornativepeoples,farmersandranchers,aswellasforsalmon,steelheadandotherfishandwildlife.TheUnitedStatesArmyCorpsofEngineers(USACE)hasalonghistoryofinvolvementwiththeYubaRiver.WiththeadventoftheCaliforniagoldrushinthemid‐1800s,hydraulicminingwashedawayentiresectionsoftheupperYubaRiverWatershed.Thereleaseofincredibleamountsofsedimentandcontaminatedminingdebristhreatenednearbycities,farmsandtheriveritself.TheUnitedStatesCongressdirectedtheFederalCaliforniaDebrisCommission(CDC)tomanagethisdangerousminingsediment.In1906constructionwascompletedonDaguerrePointDam,andthenthe260‐foottallEnglebrightDamwascompletedin1941,bothtoimpoundminingdebris.Thesedamscontinuetocontainthiscontaminatedminingdebris,withanestimated28millioncubicyards(yd3)impoundedbehindEnglebrightDamand4millionyd3behindDaguerrePointDam.UponCongressionaldecommissioningoftheCDCin1986,administrationofDaguerrePointDamandEnglebrightDamandLakewasassumedbyUSACE. 1. StudyAuthorities

 Ecosystemrestoration,orenvironmentalprotection,becameamissionofUSACEbytheWaterResourcesDevelopmentAct(WRDA)of1990,PublicLaw(P.L.)101‐640,Section306,whichreads: 

(a) GENERALRULE.—TheSecretaryshallincludeenvironmentalprotectionasoneoftheprimarymissionsoftheCorpsofEngineersinplanning,designing,constructing,operating,andmaintainingwaterresourcesprojects.(b) LIMITATION.—Nothinginthissectionaffects—(1) existingCorpsofEngineers’authorities,includingitsauthoritieswithrespecttonavigationandfloodcontrol;(2) pendingCorpsofEngineerspermitapplicationsorpendinglawsuitsinvolvingpermitsorwaterresourcesprojects;or(3) theapplicationofpublicinterestreviewproceduresforCorpsofEngineerspermits.

 WRDA1996,P.L.104‐303,Section210establishedcost‐sharingforecosystemprotection/restoration: 

Page 4: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

2   

(a) InGeneral.‐‐Section103(c)oftheWaterResourcesDevelopmentActof1986(33U.S.C. (c);100Stat.4085)isamended‐‐

(1) bystriking``and''attheendofparagraph(5);(2) bystrikingtheperiodattheendofparagraph(6)andinserting``;and'';and(3) byinsertingafterparagraph(6)thefollowing:``(7)environmental

protectionandrestoration:35percent;exceptthatnothinginthisparagraphshallaffectorlimittheapplicabilityofsection906.''.

 TheauthoritytostudytheSacramentoRiverBasinforfloodcontrolandalliedpurposes,includingecosystemrestoration,wasgrantedintheRiversandHarborsActof1962,P.L.87‐874,Section209,whichreads: 

TheSecretaryoftheArmyisherebyauthorizedanddirectedtocausesurveysforfloodcontrolandalliedpurposes,includingchannelandmajordrainageimprovements,andfloodsaggravatedbyorduetowindortidaleffects,tobemadeunderthedirectionoftheChiefofEngineers,indrainageareasoftheUnitedStatesanditsterritorialpossessions,whichincludethefollowingnamedlocalities:Provided,thataftertheregularorformalreportsmadeonanysurveyaresubmittedtoCongress,nosupplementaloradditionalreportorestimateshallbemadeunlessauthorizedbylawexceptthattheSecretaryoftheArmymaycauseareviewofanyexaminationorsurveytobemadeandareportthereonsubmittedtoCongress,ifsuchreviewisrequiredbynationaldefenseorbychangedphysicaloreconomicconditions:Providedfurther,thattheGovernmentshallnotbedeemedtohaveentereduponanyprojectfortheimprovementofanywaterwayorharbormentionedinthistitleuntiltheprojectfortheproposedworkshallhavebeenadoptedbylaw:

 SacramentoRiverBasinandstreamsinnorthernCaliforniadrainingintothePacificOceanforthepurposesofdeveloping,wherefeasible,multi‐purposewaterresourceprojects,particularlythosewhichwouldbeeligibleundertheprovisionsoftitleIIIofPublicLaw85‐500.

 (TitleIIIofPublicLaw85‐500concernswatersupply.) TheauthoritytoreviewcompletedUSACEprojectswasgrantedintheFloodControlActof1970,P.L.91‐611,Section216,whichreads: 

TheSecretaryoftheArmy,actingthroughtheChiefofEngineers,isauthorizedtoreviewtheoperationofprojectstheconstructionofwhichhasbeencompletedandwhichwereconstructedbytheCorpofEngineersintheinterestofnavigation,floodcontrol,watersupply,andrelatedpurposes,whenfoundadvisabledue(to)thesignificantlychangedphysicaloreconomicconditions,andtoreportthereontoCongresswithrecommendationsontheadvisabilityofmodifyingthestructuresortheiroperation,andforimprovingthequalityoftheenvironmentintheoverallpublicinterest.

 UnderSection216authority,theUnitedStatesArmyCorpsofEngineersSacramentoDistrictpreparedanInitialAppraisalReport(IAR)in2005.Thereportrecommendeda

Page 5: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

3   

cost‐sharedfeasibilitystudytodeterminetheFederalinterestinfishpassageimprovement,restorationoffisheries,restorationofaquatichabitat,andflooddamagereductionassociatedwithDaguerrePointDam.(DaguerrePointDamprovideslimitedfloodriskmanagementbycreatingabackwatereffectintheriver,whichcausessomefloodwaterstoflowoutandbedetainedintheGoldfields.)AContinuingAuthoritiesProgram(CAP)Section1135studywasnotrecommendedbecausealternativecoststoaddressaquaticecosystemproblemsalongtheYubaRiverwereexpectedtoexceedtheCAPlimit. TheEnergyandWaterDevelopmentAppropriationsAct,2014,DivisionDofPublicLaw113‐76,theConsolidatedAppropriationsAct,2014initiatedthereconnaissancestudy: 

ThattheSecretarymayinitiateuptobutnomorethanninenewreconnaissancestudystartsduringfiscalyear2014:Providedfurther,Thatthenewreconnaissancestudystartswillconsistofthreestudieswherethemajorityofthebenefitsarederivedfromnavigationtransportationsavings,threestudieswherethemajorityofthebenefitsarederivedfromfloodandstormdamagereduction,andthreestudieswherethemajorityofthebenefitsarederivedfromenvironmentalrestoration:Providedfurther,Thatthenumberofenvironmentalrestorationstudiesselectedshallbelimitedtonomorethanthelessor(sic)ofthenumberofnavigationstudiesorthenumberoffloodandstormdamagereductionstudiesselected:Providedfurther,ThattheSecretaryshallnotdeviatefromthenewstartsproposedintheworkplan…

 TheAct’saccompanyingStatementofManagersreportdesignatedspecifiedprograms,projects,andactivities.BasedonthecategoriesandcriteriaprovidedintheStatementofManagers,USACEidentifiedstudiesinthe2014WorkPlan.OneofthosestudieswastheYubaRiverEcosystemRestorationstudy,listedasYubaRiverFishPassage,California(EnglebrightandDaguerrePointDams). 2. StudyPurpose

 ThepurposeofaSection905(b)analysis,alsoknownasareconnaissancereport,istoaddresstherequirementsofSection905(b)oftheWaterResourcesDevelopmentAct(WRDA)of1986,asamended.Thepurposeofthis905(b)analysisistodeterminewhetherthereisaFederalinterestinparticipatinginacost‐sharedfeasibilitystudytoinvestigateecosystemrestorationintheYubaRiverwatershedintheinterestofwaterresourcedevelopmentopportunities.TheanalysisusesexistingdatatodetermineFederalinterest,developpreliminarycostsandbenefits,andestimatethecostofpreparingthefeasibilityreport.Additionally,perPlanningBulletin2014‐02:SMARTPlanningintheReconnaissancePhase,theanalysisdescribesareasofriskandremaininguncertaintiesthataffectfeasibility‐phaseassumptions.Theanalysisincludesadescriptionoftheexistingproblem(s)intheYubaRiverwatershed,identificationofFederalinterest,andpotentialsolution(s)thatwouldresultinapolicy‐consistentstudywithawillingandcapablesponsor.ThesponsorforthefeasibilitystudyistheYubaCountyWaterAgency(YCWA). 3. Recommendation/FindingofFederalInterest

 BasedonconsistencywithArmyandbudgetarypoliciesandthelikelihoodofaproject

Page 6: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

4   

meetingcriteriaforFederalparticipationinimplementation,theSacramentoDistrictrecommendscontinuingwithafeasibilitystudy.ThereisFederalinterestinproceedingtothefeasibilityphaseofthisstudytofurtheranalyzeandevaluateecosystemrestorationintheYubaRiverwatershed.PreliminarydataindicatethattherearesignificantNationalEcosystemRestoration(NER)benefitsassociatedwithrestorationofstructures,functions,andprocessesintheYubaRiver.Federalinterestinecosystemrestorationisbasedonthenationalsignificanceoftheecosystemresources.ThesignificantresourceswithintheYubaRiverwatershedarespring‐runChinooksalmonandsteelheadtrout.Significanceiscomposedofinstitutionalsignificance,technicalsignificance,orpublicsignificance.

� Institutionalsignificancemeansthattheimportanceofanecosystemresourceisacknowledgedinthelaws,adoptedplans,andotherpolicystatementsofpublicagencies,tribes,orprivategroups.IntheYubaRiver,therearecurrentlythreefishspecieslistedasthreatenedundertheESA:1)spring‐runChinooksalmon;2)steelhead;and3)greensturgeon.ThelowerYubaRiverisdesignatedcriticalhabitatforeachofthesespecies.TheJuly2014NOAAFisheries“RecoveryPlanforSacramentoRiverwinter‐runChinooksalmon,CentralValleyspring‐runChinooksalmon,andCentralValleysteelhead”seekstorecovertheseecologicalvalues.In1998,theEcosystemRestorationProgramPlanofCALFEDrecommendedaprogramtoevaluatethefeasibilityofreturningsteelheadandspring‐runChinooksalmontotheUpperYubaRiverupstreamofEnglebrightDam.Spring‐runChinooksalmonarealsolistedasthreatenedundertheStateofCalifornia’sEndangeredSpeciesAct.TheYubaAccordFisheriesAgreement,whichprovidesassurancesthatinstreamflowswillbemaintainedforthebenefitoffishspecies,isanotherexampleofaformalplan.TheStateofCalifornia’sSalmon,SteelheadTrout,andAnadromousFisheriesProgramActof1988statesthatitisapolicyoftheStatetosignificantlyincreasethenaturalproductionofsalmonandsteelhead.SierraCounty,throughwhichtheNorthYubaflows,statesinElement13ofitsGeneralPlanthat,“ItistheCounty’sgoaltoprotectanddefenditsabundantanddiverseplantandanimalspecies.”

 � Technicalsignificancemeansthattheimportanceofecosystemresourcesisbasedon

thescientificortechnicalknowledgeorjudgmentofcriticalresourcecharacteristics.TechnicalsignificanceisshownbecausetheESAlistingofspring‐runChinooksalmonandsteelheadisbasedonscientificandtechnicalknowledgeandiswell‐documentedinscientificliterature.

 � Publicsignificancemeansthatsomesegmentofthegeneralpublicrecognizesthe

importanceofanecosystemresource.MembersofthepublichaveformedorganizationsbasedontheirinterestinfishingandthecontinuationofsalmonidpopulationsintheYubaRiver.OnesuchorganizationisSYRCL;theirYubaSalmonNowcampaignaimstorestoresalmonhabitatinthelowerYubaRiverandultimatelygetsalmonpastEnglebrightDamintotheupperYubaRiver.AnotherorganizationisAmericanRivers;in2011,theynamedtheYubaasoneofAmerica’sMostEndangeredRivers,primarilybecauseofthelackoffishpassage.

This905(b)analysisincludesadescriptionoftheexistingproblems,evidenceofFederal

Page 7: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

5   

interest,acommitmentfromwillingandcapablesponsors,andthatthereisstrongpotentialtoimplementaviableecosystemrestorationstudy.ThefeasibilityreportwillbecompletedinaccordancewithSMARTplanningprinciplesandrisk‐informeddecision‐making. 4. StudyArea

 TheYubaRiverWatershed(Figure1)encompasses1,340squaremilesonthewesternslopesoftheSierraNevadaMountainRange,andislocatedinportionsofSierra,Placer,Yuba,andNevadacounties(Reynoldsetal.1993).TheYubaRiverisatributaryoftheFeatherRiverwhich,inturn,flowsintotheSacramentoRivernearthetownofVerona,California.TheYubaRiverflowsthroughforest,foothillchaparral,andagriculturallands.Leveesareabsentfrommostofitscourseexceptforneartheriver’sconfluencewiththeFeatherRiver.Atthatpoint,theYubaRiverisboundedbysetbackleveesforapproximatelysixmiles.

Page 8: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

6   

Figure1.StudyAreaMap(nottoscale).

Page 9: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

7   

TheprimarywatercoursesoftheupperYubaRiverWatershedaretheSouth,Middle,andNorthYubarivers.TheSouthYubariverflowsintoEnglebrightLake.TheMiddleYubaRiverflowsintotheNorthYubaRiverandtogethertheyarereferredtoastheupperYubaRiver.BeginningattheconfluenceoftheNorthYubaandtheMiddleYubarivers,themainstemupperYubaRiverflowsapproximately7.8milesdownstreamtoEnglebrightDam.EnglebrightDam’sreservoirextendsapproximately8milesfromitshighwatersurfaceelevationatRM32.2totheEnglebrightDamatRM24(YSF2013).BelowEnglebrightDam,thelowerYubaRiverreachextendsapproximatelyanadditional24milesdownstreamtotheconfluencewiththeFeatherRiver.ThestudyareabeginsinthecityofMarysvilleandextendsupstreamapproximately90miles,pastSierraCity,California,inSierraCounty.Figure2.EnglebrightDam.

Source:USGeologicalSurveyDaguerrePointDamislocatedonthelowerYubaRiverapproximately11.5rivermiles(RM)upstreamfromtheconfluenceofthelowerYubaandlowerFeatherriversnearMarysville(USACE2013).OwnedbyUSACE,DaguerrePointDamisa25feet(ft)tall,low‐headdamacrossthelowerYubaRiverandthereisnoreservoirassociatedwiththedam.EnglebrightDam,locatedapproximately12.3milesupstreamofDaguerrePointDam,isa260‐fttallconcretedamalsoownedbyUSACE.LocatedontheYubaRiverapproximately18milesupstreamofEnglebrightDam,the645fthighNewBullardsBarDam(ownedbyYCWA)isthetallestman‐madestructureintheYubaRiverWatershed.

Page 10: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

8   

Figure3.DaguerrePointDam.

Source:USACE

 

Figure4.NewBullardsBarDam.

    Source:Trails.comAquaticandRiparianHabitatAccordingtotheNationalMarineFisheriesService(NMFS)andnumerousstudies,atleast80%ofhistoricriparianhabitathasbeenlostintheWesternUnitedStates(NMFS2014;Krueper1993).RiparianhabitatssupportthegreatestdiversityofwildlifespeciesofanyhabitattypeinCalifornia(CALFED2000ascitedinRMT2013).Riparianhabitatislinkedtoaquatichabitatbothbyfloodwatersaswellasbeingasourceofinvertebrateprey,temperature‐controllingshade,andstructuralrefugeintheformoflargewoodydebris(CDFW2010).TheYubaRiverflowsthrougharuralarea,sourbandevelopmenthasnotcontributedtohabitatloss.However,habitatalongportionsoftheYubaRiverisreducedduetopastminingpracticesanddamconstruction.AlthoughtheamountofhabitatalongthelowerYubaRiverhasbeenalteredfrompristineconditions,ithasbeenassessedashealthyandrecoveringfromhistoricaldisturbance(YCWA2013).

Page 11: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

9   

RiparianvegetationalongthelowerYubaRiveriscomposedlargelyofwillowshrubs,cottonwoodandotherhardwoodspecies,withasimpleunderstoryofHimalayanblackberryorblueelderberryshrubs(YCWA2013).FieldobservationsreportedthatwoodyspeciesinvariouslifestagesarepresentthroughoutthelowerYubaRiver.IntheupperpartoftheYubaRiverwatershed,aldersandquakingaspenbecomemorecommon,inadditiontocottonwoodsandwillows(Potter2005).Riparianhabitatinboththelowerandhigherelevationssupportsthelittlewillowflycatcher(Empidonaxtrailliibrewsterii),aCaliforniaendangeredsubspeciesofwillowflycatchers(USFS2014).Whereasriparianhabitatgenerallybordersriversandstreams,aquatichabitatiscomposedoftheplantsandanimalswithinthewater.FortheYubaRiver,fishspeciesincludeChinooksalmon,steelhead,greensturgeon,Sacramentopikeminnow(Ptychocheilusgrandis),commoncarp(Cyprinuscarpio),Sacramentosucker(Catostomusoccidentalis),channelcatfish(Ictaluruspunctatus),brownbullhead(Ictalurusnebulosus),bluegill(Lepomismacrochirus),andgreensunfish(Lepomiscyanellus).Thesespeciesdependoncleanwateroftheappropriatetemperature,adequatedissolvedoxygen,appropriatestreambedsubstrate,food,andareastorest. BecauseofthemountainsnowmeltandcoldwateroutflowsfromNewBullardsBarDam,theYubaRiverissuitableforcold‐waterfishspeciessuchassalmonidsandtrout.NMFSdesignatedtheYubaRiverfromMarysvilletoEnglebrightDamascriticalhabitatforspring‐runChinooksalmonandsteelhead.IntheCentralValleyofCalifornia,anestimated72%ofthehistoricChinooksalmonspawningandholdinghabitatisnolongeravailable(Yoshiyamaetal.2001).TheamountofsteelheadhabitatlostisprobablymuchhigherthanthatforChinooksalmon,becausesteelheadweremoreextensivelydistributedinthepast(NMFS2014).Manyoftheselossesarefromurbandevelopment,agriculture,andwatersupplyfacilities. HistoricalGoldMiningExtensivehydraulicminingoccurredintheYubaRiverwatershedduringthelate1800s.Inhydraulicmining,watercannonsshothigh‐pressureflowsouttowashawayhillsides.Thematerialthatwasdislodgedwasthensluicedtoexposethegold.Gilbert(1917),ascitedinYoshiyamaetal.(2001),estimatedthat“…duringtheperiod1849‐1909,684millioncubicyardsofgravelanddebrisduetohydraulicminingwerewashedintotheYubaRiversystem–morethantriplethevolumeofearthexcavatedduringtheconstructionofthePanamaCanal.”BeakConsultants,Inc.(1989)stated,“thedebrisplainrangedfromapproximately700feetwideandupto150feetthickneartheedgeofthefoothillstonearly3mileswideand26feettallnearMarysville.”Thisdebrisfieldisstillminedforresidualgolddepositsandgravel.HydraulicminingintheYubaRiveraccountedfor40percentofalltheminingdebristhatwashedintotheCentralValley(Mount1995).Inadditiontoeliminatingmuchoftheriparianvegetationcorridor(eitherbyburyingit,byretardingitsregeneration,orbyitsuseasrawmaterialforconstructingbrushdamstocontainsediment)alongthelowerYubaRiver(NMFS2005),thehydraulicminingdebrisprobablyhaddevastatingimpactsonsalmonids.Thisisbecausethesedimentsinthedebris

Page 12: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

10   

wouldhavesuffocatedincubatingeggsandpre‐emergentfry(NMFS2002).Evenbythe1870sand1880s,theYubaRiversalmonrunshadbeengreatlydiminishedbyhydraulicminingdebriseffects(Yoshiyamaetal.2001).Historically,theYubaRiverWatershedsupportedlargenumbersofspring‐runChinooksalmon,fall‐runChinooksalmon,andsteelhead,andwasamajorcontributortoanadromoussalmonidsstocksintheCentralValleyofCalifornia.Lossofhistoricspawningandrearinghabitatintheupperbasinlikelyhadparticularlysevereimpactsonspring‐runChinooksalmonandsteelheadpopulations,whichdependedontheupperbasinforsuccessfulsummerholdingandrearing(Yoshiyamaetal.1998;2001). Alongwithhydraulicmining,mercurywasusedtoprocessgolddeposits.AccordingtotheUSGeologicalSurvey,hundredsofpoundsofliquidmercurywereaddedtothetypicalsluicebox.Goldsanktothebottomofthesluice,whilesandandgravelpassedoverthehigh‐densitymercury,allowinggoldtoseparateandsinktothebottom.IntheSierraNevada,upto9millionpoundsofmercurywerelostinthismannertotheenvironment(Churchill2000).IntheYubaRiverstudyarea,muchofthisleftovermercuryiscontainedinsedimentheldbehindthedebrisdams.Althoughmostofthemercuryisnotbiologicallyavailable,enoughhasmethylizedinEnglebrightLakethatitisbioaccumulatinginthelargerpredatoryfish.MercurylevelsinthelargerpredatoryfisharehighenoughthattheCaliforniaOfficeofEnvironmentalHealthHazardAssessmentissuedasafe‐eatingadvisoryforEnglebrightLake.Guidelinesadvisewomenages18‐45andchildrenages1‐17toavoideatinglargemouth,smallmouth,orspottedbass.TheYubaGoldfields,locatedfromapproximately8to16milesupstreamofMarysville,aredominatedbyapproximately20,000acresofdredgertailingsthatwerereworkedfromhydraulicminewaste.DredgingofgoldfromthehydraulicwasteintheGoldfieldsbeganin1902,andby1910,15dredgeswereoperatinginthelowerYubaRiver.Theareahasbeendredgedandre‐dredgedintermittentlythroughouttheyears,anddredgingcontinuestoday.Figure5.YubaGoldfields.

Source:ENGEOHydraulicminingresultedintorrentsofsedimentbeingtransporteddownslopetothevalley

Page 13: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

11   

andcausedrapidaggradationandexacerbationoffloodingalongvalleyrivers,includingthelowerYubaRiver(JamesandSinger2008).Twomajordebrisdams(i.e.,DaguerrePointDamin1906andEnglebrightDamin1941)wereconstructedontheYubaRivertopreventcontinuingmovementofsedimentintotheFeatherandSacramentorivers,andultimatelytheBay‐Delta.Dams Duringthelate1800sandearly1900s,developmentoftheupperYubaRiverWatershedforhydropowerandwatersupplywasinprogress.Mostofthedamsanddiversionsthatwereusedprimarilyforgoldminingwereinplaceduringthisperiod,buttheywerebeingreplacedorremovedasdevelopmentalemphasisinthewatershedshiftedfromgoldminingtofloodcontrol,watersupplyandhydropowergeneration.Debrisdamsalsowereinplaceorbeingaddedatseverallocationsthroughoutthemiddletolowerelevationsofthewatershed.Thepresence,operationandmaintenanceofdamscanhinderorprecludefishaccesstoupstreamsub‐basins,whichhistoricallyprovidedholding,spawning,incubationandrearinghabitats(NMFS2014a).Inadditiontotheeffectsofharvest,hatcheries,predation,andhabitatdegradation,theeffectsofhydropowerdamsandotherwaterandsedimentcontrolfacilitieshavecontributedtothesignificantdeclineofCentralValleysalmonsincethemid‐1800s,includingtheYubaRiver(NMFS2014).Althoughother,smallerdamsarepresentinthewatershed,EnglebrightDamisthefirstbarriertosalmonids,whileNewBullardsBardamisthesecondontheNorthYuba.Asdocumentedinthe2013biologicalassessmentonDaguerrePointDam,USACEimplementedprotectiveandvoluntaryconservationmeasuresforlistedspeciesunderitsobligationtoSection7(a)(1)oftheEndangeredSpeciesActandseveralvoluntaryconservationmeasuresinaccordancewithUSACE’sEnvironmentalStewardshipandMaintenanceGuidanceandProcedures,respectively.USACEisincompliancewiththeEndangeredSpeciesAct.

4.1. SpeciesAddressedbytheSection905(b)Analysis Detaileddescriptionsofthefishspecies,includingtheirlifehistoriesandhabitatutilizationintheYubaRiver,areprovidedintheBiologicalAssessmentaddressingtheOperationsandMaintenanceofExistingFishPassageFacilitiesatDaguerrePointDam(USACE2013).MuchofthatinformationwasbasedupontheYubaAccordRiverManagementTeam(RMT)2013reportonthefishresourcesofthelowerYubaRiverthroughreviewofpreviouslyconductedstudies,aswellasrecentandcurrentlyongoingdatacollectionactivitiesoftheirMonitoringandEvaluation(M&E)Program.Briefdescriptionsareprovidedbelowforcontextinthisanalysis.Spring‐runChinookSalmon(Oncorhynchustshawytscha)ListingStatusandCriticalHabitatOnSeptember16,1999,NMFSlistedtheCentralValleyEvolutionarilySignificantUnit(ESU)ofspring‐runChinooksalmonasa“threatened”speciesundertheESA(64FR50394).In

Page 14: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

12   

August2011,NMFScompleteda5‐yearstatusreviewofthespring‐runChinooksalmonESU.Basedonareviewoftheavailableinformation,NMFS(2011a)recommendedthatthespring‐runChinooksalmonESUremainclassifiedasathreatenedspecies.NMFS’reviewalsoindicatesthatthebiologicalstatusoftheESUhasdeclinedsincethepreviousstatusreviewin2005.CriticalhabitatwasdesignatedfortheCentralValleyspring‐runChinooksalmonESUonSeptember2,2005(70FR52488).OntheYubaRiver,criticalhabitatisdesignatedfromtheconfluencewiththeFeatherRiverupstreamtoEnglebrightDam.Thedamblocksallupstreampassage,however,theCentralValleyspring‐runChinooksalmonESUcanswimupstreamofDaguerrePointDambyusingthefishladders.LifeHistoryandHabitatUtilizationAdultImmigrationandHoldingSpring‐runChinooksalmonpreviouslyhavebeenreportedtomigrateimmediatelytoareasupstreamoftheHighway20BridgeafterenteringtheYubaRiverfromMarchthroughOctober(VogelandMarine1991;YCWAetal.2007),andthenover‐summerindeeppoolslocateddownstreamoftheNarrows1and2powerhouses,orfurtherdownstreamintheNarrowsReachthroughthereportedspawningperiodofSeptemberthroughNovember(CDFG1991a;SWRCB2003).TheresultsfromtheRMT’sM&EProgram,includingtheVAKIRiverwatcher™monitoringandparticularlythethree‐yearacoustictelemetrystudy,foundpastcharacterizationsoftemporalandspatialdistributionstobelargelyunsupported.Taggedphenotypicadultspring‐runChinooksalmoninthelowerYubaRiveractuallymigratedupstreamofDaguerrePointDamfromMaythroughSeptember,andutilizedabroadexpanseofthelowerYubaRiverduringthesummerholdingperiod,includingareasasfardownstreamasSimpsonLaneBridge(i.e.,~RM3.2),andasfarupstreamastheareajustbelowEnglebrightDam.Themajorityoftaggedspring‐runChinooksalmonweredetectedintheplungepoollocatedimmediatelydownstreamofDaguerrePointDamfromtheonsetoftagginginMay/June,throughtheover‐summerholdingperiodaslateasSeptember.PeriodsofoccupationintheDaguerrePointDampoolduringthestudyrangedfrom0to116days.Therearenodefinitiveexplanationsforthisobservation,butitispossiblethatDaguerrePointDamrepresentedapassageimpediment,orthatthesefishover‐summeredintheDaguerrePointDampoolduetosuitablehabitatconditionsavailablebelowthedam(e.g.,favorablewaterdepths,cover,watertemperaturesandproximitytospawninggravels).Chinooksalmonpassagewasobservedoveravarietyofflowconditions.FlowthresholdsprohibitingpassageofChinooksalmonthroughtheladdersatDaguerrePointDamwerenotapparentinthedata.NMFS(2007)statedthatwhenhighflowconditionsoccurduringwinterandspring,adultspring‐runChinooksalmonandsteelheadcanexperiencedifficultyinfindingtheentrancestotheladdersbecauseoftherelativelylowamountofattractionflowsexitingthefishladders,comparedtothemagnitudeofthesheet‐flowspillingoverthetopofDaguerrePointDam.Inaddition,NMFS(2007)statedthattheanglesofthefishladderentrance

Page 15: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

13   

orificesandtheirproximitiestotheplungepoolalsoincreasethedifficultyforfishtofindtheentrancestotheladders.AdultSpawningandEmbryoIncubationThespring‐runChinooksalmonspawningperiodinthelowerYubaRiver,baseduponRMTinvestigations,extendsfromapproximatelySeptember1throughmid‐October.Theearliestspawning(presumedtobespring‐runChinooksalmon)generallyoccursintheupperreachesofthehighestqualityspawninghabitat(i.e.,belowtheNarrowspool)andprogressivelymovesdownstream.Thisspatialtrendreflectscoolerwatertemperaturesextendingfartherdownstreamasthespawningseasonprogresses(RMT2013).Spring‐runChinooksalmonspawninginthelowerYubaRiverisbelievedtooccurupstreamofDaguerrePointDam.WiththeexceptionoftheEnglebrightDamReach,thereisanabundanceofsuitablespawninggravelinthelowerYubaRiver.JuvenileRearingandOutmigrationSnorkelobservationsconductedbytheRMT(2013)indicatethatthedensityofjuvenileChinooksalmonwashighlyvariablethroughoutthelowerYubaRiveralthough,withtheexceptionoftheupstream‐mostsurveyreach(i.e.,EnglebrightDamReach)thedensityofjuvenileChinooksalmongenerallywashigherinthesurveyreacheslocatedupstreamratherthandownstreamofDaguerrePointDam.Theseobservationsareconsistentwithpreviousreports,indicatingthat.juvenileChinooksalmoncollectedbyelectrofishingandobservedbysnorkelingexhibithigherabundancesaboveDaguerrePointDam(Beak1989;CDFG1991;Kozlowski2004).Thismaybeduetolargernumbersofspawners,greateramountsofmorecomplex,high‐qualitycover,andlowerdensitiesofpredatorssuchasstripedbass(Moronesaxatilis)andAmericanshad(Alosasapidissima),whichreportedlyaregenerallyrestrictedtoareasbelowDaguerrePointDam(YCWAetal.2007).TheRMT(2013)reportedthatjuvenileChinooksalmonappearedtooccupyareasincloseproximitytotheshoreduringmostsurveymonthsandinmostsurveyreaches.TheoverallfindingsindicatethatjuvenileChinooksalmoninthelowerYubaRiverinitiallypreferslower,shallowerhabitat,andmoveintofasteranddeeperwaterastheygrow.EmigrationRecentRotaryScrewTram(RST)monitoringdataindicatethatthevastmajorityofspring‐runChinooksalmonemigrateaspost‐emergentfryduringNovemberandDecember.Overall,most(approximately84%)ofthejuvenileChinooksalmonwerecapturedattheHallwoodBoulevardRSTssoonafteremergencefromNovemberthroughFebruary,withrelativelysmallnumberscontinuingtobecapturedthroughJune.Althoughnotnumerous,capturesof(over‐summer)holdoverjuvenileChinooksalmonprimarilyoccurredfromOctoberthroughJanuarywithafewindividualscapturedintoMarch(Massa2005;MassaandMcKibbin2005).Thesefishlikelyrearedintheriverovertheprevioussummer,representinganextendedjuvenilerearingstrategycharacteristicofspring‐runChinooksalmon(RMT2013).

Page 16: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

14   

Figure6.Chinooksalmon.

Steelhead(O.mykiss)Steelheadexhibitsperhapsthemostcomplexsuiteoflife‐historytraitsofanyspeciesofPacificsalmonid.Membersofthisspeciescanbeanadromousorfreshwaterresidentsand,undersomecircumstances,membersofoneformcanapparentlyyieldoffspringofanotherform(YCWA2010).ListingStatusandCriticalHabitatOnMarch19,1998(63FR13347)NMFSlistedtheCaliforniaCentralValleysteelheadESUas“threatened”.OnJanuary5,2006NMFSissuedafinaldecisionthatdefinedCentralValleysteelheadasaDistinctPopulationSegment(DPS)ratherthananESU,andretainedthestatusofCentralValleysteelheadasthreatened(71FR834).InAugust2011,NMFScompleteda5‐yearstatusreviewoftheCentralValleysteelheadDPS,indicatedthatthebiologicalstatusoftheDPShasdeclinedsincethepreviousstatusreviewin2005,andrecommendedthatthesteelheadDPSremainclassifiedasathreatenedspecies.OnFebruary16,2000(65FR7764),NMFSdesignatedcriticalhabitatforCentralValleysteelheadincludingthelowerYubaRiverupstreamtoEnglebrightDam.NMFSpublishedafinalruledesignatingcriticalhabitatforsteelheadonSeptember2,2005(70FR52488),whichagainincludestheYubaRiverfromtheconfluencewiththelowerFeatherRiverupstreamtoEnglebrightDam.LifeHistoryandHabitatUtilizationAdultImmigrationandHoldingRMT(2010;2013)examinedpreliminarydataandidentifiedvariableannualtimingofO.mykissascendingthefishladdersatDaguerrePointDamsincetheVAKIRiverwatcher™beganoperationsin2003.TheyidentifiedtheperiodextendingfromAugustthroughMarchasencompassingthemajorityoftheupstreammigrationandholdingofadultsteelheadinthelowerYubaRiver.AdultSpawningandEmbryoIncubationSteelheadspawninggenerallyoccursinthelowerYubaRiverfromJanuarythroughApril(RMT2013).RMT(2013)reportedthatsteelheadredds(eggbeds)showadistinctive

Page 17: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

15   

patternspatiallythroughoutthelowerYubaRiver,withthemajorityofreddsintheupperreaches(TimbuctooBendandParksBar)ofthelowerYubaRiver.InthelowerYubaRiver,steelheadhavebeenobservedtospawninsidechannelareasaswellasinmainstemareas(YCWAunpublisheddata).JuvenileRearingandOutmigrationSomejuvenileO.mykissmayrearinthelowerYubaRiverforshortperiods(uptoafewmonths)andexhibitdownstreammovementfromAprilthroughSeptember.Othersmayspendfromonetothreeyearsrearingintheriver.MostjuvenilesteelheadrearingreportedlyoccursaboveDaguerrePointDam,withdecreasingabundancedownstreamofDaguerrePointDam.SWRIetal.(2000)suggestedthathigherabundancesofjuvenileO.mykissaboveDaguerrePointDammayhavebeenduetolargernumbersofspawners,greateramountsofmorecomplex,highqualitycover,andlowerdensitiesofpredatorssuchasstripedbassandAmericanshad,whichreportedlywererestrictedtoareasbelowDaguerrePointDam.SmoltEmigrationAlthoughnotnumerous,capturesof(over‐summer)holdoverjuvenileO.mykisswereobservedintheRSTcapturesprimarilyfromOctoberthroughmid‐April(RMT2013).Thesefishlikelyrearedintheriverovertheprevioussummer,representinganextendedjuvenilerearingstrategycharacteristicofholdoverjuvenileO.mykiss.JuvenileO.mykissthatexhibitextendedrearinginthelowerYubaRiverareassumedtoundergothesmoltificationprocessandvolitionallyemigratefromtheriver,andarereferredtoasyearling+smolts.Figure7.Steelhead.

Source:OregonDFWFall‐runChinooksalmon(O.tshawytscha)ListingStatusCentralValleyfall‐andlatefall‐runChinooksalmonareconsideredbyNMFStobethesameESU(64FR50394).NMFSdeterminedin1999thatlistingthisESUasathreatenedspecieswasnotwarranted(64FR50394),butsubsequentlyclassifiedthisESUasaFederalSpeciesofConcernbecauseofspecificriskfactors,includingpopulationsizeandhatcheryinfluencein2004(69FR19975).IntheCentralValley,fall‐runChinooksalmonarethemostnumerousofthefoursalmonruns,andcontinuetosupportcommercialandrecreationalfisheriesofsignificanteconomic

Page 18: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

16   

importance.Becauseoftheircommercialimportance,allruns(spring‐andfall‐runChinooksalmon)ofChinooksalmonandtheirdesignatedEssentialFishHabitat(EFH)aremanagedundertheMagnuson‐StevensFisheryConservationandManagementAct(MSA).IntheYubaRiverBasin,EFHisdesignatedupstreamanddownstreamofEnglebrightDamandReservoir.LifeHistoryandHabitatUtilizationAdultImmigrationandStagingUnlikespring‐runChinooksalmon,adultfall‐runChinooksalmondonotexhibitanextendedover‐summerholdingperiodinthelowerYubaRiver(RMT2010).Rather,itisbelievedthattheystageforarelativelyshortperiodoftimepriortospawning,assupportedbytherecentevaluationbytheRMToftheacoustictelemetrymonitoringdataandtheVAKIRiverwatcher™data(RMT2013).Bycontrasttophenotypicadultspring‐runChinooksalmon,whichexhibitedextendedperiodsofholdingdownstreamofDaguerrePointDam,RMT(2013)foundthattheacoustically‐taggedfall‐runadultChinooksalmonheldforanaverageofonlyapproximately3daysdownstreamofDaguerrePointDampriortopassingupstreamthroughthefishladders.SpawningandEmbryoIncubationAccordingtoRMT(2010),fall‐runChinooksalmonareprimarilyobservedspawningduringOctoberintheupperreachesofthelowerYubaRiverupstreamofDaguerrePointDam.Spawningfall‐runChinooksalmonbeginexpandingtheirspatialdistributionfurtherdownstreaminlaterfallmonthsassuitabletemperaturesbecomeavailablenearordownstreamofDaguerrePointDam(RMT2010).JuvenileRearingandDownstreamMovementInthelowerYubaRiver,mostfall‐runChinooksalmonreportedlyexhibitdownstreammovementasfryshortlyafteremergencefromgravels,althoughsomeindividualsrearintheriverforaperioduptoseveralmonthsandmovedownstreamasjuveniles(RMT2010).BaseduponRMT(2013)datareview,thephenotypicfall‐runChinooksalmonfryrearingperiodgenerallyextendsfrommid‐DecemberthroughApril,andthejuvenilerearinglifestageextendsfrommid‐JanuarythroughJune.Juveniledownstreammovement,whichincludesbothfryandlargerjuvenilesasindicatedbycapturesintheHallwoodBoulevardRSTs,generallyoccursfrommid‐DecemberthroughJune.GreenSturgeon(Acipensermedirostris)ListingStatusandCriticalHabitatTheSouthernDPSofNorthAmericangreensturgeon(Acipensermedirostrus)waslistedasaFederallythreatenedspeciesonApril7,2006(71FR17757)andincludesthegreensturgeonpopulationspawningintheSacramentoRiverandutilizingtheSacramento‐SanJoaquinRiverDelta,andSanFranciscoEstuary.OnOctober9,2009,NMFS(74FR52300)designatedcriticalhabitatfortheSouthernDPSofNorthAmericangreensturgeon.CriticalhabitatinthelowerYubaRiverincludesthestream

Page 19: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

17   

channelstotheordinaryhighwaterlineextendingfromtheconfluencewiththemainstemFeatherRiverupstreamtoDaguerrePointDam.LifeHistoryandHabitatUtilizationSincethe1970s,numeroussurveysofthelowerYubaRiverdownstreamofEnglebrightDamhavebeenconducted,includingannualsalmoncarcasssurveys,snorkelsurveys,beachseining,electrofishing,rotaryscrewtrapping,reddsurveys,andothermonitoringandevaluationactivities.Althoughnotspecificallydesignedforgreensturgeon,overthemanyyearsofthesesurveysandmonitoringofthelowerYubaRiver,onlyoneconfirmedobservationofanadultgreensturgeonhasoccurredpriorto2011.Ofthethreeadultorsub‐adultsturgeonobservedbysnorkelingintheYubaRiverbelowDaguerrePointDamduring2006,onlyonewasconfirmedtobeagreensturgeon.AspartofongoingsturgeonmonitoringeffortsintheFeatherRiverBasinundertheAnadromousFishRestorationProgram(AFRP),rovingunderwatervideosurveyswereconductedinthelowerYubaRiver.DuringlateMay2011,underwatervideographicmonitoringobserved4‐5greensturgeonnearthecenterofthechannelattheedgeofthebubblecurtainbelowDaguerrePointDam.During2012and2013,underwatervideographyalsowasusedinanattempttodocumentthepresenceofgreensturgeondownstreamofDaguerrePointDam,butnoobservationsofgreensturgeonweremade.BecausegreensturgeonhaverarelybeenobservedinthelowerYubaRiver,nosite‐specifichabitatutilizationinformationisavailable.However,DaguerrePointDamisacknowledgedtobeimpassibletogreensturgeon.Figure8.GreenSturgeon.

Source:CADFWCaliforniaRed‐LeggedFrog(Ranadraytonii)AnotherthreatenedspeciesthathashistorichabitatinthestudyareaistheCaliforniaRed‐LeggedFrog(CRLF)(Ranadraytonii).CRLFhistoricallyoccupiedportionsofthewesternslopeoftheSierraNevada,butpopulationshavebeenfragmentedandnearlyeliminateddueinlargeparttohabitatlosscausedbyagriculture,floodinfrastructure,andurbandevelopment.Suchhumanactionsledtothelossofstreamsandwetlands.ThelastsightingsoftheCRLFinYubaCountyoccurredinthe1960sandwerenorthofthestudyarea,alongtheNorthandSouthForksoftheFeatherRiver.

Page 20: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

18   

Figure9.CaliforniaRed‐LeggedFrog.

   5. SummaryofApplicablePriorStudies,Reports,andExistingWaterProjects

 5.1. WaterProjects

 5.1.1.Sacramento‐SanJoaquinDeltaTheDeltaisavast,low‐lyinginlandregionlocatedeastoftheSanFranciscoBayArea,attheconfluenceoftheSacramentoandSanJoaquinRivers.TheDeltaisacomplexareathatisimportanttoestuarinespecies,includinganadromousfish,agriculture,andproductionanddistributionofCaliforniawaterresources.TheCentralValleyProject,managedbytheUSBureauofReclamation,andtheStateWaterProjectstorewaterandtransferitfromthenorthernpartofthestatetothedriersouthernpart.WhilewaterdrawnfromtheDeltaprovidesformuchofCalifornia'swaterneeds,includingdrinkingwaterandagriculturalirrigation,fishareimpactedbythedistributionfacilities.Thefacilities,mainlypumpsandwaterpulledtowardthepumps,canaltermigratorycuesforsalmonidstravelingouttotheocean.Fishcanalsobelostinthepumps.Toreducethenegativeeffectstofish,watertransfersarehighlyregulated.5.1.2.YubaRiverDebrisControlProject

 TheRiversandHarborActofJune13,1902authorizedtheconstructionoftheYubaRiverDebrisControlProject,ofwhichDaguerrePointDamisapart,atanestimatedfirstcostof$800,000,one‐halfofwhichwasbornebytheU.S.CaliforniaDebrisCommission(CDC)andone‐halfbytheState. TheCDC,consistingofthreeArmyengineersappointedbythePresident,wasestablishedtoprovidefor:resumptionofhydraulicminingwithoutinjurytonavigationordamagetooverflow;torestore,asnearlyaspracticable,navigationconditionsasof1860;andtoaffordreliefinfloodtimeandtoprovidesufficientwatertomaintainscouringforceinsummertorestorechannelcapacities.TheCDCwaseffectiveindebrismanagement.UpondecommissioningoftheCDCbySection1106ofWRDA1986(P.L.99‐662),,administrationDaguerrePointDamwasassumedbyUSACE. 

Page 21: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

19   

  DaguerrePointDam 

DaguerrePointDam(Figure2)islocatedontheYubaRiverapproximately11.5milesupstreamofMarysville.AlthoughthedamwascompletedinMayof1906,theriverwasnotdivertedoverthedamuntil1910(USACE2007).DaguerrePointDamrapidlyfilledtocapacitywithsedimentanddebristhatmoveddownstreamduringfloodingin1911(Hunerlachetal.2004).DaguerrePointDamwasrebuiltin1965afteritwasdamagedandbreachedbyfloodsin1963and1964.Theareabehindthedamisalmostentirelyfilledwithupto4millioncubicyardsofsediment(DWRandUSACE2003)thathasaccumulatedsinceitwasrebuilt.AportionofthissedimentnexttotheupstreamfaceofthedamisremovedannuallybyUSACEtofacilitatefishpassage.Presently,USACEisresponsiblefortheoperationandmaintenanceofDaguerrePointDam.DaguerrePointDamkeyfeaturesincludethefollowing(USACE2012): Overflowconcreteogee(“s‐shaped”)spillwaywithconcreteapronandabutments Ogeespillwaysectionis575feetwideand25feettall Originallydesignedtoretainhydraulicminingdebris Currentlyusedtofacilitatewaterdiversionforirrigationpurposes Notoperatedforfloodcontrol Nostoragecapacity–reservoirfilledwithhydraulicminingdebrisandsediments

TherearethreewaterdiversionsassociatedwithDaguerrePointDam,whichutilizetheelevatedhead1createdbythedam,ortheinfluenceofthedaminthepreventionofadditionalriverchannelincision,togravity‐feedtheircanals.ThethreediversionsaretheHallwood‐Corduadiversion,theSouthYuba/Brophydiversion,andtheBrownsValleyIrrigationDistrict(BVID)diversion,whichhaveacombinedcapacityof1,085cfs.Also,theincreasedwaterlevelcreatedbyDaguerrePointDamsignificantlyenhancesgroundwaterrechargeintheYubagroundwatersub‐basins,whichiscriticallyimportantsourceofwaterreliabilityforYubaCounty.Inadditiontothedamstructure,therearetwofishladders,eachwithacontrolgate.Thetwofishladdersutilizethehydraulicheadcreatedbythedamduetotheinfluenceofthedampreventingadditionalchannelincisionabovethedam.Thepurposeofthesetwofishladdersistopermitsalmonandsteelheadaccessuprivertotheseasonalspawningareas.Othernativespecies,pikeminnowandsuckers,havealsobeenobservedusingtheladders.However,theladdersdonotmeetmodernfishpassagedesignstandards,andtheyarenoteffectiveinpassingallspeciesofconcernoverafullrangeofflows(NMFS2014a).TherearenorecreationfacilitieslocatedatDaguerrePointDam. EnglebrightDam OriginallyknownasUpperNarrowsReservoir,HarryL.EnglebrightDamandLakeisonthe                                                            1The“elevatedhead”atDaguerrePointDamiscreatedbythehydraulicconditionsassociatedwithwaterbeingimpoundedbehind(i.e.,upstream)ofthedam.TheCorpshasnocontroloverthein‐riverflows,andhasnodiscretionarycontroloverthe“head”forlocalwaterusersinthevicinityofDaguerrePointDam.

Page 22: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

20   

mainstreamoftheYubaRiver(RM23.9)approximately20milesnortheastofMarysville.TheconcretearchdamandreservoirwasauthorizedbytheRiversandHarborsActof1935aspartoftheSacramentoRiverandTributariesProject.CompletedbytheCDCin1941,theprojectwasauthorizedprimarilytocontainhydraulicminingsedimentsoriginatinginupstreamareas(USACE2013).EnglebrightDamis260feethigh(Figure3),andthestoragecapacityofthereservoirwas69,700AFatthetimeofconstruction(Childsetal.2003).However,duetosedimentbuildupsinceconstruction,thegrossstoragecapacitywasmorerecentlyestimatedatapproximately50,000AF(USGS2003).ThevolumeofsedimentinEnglebrightLakeissignificantandwasestimatedatapproximately28millioncubicyardsin2003bytheUSGS(MWH2013).AdditionaldetailsregardingEnglebrightDamandLakeareprovidedbelow.

Englebright Dam is a concrete constant angle arch structure. Dam crest length of 1,142 feet and the dam top crest width is 21 feet. Dam spillway crest elevation is 527 feet msl. Maximum spillway design capacity is 108,000 cfs. Reservoir water surface elevation generally fluctuates between 517 feet to 525 feet msl on a

daily and weekly basis. Englebright Reservoir is used as an afterbay for releases from New Bullards Bar Reservoir

through the New Colgate Powerhouse and is used as a regulating reservoir to meet recreation and power generation needs and to capture uncontrolled flows from the Middle and South Yuba rivers to manage downstream releases to the lower Yuba River.

Englebright Lake is approximately 9 miles long. Englebright Dam provides the hydraulic head for approximately 67 MW of electric

generation at the Narrows 1 and 2 powerhouses.

Waterinthereservoirprovidesforrecreationalopportunitiesandforhydroelectricpowergeneration.Thereservoirdoesnothaveanydedicatedfloodstoragespaceandonlyprovidesincidentalfloodcontrolbenefits.Sincethereservoirwasconstructedforminingdebrisretentionandnotforfloodcontrolpurposes,itdoesnothavealow‐leveloutlet.Infact,thedesignofthedamallowsunregulatedfloodflowstospilloverEnglebrightDamduringfloodevents.Sincearound1941,controlledreleasesintothelowerYubaRiverhavebeenmadefromthePacificGasandElectricNarrows1powerplantandsince1970fromtheYCWANarrows2powerplant,bothFederalEnergyRegulatoryCommission(FERC)‐licensedfacilities.Thesepowerplantsarejustdownstreamofthedam.EnglebrightDamrepresentsthedelineationbetweentheupperandlowerYubaRiver(USACE2012).EnglebrightLakeiscurrentlyusedforrecreationandhydroelectricpowergeneration.EnglebrightDamanditsassociatedhydropowerfacilitiesareimpassableintheupstreamdirectionandthereforerepresenttheupstreamlimitofanadromousfishmigrationintheYubaRiver(NMFS2014a).  5.1.3.NewBullardsBarDamThelargeststructureontheriver,NewBullardsBarDam,isontheNorthYubaRiver,approximately18milesupstreamfromEnglebright.Constructionwascompletedin1970byYCWAaspartofFERCProjectNo.2246toprovidewaterforpowergeneration,irrigationand

Page 23: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

21   

domesticneeds,floodcontrol,andrecreation(YCWA2010),andthedamis645feethigh.ReleasesfromNewBullardsBarReservoiraremadethroughtheNewColgatePowerhouse,throughthedam’slow‐leveloutlet,orgatedspillway(YCWAetal.2007;YCWA2014).Thereservoirisusedheavilyforrecreation,anditpowerstwohydroelectricplants.Figure4displaysNewBullardsBarDam.AdditionaldetailsaboutNewBullardsBarDamandReservoirareasfollows(YCWA2010):

1,110‐footradius,doublecurvature,concretearchdam. Damheightis645feet Overflow‐typespillwaywithawidthof106feet. Spillwaycrestelevationof1,902feetmsl. Three30‐footwideand54‐foottallTainterGatesonthespillway. Maximumspillwaydesigncapacityof160,000cfs. Provides hydraulic head for 340 MW of hydroelectric peaking power at the Colgate

powerhouse. Thereservoirextendsapproximately8.5milesupstreamatthenormalmaximumwater

surfaceelevation(1,956feet). Estimatedreservoirstoragecapacityis966,103acre‐feet. Reservoirmaximumdepthis645feet. Normalwaterlevelfluctuationsof150feet

5.1.4.OtherExistingWaterProjectsOtherdamshavebeenconstructedintheYubaRiverWatershedforirrigationanddrinkingwatersupplies.Manyoftheearlierdamsarenowusedforhydropowerinadditiontonewerdamsconstructedwithhydropowerasapurpose.OtherhydroelectricprojectswithintheYubaRiverwatershedaretheYuba‐BearProjectmanagedbytheNevadaIrrigationDistrict(awateragencybasedinGrassValley,California)andtheDrum‐SpauldingProjectoverseenbyPacificGasandElectricCompany.

5.2. PriorStudiesTheYubaRiverdownstreamofEnglebrightDamisoneofthemorethoroughlystudiedriversintheCentralValleyofCalifornia.MuchoftheresearchisconnectedtotheFederalEnergyRegulatoryCommission(FERC)relicensingprocessofYCWA’sYubaRiverDevelopmentProject(YRDP).InAppendixE6ofYCWA’sApplicationforNewLicense,TechnicalMemorandum7‐8summarizestheavailableliteratureforspring‐runChinooksalmonwherespecificallyidentified,Chinooksalmoningeneralwhererunsarenotspecificallyidentified,andO.mykiss(includingsteelhead).Thetechnicalmemorandumsummarilydescribes21availablefieldstudiesanddatacollectionreports,20otherrelevantdocuments(e.g.,plans,policies,historicalaccountsandregulatorycompliance),14ongoingdatacollection,monitoringandevaluationactivitiesfortheM&EProgram,and4otherdatacollectionandmonitoringprograms.Additionalkeypriorstudiesandreportsaredescribedbelow.

Page 24: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

22   

AssessmentofInfrastructureandRelatedItemstoSupportAnadromousFishPassagetotheYubaRiverWatershed,PreparedbyMWHfortheYubaSalmonForum.March2013.ThereportprovidedanassessmentofinfrastructuretosupportanadromousfishpassagetotheYubaRiverWatershed,includinganengineeringassessmentofthefacilities,appurtenances,costs,permitting,andchangestotheinfrastructureandoperationsofexistingfacilitiesrequiredfortheimplementationandoperationsandmaintenance(O&M)ofanAnadromousFishPassageProgramtolocationsintheupperYubaRiverWatershed,includingtheNorth,Middle,andSouthYubarivers.BiologicalAssessmentfortheApplicationforNewFERCLicenseDraft,YCWA,April2014 TheBAidentifiedandevaluatedpotentialeffectsonthreatenedandendangeredspeciesfromtheYCWA’spowergeneratingactivities.ItwasrequiredaspartoftheFERCrelicensingprocess. BiologicalAssessmentforOperationandMaintenanceforDaguerrePointDamontheYubaRiver,USACE,October2013 TheBAdefinedandevaluatedthepotentialeffectsofUSACE’slimitedongoingdiscretionaryactivitiesatDaguerrePointDamonthreatenedandendangeredspeciesandtheirdesignatedcriticalhabitatsinthelowerYubaRiver.ItsupersededtheJanuary2012BAfortheOngoingOperationandMaintenanceofEnglebrightandDaguerrePointDams.BiologicalAssessmentforOperationandMaintenanceforEnglebrightReservoirontheYubaRiver,USACE,October2013 

TheBAdefinedandevaluatedthepotentialeffectsofUSACE’songoingdiscretionaryactivitiesatEnglebrightDamandReservoironESA‐listedspeciesandtheirdesignatedcriticalhabitatsinthelowerYubaRiver.ItsupersededtheJanuary2012BAfortheOngoingOperationandMaintenanceofEnglebrightandDaguerrePointDams.  

BiologicalOpinionforOperationandMaintenanceofDaguerrePointDamandFishLadders,NMFS,May2014 TheBiOprespondedtothe2013DaguerrePointDamBAandconcludedthatimplementationoftheproposedactionisnotlikelytojeopardizethethreatenedandendangeredspeciesoradverselymodifytheirdesignatedcriticalhabitat.NMFSincludedReasonableandPrudentMeasuresanddiscretionarytermsandconditionsthatareintendedtominimizeincidentaltakeassociatedwiththeproposedaction.TheBiOpsupersededtheFebruary2012BiOpforOperationandMaintenanceofEnglebrightandDaguerrePointDams. DaguerrePointDamFishPassageImprovementProjectAlternativeConcepts

Page 25: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

23   

Evaluation,WoodRodgers,Inc.,Sacramento,CA,September2003 Thisevaluationdescribedthepotentialsolutions(andlimitationsofeach)forfishpassageimprovementsatDaguerrePointDamasrecommendedbytheCaliforniaDepartmentofFishandGame(DFG,nowtheDepartmentofFishandWildlife).Itprovidedcostsforeachsolutionandcomparedtheimpactstofishpassage,watersupplyinterests,anddownstreamfloodprotectionrelativetothecostforimplementation. InterimMonitoring&EvaluationReportDraft,LowerYubaRiverAccord,RiverManagementTeam,April2013 TheInterimMonitoringandEvaluation(M&E)Reportservedasbotha‘reportcard’ontheLowerYubaRiverAccord’sRMT’sM&EprogramresultsregardingtheimplementationoftheYubaAccordforregulators,stakeholdersandthebroaderscientificcommunity,andtohelpinformtheFERCrelicensingprocess. LetterofConcurrenceforOperationandMaintenanceforEnglebrightReservoirontheYubaRiver,NMFS,May2014 Theletterwasrespondedtothe2013USACEBiOpforOperationandMaintenanceforEnglebrightReservoir.Intheletter,NMFSconcurswithUSACE’sdeterminationthattheprojectproposedintheBiOpisnotlikelytoadverselyaffectCentralValleyspring‐runChinooksalmonandsteelheadorgreensturgeonorthespecies’designatedcriticalhabitats. PreliminaryFishPassageImprovementStudy,USACE,August2001 ThispreliminarystudyidentifiedpotentialalternativesforfishpassageimprovementatDaguerrePointDamontheYubaRiver.Itincludedpreliminaryplanstoreducefisheriesresourceproblemsinthestudyarea.Itprovidedtheprojectstatusandplannedfutureeffortsneededtoconductafeasibilitystudywhichwouldimprovefishpassage. UpperYubaRiverWatershedChinookSalmonandSteelheadHabitatAssessment,DWR,2007 TheCaliforniaDepartmentofWaterResources’(DWR)UpperYubaRiverStudiesProgramconductedthisstudytodeterminewhetherthere‐ introductionofwildChinooksalmonandsteelheadtotheupperYubaRiverwatershedisbiologicallyfeasible.ThestudyconcludedthattheMiddleYubaRivercouldsupportasmallsalmonrun. YubaRiver,California,DaguerrePointDamInitialAppraisalReport,USACE,August2005 ThisSection216studydeterminedthatthereisFederalinterestinproceedingwithdetailedfeasibility‐levelstudiestoincludefishpassageimprovement,fisheriesrestoration,aquatichabitatrestoration,andflooddamagereductionassociatedwithDaguerrePointDam. YubaRiverBasinPostAuthorizationDocumentationReport,USACE,December2012

Page 26: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

24   

 TheYubaRiverBasin,California,PostAuthorizationDocumentationReport(PADR)reaffirmedthatthereisFederalinterestinprojectimprovementswithintheLinda/OlivehurstareaoftheauthorizedYubaRiverBasinProject.Theproject,asauthorized,includesimprovementstostrengthenexistingleveestoprovidefloodriskmanagement(FRM)benefitstotheCityofMarysvilleandtotheReclamationDistrict784area.YubaSalmonForumSummaryHabitatAnalysis,PreparedbyCardnoENTRIXfortheYubaSalmonForum,September2013Thisreportprovidesasummaryassessmentofpotentialanadromousspring‐runChinooksalmonandsteelheadhabitatintheYubaRiverWatershed.ThesummaryassessmentwasdesignedtoprovidetheYSFwithhabitatinformationthatcanbeusedtoreviewpotentialactionsthatwarrantfurtherinvestigationregardingintroductionofCentralValleyspring‐runChinooksalmonandCentralValleysteelheadintotheNorth,Middle,and/orSouthYubariversand/orportionsoftheYubaRiver.Thesummaryassessmentincludesasynthesisofdatafromvarioussourcesthatincludeshydrology,watertemperature,upstreammigrationbarriers,andaquantificationofmigration,holding,spawning,incubation,rearing,andsmoltemigrationhabitat.   5.3 RestorationProjects OtherentitiesarealsoworkingtorestorelowerYubaRiverriparianandaquatichabitat.TheSouthYubaRiverCitizen’sLeague(SYRCL)completedtheHammonBarRiparianHabitatRestorationProjectwhichrestoredfiveacresofriparianhabitatand3.5milesofjuvenilerearingaquatichabitat. 6. Scoping DuetoitsrelationshiptoESA‐listedspecies,thisstudyisimportanttomanystakeholdersaswellasFederal,state,county,andlocalgovernmentalagencies,andconservationgroupswhichareactivelyworkingtobringsalmonbacktotheupperpartsoftheriver.TheYubaSalmonForum,ofwhichUSACEisapart,convenedin2009toaddressreintroductionplanninginacollaborativeforumwithbroadrepresentationandacharter.Thisanalysisincorporatessomeoftheconsensusreachedbythatgroup. TheYubaAccordisa2008settlementagreementrepresentingnearlythreeyearsofintensenegotiationsamong17stakeholders,includinglocalirrigationdistricts,stateandFederalresourceagenciesandconservationgroups.Thesettlementprovidesforhigherflowrequirementsthatareprotectiveofthesalmonidfishery.Also,thesettlementcreatedtheRiverManagementTeam,whichperformsfisheryandrestorationstudiesonthelowerYubaRiverandprovidesinputtoYCWAonflowmanagementdecisions.OnAugust6,2014,CorpsstaffmetwithrepresentativesfromNMFSandFWStobriefthemonthereconnaissancestudyandtheprocessleadingtoafeasibilitystudy.Thestaffheardaboutothersimilarprojectsandstudies,suchasNFMS’“RIPPLEreports.”FWSaskedUSACEtoinvestigateamphibianhabitat,particularlyforthefoothillyellow‐leggedfrog(Ranaboylii),

Page 27: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

25   

alongtributariestotheYubaRiver.Thisfeedbackwillberesearchedandpossiblyincorporatedintothefeasibilitystudy,andUSACEwillcontinuetodialoguewiththeNMFSandFWSrepresentatives. Overthecourseofpreparationofthisanalysis,USACEmetwithrepresentativesfrompotentialnon‐federalsponsorsforthisstudy(DWRandYCWA).Cooperatingagenciesandstakeholdersinadditiontothesponsorsforthisstudyinclude,butarenotlimitedto:NMFS,FWS,CaliforniaDepartmentofFish&Wildlife(CDFW),theTahoeNationalForest,publicrecreationgroups,irrigationdistricts,theSouthYubaRiverCitizensLeague(SYRCL),andTroutUnlimited.USACEwillconsultwiththeNativeAmericantribesofthearea. 7. Problems,Opportunities,andFutureWithout‐ProjectConditions Problemsareundesirableconditionstobechangedthroughtheimplementationofanalternativeplan.Opportunitiesarepositiveconditionstobeimprovedbyanalternativeplan.Thedifferencebetweenproblemsandopportunitiesisoftensimplyamatterofperspective. BecausehabitatsoftheYubaRiverarehealthyandrecoveringfromhistoricaldisturbances(YCWA2013),thelargestremainingproblemisthelossofhabitatconnectivityforanadromousfishspecies,whicharenationallysignificantresources.Fishcannotaccessupstreamhabitatbecauseofthepresenceofdamsoreffectivefishpassagemechanisms.Conceptualmodelsarehelpfulduringthefirststepsoftheplanningprocess,astheyprovideakeylinkbetweenearlyplanning(e.g.,aneffectivestatementofproblem,need,opportunity,andconstraint)andlaterevaluationandimplementation.Forthis905(b)analysis,thefollowingconceptualmodel(Figure10)wasdeveloped,whichexploresthesalmonidlifecycleanditsconnectiontotheYubaRiver.

Page 28: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

26   

Figure10.SalmonidLifeCycleConceptualModel. 

  

7.1. ProblemsTheconceptualmodelassistsinunderstandingtheanadromoussalmonids’lifecyclesandfunctionalrelationshipsintheYubaRiver,assummarizedbelow. 

1. Aquatichabitatconnectivityhasbeenlost.Inparticular,anadromousfishcannotaccesshistoricspawninghabitataboveEnglebrightDam.

 DaguerrePointDammay,undercertainconditions,beanimpedimenttoanadromousfishpassage—salmonidscan’tusethefishladdersundersomeflowconditions,andsturgeoncan’tusetheladdersatall.Additionally,fishmaybecomeinjuredastheypassdownstreamoverDaguerrePointDam.EnglebrightDamblocksallanadromousfishpassage.

 2. Thequalityandquantityofaquatic,riparian,andgeneralfloodplainhabitathas

beendiminished.Inparticular,anadromousfishspawninggravelhasbeenreducedthroughouttheYubaRiver,andjuvenilerearinghabitathasbeenreducedinthelowerYubaRiver.

Page 29: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

27   

 Inadditiontowhathasbeenlostupstreamofthedams,habitatloss,especiallyforjuvenileanadromousfish,hascontributedtoreducedpopulationsofnativefishintheYubaRiver.AlthoughUSACE’sgravelaugmentationprogramhasincreasedtheamountofspawninghabitatdownstreamofEnglebrightDam,highquality,complexanddiversejuvenilerearinghabitatislacking,asisfloodplainhabitat.

 

3. Salmonidgeneticdiversityhasdeclinedthroughoutthestudyareaandworld‐wide. 

Thelimitedavailabilityofspawninghabitatandimpededpassagecanresultinoverlapofdifferentspawningrunsinthesamespawningareaduringthesameperiod,whichreducesgeneticintegrity.Also,hatcheryfishstrayintothelowerYubaRiverfromtheFeatherRiverandothersystemsandinterbreedwiththenativefishaswellascompetewithnative‐spawnedYubaRiverfishforspawninghabitatandotherresources.

AnadromoussalmonidpopulationsintheYubaRiverwatershedhaveendurednearly150yearsofintensehumandegradationoftheirriverinehabitat,startingwithhydraulicgoldmininginthemid‐nineteenthcentury,andcontinuingthroughtheconstructionofdams,includingthetwoCorpsdams‐EnglebrightandDaguerrePoint.Numerousstressors,severalofwhichareassociatedwithpasthydraulicminingpracticesandthesetwodams,continuetoaffectthefisheryresourcesintheYubaRiver.ManyofthemostimportantstressorsaffectinganadromoussalmonidsintheYubaRiverincludepassageimpedimentsandbarriers,physicalhabitatalteration,lossofriparianhabitatandinstreamcover(e.g.,riparianvegetation,instreamwoodymaterial),lossofnaturalrivermorphologyandfunction,lossoffloodplainhabitat,entrainment,predation,andhatcheryeffects.Thekeylimitingfactors,threatsandstressorsaffectingspring‐andfall‐runChinooksalmon,aswellassteelhead,arethoroughlydiscussedinUSACE’s2013BAsandarebrieflysummarizedbelow.Thegeomorphicconditionscausedbyhydraulicanddredgeminingsincethemid‐1800s,andtheconstructionofEnglebrightDam,whichaffectsthetransportofnutrients,fineandcoarsesedimentsand,toalesserdegree,woodymaterialfromupstreamsourcestothelowerriver,continuetolimithabitatcomplexityanddiversity,particularlyforjuvenilesalmonidsrearinginthelowerYubaRiver.Restrictedavailabilityofcomplex,diversehabitatssuchasmultiplebraidedchannelsandsidechannelsassociatedwiththelossofnaturalrivermorphologyandfunctionalsopresentlycontinuestobearelativelyhighstressortoYubaRiveranadromoussalmonids.Riparianvegetationandlargewoodymaterial(LWM)playanimportantroleinhabitatcomplexityanddiversity.TheabundanceanddistributionofthesephysicalhabitatcharacteristicspotentiallylimitstheproductivityofjuvenilesalmonidsinthelowerYubaRiver.Also,thelowerYubaRiverfloodplainiscomprisedofunconsolidatedalluviumwithoutanabundanceofcharacteristicsassociatedwithincreasedjuvenilesalmonidgrowth.EnglebrightDamisanimpassablebarriertotheupstreammigrationofanadromoussalmonids,andmarkstheupstreamextentofcurrentlyaccessibleChinooksalmonandsteelheadhabitatinthelowerYubaRiver.AccordingtoNMFS(2007,2009,2014),thegreatestimpacttolistedanadromoussalmonidsintheYubaRiverWatershedisthecompleteblockageofaccessforthesespeciestotheirhistoricalspawningandrearinghabitataboveEnglebrightDam.BecauseofthelossofhistoricalspawningandrearinghabitataboveEnglebrightDam,

Page 30: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

28   

resultantlossofreproductiveisolationandsubsequenthybridizationwithfall‐runChinooksalmon,restrictionofspatialstructureandassociatedvulnerabilitytocatastrophicevents,theexistenceofEnglebrightDamisaveryhighstressortoYubaRiverspring‐runChinooksalmon,aswellastosteelhead.InadditiontoEnglebrightDam,therearenumerousissuesassociatedwithanadromousfishpassageatUSACE’sDaguerrePointDam.NMFS(2014)statedthatpassageconditionsatDaguerrePointDamareconsideredtobeinadequateforChinooksalmonandsteelheadthroughoutmuchoftheyearduetothedesignoftheexistingladders.Whenhighflowconditionsoccurduringwinterandspring,adultspring‐runChinooksalmonandsteelheadreportedlycanexperiencedifficultyinfindingtheentrancestotheladdersbecauseoftherelativelylowamountofattractionflowsexitingthefishladders,comparedtothemagnitudeofthesheet‐flowspillingoverthetopofDaguerrePointDam(USACE2013).Inaddition,NMFS(2014)statedthattheanglesofthefishladderentranceorificesandtheirproximitiestotheplungepoolalsoincreasethedifficultyforfishtofindtheentrancestotheladders.Otherconfigurationanddesignfeaturesofthefishladdersandpassagefacilitiesthatreportedlycouldeitherdelayorimpedeanadromoussalmonidaccesstospawningandrearingareasabovethedaminclude:(1)thecontrolgate,actingasasubmergedorifice,isonlypassableatlowflows(actualflowdataareunavailable)duringthesummerandfall;(2)“masking”oftheentrancestotheladderswhenflowoverthespillwayoccurs;(3)theladdersbecomecloggedwithdebris;(4)unfavorablewithin‐bayhydrauliccharacteristics,particularlyassociatedwithdebriscollection;(5)unfavorablefishladdergeometricconfigurations;and(6)sedimentationandunfavorablehabitatconditionsassociatedwithegressfromthefishladders.NMFS(2014)andotherdocuments(NMFS2002;CALFEDandYCWA2005)suggestthatjuvenilesalmonidsalsomaybeadverselyaffectedbyDaguerrePointDamontheirdownstreammigrations,becauseDaguerrePointDamcreatesalargeplungepoolatitsbase,whichprovidesambushhabitatforpredatoryfishinanareawhereemigratingjuvenilesalmonidsmaybeinjuredordisorientedafterplungingoverthefaceofthedamintothedeeppoolbelow.TheintroducedpredatorystripedbassandAmericanshadhavebeenobservedinthispool(CALFEDandYCWA2005).

7.2. OpportunitiesAccordingtoUSDOI(2010),someofthefactorsresponsibleforreductionsinChinooksalmonpopulationscanbeminimizedthroughrestorationactions.Opportunitiesexisttosignificantlyimproveaquatichabitatconnectivity,habitatqualityandquantity,andgeneticdiversity,andtolessenstressorsaffectinganadromoussalmonidsintheYubaRiverWatershedovertheperiodofanalysis.

1. ThereisanopportunitytoreintroduceanadromoussalmonidsintotheupperYubaRiverWatershed.

Reintroductionoftargetpopulations(e.g.,spring‐runChinooksalmonandsteelhead)intothehighestquality,mostavailableandpersistenthabitatintheupperYubaRiverWatershedwouldbeexpectedtoexpandthegeographicdistributionofanadromoussalmonids,increasetheoverallamountofhabitatavailablebyreconnectingaccessto

Page 31: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

29   

previouslyblockedhabitat,decreasethepossibilityofcatastrophicdecline,andincreasetheattributesofspatialstructureanddiversity.Allofthesefactorsdecreasetheextinctionriskandtherebycontributetorecovery.

2. Thereisanopportunitytorestoreside‐channelhabitatinthelowerYubaRiver.InthelowerYubaRiver,opportunitiesexisttoimplementside‐channelhabitatrestorationactions,shallowwaterrearingimprovementactions,riparianhabitatimprovementsandoff‐channelrearingactions.HabitatimprovementactionsinthelowerYubaRiveralsowouldbeexpectedtoincreasetheproductivityofYubaRiveroriginjuveniles.LowerYubaRiverhabitatimprovementactionscouldincreasethecarryingcapacityofspawninghabitatand,correspondingly,initialyearclassstrengthofspring‐runChinooksalmon.Perhapsmoreimportantly,itisanticipatedthatthelowerYubaRiverhabitatimprovementactionswouldfocusonjuvenilerearingandcontributetotheoverallgoalofincreasingproductivityandsurvivalofjuvenileanadromoussalmonidswhichsubsequentlyreturnasadultstothelowerYubaRiver. 

3. Thereisanopportunitytoconsiderrecreationinconjunctionwithanyrecommendedecosystemrestorationfeatures.

4. Theremaybeanopportunitytore‐establishaCaliforniared‐leggedfrogpopulation,notonlyalongtheYubaRiver,butalsointributaries.

Opportunitieswillbeexploredfurtherduringthefeasibilitystudy. 

7.3. FutureWithout‐ProjectConditions IfnoFederalactionistaken,thefisheries‐relatedproblemsdescribedaboveareexpectedtocontinue,andthestressorswillpersistandpotentiallybecomeexacerbated.Incrementalimprovementstocurrentlyaccessiblehabitatmaybemadebyotherentities.PopulationsofChinooksalmonandsteelhead,whilestabilizing,willbelessthanwhatanincreaseinconnectedhabitatcouldsupport.Also,populationswillnotbeasresilienttochangingconditionsduetothelackofaccesstoupstreamhabitataswellasgenetichomogenization.MiningwillcontinueintheGoldfields,andthetailingswillremain.RestorationopportunitiesmaybepresentintheGoldfields,however,duetothetremendousvolumeofgraveltailingsandinabilityofthosetailingstosupportmuchvegetation,thisanalysisdoesnotincludeanyrecommendationsfortheGoldfields.Restorationactionsbyotherentitieswillcontinue.TheUSBureauofReclamation’sCentralValleyBasinFisheriesProgramshastwoprojectsintheplanningphase,theNarrowsChannelRestorationandtheDaguerreAlleyFloodplainRestorationProjects.TheYubaRiverNarrowsChannelRestorationProjectwillrestoreupto0.5milesofin‐channelspawninghabitatbyrestoringandreplenishinggravelandremovingshotrockdebrisfromtheNarrowsReach,whichisbelowEnglebrightDam.TheDaguerreAlleyFloodplainRestorationProjectwillrestoreupto180acresoffloodplainhabitatandapproximately

Page 32: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

30   

2.5milesofside‐channelhabitat,whichisparticularlybeneficialtojuvenilesalmonids.Thenumberofsalmonidsreturningfromtheoceanwillcontinuetofluctuateduetovariousstressors,suchasfishingandoceanconditions.BecauseofmanagementactionsbythePacificFisheryManagementCouncil,suchasseasonalcommercialandrecreationalfishingbanswhensalmonidnumbersarelow,itisexpectedthatreturningsalmonidpopulationswillbesufficienttoutilizeavailablespawningandrearinghabitatintheYubaRiver.Overthenext50years,climatechangeisexpectedtobeastressorforanadromoussalmonidsintheYubaRiver,andclimatechangeingeneralposesanadditionalrisktothesurvivalofsalmonidsintheCentralValley(NMFS2014).AccordingtoNationalOceanicandAtmosphericAdministration(NOAA)research,undertheexpectedwarmingofaround5°C,substantialhabitatintheCentralValleywouldbelost,althoughsignificantamountsofhabitatcouldremain,primarilyintheFeatherandYubarivers(Lindleyetal.2007).Literaturesuggeststhatbytheyear2100,meansummertemperaturesintheCentralValleymayincreaseby2to8°C,precipitationwilllikelyshifttomorerainandlesssnow,withsignificantdeclinesintotalprecipitationpossible,hydrographswilllikelychange,andChinooksalmonandsteelheadwillbemorethermallystressedbystreamwarmingatthesouthernendsoftheirranges(e.g.,CentralValleyDomain)(NMFS2014).NMFS(2014)hasprioritizedtheupperYubaRiver(upstreamofEnglebrightDam)asaprimaryareatore‐establishviablepopulationsofspring‐runChinooksalmonandsteelhead.RecentstudiesconductedbyYSF(2013)demonstratethatofallrivers/reachesintheYubaRiverWatershed,theNorthYubaRiverupstreamofNewBullardsBarReservoirandthelowerYubaRiverdownstreamofEnglebrightDamprovidethemostthermallysuitableamountsofhabitatinthewatershed.TheNorthYubaRiver,becauseofthelackofstoragereservoirsandwatermanagementinfrastructure,mostcloselyapproximatesunimpairedconditions.AccordingtoYCWA(2010),becauseofspecificphysicalfactors,hydrologicfactors,andflowsnegotiatedundertheYubaAccordthelowerYubaRiverisexpectedtocontinuetoprovidethemostsuitablewatertemperatureconditionsforanadromoussalmonidsofallCentralValleyfloorrivers,eveniftherearelong‐termclimatechanges.ThisisbecauseNewBullardsBarReservoirisadeep,steep‐slopedreservoirwithamplecoldwaterpoolreservesthatwillcontinuetobeavailabletoprovidesustained,relativelycoldflowsofwaterintothelowerYubaRiverduringthelatespring,summerandfallofeachyear(YCWA2010).UrbandevelopmentalongtheYubaRiverwillbenegligible.Mostoftheupperwatershedisnationalforestland.ThetownsalongtheupperportionsoftheYubaRiverareoveranhour’sdrivefromjobcenters,sotheyarenotexpectedtogrowsignificantly.AreasalongthelowerYubaRiverareexpectedtoremainrural;indeed,YubaCounty’scurrentgeneralplan,from1996,statesthat,“theYubaCountywatershedwillbeconservedandprotectedthroughcarefulmanagementofgrowth,developmentandtimberharvestingwithinthewatershed.”Apreliminarypermitforaproposed3mega‐watthydroelectricprojectonthesouthsideofDaguerrePointDamiscurrentlyundergoingapreliminaryFERCproceeding(P‐14432)(NMFS2014a).However,noactionsareplannedatthistime.Itisassumedforthisanalysisthatthe

Page 33: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

31   

projectwouldberequiredtomitigateitsownimpacts,ifpermitted. 

AuthorizedFunctions‐DaguerrePointDam UndertheDaguerrePointDamprojectauthority,USACEisresponsibleforvariousdiscretionaryandnon‐discretionaryfunctions.Thediscretionaryfunctionsinclude,butarenotlimitedto,thetimingandfrequencyofmonitoringandclearingdebrisfromthefishladders,andmanagingsedimentbuildupacrosstheupstreamfaceofthedam.FuturegravelinjectionsandtheLargeWoodyMaterialManagementPlanareanticipatedascomponentsofUSACE’svoluntaryconservationmeasuresassociatedwiththerecentESAconsultation.USACE’sGravelAugmentationImplementationPlancontainsguidanceforalong‐termgravelinjectionprogramtoprovidespring‐runChinooksalmonspawninghabitatinthebedrockcanyondownstreamofEnglebrightDam.Non‐discretionaryfunctionsincludetheinspectionandmaintenanceofthedamstructureandfishladderstoensuretheyremainingoodrepair. 

AuthorizedFunctions‐EnglebrightDam UndertheEnglebrightDamprojectauthority,USACEisresponsibleforvariousdiscretionaryandnon‐discretionaryfunctions.Thediscretionaryfunctionsincludeactivitiesrelatedtothemannerandfrequencyofmaintainingtherecreationalfacilitiesatthedam.Non‐discretionaryfunctionsincludetheinspectionandmaintenanceofthedamstructuretoensureitremainsingoodrepair.Asadebrisdam,USACEdoesnotconductanywatercontroloperationsorreleases.

8. PlanningGoalsandObjectives EcosystemrestorationisoneoftheprimarymissionsofUSACE’sCivilWorksprogram.Theecosystemrestorationplanningobjectiveistocontributetonationalecosystemrestoration(NER).ContributionstoNERoutputsareincreasesinthenetquantityand/orqualityofdesiredecosystemresourcesovertheperiodofanalysis(often50years).MeasurementofNER,whichisbasedonchangesinecologicalresourcequalityasafunctionofimprovementinhabitatqualityand/orquantity,isexpressedquantitativelyinphysicalunits,alsoknownasmetrics.TheNERPlanisthealternativeplanthatreasonablymaximizesecosystemrestorationbenefitscomparedtocosts,consistentwiththeFederalobjective. Specificplanningobjectiveswillbedevelopedwiththenon‐Federalsponsorandstudystakeholdersduringthefeasibilitystudy.Theobjectiveswillidentifyhowtheplancanreducetheriskofcontinuedundesiredoutcomes,suchassteelheadpopulationdeclines,and/orincreasethelikelihoodofdesiredoutcomes,suchasmilesofaccessibleriparianhabitat.Metricswillbedevelopedinordertoassesstheoutputsandeffectsofthealternatives.Thesemetricswilllikelybebasedontheanadromousfishspeciesasindicatorspecies. Salmonareaneffectiveindicatorspeciesbecausetheyarefairlyeasytoobserveandtheyoccupytheentireriverecosystem.Theyaresensitivetoavarietyoffactors:waterquality,foodwebs,riverflowsandprocesses,turbidity,andwatertemperature.Generally,ifthequalityofthewatershedecosystemdeclines,salmonpopulationswill

Page 34: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

32   

decline.Also,salmonserveakeyroleinbringingnutrientsfromtheocean,suchasnitrogen,intoinlandareas.Thesenutrientsnourishcountlessotherorganisms. Onewaytoidentifyobjectivesistouseanexampleofafunctioninghabitat.Forriverecosystemrestorationprojects,suchanexampleisoftencalleda“referencereach.”OnehasnotyetbeenidentifiedalongtheYubaRiver,partlybecausetheUpperYubacan’teasilybecomparedtotheLowerYuba.Duringthefeasibilitystudy,possiblereferencereachesinotherwaterwayswillbeinvestigated,suchasalongtheCosumnesRiver,theonlyundammedriverdrainingwestoutoftheSierra,andtheTrinityRiverorBattleCreek,whichareundergoingrestorationefforts. Forthereconnaissancestudy,thefollowingpreliminaryobjectiveswereidentified.Theseobjectivesaddressthreebroadercategoriesofproblemsandopportunities:1)connectivity,2)habitatqualityandquantity,and3)geneticintegrity.Alternativesthatmeettheseobjectiveswillincreaseanadromousfishspecies’resiliencytowithstandclimatechangeaswellascatastrophiceventssuchaswildfires. Appropriate,limitedrecreation,inconjunctionwithecosystemrestorationfeatures,willbeconsidered,consistentwithUSACEpolicy. Alloftheobjectivesarethroughoutthestudyareaovertheperiodofanalysis,whichisexpectedtobe50years.

Connectivity:� ImproveorprovideaccesstohabitatforanadromoussalmonidswithintheYubaRiver

watershed.� ImproveupstreamanddownstreampassageforgreensturgeoninthelowerYuba

Rivertoprovideaccesstosuitablehabitat. 

HabitatRestoration� Restorerearinghabitatofjuvenileanadromoussalmonids.� Restorespawninghabitatofspring‐runChinookdownstreamofEnglebrightDam.

 GeneticIntegrity

� Preservegeneticdiversityofanadromoussalmonids,particularlyspring‐runChinooksalmon.Recreation

� Providerecreationopportunitiesinconjunctionwithecosystemrestorationfeatureswhererecreationusewouldnotdetractfromecosystemoutputs.

Meetingtheaboveobjectiveswillincreasetheresiliencyofsalmonidsandgreensturgeon.Increasingtheavailabilityandqualityofspawningandrearinghabitatwillincreasethelikelihoodthatnationally‐significantsalmonidscouldcontinuetoreproduce.Preservinggeneticdiversityprotectstheabilityofaspeciestowithstanddiseasesorchangingconditions.

Page 35: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

33   

9. PlanningConstraintsandKeyConsiderations Duringthefeasibilitystudy,specificstudyobjectivesandconstraintswillbeaddressedwiththenon‐federalsponsorandstudystakeholders.Atthistime,noabsoluteconstraintshavebeenidentified.However,akeylimitationontheformulationprocessisthatthestudywillnotrecommendanyactionthatislegallyrequiredofanotherentityorUSACEO&M.Forinstance,accordingtothePlanningGuidanceNotebookAppendixE,USACEwillnotproposeanyrestorationprojectsorfeaturesthatwouldresultintreatingorotherwiseabatingpollutionproblemscausedbyotherpartieswheretheotherpartieshave,orarelikelytohave,alegalresponsibilityforremediationorothercomplianceresponsibility.Anysuchactionswillbecomepartofthewithout‐projectcondition. Thefollowingconsiderationswererecognized.Theyarenotconstraints,astheywillnotprecludeconsiderationorselectionofanypotentialmeasuresoralternatives.However,thefeasibilitystudywillseektoidentifymeasuresandalternativesthataddresstheseconsiderationstotheextentpracticable. 

� Avoidorminimizewherepracticableprovidingupstreampassagefornon‐nativefish.� Avoidorminimizewherepracticablefeaturesthatwouldrequireadditionalwater

rights.� Avoidorminimizeadverseeffectsonthedownstreamwaterusers’diversionsat

DaguerrePointDam.� Avoidorminimizewherepracticableincreasingfloodrisk.� Avoidorminimizewherepracticableimpedingnavigation.� Avoidorminimizewherepracticableimpactstogroundwaterrecharge.� Avoidorminimizewherepracticableimpedinggreensturgeonrecoveryefforts.� AvoidorminimizewherepracticableimpedingCRLFrecoveryefforts.� Avoidorminimizewherepracticableimpedingpublicaccessascurrentlyallowed.

 

AnoutstandingchallengeisandwillremainthepresenceofsignificantquantitiesoftoxicsedimentsbehindEnglebrightandDaguerrePointDams(includingmercury,arsenic,chromium,copper,andnickel) depositedfrompastmining.Responsibilitiesforanyhazardouscleanupwouldbedeterminedinaccordancewithapplicablelaws,regulations,andpolicies.10. FishandWildlifeResourcesConsiderations

 10.1. ResourceSignificance

 

EcosystemrestorationisaprioritymissionofUSACE.Incontrasttomoretraditionalstudyoutputs,manyoftheoutputsofecosystemrestorationprojectscannotbemeasuredinmonetaryterms.Withouttheoptionofquantifyingecosystemoutputsinmonetaryterms,othercriteriamustbeconsideredforevaluatingandjustifyingecosystemrestorationprojects.Onesuchcriterionisthe“significance”oftheecosystemresource(s)associatedwithsuchprojects.Forthispurpose,resourcesignificancecanbedescribedintermsofinstitutional,public,andtechnicalconsiderationsasreflectedinSection3.

Page 36: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

34   

 

10.2. EnvironmentalCompliance 

Thestudymustbecompliantwithallapplicablelawsandregulatoryrequirements.Duringthefeasibilitystudy,anenvironmentaldocumentwillbepreparedtoevaluatepotentialimpactsofanecosystemrestorationstudyontheexistingenvironment.Factorsaddressedbytheevaluationinclude,butarenotlimitedto,publicsafety,waterquality,wetlands,threatenedandendangeredspecies,noise,economics,fish,andwildlife.TheNationalEnvironmentalPolicyAct(NEPA)reviewprocesswillbecompleted,pursuanttorequirementsin33CFRPart230.ThisprocessincludesdemonstratingcompliancewithallapplicablelawsandregulationstoincludetheESA,CleanWaterAct,NationalHistoricPreservationAct,FishandWildlifeCoordinationAct,NoiseControlAct,Magnuson‐StevensAct,ExecutiveOrder11988onFloodplainManagement,andExecutiveOrder11990ontheProtectionofWetlands. 

10.3. SurveysNeededforFeasibilityStudy TherehavebeenmanystudiesandsurveysintheYubaRiverWatershed.Recently,effortshaveincreasedtounderstandportionsofthissystem,primarilythelowerYubaRiver,resultingfromtheLowerYubaRiverAccordandFERCrelicensingeffortsforthehydropowerfacilitiesassociatedwithEnglebrightDamandNewBullardsBarDam.InadditiontothelowerYubaRiverstudies,therehavebeenhabitatsurveysandmodelingofhabitatintheUpperYubaRiverWatershedtoidentifyquantityandqualityofhabitatforsalmonintheeventthatpassageisrestoredtoallowfishtoaccessthesereaches.Manyofthesestudiesandmodelshavebeenfocusedonwatertemperature,whichislikelyalimitingfactorformuchofthewatershed.However,theremaybestructuralopportunitiesthatneedtobeevaluatedwhichwouldrequireadditionalevaluationofcurrenthabitatconditions. Whiletherehasbeenasignificantefforttounderstandthissystemanditsprocesses,therewilllikelybeadditionalsurveysandstudiesforsupportingthefeasibilitystudy.Muchofthiseffortwilllikelybuildonthepreviousandongoingefforts,butmayneedtobesite‐specificorbuilduponorcontinueeffortsthatwereperformedpreviously,butarenotcurrentlyongoing.TheremaybenewstudieslookingatthepredatorpopulationsandmovementsinthelowerYubaRiverandperhapsadditionalhabitatevaluationsintheupperYubaRiver.Also,hydraulicevaluationsofareasinthewatershedmaybenecessarytoidentifyfeasiblelocationsforcollectingfishifrelocationisconsideredinthealternatives.Surveysoftributaryhabitatsshouldbeconsideredtohelptodeterminetheextentofopportunitytorestorehabitatforfish,amphibiansandotherriparianhabitat‐associatedanimals.Sincemuchoftheexistinghabitatworkhasbeenfocusedonsalmonandsteelhead,itmayrequireadditionalefforttoidentifyandevaluateopportunitiesforotherESA‐listedspeciessuchastheCRLF. Somespecificstudiesmightincludeuseofacoustictelemetryandsnorkelsurveystomonitorfishmovementandhabitatuse.Continuedsurveysofredds,gravelmovement,andchannelcomplexitymightalsobenecessarytohelpdevelopalternativesandbetteridentifyfuture‐without‐projectconditions.

Page 37: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

35   

11. HistoricalandCulturalResourcesConsiderations HistoricalResources

 

YCWAconductedarchaeologicalandhistoricalarchitecturestudiesaspartoftheFERCrelicensingprocess.TheFERCProjectAreaofPotentialEffects(APE)lieswithinthereconnaissancestudyarea.TheAPEencompassesapproximately9,600acres,andYCWAreceivedtheCaliforniaStateHistoricPreservationOffice’s(SHPO’s)concurrenceontheAPEinaletterdatedFebruary5,2013. In2009,YCWAperformedrecordssearchesattheNortheastInformationCenteratCaliforniaStateUniversity,ChicoandtheNorthCentralInformationcenteratCaliforniaStateUniversity,Sacramento.Itwasdeterminedthatapproximately2000acresoftheAPEhadbeenpreviouslysurveyed.Onehundredandfifty‐six(156)previouslyrecordedarchaeologicalsitesarewithintheFERCProjectBoundaryand0.25‐milebuffer.Ofthese,26siteswereinsidetheAPEandtheremaining130sitesarewithinthe0.25‐milebufferoutsidetheAPE.NopreviouslyrecordedsiteswereidentifiedfortheSierraCountyportionoftheFERCProject.NoneofthepreviouslyrecordedsiteswithintheAPEhadbeenformallyevaluatedfortheNational Register of Historic Places (NRHP)atthetimeofthe2009recordssearch.Sincetherecordssearchesareoverfiveyearsold,anewrecordssearchwillbeconductedfortheAPEduringthefeasibilitystudy.ThefeasibilitystudywillhaveitsownAPEseparatefromtheFERCAPE. In2011and2012,YCWAconductedfieldsurveyswithintheentireexpandedFERCProjectAPEwhichwerecoordinatedwithUSForestServicearchaeologists.Becausetheprevioussurveysweremorethantenyearsold,itwasdecidedthattheentireAPEshouldberesurveyed.Anadditional31siteswererecorded.Thestudyidentifiedatotalof57archaeologicalsiteswithintheAPE.Of the 57 sites identified within the APE, twenty-three were prehistoric archaeological sites. Sixteen prehistoric sites were previously recorded prior to the 2011- 2012 surveys. Thirty-two historic sites were identified within the APE. Of the historic sites identified in the APE, eight were previously recorded. A total of two previously recorded multicomponent sites were identified within the FERC Project APE. Additionally, thearchaeologicalsurveyidentified13isolatedartifacts. YCWA evaluated both previously recorded and newly identified archaeological sites and built environment resources for their eligibility for listing on the NRHP when those resources could be evaluated at the inventory level. As a result, 10 archaeological sites and 16 built environment resources were evaluated as ineligible for listing on the NRHP and will require no further management upon SHPO NRHP eligibility concurrence with eligibility determinations. The New Colgate Powerhouse and Penstock are recommend as eligible for listing on the NRHP and will require SHPO NRHP eligibility concurrence. Of the 57 archaeological sites identified in the APE, 47 sites remain unevaluated for NRHP eligibility.  In2000,USACEevaluatedDaguerrePointDamasnoteligibleforinclusiontotheNRHP.Theineligibilitydeterminationwasbasedonfourcriteria:A)thedam’sinsignificancewithrespecttoimportanthistoricalevents,namelytheCaliforniagoldrush,B)thelackofassociationwithsignificantpersons,C)thelackofuniqueconstructionmethodsor

Page 38: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

36   

style,andD)thedamisnotlikelytoyieldimportantinformation.Also,thedamlacksoverallintegrity,sinceitisa1965replacementstructure.TheSHPOwasnotconsultedregardingthepreviousNRHPeligibilitydetermination.This,alongwiththeresultsandrecommendationsfromthepedestriansurvey,needtobecoordinatedwiththeSHPOpriortoproceedingwithanyactualconstructionorground‐disturbingactivities. NativeAmericanResources

 

YCWAcontactedtheNativeAmericanHeritageCommissionin2009todeterminewhichNativeAmericanTribescouldhaveinterestintheProjectArea.ItisrecommendedthatanewTribalcontactlistbeobtainedfromtheNativeAmericanHeritageCommissiontoensurethatallinterestedTribeshavebeencontacted.YCWAconductedaNativeAmericanTraditionalCulturalProperties(TCP)studytodetermineiftheproposedstudyhadthepotentialtohave anadverseeffectonhistoricproperties,includingtraditionalculturalproperties(TCP)andethnographicresourcesthatqualifyforlistingontheNationalRegisterofHistoricPlaces(NRHP). TheAPEforthisFERCstudywasapproximately4,300acresandwhichoverlapsmostofthereconnaissancestudyarea.SincetheTCPstudywascompletedin2012,YCWAexpandedtheAPEto9,600acres,whichwasconcurredwithbytheSHPOin2013.YCWAconductedseveralconsultationmeetingswithtribesandagenciesbeginningin2009andcontinuinginto2012.ThestudydidnotidentifyanyTCPswithinorneartheFERCProjectAPE. AfterobtainingacurrentlistofTribeswithinterestinthestudyarea,USACEwillcontinuetoconsultaboutthefeasibilitystudywithinthefeasibilitystudyAPE. 12. FormulatingAlternativePlans

 12.1. PreliminaryMeasures

 Ameasureisafeatureoranactivitythatcanbeimplementedataspecificgeographiclocationtoaddressoneormoreplanningobjectives.Generally,measuresarecomponentsthataregroupedtogethertoformalternativeplans.Basedonpublishedreports,sitevisits,Corpsoperationsandmaintenance(O&M)actions,andcommunicationwiththelikelynon‐federalsponsorandstakeholders,belowisapreliminarylistofmeasuresarrangedbyobjectivefortheYubaRiver.Thesepreliminarymeasureshavebeenidentifiedasbeingconceptuallyrepresentativeofarangeofmeasuresfortherestorationofanadromousfishpopulationsand/ortheirhabitatwithintheYubaRiverWatershed.Thefinalformofameasuremaybedifferentthanwhatislistedbelow.However,regardlessoftheformofanyspecificmeasure,twooverarchingconsiderationswillbeassessedwhenfurtherdescribingand/orexamininganypotentialmeasureduringthefeasibilitystudy:(1)anysignificantreductioninthequalityofexistinganadromousfisherieshabitatbelowEnglebrightDamistobeavoided,asitwouldpotentiallyrepresentadegradationofexistingpopulations;and(2)giventhehighfloodriskthatcurrentlyexistsinmostoftheSacramentoRiverBasinandtheextensiveefforts(andtremendouscosts)currentlybeingexpendedtoimprovefloodprotection,anysignificantreductioninfloodmanagementcapabilityofthelowerYuba,Feather,orSacramentorivers

Page 39: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

37   

shouldbeconsideredunacceptable.ThiswouldincludeavoidingreleaseoflargequantitiesofsedimentfrombehindEnglebrightDam. AquaticHabitatConnectivity

� RemoveDaguerrePointDam� RemoveEnglebrightDam� ConstructsteppoolsuptoDaguerrePointDam� ConstructaseconddamassteptoEnglebrightDam� ReconstructfishladdersatDaguerrePointDam� InstallafullfishladderatEnglebrightDam� NotchEnglebrightDamandinstallapartialfishladder� ConstructafishbypassaroundDaguerrePointDam� ConstructafishbypassaroundEnglebrightDam� CollectandhaularoundEnglebrightDam� CollectandhaularoundNewBullardsBarDam� Hallwood‐Corduafishscreenimprovement� SouthYuba/Brophyfishscreenimprovement

 

HabitatRestoration� SinoroBarshot‐rockremoval,gravelplacement� Shot‐rockstabilization� DeerCreekgravelaugmentation� Gravelplacement� UpperRoseBarimprovementwithlocalgravel� Nativeriparianvegetationplanting� PredatorcontrolatDaguerrePointDamandingeneral� DaguerreAlleyside‐channel� Other/variousside‐channelconstruction� Ricefieldrearing� Floodplainrearinghabitatrestoration� Naturalhabitatfeatures(suchasrootwads,wholetrees,andwoodjams)installation� Engineeredrifflesorboulderfieldstoreducevelocitiesandrestorechannelcomplexity� Bioengineeringfeaturestofacilitatevegetationestablishment� Installnewsecurityfeaturesorreconstructexistingbarriers,etc.tolimitpublicaccess

(whereaccessiscurrentlyprohibited)atDaguerrePointDamtoreducepoaching. GeneticIntegrity

� Segregationstructure(weirorgate)forspring‐andfall‐runChinooksalmondownstreamofEnglebrightDam

� Segregationstructureforwildandhatcheryfish� CollectandhaularoundEnglebrightDam� CollectandhaularoundNewBullardsBarDamandReservoir� CoordinatedmanagementwithFeatherRiveroperationsandhatchery

 

12.1.1.ScreeningofMeasures 

Apreliminaryscreeningoftheidentifiedmeasureswasdoneinanattempttoreducethe

Page 40: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

38   

numberofcandidatemeasuresbeforecombiningthemintopreliminaryalternatives.Forexample,theremovalofNewBullardsBarDamwasscreenedoutbecausedamremovalwouldeliminate170,000acre‐feetofdedicatedfloodstorage,thussignificantlyincreasingfloodrisk.Measureshadtoaddressatleastoneobjectiveandbepracticable.Forexample,wetlandrestorationandvernalpoolprotectionwereconsideredbutscreenedoutbecausetheydonotaddressoneofthethreemainobjectivesoffishhabitatconnectivity,riverineaquatichabitatrestoration,orsalmonidgeneticintegrity.MeasurestargetingtheGoldfieldswerenotretainedduetopracticability;atthistime,techniquesarelackingtorestorelargeamountsofcobbleintoriparianhabitat.Installationofahatcherywasscreenedoutbecauseitconflictswiththeobjectiveofmaintaininggeneticintegrity.Duringthefeasibilitystudy,themeasureslistedabove,aswellasanyadditionalmeasuresyettobeidentified,willbescreenedtodeterminewhethereachmeasureshouldberetainedforuseintheformulationofthealternativeplans.Screeningcriteriaduringthefeasibilityphasewilllikelyincludecosteffectiveness,whetherthemeasuremeetsmultipleobjectives,howwellthemeasurehasperformedatotherprojects(likelihoodofsuccess),andwhetherthemeasureisexpectedtobeconstructedbyanotherentity.Also,thefourplanningcriteriaofcompleteness,efficiency,effectiveness,andacceptabilitywillbeemployedtoscreenmeasuresandformulatealternatives. 

12.2. AlternativeFormulationStrategies Analternativeformulationstrategyisamethodforgroupingmeasuresintoalternatives.Forthereconnaissancestudy,aformulationstrategybasedonfishpassagebarrierstosalmonids,classesofaquatichabitatrestoration,andriverreacheswasused.Barrierstosalmonidsarethedams,andbecausethedamsarelargestructuresandthecausesofthemajorproblemontheriver(fishpassage),itwaslogicalthatalternativesshouldbeformulatedtoaddressproblemsposedbythosestructures.Classesofaquatichabitatrestorationwerefocusedonsalmonidlifephase:spawningorjuvenilerearing.Lastly,riverreacheswereincludedintheformulationstrategysimplytoorganizefeaturesbylocation.Thealternativeformulationstrategywillbefinalizedduringthefeasibilityphaseofthestudy.Duringthefeasibilitystudy,theformulationstrategyorstrategieswillbedevelopedbasedonscoping.Throughscoping,stakeholderinputwillbesought.Someofthepreliminaryalternativespresentedinthisanalysismaybemodified,somemaybeeliminated,andstillotheradditionalalternativesmaybeadded. 13. ArrayofAlternatives

 Forthepurposesofthisanalysis,ninepotentialalternativeswereconsidered,includingtheNoActionalternative.ThealternativesareintendedtodemonstrateminimumandmaximumconnectivitylevelsalongthereachesfromDaguerrePointDamtoEnglebrightDam,fromDaguerrePointDamtoNewBullardsBarDam,andfromDaguerrePointDamtotheNorthYubaRiverupstreamofNewBullardsBarDam.Operationofthecollect‐and‐haulmeasurewouldbeanO&Mrequirement,andthusundertakenbythenon‐federalsponsor.Quantifiablemetricstoevaluatealternativebenefits/outputswillbeidentifiedduringthefeasibilitystudy.ThepreliminaryarrayofalternativesalongwiththeirexpectedoutputsisshowninTable1. 

Page 41: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

39   

Thepreliminaryalternativesweredevelopedbasedonseveralassumptions.Onewasassumingthatscreeningofmeasuresdonebyothergroups,suchastheYSFwasconsistentwiththeprocessUSACEwillfollow,sothatUSACEwouldreachthesameconclusions.Forinstance,completeremovalofEnglebrightDamwasnotincluded,asearlierstudieshaveindicateditwouldbecost‐prohibitive,especiallywithrespecttodisposingofthetoxiccontaminatedsedimentbehindit.

Page 42: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

40 

 

Table1.PreliminaryPotentialAlternatives. 

Alternative Description Benefits/Outputs PreliminaryConstructionCostEstimate1

NoAction USACEwillnot construct a restoration project. 0 $01–DaguerretoEnglebright,MinimumConnectivity

� PlantriparianvegetationandplaceLWM.� ReconstructtheDaguerrefishladders.

� Minimalincreaseinconnectivity� 12milesofjuvenilehabitat�Noincrease in genetic integrity

$30‐40M

2–DaguerretoEnglebright,MinimumConnectivityplusSegregationFacility

Sameasabove withthe addition of:� segregationstructuretosortspringandfallruns,hatcheryfish,andwildsalmonids

� Minimalincreaseinconnectivity� 12milesofjuvenilehabitat� Increaseingeneticintegrity

$35‐50M

3a–DaguerretoEnglebright,MaximumConnectivity

� PlantriparianvegetationandplaceLWM.� ConstructbypasschannelatDaguerre(forgreensturgeon).

� Constructstep‐poolsforfishpassageatDaguerre.

� Moderateincreaseinconnectivity� 12milesofjuvenilehabitat� Noincreaseingeneticintegrity

$30‐60M

3b–DaguerretoEnglebright,MaximumConnectivityplusSegregationFacility

� PlantriparianvegetationandplaceLWM.� ConstructbypasschannelatDaguerre(forgreensturgeon).

� Constructstep‐poolsforfishpassageatDaguerre.

� Installasegregationstructure.

� Moderateincreaseinconnectivity� 12milesofjuvenilehabitat� Increaseingeneticintegrity

$30‐65M

3c–DaguerretoEnglebright,MaximumConnectivity,RemoveDaguerre

� PlantriparianvegetationandplaceLWM.� RemoveDaguerrePointDam(andrelocatediversions).

� Moderateincreaseinconnectivity� 12milesofjuvenilehabitat� Noincreaseingeneticintegrity

$125‐150M

4a–DaguerretoNewBullardsBar,MaximumConnectivityplusSegregationFacility

Sameas3bplus:� notchingEnglebrightDamandconstructingapartialladder

� Moderateincreaseinconnectivity� 30milesofjuvenilehabitat� Noincreaseingeneticintegrity

$100‐150M

4b–DaguerretoNewBullardsBar,MaximumConnectivity,RemoveDaguerreplusSegregationFacility

Sameas3cwith the additions of:� segregationstructure� notchingEnglebrightDamandconstructingapartialladder

� Moderateincreaseinconnectivity� 30milesofjuvenilehabitat� Increaseingeneticintegrity

$2.6‐2.7B

Page 43: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

41 

Alternative Description Benefits/Outputs PreliminaryConstructionCostEstimate1

5a–DaguerretoUpperYuba2,MaximumConnectivityplus

Sameas3awith the additionsof:� collectingandhaulingmigratingsalmonids� segregationstructure

� Maximumincreaseinconnectivity� 40+milesofjuvenilehabitat� Increaseingeneticintegrity

$270‐ 305M

5b–DaguerretoUpperYuba1,MaximumConnectivity,Daguerre

Sameas3cwith the additionsof:� collectingandhaulingmigratingsalmonids� segregationstructure

� Maximumincreaseinconnectivity� 40+milesofjuvenilehabitat� Increaseingeneticintegrity

$300‐500M

1Thesecostestimatesaregenerallypreparedbasedonverylimitedinformation,andtheyhavewideaccuracyranges.Theyareonlypresentedinthisanalysistoconveyrelativecostsamongalternatives.Actualcostestimateswillbedevelopedduringthefeasibilitystudy.

2UpperYubaextendspastNewBullardsBarReservoir.

Page 44: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

42  

Thecostrangeofthepreliminaryactionalternativesisestimatedtobe$30millionto$2.7billion.PreliminarycostswerebasedonotherYubaRiverstudies,suchasthe2013YSFFishPassageInfrastructureReport,otherCorpsestimatesfordifferentrestorationprojects,USForestServiceriverrestorationcosts,andlocalrestorationprojectslikeconstructionofasidechannelalongtheGreenRiverinKent,Washington. Inordertoevaluatethealternativesforthefeasibilitystudy,resultsofmonitoringoftheYubaRiverhabitatrepairworkalreadyunderwaybyUSACEaspartofitsO&Mactivitieswillbereviewed.Othercomparisonandevaluationcriteriainadditiontothatusedtoscreenmeasuresmayincludehowmuchanalternativeplanreducespredationandwhetheritaddstowatertemperaturemanagementcapability. Anyalternativethathasthepotentialtoreleasemercurythroughground‐orstreambed‐disturbingactivitieswillneedtobeinvestigatedfurther.Attemptswillbemadetoformulatealternativesthatavoidactionsthatcouldmakemercurybiologicallyavailable.However,ifremediationisrequiredbytheComprehensiveEnvironmentalResponse,Compensation,andLiabilityAct(CERCLA),financialresponsibilityforsuchremediationwillbedeterminedinaccordancewiththerequirementsofCERCLA,applicableregulationsandCorpspolicyasdescribedinEngineerRegulation1165‐2‐132. Additionally,severalecosystemrestorationmodelswillbeused.USACE’sEngineerResearchandDevelopmentCenter(ERDC)hasaconnectivitymodeltoevaluatefishpassagebarriers.TheForestService’sFishXingsoftwarecanbeusedtodesignaquaticorganismpassagefacilities.USACE’sInstituteforWaterResources(IWR)isdevelopingasalmon‐specificmodelforlargerfishpassageprojects.GregPasternakwiththeUniversityofCalifornia,Davisdevelopedanecohydraulic2‐dimensionalmodelusingSRH‐2DofthelowerYubaRiver.AUSFishandWildlifeService(FWS)HabitatEvaluationProcedure(HEP)modelforChinooksalmonmaybeused.IWRPlan,theCostEffectiveness/IncrementalCostAnalysis(CE/ICA)softwarefromtheIWRPlanningSuite,willbeusedtoevaluateandcomparealternatives. 

13.1. EnvironmentalImpacts Therelativelevelsofpotentialenvironmentalimpactsforthepreliminaryalternativeswereestimatedbasedontheamountofground‐orstreambed‐disturbingworkthateachalternativewouldentail.Clearly,potentialenvironmentalimpactsneedtobequantifiedandanalyzedduringthefeasibilitystudy.Table2displaysthealternativesandthepreliminarilyexpectedlevelofimpactbycategory—“highs”arebolded. Mostimpactswouldbetemporaryduetoconstruction,includingimpactstobiologicalresources;somewildlifecouldbeaffectedduringconstructioninandalongtheriver.Negativeeffectswillbeminimizedbyschedulingworkaroundprotectivewindows,employingbestmanagementpracticesandadheringtoFederalandapplicablestateregulations.ModificationstoEnglebrightDamwouldlikelyaffecthydroelectricfacilities,sothoseeffectswouldhavetobefullyexplored,evaluated,andaddressedduringthefeasibilitystudy.

Page 45: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

43  

Table2.PreliminaryEnvironmentalImpactAssessment.Alternative ImpactCategory

Soils Land

AirQualit

WaterQuality

BiologicalResource

CulturalResource

Traffic Noise Recreation Aesthetics

NoAction None None None None None None None None None None1–DaguerretoEnglebright,Minimum

Low Low Low Low Low Low Low Low Low Low

2 – Daguerre toEnglebright, MinimumConnectivity plus

Low Low Low Low Low Low Low Low Low Low

3a–DaguerretoEnglebright,Maximum

High Low Low High High Low High Low Low Low

3b–DaguerretoEnglebright,MaximumConnectivityplus

High Low Low High High Low High Low Low Low

3c–DaguerretoEnglebright,MaximumConnectivity,Remove

High Low Low High High Low High Low Low Low

4a–DaguerretoNewBullardsBar,MaximumConnectivityplusSegregationFacility

High Low Low High High Low High High High Low

4b–DaguerretoNewBullardsBar,MaximumConnectivity,RemoveDaguerreplusSegregation

High Low Low High High Low High High High Low

5a–DaguerretoUpperYuba,MaximumConnectivityplus

High High High High High Low High High High Low

5b–DaguerretoUpperYuba,MaximumConnectivity,DaguerrePointDamRemovalplusSegregation

High High High High High Low High High High Low

  

Page 46: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

44  

14. KeyAssumptionsandUncertainties Inordertoscopethefeasibilitystudy,thefollowingassumptionsweremadeanduncertaintiesidentified.ThescopeofthefeasibilitystudywillbebasedontheseassumptionsaswellasanyothersidentifiedduringProjectManagementPlan(PMP)development.Uncertaintiesareitemsoractivitiesthatmaysignificantlyimpactthefeasibilitystudy;theycanchange,ordetailsarenotyetknown.ThesewillberefinedfurtherduringdevelopmentofthePMPandwillbedocumentedandqualifiedinariskregister. Assumptions:

 

� Ahighdegreeofstudy/projectmanagementcoordinationwillbeneededamongthestudyteam,includingthenon‐federalsponsor(s),andtheverticalteamandstakeholders.

 

� Thenon‐federalsponsororotherstakeholderswillsupplysomepreliminaryengineeringdesignworkandtechnicalsupport,whichwillbereviewedbyUSACEtoverifythatitmeetsFederalstandardsandrequirements.

 

� WatermanagementwithrespecttoanadromousfishspeciesisbeingaddressedthroughFERCrelicensingandtheYubaRiverAccord.

 

� EnvironmentalanalysiswillbeanEnvironmentalImpactStatement(EIS). 

� Environmentalspecialistwillneedtocoordinatewithnon‐federalsponsoronCaliforniaEnvironmentalQualityAct(CEQA)analysis.

 

� ThedecisiondocumentwillbeanintegratedfeasibilityreportandNEPA/CEQAdocument.

 

� Notopographic,bathymetric,orsoilsurveyswillbeconducted.

� AnMCACEScostestimatewillbeperformedontheselectedplanatalevelsuitableforafeasibilitystudy.

 

� Preliminarycostsareavailable. 

� Dataonthelikelihoodofrestorationmeasuresuccessareavailableandappropriate.

� Duetosignificanttribalinterestonotherprojectsintheregionandnotduetoanyknowncontroversy,consultationeffortscouldbegreaterthanforsimilarfeasibilitystudies.

 

Uncertainties 

� Damsafetyisnotknowntobeahighrisk.� Detailsandschedulesofotheractivities,includingrestorationactions,arenotfully

known.  

 

Page 47: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

45  

15. Feasibility‐PhaseCostEstimateandSchedule ThefeasibilitystudywillbeaCorpsSMARTPlanningstudy,whereSMARTstandsforSpecific,Measurable,Attainable,Risk‐Informed,andTimely.Assuch,itwillmeetthe“3x3x3”planningrule:thestudywilltakenolongerthanthreeyearstoresultinasignedChief’sReportatacostnogreaterthan$3millionandinvolveallthreelevelsoftheorganization(district,division,headquarters). Thefeasibilitystudyisexpectedtocostapproximately$3million.Outofthe$3million,$150,000isa100%FederalcostforIEPR.Sotheremainingstudycosttobecost‐shared50%‐50%is$2.85million.Thenon‐federalsponsorwillpay$1.425million.TheFederalgovernmentwillpay$1.425millionplusthe$150,000forIEPRforatotalof$1.575million.ThecostestimatewillberefinedduringPMPdevelopment.ThecostestimateisbrokendownbydisciplineasshowninTable3below.(DistrictQualityControlisincludedwitheachdiscipline.) Table3.Preliminaryfeasibilitystudycostestimate.

Discipline Cost ($)ProjectManagement 500,000PlanFormulation 500,000Economics 70,000DamSafety 15,000FishBiology 150,000EnvironmentalPlanning 450,000CulturalResources 95,000HydraulicEngineering 270,000CivilDesign 100,000GeotechnicalEng. 100,000EnvironmentalEng. 100,000RealEstate 50,000TribalLiaison 50,000CostEngineering 120,000Operations 75,000AgencyTechnicalReviewTeam 100,000IEPR1 150,000Contingency 105,000

Total 3,000,0001IndependentExternalPeerReview

 ThecostestimateisbasedonthecostofasimilarecosystemrestorationstudyinvolvingfishhabitatconnectivityanddamsaswellastheassumptionslistedinSection14.ItwillbefurtherrefinedduringthedevelopmentofthePMP.Althoughthepreliminaryoverallestimateofthecostofthefeasibilitystudyisanticipatedtoremainasindicated,significantre‐allocationamongthespecificdisciplineslistedabovemaybenecessary.Additionally,thedisciplineallocationmaychangeasaresultofnon‐Federalsponsorcostsharecontributions.

Page 48: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

46  

 Belowisapreliminaryschedulebasedontheavailabilityoffullfunding,asimilarfeasibilitystudy,andstandardreviewdurations.

Action Date Duration

Sign FCSA Mar 2015 +1 month

Start Feasibility Study Apr 2015 +6 months

Alternatives Milestone Oct 2015 +1 year

Tentatively Selected Plan Milestone Oct 2016 +8 months

Agency Decision Milestone Jun 2017 +3 months

Final Report Milestone Sep 2017 +3 months

Civil Works Review Board Dec 2017 +3 months

Chief’s Report Mar 2018

 16. Letter of Intent  Asthenon‐federalsponsor,YCWAiswillingandabletopartnerinthe50/50cost‐shareofthefeasibilitystudyandfullyunderstandtheresponsibilitiesrequiredofanon‐federalsponsorforfeasibilitystudies.Thenon‐federalsponsorisalsoawareofthecost‐sharingrequirementsforpotentialprojectimplementation.ALetterofIntentfromthenon‐federalsponsorstatingawillingnesstopursethefeasibilitystudyandtoshareinitscost,andanunderstandingofthecost‐sharingthatisrequiredforprojectconstruction,isincludedasAttachmentA. 17. Recommendation  IrecommendthattheYubaRiverEcosystemRestorationStudyproceedintothefeasibilityphase.ThisrecommendationisbasedonFederalinterest,consistencywithArmyandbudgetarypolicies,andthelikelihoodofaprojectmeetingcriteriaforFederalparticipationinprojectimplementation.    Date MichaelJ.Farrell Colonel,U.S.Army DistrictCommander

L2PDWMJH
Typewritten Text
L2PDWMJH
Typewritten Text
/S/
Page 49: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

  

AttachmentA–LetterofIntent

Page 50: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.
L2PDWMJH
Text Box
This page left blank intentionally.
Page 51: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.
Page 52: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.
L2PDWMJH
Text Box
This page left blank intentionally.
Page 53: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

 

        

 

AttachmentB–Bibliography

Page 54: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.
L2PDWMJH
Text Box
This page left blank intentionally.
Page 55: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

Bibliography 1  

YubaRiverEcosystem

Section905(b)AnalysisBibliography

 Adams,P.B.,B.Churchill,J.E.Grimes,S.T.Hightower,S.T.Lindley,andM.L.Moser.2002.

NMFSStatusReviewforNorthAmericanGreenSturgeon. BeakConsultants,Inc.1989.YubaRiverFisheriesInvestigation,1986‐1988.Summary

ReportofTechnicalStudiesontheLowerYubaRiver,California.PreparedforSateofCaliforniaResourcesAgencyDepartmentofFishandGame.

 Beamesderfer,R.C.P.,M.L.Simpson,andG.J.Kopp.2007.UseofLifeHistory

InformationinaPopulationModelforSacramentoGreenSturgeon.Environ.Biol.Fish.DOI10.1007/s10641‐006‐9145‐x.

 CALFED. 2000. Final Programmatic Environmental Impact Statement/Environmental Impact Report. CALFED Bay-Delta Program. Prepared by the CALFED Bay-Delta Program for the U.S. Bureau of Reclamation, U.S. Fish and Wildlife Service, National Marine Fisheries Service, U.S. Environmental Protection Agency, Natural Resources Conservation Service, U.S. Army Corps of Engineers, and the California Resources Agency. CALFEDandYCWA.2005.DraftImplementationPlanforLowerYubaRiverAnadromous

FishHabitatRestoration.Multi‐AgencyPlantoDirectNear‐TermImplementationofPrioritizedRestorationandEnhancementActionsandStudiestoAchieveLong‐TermEcosystemandWatershedManagementGoals.PreparedbyLowerYubaRiverFisheriesTechnicalWorkingGroup.

 CDFG.1991.SteelheadRestorationPlanfortheAmericanRiver. CDFG.1998.ReporttotheFishandGameCommission:AStatusReviewoftheSpring‐Run

ChinookSalmon(Oncorhynchustshawytscha)intheSacramentoRiverDrainage.CandidateSpeciesStatusReport98‐01.

CDFW.2010.CaliforniaSalmonidStreamHabitatRestorationManual.

https://www.dfg.ca.gov/fish/resources/habitatmanual.asp.AccessedSep2014. Churchill,R.K.2000.ContributionsofmercurytoCalifornia'senvironmentfrom

mercuryandgoldminingactivities;Insightsfromthehistoricalrecord,inExtendedabstractsfortheU.S.EPAsponsoredmeeting,AssessingandManagingMercuryfromHistoricandCurrentMiningActivities.

 DWR.2004.EvaluationoftheFeatherRiverHatcheryEffectsonNaturally

SpawningSalmonids. DWRUpperYubaRiverStudiesProgramStudyTeam.2007.UpperYubaRiver

Page 56: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

Bibliography 2  

WatershedChinookSalmonandSteelheadHabitatAssessment. Klimley,A.P.,P.J.Allen,J.A.Israel,andJ.T.Kelly.2007.TheGreenSturgeonandIts

Environment:Past,Present,andFuture.EnvironmentalBiologyofFishes.Volume79:415‐421.

 Krueper,D.J.1993.EffectsoflandusepracticesonWesternriparianecosystems.Pages

321‐330inStatusandmanagementofNeotropicalmigratorybirds.USDAForestService,RockyMountainForestandRangeExperimentStation.

Lindley,S.T.,R.S.Schick,E.Mora,P.B.Adams,J.J.Anderson,S.Greene,C.Hanson,B.P.May,D.McEwan,R.B.MacFarlane,C.Swanson,andJ.G.Williams.2007.FrameworkforAssessingViabilityofThreatenedandEndangeredChinookSalmonandSteelheadinthe Sacramento‐SanJoaquinBasin.SanFranciscoEstuaryandWatershedScience.Volume5(1):26Article4.

 McEwan,D.andT.A.Jackson.1996.SteelheadRestorationandManagementPlan

forCalifornia.CaliforniaDepartmentofFishandGame. Mount,J.F.1995.CaliforniaRiversandStreams: TheConflictBetweenFluvialProcess

andLandUse.UniversityCaliforniaPress,Berkeley,California. Moyle,P.B.2002.InlandFishesofCalifornia.UniversityofCaliforniaPress,Berkeleyand

LosAngeles,California. NMFS.2002.BiologicalOpinionontheEffectsofUSACE’OperationofEnglebrightDamand

DaguerrePointDamontheYubaRiver,inYubaandNevadaCounties,California,ontheThreatenedCentralValleySpring‐RunChinookSalmon(Oncorhynchustshawtscha),theCentralValleySteelhead(0.mykiss)andTheirRespectiveDesignatedCriticalHabitats.

 NMFS.2005.BiologicalOpinionBasedonReviewoftheProposedYubaRiverDevelopment

ProjectLicenseAmendmentforFederalEnergyRegulatoryCommissionLicenseNumber2246,LocatedontheYubaRiverinYubaCounty,California,andItsEffectsonThreatenedCentralValleySpring‐RunChinookSalmon(Oncorhynchustshawytscha)andCentralValleySteelhead(O.mykiss),inAccordanceWithSection7oftheEndangeredSpeciesActof1973,AsAmended.

NMFS.2007.FinalBiologicalOpinionontheEffectsofOperationofEnglebrightand

DaguerrePointDamsontheYubaRiver,California,onThreatenedCentralValleySteelhead,theRespectiveDesignatedCriticalHabitatsfortheseSalmonidSpecies,andtheThreatenedSouthernDistinctPopulationSegmentofNorthAmericanGreenSturgeon.November2007.

 NMFS.2009.EndangeredandThreatenedWildlife andPlants: FinalRulemaking

Page 57: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

Bibliography 3  

To Designate Critical Habitat for the Threatened Southern DistinctPopulationSegmentofNorthAmericanGreenSturgeon;FinalRule.

 NMFS.2012.FinalBiologicalOpinionontheU.S.ArmyCorpsofEngineers’Continued

OperationandMaintenanceofEnglebrightDamandReservoir,DaguerrePointDam,andRecreationalFacilitiesOnandAroundEnglebrightReservoir.

 NMFS.2014.PacificSalmonids:MajorThreatsandImpacts.

http://www.nmfs.noaa.gov/pr/species/fish/salmon.htm.AccessedAugust2014.

 NMFS2014a.RecoveryPlanforSacramentoRiverwinter‐runChinooksalmon,

CentralValleyspring‐runChinooksalmon,andCentralValleysteelhead. NMFS.2014b.FinalBiologicalOpinionontheU.S.ArmyCorpsofEngineers’Operation

andMaintenanceforDaguerrePointDamontheYubaRiver. NMFS.2014c.LetterofConcurrencefortheU.S.ArmyCorpsofEngineers’

OperationandMaintenanceforEnglebrightReservoirontheYubaRiver. Pasternack,G.B.2010.Gravel/CobbleAugmentationImplementationPlan(GAIP)

for19theEnglebrightDamReachoftheLowerYubaRiver,CA.PreparedfortheU.S.20ArmyCorpsofEngineersSacramentoDistrict.

Potter,D.A.2005.Riparianplantcommunityclassification:westslope,centraland

southernSierraNevada,California.Gen.Tech.Rep.R5‐TP‐022.Albany,CA:U.S.DepartmentofAgriculture,ForestService.PacificSouthwestRegion.630p.

 Reisenbichler,R.R.andS.P.Rubin.1999.GeneticChangesfromHatcheryPropagation

AffectProductivityandViabilityofWildPopulations.ICESJournalofMarineScience,56:459‐466.

Reynolds,F.L.,Mills,T.J.,Benthin,R.,andLow,A.1993.RestoringCentralValleyStreams:A

PlanforAction.CaliforniaDepartmentofFishandGame,InlandFisheriesDivision.Sacramento,California.

RiverManagementTeam(RMT).2013.AquaticResourcesoftheLowerYubaRiver–Past,

Present&Future,YubaAccordMonitoringandEvaluationProgram,DraftInterimReport.April2013.

RMT.2010.RiverManagementTeamTechnicalMemorandum:LowerYubaRiverWater

TemperatureObjectives.November2010. SWRI,JSA,andBookman‐EdmonstonEngineering,Inc.2000.HearingExhibitS‐YCWA‐19.

Page 58: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

Bibliography 4  

ExpertTestimonyonYubaRiverFisheriesIssuesbySurfaceWaterResources,Inc.,Junes&StokesAssociates,andBookman‐EdmonstonEngineering,Inc.,AquaticandEngineeringSpecialistsforYubaCountyWaterAgency.PreparedfortheCaliforniaState WaterResourcesControlBoardWaterRightsHearingonLowerYubaRiver.

 USACE.2013.BiologicalAssessmentforOperationandMaintenanceforDaguerrePoint

DamontheYubaRiver. USACE.2013.BiologicalAssessmentforOperationandMaintenanceforEnglebright

ReservoirontheYubaRiver.UnitedStatesForestService(USFS)TahoeNationalForest.2014.Willow

Flycatcher–Introduction.http://www.fs.usda.gov/detail/tahoe/landmanagement/

resourcemanagement/?cid=stelprdb5357314 Vogel,D.A.andK.R.Marine.1991.GuidetoUpperSacramentoRiverChinookSalmonLife

History.U.S.BureauofReclamationCentralValleyProject. YCWA,DWR,andReclamation.2007.DraftEnvironmentalImpactReport/Environmental

ImpactStatementfortheProposedLowerYubaRiverAccord.StateClearinghouse(SCH)No: 005062111.PreparedbyHDR|SurfaceWaterResources,Inc.

 YCWA.2010.Pre‐ApplicationDocument,YubaCountyWaterAgencyYubaRiver

DevelopmentProjectFERCProjectNo.2246. YCWA.2012.TechnicalMemorandum13‐1:TraditionalCulturalProperties,YubaCounty

WaterAgencyYubaRiverDevelopmentProjectFERCProjectNo.2246. YCWA.2013.TechnicalMemorandum12‐1:HistoricProperties,YubaCountyWaterAgency

YubaRiverDevelopmentProjectFERCProjectNo.2246.YCWA.2014.YubaRiverDevelopmentProjectFinalLicenseApplicationforFERCProjectNo.2246.

April2014.http://www.ycwa‐relicensing.com/Relicensing%20Documents/Forms/AllItems.aspx?RootFolder=%2fRelicensing%20Documents%2fRelicensing%20Documents%2009%20%2d%20Final%20License%20Application&FolderCTID=&View=%7b31B99738%2dB3DA%2d4CD0%2dA63E%2d01898DE55BAB%7d

Yoshiyama,R.M.,F.W.Fisher,andP.B.Moyle.1998.HistoricalAbundanceandDeclineof

ChinookSalmonintheCentralValleyRegionofCalifornia.NorthAmericanJournalofFisheriesManagement.Volume18:487‐521.

 Yoshiyama,R.M.,E.R.Gerstung,F.W.Fisher,andP.B.Moyle.2001.HistoricalandPresent

DistributionofChinookSalmonintheCentralValleyDrainageofCalifornia.ContributionstotheBiologyofCentralValleySalmonids.FishBulletin179,Volume1.

Page 59: Yuba River Ecosystem Restoration Section 905(b) Analysis · restoration of fisheries, restoration of aquatic habitat, and flood damage reduction associated with Daguerre Point Dam.

Bibliography 5  

YubaSalmonForum(YSF).2013.SummaryHabitatAnalysis.PreparedfortheYubaSalmonForumTechnicalWorkingGroup.PreparedbyCraigAddley,PhD(CardnoENTRIX),KatieRoss‐Smith,PhD(CardnoENTRIX),andPeterGraf(CardnoENTRIX.September2013.

YSF.(2013).AssessmentofInfrastructureandRelatedItemstoSupportAnadromous

FishPassagetotheYubaRiverWatershed,PreparedbyMWHfortheYubaSalmonForum.March2013.