Top Banner
Version 3 Yokogawa Simulation Page 1 of 6 A.B.N. 36 003 888 364 Yokogawa Simulation A Division of Yokogawa Australia Pty Ltd Tower A,112-118 Talavera Road Macquarie Park NSW 2113 Locked Bag 2024 North Ryde PO NSW1670 Australia Telephone: +61 2 8669 1300 Facsimile: +61 2 8669 1330 www.yokogawa.com/au/ Yokogawa Australia Pty Ltd Yokogawa Generic 100MW Combined Cycle Power Plant Simulator
6

Yokogawa Generic 100MW CCPP Simulator · PDF filewhich is a copy of the DCS in reference plant. ... delivery of power plant simulators with a wide variety of control systems vendors

Mar 08, 2018

Download

Documents

trandat
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Yokogawa Generic 100MW CCPP Simulator · PDF filewhich is a copy of the DCS in reference plant. ... delivery of power plant simulators with a wide variety of control systems vendors

Version 3 Yokogawa Simulation Page 1 of 6

A . B . N . 3 6 0 0 3 8 8 8 3 6 4

Y o k o g a w a S i m u l a t i o n

A D i v i s i o n o f Y o k o g a w a A u s t r a l i a P t y L t d

T o w e r A , 1 1 2 - 1 1 8 T a l a v e r a R o a d

M a c q u a r i e P a r k N S W 2 1 1 3

L o c k e d B a g 2 0 2 4 N o r t h R yd e P O

N SW 1 6 7 0 A u s t r a l i a

T e l e p h o n e : + 6 1 2 8 6 6 9 1 3 0 0

F a c s i m i l e : + 6 1 2 8 6 6 9 1 3 3 0

w w w . yo k o g a w a . c o m /a u /

Yokogaw a Aust ra l ia P ty L td

Yokogawa Generic 100MW Combined Cycle Power Plant Simulator

Page 2: Yokogawa Generic 100MW CCPP Simulator · PDF filewhich is a copy of the DCS in reference plant. ... delivery of power plant simulators with a wide variety of control systems vendors

Yokogawa Generic 100MW CCPP Simulator

Version 3 Yokogawa Simulation Page 2 of 6

ACTUAL PLANT SPECIFICATION

The simulator replicates a 100 MW CCGT power station consisting of 2 gas turbines, 2 HRSG’s and 1 steam turbine controlled by a Yokogawa CS3000 control system. The simulator provides high fidelity replication of the power station plant control room and plant behaviour. All major systems of the plant are simulated.

GAS TURBINE & HRSG

The Gas turbines have the following basic characteristics:

� General electric

� Single shaft for Turbine and Compressor

� Exhaust Gas Flow 146 kg/s

� Speed 3000 rpm

� Peak load 35 MW

� Flue Gas Outlet Temperature 590oC

The HRSGs have the following basic characteristics:

� Forced circulation

� Dual Pressure

� Economiser

� temperature control by feed water injection

� Evaporation Rate 17 kg/s (Peak)

� Superheater Outlet Temperature 530°C

� Economiser Feed Inlet Temperature 127°C

STEAM TURBINE

� MHI

� Single stage Turbine

� Condensing Turbine

� Two main Stop and Control Valves

� Turbine bypass system

� Peak load 35 MW

� Steam Flow 35.5 kg/s (Peak)

� Condenser Pressure 7.5 kPA abs (CMR)

� Circulating Water Throughput 3338 Kg/s

� Main Steam Pressure 39.5 Bar

DCS CONTROLS CONFIGURATION

• Yokogawa CS3000

• Turbine Control GE Mark IV

KEY FEATURES OF SIMULATOR

• The plant modelling is high fidelity meaning that all dynamic transients are realistic and follow the laws of physics. To the trainee, they appear to be operating a real plant

• The DCS HMI and logic are fully stimulated which is a copy of the DCS in reference plant. It allows basic and advanced DCS engineering training to be conducted on the simulator

• The simulator allows training scenarios to be available at any time and the training program can be tailored to any of the many plant malfunctions and operating conditions which could be anticipated or previously experienced on a power plant.

• The simulator is supplied with an extensive training exercise system that allows objective trainee competency testing. The training exercise is fully configurable and an automatic scoring calculation is used for evaluating the trainee performance.

• 19 initial conditions (ICs) and 100 malfunctions are provided

• All the software runs on standard PC and server hardware

Page 3: Yokogawa Generic 100MW CCPP Simulator · PDF filewhich is a copy of the DCS in reference plant. ... delivery of power plant simulators with a wide variety of control systems vendors

Yokogawa Generic 100MW CCPP Simulator

Version 3 Yokogawa Simulation Page 3 of 6

PLANT OVERVIEW & DCS GRAPHICS

Page 4: Yokogawa Generic 100MW CCPP Simulator · PDF filewhich is a copy of the DCS in reference plant. ... delivery of power plant simulators with a wide variety of control systems vendors

Yokogawa Generic 100MW CCPP Simulator

Version 3 Yokogawa Simulation Page 4 of 6

SIMULATOR HARDWARE CONFIGURATION

The following is the typical hardware configuration. All computers are standard desktop PCs and server (ESXI server). The reduced-hardware architecture is made possible by employing the latest best practice in virtualisation, through the VMWare® ESX package. This not only reduces the overall hardware requirement but also offers greater reliability and a greatly extended range of features. The hardware configuration is very flexible and can be tailored to suit customer’s requirements.

HMI HMI

Gigabit Ethernet

Operator Trainee Station 1

with dual monitors

Colour Laser Printer

Operator Trainee Station 2

with dual monitors

Instructor and engineering

station with dual monitors

Instructor Station/

Engineering Station

Main Simulation computer (ESXI server)

EWS VM

FCS VM 1

FCS VM 2

FCS VM 3

Linux VM

Typical Hardware Layout

INSTRUCTOR FUNCTIONS

The Trainer's interface with the simulator is through the graphical user interface in the Instructor Station. The main functions the trainer can do are:

• Loading an IC (Initial Condition) or Snapshot: Introducing a Condition of plant, ready for a training session;

• Saving an IC or Snapshot: Saves a particular situation for continued running at a later date for the same trainee, or for use during some other training period;

• Setting the simulator to Run/freeze mode: Runs the simulator and so permit a trainee to perform operating situations, guided by the various monitoring and alarm systems; Freeze the simulator for detailed analysis of the plant status or pause in the training session;

• Applying malfunctions: Initiating a single event or pre-program a set of plant or equipment failure situations that a Trainee has to address and to take appropriate actions, so as to rectify poor operating or plant alarm situations;

• Applying scenario: Introduce a pre-programmed operating exercise that forms the basis for a class training session;

Page 5: Yokogawa Generic 100MW CCPP Simulator · PDF filewhich is a copy of the DCS in reference plant. ... delivery of power plant simulators with a wide variety of control systems vendors

Yokogawa Generic 100MW CCPP Simulator

Version 3 Yokogawa Simulation Page 5 of 6

• Backtracking: Go back in time, to allow a trainee to operate in a different manner from a previous time and to establish an alternative outcome;

• Develop automatic training exercises and reporting of trainee training session results;

• Trainee management: record trainee details and recall trainee history;

• Signal forcing and parameter manipulation like ambient temperature;

• Changing speed: models can be running slower or faster than real time to suit training purpose like reduced the time needed for turbine heat soak;

• Dynamic logic display: dynamic values of the coslog logic can be seen and logic variables can be forced. Coslog is the Yokogawa logic package to emulate logic like protection relay logic, PLC logic, etc.

Instructor Graphical User Interface

Malfunction Menus

Page 6: Yokogawa Generic 100MW CCPP Simulator · PDF filewhich is a copy of the DCS in reference plant. ... delivery of power plant simulators with a wide variety of control systems vendors

Yokogawa Generic 100MW CCPP Simulator

Version 3 Yokogawa Simulation Page 6 of 6

HISTORY OF YOKOGAWA SIMULATION

In 1998 Yokogawa Electric Corporation acquired TechComm Simulation of Australia. TechComm Simulation was a simulator manufacturer specialising in high fidelity replica Fossil Fuel Fired Power Plant training simulators. TechComm was established as Costec Pty Ltd in 1983 and had built simulators around the world.

The TechComm Simulation business was merged with Yokogawa Australia and operates from offices in Sydney, Australia. The simulator design and development group in Sydney supports all Yokogawa worldwide affiliates in the Power Plant Training Simulator and Services market.

Over the past 25 years the Yokogawa Simulator Group in Sydney has built an enviable reputation for the design and delivery of power plant simulators with a wide variety of control systems vendors in diverse locations such as Korea, Australia, Middle East, Singapore, Vietnam, Thailand, Mexico, Zimbabwe and Egypt.

For more information please contact Max Barry, Director Yokogawa Simulation Email: [email protected] Telephone: +612 8669 1302 Richard Porter, Simulation Group Manager Email: [email protected] Telephone: +612 8669 1333