Your experienced and reliable Partner for Construction of Civil, Architectural, Small Power, HVAC, Firefighting, Drainage and Plumbing Works required by Power Plants, Substations, Desalination Plants and Industrial Plants. We are also General Contractors for any type of Horizontal & Vertical Projects. Since 1977 Assad Said 2015.11 Edition ص. ب3936 لرياض ا11481 - رقم العضوية: 5045 - كة العربية السعوديةممل اللهاتف ا: 4790900 11 966 / + 4788344 11 966 + - فاكس: 4765284 11 966 + Website: www.assadsaid.com P.O. Box 3936, Riyadh 11481 - C.C. No. 5045 - Kingdom of Saudi Arabia Tel.: +966 11 4790900 / +966 11 4788344 Fax: +966 11 4765284 Email: [email protected]COMPANY PROFILE
99
Embed
Your experienced and reliable Partner for Construction of ...assadsaid.com/home/download_file/pages/522c2470b0f8a00.pdfCONTRACTOR’S APPROVAL DOCUMENTS CLIENT’S APPRECIATION AND
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Assad SaidFor Contracting Co., Ltd.
Your experienced and reliable Partner for Construction of Civil, Architectural, Small Power, HVAC, Firefighting, Drainage and Plumbing Works required by Power Plants, Substations, Desalination Plants and Industrial Plants. We are also General Contractors for any type of Horizontal & Vertical Projects.
Since 1977
Assad Said2015.11 Edition
المملكة العربية السعودية - 5045: رقم العضوية - 11481الرياض 3936ب .ص
DETECON, SEC-Saudi Electricity Co., Ministry of Justice, Ministry of Interior, Ministry of Education, Ministry of Defense And
Aviation, Ministry of Culture and Information.
Through the years and through the dedicated efforts and indefatigable inspiration of its president and founder, Mr.
Mohammed Assad Ameen Said, Assad Said For Contracting Co., Ltd. continues to prosper, and along the way leaving
an indelible mark in the construction industry for the quality and timely delivery of all its works.
BRIEF HISTORY
Assad SaidFor Contracting Co., Ltd.
PROJECTS HIGHLIGHTS
Assad SaidFor Contracting Co., Ltd.
INDUSTRIAL DIVISION PROJECT HIGHLIGHTS
POWER GENERATION
7,770MW Total Cumulative
Capacity from Power Plant Generation Projects.
Two Ongoing Independent Power Plant Projects located in Dhurma and Ras Al-Khair
One Ongoing Power Plant Expansion Project located in Tabuk.
Two Completed Independent Power Plant Projects located in Dhurma and Rabigh.
Ten (10) Nos. of Power Plant Extension . The Projects are located in Riyadh, Dammam, Jubail, Wadi Dawasir, Shuaibah, Asir, Abha, Bisha, Jizan & Qunfuda.
DESALINATION AND DISTRIBUTION SYSTEM
1,641,614m³ Per Day
Cumulative Capacity of
Desalinated Water for Ongoing
and Executed Project.
Ongoing Desalination Plant Project at Ras Al Khair. It is the biggest desalination plant of its kind in the world to produce 728,000m³ per day capacity of desalinated water.
Ongoing Construction of Pumping Stations Line Valve Stations, Tap-Off & Tie-In Station and Terminal Groups located in Ras Al-Khair, Al-Rayan, Rumah and Riyadh
Completed Three Desalination Plant Project located in Shuaibah and Yanbu Industrial City with Combined Total Capacity of 913,694m³ per day
POWER TRANSMISSION AND DISTRIBUTION
55 Total Nos. of Completed and
Ongoing Substation Projects
Four Ongoing 380/132/13.8kV Substation
Completed Works
11 Nos. - 380/132/13.8kV S/S
1 No. - 380/230kV Substation
2 Nos. - 380/115kV Substation
3 Nos. - 380kV & Control Building
23 Nos. - 132/13.8kV Substation
1 No. - 380kV GIS Building Ext.
10 Nos. - 132kV GIS Building Ext.
Overhead Transmission Lines Foundation Works
460km 380kV OHTL
689km 132kV OHTL
MANUFACTURING PLANT
4 Total Nos. of
Completed and Ongoing Manufacturing Plant Projects
SADARA Propylene Oxide Plant Ongoing Works located at Jubail Industrial City III
GE Manufacturing Technology Center located in Dammam Industrial City II.
SAHARA Basell Propane Dehydrogenation (PDH) and Polypropylene Plant (PP) located in Jubail Industrial City II.
Saudi Cement Co. 8.5km Cross Country Belt Conveyor Line and Upgrading located in Hofuf.
Assad SaidFor Contracting Co., Ltd.
GOVERNMENT PROJECTS AND PRIVATE SECTOR HIGHLIGHTS
GOVERNMENT PROJECTS
Ongoing Projects
Ministry of Justice Construction of 22 Court Buildings located in Jeddah, Madinah, Hail, Al-Rass, Unaizah, Dammam, Al-Khobar, Al-Ahsa, Al-Qatif and Rafha
Royal Commission for Jubail and Yanbu Construction of Royal Commission Public Housing, Housing Ownership Program Phase-2, Phase-3 & Phase-5
Ministry of Education Taibah University Construction of Faculty Arts Building, TV Circuit and Remote Learning Building, General Classroom Male Building, Higher Institute of Preachers Building.
GOVERNMENT PROJECTS
Completed Projects
General Authority for Military Industries First Housing Extension Project in Al-Kharj, Construction of 80 Duplex Villas and 3 Mosque
Ministry of Interior Projects
Two (2) Civil Defense Centers located in Sulay and Dilam,
Two (2) External Police Department located in Deriyah and Jizan
One (1) Governorate Complex located in Quwayiyah.
Four (4) Health Care Centers located in Buraidah, Hail, Jizan and Al-Baha.
PRIVATE SECTOR
Completed Projects
NOFA Equestrian Resort
Racing Stables Project located in Tibrak Riyadh Province, 156km from Riyadh City Center.
NOFA Equestrian Resort
Western Villas Project located in Tibrak Riyadh Province, 156km from Riyadh City Center.
Assad SaidFor Contracting Co., Ltd.
COMPLETED MAJOR POWER PLANT PROJECTS
ONGOING MAJOR POWER PLANT PROJECTS
Years Completed
Contract Amount SAR
Client Owner Location Power Plant
Capacity Project Name No.
2013 113,985,437.00
Hyundai Heavy Industries Co., Ltd.
Dhuruma Electricity Co.
Dhurma, 1,750 MW
Construction of RIYADH PP11 2x1,750MW Independent Power Plant
1
2012 133,000,000.00
SEPCOIII Electric Power Construction.
Corp. SEC-Rabigh Rabigh, 2x660 MW
Construction of Rabigh 2x660MW Independent Power Plant
2
2009 64,000,000.00 Hyundai Heavy
Industries Co., Ltd. Marafiq IWPP Jubail 2,745 MW
Building Works Package # 2 & Fdn. For Turbine Generator in Block # 2&4
3
310,985,437.00 Total Amount SAR
Year of Completion
Contract Amount SAR
Client Owner Location Power Plant
Capacity Project Name No.
2016 446,283,061.00 Worley Parsons Dhuruma
Electricity Co. Dhurma, 1,800 MW
Early and General Civil Works At PP13
1
2016 136,000,000.00 SEPCOIII Electric
Water Construction Corp.
SWCC – Saline Water
Construction Corp
Ras Al Khair 2,400 MW
Ras Al-Khair Power & Desalination Plant, Phase-I Package "P" Power Plant
2
582,283,061.00 Total Amount SAR
INDUSTRIAL DIVISION - POWER PLANT PROJECTS
Assad SaidFor Contracting Co., Ltd.
INDUSTRIAL DIVISION - POWER PLANT PROJECTS
COMPLETED POWER PLANT EXTENSION PROJECTS
Years Completed
Contract Amount SAR
Client Owner Location Power Plant
Capacity Project Name No.
2009 52,462,500.00 SIEMENS PG SWEC Shuaibah Main Civil Works Lot-2 Tank Area 1
2009 23,959,000.00 Al-Touhki Co. For Trading and Industry
SEC-COA Wadi Dawasir 2x60MW
Reinforcement of Wadi Dawasir Power Plant Contract No. 10721153/00
SEC-WOA Asir & Bisha 144MW Construction of Asir & Bisha Central Power Station Extension
6
2005 23,625,000.00 SIEMENS PG Saudi Petro-Chemical Co.
Jubail 180MW Construction of Jubail Co-Generation Power Plant
7
2000 17,000,000.00 Westinghouse, SIEMENS
SEC-COA Qunfuda 200MW Construction of Tihama Central Power Extension
8
1998 10,000,000.00 Saudi American General Electric
SEC-COA Riyadh PP9 Riyadh Power Plant No.9 Reconstruction of STG Foundation
9
1997 33,000,000.00 Westinghouse, SIEMENS
SEC-WOA Abha &Jizan 2x75MW Asir and Jizan Central Power Station Extension
10
1993 71,000,000.00 Consortium of ABB-Sadelmi, Petrola Int’l, GE & SST
SEC-WOA Rabigh Rabigh Steam Power Plant Extension 1 & 2
11
1988 10,000,000.00 General Electric SEC-SRB Jizan 2x50MW Jizan Power Plant Extension Frame 7 12
304,365,890.00 Total Amount SAR
Assad SaidFor Contracting Co., Ltd.
INDUSTRIAL DIVISION - POWER PLANT PROJECT
EARLY AND GENERAL CIVIL WORKS AT PP13 CONTRACT NO. 4400004960
PROJECT CONTRACT DETAILS SCOPE OF WORKS
Location Dhurma, Saudi Arabia Complete Foundation Works of Power Generation Building, Pipe Racks and Miscellaneous Works, Gas Turbine Generator Foundations and Slab Paving, HRSG Foundations and Pits, Storage Tank Foundation, Electrical Underground Structures and Grounding, Underground Piping, Manholes and culverts, Underground Water Tank, Pits and Lifting Station, STG Miscellaneous Foundation and Slab Paving, ACC Misc. Foundations, WSAC, Pump Foundations and ASL Containment Walls, Pre-Engineered Building Foundations and Slabs, Erosion Control, Evaporation Ponds, Roads and Walkways and Transformer Foundations.
Owner SEC-Dhurma
Consultant Worley Parsons
Main Contractor Assad Said For Contracting Co., Ltd.
Contract Amount SAR 446,283,061.00 Total Site Development Area 503,688 m2
Year of Completion 2016 Total Volume of Reinforced Concrete 146,434 m3
Project Status Ongoing Total Weight of Rebar's 14,434 Tons
Assad SaidFor Contracting Co., Ltd.
RAS AL-KHAIR POWER & DESALINATION PLANT, PHASE-I PACKAGE "P" POWER PLANT
INDUSTRIAL DIVISION - POWER PLANT PROJECT
PROJECT CONTRACT DETAILS SCOPE OF WORKS
Location Ras Al-Khair, Saudi Arabia Complete Foundation Works of Pipe Rack Structure, Steam Bypass Station, Duct bank and Cable Pit, Neutralization Tank, Demineralization Building, Air Compressor Building, Fire Water Pump House, Fire Water Retaining Basin, Waste Water Treatment Plant, Local Switchgear Building, Fuel Oil Bulk Transfer Pump Station, Back Up Fuel Oil Station, Foam Pump Station, Structure for Damp Condenser, Dump Condenser Drain Pit, Structure for Boiler Blow down Cooling Unit, Structure for Rotor Air Cooler, GRP Civil Works, Firefighting Civil Works, Gas Station Shed 1 & 2 Structure, Gas Storage Structure, Fuel Meter Structure, Pipe rack & Pipe Sleeper Structure.
Owner SWCC – Saline Water Conversion Corp.
Main Contractor SEPCOIII Electric Power Construction Corp.
Civil Subcontractor Assad Said For Contracting Co., Ltd.
Contract Amount SAR 136,000,000.00 Total Volume of Reinforced Concrete 65,288 m3 (including Piling Works)
Year of Completion 2016 Total Weight of Rebar's 9,706 Tons (including Piling Works)
Project Status Ongoing Buildings Steel Structure 1,030 Tons
Assad SaidFor Contracting Co., Ltd.
CONSTRUCTION OF RIYADH PP11 2x1,750MW INDEPENDENT POWER PLANT
INDUSTRIAL DIVISION - POWER PLANT PROJECT - COMPLETED
PROJECT CONTRACT DETAILS SCOPE OF WORKS
Location Dhuruma, Saudi Arabia Complete Foundation Works of Gas & Steam Turbine Building, Local Electrical Building for GTG
& STG , Fuel Gas Compressor Shade , HP Feed Water Pump Shade, Fuel Gas Reduction Shade ,
H2 Bottle Shade, N2 Bottle Shade for HRSG, N2 Bottle Shade for Fuel Gas system , Chemical
Dosing Shade, Car Parking Canopy, Local Electrical Building for HRSG & CCW, Local Electrical
Building for Fuel Gas System, Hydrogen Generation Building, CO2 Bottle House, Central Fire
Brigade Building, Social Building, Security Control Building, Gate house, ACC Electrical Building,
Emergency Diesel Generator Building, Elevator for HRSG .
Owner SEC – Dhuruma Electricity Company
Main Contractor Hyundai Heavy Industries Co., Ltd.
Civil Subcontractor Assad Said For Contracting Co., Ltd.
Contract Amount SAR 113,985,437.00 Total Volume of Reinforced Concrete 40,173 m3
Year Completed 2013 Total Weight of Rebar's 2,223 Tons
Assad SaidFor Contracting Co., Ltd.
CONSTRUCTION OF RABIGH 2x660MW INDEPENDENT POWER PLANT
INDUSTRIAL DIVISION - POWER PLANT PROJECT
PROJECT CONTRACT DETAILS SCOPE OF WORKS
Location Rabigh, Saudi Arabia Complete Foundation Works of #1 Main Power Building , #1 Foundation of Turbine-Generator,
#1 Boiler , Central Control Building, #1 FD Fans , #1 ESP , #1 ID Fans , Start-up oil Fired Boiler ,
Ash Handling And ESP Control Building , #1 Generator Transformer , #1 Unit Aux.
Transformer, #1 UST Transformer , #1 Condenser Water Tank , #1 Lubricating Oil Tank , Boiler
Blow down Pit , and all other equipment foundations and underground facilities in this area.
Owner SEC - Rabigh Electricity Company
Main Contractor SEPCOIII Electric Power Construction. Corp.
Civil Subcontractor Assad Said For Contracting Co., Ltd.
Contract Amount SAR 133,000,000.00 Total Volume of Reinforced Concrete 25,230 m3
Year Completed 2013 Total Weight of Rebar's 2,330 Tons
Assad SaidFor Contracting Co., Ltd.
MARAFIQ IWPP - BUILDING WORKS PACKAGE # 2 & TURBINE GENERATOR FDN. BLK. # 2&4
INDUSTRIAL DIVISION - POWER PLANT PROJECT - COMPLETED
PROJECT CONTRACT DETAILS SCOPE OF WORKS – CIVIL AND BUILDING WORKS
Location Jubail, Saudi Arabia Complete Foundation Works of Turbine and Generator Building #2 & #4, Local Electrical
Building for HRSG, Ware House & Workshop Building, Fuel Gas Compressor Building,
Administration Building , Central Control Building, Water Treatment Building, Air Compressor
Building, Fire Truck Building, Fire Fighting Pump Building, Guard House and 22 Units of
Shelters .
Owner Marafiq IWPP
Main Contractor Hyundai Heavy Industries Co. Ltd.
Civil Subcontractor Assad Said For Contracting Co., Ltd.
Contract Amount SAR 64,000,000.00 Total Volume of Reinforced Concrete 19,546 m3
Year Completed 2009 Total Weight of Rebar's 2,059 Tons
Assad SaidFor Contracting Co., Ltd.
COMPLETED MAJOR DESALINATION PLANT PROJECTS
ONGOING MAJOR DESALINATION PLANT PROJECT AND WATER DISTRIBUTION SYSTEM
Years Completed
Contract Amount SAR
Client Owner Location Plant Capacity Project Name No.
2013 13,687,000.00 Doosan Heavy Industries & Construction Co. Ltd.
Client Owner Location Plant Capacity Project Name No.
2016 213,750,000.00 Doosan Heavy Industries &
Construction Co. Ltd.
SWCC – Saline Water
Construction Corp
Ras Al Khair 728,000m³ / day
Ras Al-Khair Power & Desalination Plant, Phase-I Package “D" Desalination
1
2016 254,878,113.62
SSEM-Saudi Services for Electro Mechanic
Works Co., Ltd.
SWCC – Saline Water
Construction Corp
Ras Al Khair to Riyadh
Ras Al-Khair Pipeline Package "C", Construction of Pump Stations, Line Valves & Tie-In-Stations
2
255,091,863.62 Total Amount SAR
INDUSTRIAL DIVISION - DESALINATION PLANT AND WATER DISTRIBUTION SYSTEM
Assad SaidFor Contracting Co., Ltd.
RAS AL-KHAIR POWER & DESALINATION PLANT, PHASE-I PACKAGE “D" DESALINATION
INDUSTRIAL DIVISION - DESALINATION PLANT PROJECT
PROJECT CONTRACT DETAILS SCOPE OF WORKS
Location Ras Al-Khair, Saudi Arabia Complete Civil Works Foundation of Evaporator, Brine Heater, BRP Pit, Semi-Gantry Crane, LP
Steam, Chemical Dosing, Civil Works for SW Supply Pipe, Discharge Pipe, Distillate Pipe,
Evaporator Cable Route, Drainage and Sewage for Evaporator and Power Plant, Fire Fighting,
Roads, Paving, Fence & Gate.
Complete Building Works of MSF SWGR , Sea Water Intake, Electro Chlorination ,
Potabilization SWGR, Gas Chlorination, Parking Shed and Shelters and Storage
Owner SWCC – Saline Water Conversion Corp.
Main Contractor Doosan Heavy Industries & Construction Co. Ltd.
Civil Subcontractor Assad Said For Contracting Co., Ltd.
Contract Amount SAR 213,750,000.00
Year of Completion 2016 Total Volume of Reinforced Concrete 74,166 m3
Project Status Ongoing Total Weight of Rebar's 6,926 Tons
Assad SaidFor Contracting Co., Ltd.
RAS AL-KHAIR POWER & DESALINATION PLANT, PHASE-I PACKAGE “C" PUMPING STATION
INDUSTRIAL DIVISION - WATER TRANSMISSION SYSTEM
PROJECT CONTRACT DETAILS SCOPE OF WORKS
Location Ras Al-Khair, Al-Rayan, Al-Jandalia & Riyadh, Saudi Arabia Complete Civil Works of Surge Vessel Plant Foundation s, Station Yard & Miscellaneous Structures, Station Roads, Paving & Fence. Complete Building Works of Booster Pump House, Main Pump House, Electrical Building, Mechanical Workshop, Electrical Workshop, Garage and Car Shed Maintenance, Emergency Generator, Water Quality Monitoring Building,, Spare Parts Building, Cooling Shelter, Security Guard House.
Owner SWCC-Saline Water Conversion Corp.
Main Contractor SSEM-Saudi Services for Electro Mechanic Works Co., Ltd.
Civil Subcontractor Assad Said for Contracting Co., Ltd.
Contract Amount SAR 254,878,113.62
Year of Completion 2016 Total Volume of Reinforced Concrete 50,799 m3
Project Status Ongoing Total Weight of Rebar's 4,063 Tons
Assad SaidFor Contracting Co., Ltd.
SHUAIBAH IWPP DESALINATION PLANT
INDUSTRIAL DIVISION - DESALINATION PLANT PROJECT
PROJECT CONTRACT DETAILS SCOPE OF WORKS
Location Shuaibah, Saudi Arabia Complete Civil Works Foundation of Evaporator, Brine Heater, BRP Pit, Semi-Gantry Crane, LP
Steam, Chemical Dosing, Civil Works for SW Supply Pipe, Discharge Pipe, Distillate Pipe,
Evaporator Cable Route, Drainage and Sewage for Evaporator and Power Plant, Fire Fighting,
Roads, Paving, Fence & Gate.
Complete Building Works of MSF SWGR , Sea Water Intake, Electro Chlorination ,
Potabilization SWGR, Gas Chlorination, Parking Shed and Shelters and Storage
Owner Shuaibah IWPP
Main Contractor Doosan Heavy Industries & Construction Co. Ltd.
Civil Subcontractor Assad Said For Contracting Co., Ltd.
Contract Amount SAR 58,875.000.00 Total Volume of Reinforced Concrete 45,322 m3
Year Completed 2008 Total Weight of Rebar's 4,970 Tons
Assad SaidFor Contracting Co., Ltd.
Year of Completion
Contract Amount SAR
Client Owner Location Project Name No.
2016 197,240,207.00 Worley Parsons Saudi Electricity
Co. Dhurma
380/132kV GIS Substation Buildings for PP13
1
2016 69,876,097.00 SIEMENS Arabia Limited Saudi Electricity
New North West 380/33kV Substation BSP 9051 Contract No. 4400004709
3
2016 42,899,883.00 NCC-National Contracting
Co., Ltd. Saudi Electricity
Co. Riyadh
New South West 380/132/33/13.8kV Substation BSP 9052 Contract No. 4400004800
4
352,307,980.00 Total Amount SAR
ONGOING SUBSTATIONS PROJECT
INDUSTRIAL DIVISION - POWER TRANSMISSION AND DISTRIBUTION
Assad SaidFor Contracting Co., Ltd.
380/132KV GIS SUBSTATION BUILDINGS FOR PP13
PROJECT CONTRACT DETAILS SCOPE OF WORKS
Location Dhurma, Saudi Arabia Substation Civil Works Package includes Site Preparation, Main & Building Access Road, Switchyard Finish , Surface Drainage and External Works. Substation Building Works Package includes 380kV GIS Building, 132kV GIS Building & Control Building
Owner Saudi Electricity Co.
Consultant Worley Parsons
Main Contractor Assad Said For Contracting Co., Ltd.
Contract Amount SAR 197,240,207.00
Year of Completion 2016 Total Volume of Reinforced Concrete 26,120 m3
Project Status Ongoing Total Weight of Rebar's 2,180 Tons
INDUSTRIAL DIVISION - POWER TRANSMISSION AND DISTRIBUTION
Assad SaidFor Contracting Co., Ltd.
Year Completed
Contract Amount SAR
Client Owner Location Project Name No.
2015 58,000,000.00 Al-Osais Enabensa Saudi Electricity
Co. Riyadh
Construction of Riyadh Industrial City III 380/132/13.8kV Substation S/S No. 9027
1
2015 31,334,000.00 ABB Contracting Co., Ltd. Saudi Electricity
Co. Riyadh
Construction of King Abdullah Financial Center 380/132/13.8kV Substation S/S No. 9020
2
2014 54,682,984.00 NCC-National Contracting
Co., Ltd. Saudi Electricity
Co. Riyadh
Construction of New Khasmn Al-A’nn 380/132/13.8kV Substation S/S No. 9017
3
2013 49,463,000.00 SIEMENS Germany Saudi Electricity
Co. Dhurma
Construction of RIYADH PP11 380kV Substation S/S No. 9022
4
2012 45,000,000.00 SIEMENS Arabia Ltd. Saudi Electricity
Co. Safaniyah
Construction of Safaniyah 380/230kV Substation BSP Contract No. 3-0933110.04
5
2012 58,000,000.00 ABB Contracting Co., Ltd. Saudi Electricity
Co. Riyadh
Construction of Princess Nora University 380/132/13.8kV Substation S/S No. 9024
6
2012 15,096,258.00 ABB Contracting Co., Ltd. Saudi Electricity
Co. RIyadh
Construction of Princess Nora University 132/13.8kV Substation S/S No. 8183 & 8184
7
311,576,242.00 Sub-Total Amount SAR
COMPLETED SUBSTATIONS PROJECTS
INDUSTRIAL DIVISION - POWER TRANSMISSION AND DISTRIBUTION
Assad SaidFor Contracting Co., Ltd.
Year Completed
Contract Amount SAR
Client Owner Location Project Name No.
2011 8,450,000.00 NCC-National Contracting
Co., Ltd. Saudi Electricity
Co.
Al-Oraijah, West of Riyadh
Construction of 132/13.8kV Substation S/S No. 8152
8
2011 9,700,000.00 SIEMENS Arabia Ltd. Saudi Electricity
Co. Buraidah
Dynamic Reactive Power Compensation (DRPC) SVC in Qassim S/S No. 8800
9
2013 71,986,854.00 SSEM-Saudi Services for
Electro-Mechanics Works Saudi Electricity
Co. Al-Kharj Road
Construction of 380/132kV Substation S/S No. 9023 Works Associated With Integration of New PP10 in Riyadh
10
2011 49,378,000.00 SIEMENS Arabia Ltd. Saudi Electricity
Co. Riyadh PP9
Construction of 380kV Switching Station No. 9019 (PP9) Contract No. 10631156/00
11
2009 58,404,000.00 SIEMENS Arabia Saudi Electricity
Co. Al-Rass, Qassim
Construction of New Qassim-2 380/132/13.8kV Substation S/S No. 9025 Contract No. 10831013/00
12
2009 6,690,000.00 SIEMENS Arabia Saudi Electricity
Co. Sudair
Construction of Sudair (9011) 380kV GIS Expansion Contract No. 10831055/00
13
2010 2,100,000.00 SIEMENS Arabia Saudi Electricity
Co. Buraidah
Construction of Qassim Capacitor Bank, Substation S/S No. 8800, 132kV GIS Building Expansion
14
2007 19,895,000.00 SIEMENS Germany SWEC Shuaibah Construction of Shuaibah IWPP 380kV Substation Contract No. 10831013/00
15
226,603,854.00 Sub-Total Amount SAR
COMPLETED SUBSTATIONS PROJECTS
INDUSTRIAL DIVISION - POWER TRANSMISSION AND DISTRIBUTION
Assad SaidFor Contracting Co., Ltd.
Year Completed
Contract Amount SAR
Client Owner Location Project Name No.
2007 14,344,000.00 MEEDCO-Middle East
Engineering and Development Co., Ltd.
SEC-EOA Abu Hadriyah
Construction of 380/115kV Substation BSP Contract No. 30531099/00
16
2008 5,470,000.00 NCC-National Contracting
Co., Ltd. Saudi Electricity
Co. Al-Khaleeg, Riyadh
Construction of 132/13.8kV Substation S/S No. 8140 Contract No. 10531115/00
17
2005 4,000,000.00 NCC-National Contracting
Co., Ltd. Saudi Electricity
Co. Al-Badeea, Riyadh
Construction of 132/13.8kV Substation S/S No. 8115 Contract No. 10331101
18
2005 2,700,000.00 NCC-National Contracting
Co., Ltd. Saudi Electricity
Co. Huraymilah, Riyadh
Construction of 132/13.8kV Substation S/S No. 8068 Contract No. 11331198
19
2004 6,000,000.00 Kadi Trading and
Contracting Saudi Electricity
Co. Buraidah
Construction of 132/13.8kV Substation S/S No. 8821 Contract No. 39/20/21
20
2004 14,000,000.00 Mitsui & Saudi Sadelmi Techinical Construction
Co.
Saudi Electricity Co.
Riyadh Construction of 380/132/13.8kV Substation S/S No. 9015
21
2002 40,000,000.00 SIEMENS Arabia Limited Saudi Electricity
Co. Howtat, Sudair
Construction of 380/132/13.8kV Substation S/S No. 9011
22
86,514,000.00 Sub-Total Amount SAR
COMPLETED SUBSTATIONS PROJECTS
INDUSTRIAL DIVISION - POWER TRANSMISSION AND DISTRIBUTION
Assad SaidFor Contracting Co., Ltd.
Year Completed
Contract Amount SAR
Client Owner Location Project Name No.
2003 6,000,000.00 Saudi Sadelmi Technical
Construction Co. Saudi Aramco Ghazal & Wuhaydi,
Construction of 69kV Lines & Substation
23
2001 4,000,000.00 Middle East Engineering
Development Co., Ltd Saudi Electricity
Co. Riyadh
Construction of 132/13.8kV Substation S/S No. 8114, 8070, 8077, 8008 Extension
24
2001 4,500,000.00 Middle East Engineering
Development Co., Ltd Saudi Electricity
Co. Riyadh
Construction of 132/13.8kV Substation S/S No. 8104 & 8046
25
2000 1,500,000.00 Vatech Reyrolle Saudi Electricity
Co. Riyadh
Construction of 380/132/13.8kV Substation Extension S/S No. 9010
26
2000 36,050,000.00 Reyrolle, Saudi Sadelmi Techinical Construction
Co.
Saudi Electricity Co.
Riyadh Construction of 380/132/13.8kV Substation S/S No. 9008
27
1999 60,000,000.00 Middle East Engineering Development Co., Ltd.
Saudi Electricity Co.
Ryadh Construction of 380/132/13.8kV Substation S/S No. 9009
28
1999 14,180,000.00 Middle East Engineering Development Co., Ltd.
Saudi Electricity Co.
Riyadh, Saudi Arabia
Construction of 380/132/13.8kV Substation S/S No. 8042, 8088, 8603, 8824, 8026
29
126,230,000.00 Sub-Total Amount SAR
COMPLETED SUBSTATIONS PROJECTS
INDUSTRIAL DIVISION - POWER TRANSMISSION AND DISTRIBUTION
Assad SaidFor Contracting Co., Ltd.
Year Completed
Contract Amount SAR
Client Owner Location Project Name No.
1993 Saudi Electricity
Co. Riyadh
Construction of 33.8kV Substation Extension S/S No. 7009
30
1995 11,000,000.00 Middle East Engineering
Development Co. Saudi Electricity
Co. Riyadh
Construction of 132/13.8kV Substation S/S No. 8706, 8059, 8064
31
1992 3,200,000.00 Ministry of
Defense and Aviation
KKIA, Riyadh Construction of 132/13.8kV Substation S/S No. 8081
6 380kV OHTL Khulais, Jeddah Saudi Electricity Co.
National Power Construction
Corp. Ltd., Pakistan
500,000.00 2003
Sub-Total Amount SAR 36,500,000.00
COMPLETED OVERHEAD TRANSMISSION LINES FOUNDATION
INDUSTRIAL DIVISION - POWER TRANSMISSION AND DISTRIBUTION
Assad SaidFor Contracting Co., Ltd.
No Project Name Location Owner Client Contract Amount
SAR Year
Completed
7 132kV OHTL IN S/S #9009-8065, 9011-8501, 9011-8812
Majma’a, Qassim Saudi Electricity Co. Arabian Electrical Transmission Line
Const. Ltd 500,000.00 2002
8 132kV OHTL & Fiber Optic System Riyadh, Quwayiyah,
Muzamihiya & Qassim Saudi Electricity Co. Al Sharif Co. 2,500,000.00 2002
9 132kV OHTL Batra, Qassim Saudi Electricity Co. Npcc / Saudi Electricity Co.
500,000.00 2002
10 260km 380kV OHTL Hail and Qassim Saudi Electricity Co. Sst / Saudi
Electricity Co. 10,000,000.00 2001
11 132kv OHTL & OPGW Riyadh Saudi Electricity Co. Npcc / Saudi Electricity Co.
1,500,000.00 2000
12 380kv OHTL Riyadh Saudi Electricity Co. Sst / Saudi
Electricity Co. 5,000,000.00 1999
Sub-Total Amount SAR 20,000,000.00
Grand Total Amount SAR 56,500,000.00
COMPLETED OVERHEAD TRANSMISSION LINES FOUNDATION
INDUSTRIAL DIVISION - POWER TRANSMISSION AND DISTRIBUTION
Assad SaidFor Contracting Co., Ltd.
COMPLETED MAJOR MANUFACTURING PLANT PROJECTS
ONGOING MAJOR MANUFACTURING PLANT PROJECT
Year of Completion
Contract Amount SAR
Client Owner Location Project Name No.
2016 52,226,810.00 TEKFEN Construction
and Installation Co. Inc..
SAUDI ARAMCO DOW ARABIA Co.
Industrial City III Jubail
SADARA Propylene Oxide Plant 1
No. Project Name Location Owner Client Contract
Amount SAR Year
Completed
1 GE Manufacturing Technology Center
Dammam Industrial City
General Electric Al-Alamiah Technical Corp.
49,456,000.00 2011
2
8.5km Cross Country Belt Conveyor Line And Upgrading
Hofuf Saudi Cement Co Thyseenkrupp Fordertechnik Germany
39,622,000.00 2010
3
Jubail Sahara Basell Propane Dehydrogenation (PDH) and Polypropylene Plant (PP)
Jubail Industrial City AL-WAHA Sahara Basell
Tecnimont Arabia Ltd. & Daelim Construction
187,500,000.00 2006
Total Amount SAR 276,578,000.00
INDUSTRIAL DIVISION - MANUFACTURING PLANT
Assad SaidFor Contracting Co., Ltd.
SADARA PROPYLENE OXIDE PLANT
INDUSTRIAL DIVISION - MANUFACTURING PLANT
PROJECT CONTRACT DETAILS SCOPE OF WORKS
Location Jubail Industrial City III, Saudi Arabia Complete Civil Works of Towers and Reboilers Main Process Structures and Pipe Racks Foundation , Equipment Pedestals Foundation, Air Cooler Foundation, MRU and Hydrogen Peroxide and Chiller Foundation, Tank Foundation, Pavement, Trenches and Roads. Complete Building Works of Main Control Center and Substation Building
Owner Saudi Aramco Dow Arabia
Main Contractor TEKFEN Construction and Installation Co. Inc.
Civil Subcontractor Assad Said For Contracting Co., Ltd.
Contract Amount SAR 52,226,810.00
Year of Completion 2016 Total Volume of Reinforced Concrete 18,418 m3
Project Status Ongoing Total Weight of Rebar's 2,214 Tons
Assad SaidFor Contracting Co., Ltd.
SAHARA BASELL PROPANE DEHYDROGENATION (PDH) AND POLYPROPYLENE PLANT (PP)
INDUSTRIAL DIVISION - MANUFACTURING PLANT
PROJECT CONTRACT DETAILS SCOPE OF WORKS
Location Jubail Industrial City, Saudi Arabia Complete Civil and Building Works
Owner Al-Waha, Sahara Basell
Main Contractor Tecnimont Arabia Ltd. & Daelim Construction
Civil Subcontractor Assad Said For Contracting Co., Ltd.
Contract Amount SAR 187,500.000.00 Total Volume of Reinforced Concrete 34,276 m3
Year Completed 2009 Total Weight of Rebar's 4,580 Tons
Assad SaidFor Contracting Co., Ltd.
8.5KM CROSS COUNTRY BELT CONVEYOR LINE AND UPGRADING
INDUSTRIAL DIVISION - MANUFACTURING PLANT
PROJECT CONTRACT DETAILS SCOPE OF WORKS
Location Hofuf, Saudi Arabia Complete Civil Works of Belt Conveyors Foundation, Transfer Stations Foundation, Highway Bridges, Construction of Camel Crossings, Culverts, Pipe Crossings and Outdoor Lightings Foundation including Roads and Fences. Supply, Fabrications and Erections of Steel Structures and Construction of New Substation
Owner Saudi Cement Co.
Main Contractor Thyssenkrupp Fordertechnik GMBH – Germany
Civil Subcontractor Assad Said For Contracting Co., Ltd.
Contract Amount SAR 39,623,371.00 Total Volume of Reinforced Concrete 3,808 m3
Year Completed 2010 Total Weight of Steel Structure 2,800 Tons
Assad SaidFor Contracting Co., Ltd.
GE MANUFACTURING TECHNOLOGY CENTER
INDUSTRIAL DIVISION - MANUFACTURING PLANT
PROJECT CONTRACT DETAILS SCOPE OF WORKS
Location Dammam Industrial City, Saudi Arabia Complete Site Development Works includes the construction of Driveways and Parking Sheds, Landscaping, Drainage System, Fences and Gates. Complete Building Works of GEPTEC Building, High and Low Bay, Pump House, GE Main Feeder Substation, Generator Room and Substations, Compressor Room , Visitors Building and Security Gate Houses.
Owner General Electric
Main Contractor Al-Alamiah Technical Corp.
Civil Subcontractor Assad Said For Contracting Co., Ltd.
Contract Amount SAR 49,456.000.00 Total Volume of Reinforced Concrete 9,152 m3
Year Completed 2011 Total Weight of Steel Structure 857 Tons
Assad SaidFor Contracting Co., Ltd.
Major Manufacturing Plant - Completed Projects
ONGOING MAJOR GOVERNMENT PROJECTS
No. Project Name Location Owner Contract Amount
SAR Year Completion
1 Construction of 22 Court Buildings
Jeddah, Madinah, Hail, Al-Rass, Unaizah,
Dammam, Al-Khobar, Al-Ahsa, Al-Qatif
and Rafha
Ministry of Justice 1,224,000,000.00 2017
2
Construction of Royal Commission Public Housing, Housing Ownership Program Phase-2, Phase-3 & Phase-5
Yanbu Royal Commission for Jubail and Yanbu
692,000,000.00 2017
3
Taibah University Construction of Faculty Arts Building, TV Circuit and Remote Learning Building, General Classroom Male Building, Higher Institute of Preachers Building.
Madinah Ministry of Education 98,399,343.00 2017
Total Amount SAR 2,014,399,343.00
GOVERNMENT PROJECTS DIVISION - BUILDING PROJECTS
Assad SaidFor Contracting Co., Ltd.
MINISTRY OF JUSTICE - CONSTRUCTION OF 22 COURT BUILDINGS
GOVERNMENT PROJECTS DIVISION - COURT BUILDINGS PROJECT
Complete Civil, Building and Electro-Mechanical Works of 22 Court 5 Storey Buildings. 10 Nos. of Single 5 Storey & 6 Nos. of Double 5 Storey Building
Owner MOJ – Ministry of Justice
Main Contractor Assad Said for Contracting Co., Ltd.
Contract Amount SAR 1,224,000,000.00
Year of Completion 2017 Total Volume of Reinforced Concrete m3
Project Status Ongoing Total Weight of Rebar's Tons
Assad SaidFor Contracting Co., Ltd.
CONSTRUCTION OF ROYAL COMMISSION PUBLIC HOUSING
GOVERNMENT PROJECTS DIVISION - HOUSING PROJECT
PROJECT CONTRACT DETAILS SCOPE OF WORKS
Location Yanbu, Saudi Arabia Complete Civil, Building and Electro-Mechanical Works for: Housing Ownership Program (HOP) Phase 2 and 3 with total of 453 Villas Housing Ownership Program (HOP) Phase 5 with 222 Villas Owner Royal Commission for Jubail and Yanbu
Main Contractor Assad Said for Contracting Co., Ltd. Total Site Development Area 225,000 m2
Contract Amount SAR 692 Million Total Built-up Area 185,000 m2
Year of Completion 2017 Total Volume of Reinforced Concrete 159, 280 m3
Project Status Ongoing Total Weight of Rebar's 20,000 Tons
Assad SaidFor Contracting Co., Ltd.
COMPLETED PROJECTS
No. Project Name Location Owner Contract Amount
SAR Year Completed
1
First Housing Extension Project Construction of 80 Duplex Villas and 2 Mosque
Al-Kharj General Authority for Military Industries
185,206,471.00 2015
2 Health Care Centers Buraidah, Hail, Jizan & Al-Baha
Ministry of Interior 50,900,000.00 2005
3 Civil Defense Centers And External Police Department
Deriyah, Sulay, Dilam & Jizan
Ministry of Interior 63,800,000.00 2005
4 Governorate Complex Center
Quwayiyah Ministry of Interior 20,600,000.00 2006
5 Project Management Building
Riyadh Saudi Electricity Co. 2,000,000.00 2000
6 PSAB-SSOC Building
Riyadh Ministry of Defense and Aviation
1,300,000.00 1998
7 35km Strategic Fencing Various Location In
The Kingdom of Saudi Arabia
Ministry of Defense 30,000,000.00 1998
8 Construction of Intermediate School Buildings In
Various Location In The Kingdom of
Saudi Arabia Ministry of Education 35,000,000.00 1993
Total Amount SAR 388,806,371.00
GOVERNMENT PROJECTS
Assad SaidFor Contracting Co., Ltd.
FIRST STAGE FOR HOUSING EXTENSION PROJECT
GOVERNMENT PROJECTS DIVISION - HOUSING PROJECT
PROJECT CONTRACT DETAILS SCOPE OF WORKS
Location Al-Kharj Saudi Arabia Complete Civil, Building and Mechanical Works: Construction of 80 Duplex Villas + 3 Mosque
Owner General Authority for Military Industries Total Site Development Area 230,000 m2
Main Contractor Assad Said for Contracting Co., Ltd. Total Built-up Area 102,904 m2
Contract Amount SAR 185,206,471.00 Total Volume of Reinforced Concrete 38,921 m3
Year Completed 2015 Total Weight of Rebar's 3,113 Tons
Assad SaidFor Contracting Co., Ltd.
CONSTRUCTION OF HEALTH CARE CENTERS
GOVERNMENT PROJECTS DIVISION - HEALTH CARE CENTERS PROJECT
PROJECT CONTRACT DETAILS SCOPE OF WORKS
Location Buraidah, Hail, Jizan & Al-Baha, Saudi Arabia Complete Civil, Building and Electro-Mechanical Works
Owner Ministry of Interior Total Site Development Area 52,856 m2
Main Contractor Assad Said for Contracting Co., Ltd. Total Built-up Area 11,646 m2
Contract Amount SAR 50,900,000.00 Total Volume of Reinforced Concrete 4,300 m3
Years Completed 2005 Total Weight of Rebar's 344 Tons
Assad SaidFor Contracting Co., Ltd.
CONSTRUCTION OF CIVIL DEFENSE CENTERS
GOVERNMENT PROJECTS DIVISION - CIVIL DEFENSE CENTERS PROJECT
PROJECT CONTRACT DETAILS SCOPE OF WORKS
Location Deriyah & Dilam, Saudi Arabia Complete Civil, Building and Electro-Mechanical Works
Owner Ministry of Interior Total Site Development Area 10,416 m2
Main Contractor Assad Said for Contracting Co., Ltd. Total Built-up Area 3,205 m2
Contract Amount SAR 31,000,000.00 Total Volume of Reinforced Concrete 2,548 m3
Years Completed 2005 Total Weight of Rebar's 203 Tons
Assad SaidFor Contracting Co., Ltd.
CONSTRUCTION OF EXTERNAL POLICE DEPARTMENTS
GOVERNMENT PROJECTS DIVISION - EXTERNAL POLICE DEPARTMENT PROJECT
PROJECT CONTRACT DETAILS SCOPE OF WORKS
Location Deriyah & Jizan, Saudi Arabia Complete Civil, Building and Electro-Mechanical Works
Owner Ministry of Interior Total Site Development Area 12,725 m2
Main Contractor Assad Said for Contracting Co., Ltd. Total Built-up Area 3,060 m2
Contract Amount SAR 32,800,000.00 Total Volume of Reinforced Concrete 2,836 m3
Years Completed 2005 Total Weight of Rebar's 226 Tons
Assad SaidFor Contracting Co., Ltd.
CONSTRUCTION OF GOVERNORATE COMPLEX BUILDINGS
GOVERNMENT PROJECTS DIVISION - GOVERNORATE COMPLEX PROJECT
PROJECT CONTRACT DETAILS SCOPE OF WORKS
Location Quwayiyah, Saudi Arabia Complete Civil, Building and Electro-Mechanical Works
Owner Ministry of Interior Total Site Development Area 15,475 m2
Main Contractor Assad Said for Contracting Co., Ltd. Total Built-up Area 3,515 m2
Contract Amount SAR 20,600,000.00 Total Volume of Reinforced Concrete 2,905 m3
Years Completed 2006 Total Weight of Rebar's 332 Tons
Assad SaidFor Contracting Co., Ltd.
CONSTRUCTION OF 30.5KM STRATEGIC FENCE
GOVERNMENT PROJECTS DIVISION - SECURITY FENCE PROJECT
PROJECT CONTRACT DETAILS SCOPE OF WORKS
Location Various Location in Saudi Arabia Complete fencing and its ancillary works for 65,000 cubic meter of earthworks, 25,000 cubic meter of rock blasting works, 7 km of wadi structures, diversion canals, dike walls, massive slag and gravel fill for water structures, gabions for wadi’s upstream and downstream channels. Beside above, fence work was also done for all our various other projects.
Owner Ministry of Defense
Main Contractor Assad Said For Contracting Co., Ltd.
Contract Amount SAR 30,000,000.00
Construction Period 11 Nov. 1991 to 31 Dec. 1993
Assad SaidFor Contracting Co., Ltd.
COMPLETED PRIVATE SECTOR PROJECT
No. Project Name Location Owner Contract Amount
SAR Year Completion
1 Racing Stables Project Tibrak, Riyadh Province Nofa Equestrian Resort 79,000,000.00 2006
2 Western Villas Package Tibrak, Riyadh Province Nofa Equestrian Resort 14,000,000.00 2007
3 Jubail Hadeed ISS Jubail Industrial City Saudi Iron and Steel
Company 2,000,000.00 1998
Total Amount SAR 95,000,000.00
PRIVATE SECTOR DIVISION - GENERAL CONSTRUCTION PROJECT
Assad SaidFor Contracting Co., Ltd.
NOFA EQUESTRIAN RESORT – RACING STABLES PROJECT
PRIVATE SECTOR DIVISION - GENERAL CONSTRUCTION PROJECT
PROJECT CONTRACT DETAILS SCOPE OF WORKS
Location Tibrak, Saudi Arabia Complete Civil, Building and Electro-Mechanical Works
Owner NOFA Equestrian Resort Total Site Development Area 230,000 m2
Main Contractor Assad Said for Contracting Co., Ltd. Total Built-up Area 18,635 m2
Contract Amount SAR 79,000,000.00 Total Volume of Reinforced Concrete 2,904 m3
Year Completed 2006 Total Weight of Rebar's 232.3 Tons
Assad SaidFor Contracting Co., Ltd.
NOFA EQUESTRIAN RESORT – WESTERN VILLAS PACKAGE
PRIVATE SECTOR DIVISION - GENERAL CONSTRUCTION PROJECT
PROJECT CONTRACT DETAILS SCOPE OF WORKS
Location Tibrak, Saudi Arabia Complete Civil, Building and Electro-Mechanical Works
Owner NOFA Equestrian Resort
Main Contractor Assad Said for Contracting Co., Ltd.
Contract Amount SAR 14,000,000.00
Year Completed 2007
Assad SaidFor Contracting Co., Ltd.
MAJOR CLIENT’S
& CUSTOMERS
Assad SaidFor Contracting Co., Ltd.
SEPCOIII Electric Power Construction Corporation
DOOSAN Heavy Industries & Construction
HYUNDAI Heavy Industries Co., Ltd.
TEKFEN Construction and Installation Co. Inc.
TECNIMONT Italy and Arabia Ltd.
GE General Electric
ThyssenKrupp Fördertechnik Germany
ABB Contracting Co. Ltd.
NPCC-National Power Construction Corp. Pakistan
SIEMENS Power Generation & Distribution
SIEMENS Westinghouse
VATECH
NEI / Reyrolle
Cogelex Alstom
Saudi Arabian Bechtel Company
AETCON-Arabian Electrical Transmission Line Construction Co.
Merlin Gerin
FOREIGN CLIENT’S
LIST OF MAJOR CLIENTS AND CUSTOMERS
Assad SaidFor Contracting Co., Ltd.
NCC-National Contracting Co., Ltd.
Al-Toukhi Company for Industry, Trading & Contracting
SSEM-Saudi Services
For Electro Mechanics Works Co. Ltd.
MEEDCO-Middle East Engineering & Development
Co., Ltd.
Saudi Arabian Oil Co. State-Owned Oil Company of the
Kingdom of Saudi Arabia
Saudi Electricity Co.
A Saudi Joint Stock Company
Al-Osais Inabensa
NOFA Al-Jazeerah for Contracting Est.
GAMI-General Authority for Military Industries
RCC-Riyadh Cement Company
RCJY-Royal Commission For Jubail & Yanbu
Al-Madinah Al-Munnawarah Taibah University
FOREIGN & LOCAL PRIVATE SECTOR CLIENT’S
LIST OF MAJOR CLIENTS AND CUSTOMERS
Assad SaidFor Contracting Co., Ltd.
DETASAD Al Saudia Co. Ltd.
STESA- Saudi Technical Engineering
Systems Associated
NATEL-National Telecommunication Co., Ltd.
MOJ Ministry of Justice
MOI-Ministry of
Interior
MOCI-Ministry of Culture and Information
MOE-Ministry of
Education
MODA-Ministry of Defense and Aviation
ABV Rock Group Ltd.
GOVERNMENT & LOCAL PRIVATE SECTOR CLIENT’S
LIST OF MAJOR CLIENTS AND CUSTOMERS
Assad SaidFor Contracting Co., Ltd.
MANPOWER &
EQUIPMENT RESOURCES
Assad SaidFor Contracting Co., Ltd.
Top Management No.
President 1
Chief Executive Officer 1
Director, Industrial Division 1
Chief Financial Officer 1
Chief Accountant 1
Payable Account Manager 1
Human Resources Manager 1
Public Relation Manager 1
Legal Manager 1
Technical & Tendering Manager 1
Total 10
Key Project Management No.
Operations Manager 1
Project Managers 8
Site / Construction Managers 9
QA/QC Manager 1
Technical Office Manager 1
Planning Manager 2
QS Manager 1
HSE Manager 1
Total 24
TOP MANAGEMENT
MANPOWER RESOURCES
ENGINEERING & CONSTRUCTION
Assad SaidFor Contracting Co., Ltd.
Key Project Construction Engineers No.
QS Engineers 9
Planning Engineers 4
Office Engineers 1
Architects 2
Site Engineers 76
Materials Engineer 1
QA/QC Engineers 11
QA/QC Inspectors 2
Total 106
Design and Drawings
Architects 2
AutoCAD Draftsmen 11
Total 13
Cost Control Department
Cost Control Officer In-Charge 1
Cost Control Engineer 2
Cost Control Accountants 2
Cost Control Clerk 1
Total 6
ENGINEERING AND CONSTRUCTION
MANPOWER RESOURCES
Assad SaidFor Contracting Co., Ltd.
Health Safety & Environment
HSE Manager 1
HSE Officers 22
HSE Officers Assistant 4
Male Nurse 2
Total 29
Surveying
Chief Surveyors 4
Land Surveyors 25
Land Surveyor Assistant 26
Total 55
Human Department Personnel
Human Resources Consultant 1
Payroll In-charge 1
Insurance Coordinator 1
Office Coordinator 2
Personnel Executive 1
Public Relation Officer 17
Public Relation Assistant 2
Administrative Assistant 1
Receptionist 1
IT Administrator 1
IT Technician 1
Total 29
ENGINEERING AND CONSTRUCTION
MANPOWER RESOURCES
DEPARTMENT STAFF
Assad SaidFor Contracting Co., Ltd.
Support Managers
Administrative Services Manager 1
Logistic Manager 1
Transportation Manager 1
Workshop Manager 1
Total 4
Office Personnel
Project Coordinator 1
Chairman’s Secretary 1
Technical Secretary 1
Office Secretary 6
Document Controller 2
Fixed Assets Controller 1
Total 12
Finance Department
Head Office Accountants 15
Site Accountants 11
Banking Employee 2
Total 28
Procurement Personnel
Procurement Engineer 1
Procurement Supervisor 1
Procurement Officer 1
Assistant Procurement Representative 1
Purchasers 12
Total 16
SUPPORT DIVISION / DEPARTMENT STAFF
MANPOWER RESOURCES
Assad SaidFor Contracting Co., Ltd.
Site Administration
Site Administrator 7
Site Coordinator 1
Camp Boss 4
Warehousemen 2
Time Keeper 4
Assistant Camp Boss 2
Total 20
Supervisors
Site Supervisors 18
Workshop Supervisors 4
Equipment Supervisors 6
Scaffold Supervisors 1
Batching Plant Electrical Supervisor 1
Trainee Supervisors 2
Total 32
Foremen
Civil Foremen 17 Mechanic Foremen 1
Backfilling Foremen 1 Scaffold Foremen 2
Carpenter Foremen 11 Steel Fixer Foremen 7
Mason Foremen 11 Welder Foremen 6
Total 40 Total 16
PROJECTS SITE ADMINISTRATORS & SUPERVISORY PERSONNEL