Top Banner
Yogyakarta Bus Yogyakarta Bus Replacement Project Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile
22

Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

Dec 23, 2015

Download

Documents

Annabella Cox
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

Yogyakarta Bus Yogyakarta Bus Replacement Project Replacement Project

Martha MaulidiaPelangi Indonesia

August 25-27, 2004, Santiago, Chile

Page 2: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

AgendaAgenda

• Overview of Project• Baseline• Additionality• Monitoring• Lessons Learned

Page 3: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

YOGYAKARTAYOGYAKARTA

• 475,000 inhabitants• Students from all over parts of

Indonesia and overseas• Cheap living costs, comfortable life• Tourist destination (culture and

nature)• However, they have worsening

problems with air quality and transportation system

Page 4: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

Overview of the ProjectOverview of the Project

• A project owned by an alliance of:– University (Center for Transportation Studies,

University of Gadjahmada, Yogyakarta)– Local Government (Transportation Office of

Yogyakarta Province)– Cooperative of bus owners (KOPATA)

• Unique it was proposed because there was an opportunity of the CDM incentives (co-financing, initial funding from SSN, international exposure, better outreach)

Page 5: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

Overview of the ProjectOverview of the Project

• First Proposal:– Bus Replacement– Public Transport Management Restructuring

(institutional setting, better planning and clear specification at operational standards, competitive licensing system)

– Routing and Scheduling Improvement

• Over time:– Soft measures excluded from CDM p.a.

(complicated & hard to measure)– Bus Replacement & Fuel Switching

Page 6: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

Overview of the ProjectOverview of the Project

• Existing condition:– Badly maintained buses (average age: 15-

20 years old)– Inefficient use of energy– Local air pollution– Low priced motorcycles chaotic traffic &

air pollution– Public transport not attractive

• Objectives:– To improve image of public transportation– To increase bus ridership– To reduce emissions

Page 7: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

Overview of the ProjectOverview of the Project

• Fuel Switching– Assessment of alternative fuels: bio-

diesel, clean diesel, LPG, CNG.– Engine intervention: re-powering,

rebuilding, retrofitting, re-fuelling and retiring.

– LPG was chosen based on technical feasibility studies (includes availability and continuity of supply commitment from LPG supplier).

Page 8: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

BaselineBaseline

• Appendix B of Simplified M&P: project activity reduces anthropogenic emissions by sources and directly emits less than 15,000 tons of CO2e annually Type III.C Emission reductions by low-greenhouse gas emitting vehicles.

Page 9: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

BaselineBaseline

• Project Boundary: 200 buses owned by KOPATA (Bus Owner Cooperative) in Yogyakarta

Page 10: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

BaselineBaseline

BaselineExisting Condition

Regulation: Age Limitation for Buses

Data

7 scenarios, different fuels and bus ages

Most financially attractive

Primary: financial; Secondary: technical

Primary: Survey, sample 10 buses

Page 11: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

BaselineBaseline

7 scenarios reviewed

Average age (years)

Fuel

20

Diesel

1 2 3 4 5 6 7

5

Diesel LPGDieselLPGDiesel LPG

10 5 10 New New

ExistingProjectHighest

NPV

Affordable for bus owners

Baseline

Page 12: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

BaselineBaseline

Sublet System

Employment System

2 systems of revenue divide between owners and operators

existing

proposed

Page 13: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

BaselineBaseline

• Local regulation on age limitation for buses cannot be ignored and has to be taken into account

• Difference of engine efficiency plays an important role:– DIESEL: higher compression ratio:

higher engine efficiency (compression ignition engine)

– LPG: lower engine efficiency (spark ignition engine)

Page 14: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

BaselineBaseline

• Having chosen the most financially attractive option as baseline scenario, it turns out that:– Emission reductions over 10 years is less than

3,000 ton CO2e

• Assuming transaction costs (Validation, DNA Approval, Monitoring and Verification, EB Registration) of app. $ 40,000, at $10/tonne the CER revenue ($ 30,000) is even less the transaction costs.

Page 15: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

BaselineBaseline

• Other crucial issue: leakagewhat to do with the old buses being

replaced?

• Small-scale: no leakage calculation required

Page 16: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

AdditionalityAdditionality

Barriers Approach

Technology Investment Institutional/ Managerial

LPG common for cooking, but rarely found in buses

additional converter kit expensive

requires special training and monitoring

Page 17: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

MonitoringMonitoring

• Measuring the exact amount of LPG consumed by 200 buses in 10 years.

• At each LPG filling station, a balance is provided to measure the weight of the full tank and the empty tank.

• The difference = the fuel consumption/bus/day.

Page 18: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

MonitoringMonitoring

Parameters being monitored:• Tank ID No• Weight of full tank• Weight of empty tank• Distance travelled at refuelling time• Number of buses operating• Efficiency of combustion in LPG

buses• Changing legislation

Page 19: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

Lessons LearnedLessons Learned

• Transportation improvement project involves: vehicles, fuel, & the system. At the same time: management (ownership), policy/regulation (local/ national).

• Consideration of regulation translate it into emission reductions calculation.

Page 20: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

Lessons LearnedLessons Learned

• In choosing the baseline: highest NPV does not merely describe the most financially attractive option cash flow analysis

• To switch fuel with LPG, higher value of CERs could have been achieved if the baseline is vehicles using other fuels, e.g. petroleum.

• Good project, but not good CDM project. (Other benefits: reduce local air pollution: CO, NOx and particulate; but very low GHG ER, hence CERs)Stop with CDM

• Bigger scope of the project: supply of bio-diesel or ethanol better result than LPG. Move forward with CDM.

Page 21: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

Current Status of the ProjectCurrent Status of the Project

• Excellent public exposure (radio talk shows, article and debate on local newspapers, brochure/leaflets, formal meetings)

• Proposals to various funding agencies• Continue with the proposed fuel

switching with LPG stop the CDM activities

• Continue to seek investment especially from credit scheme provided by state-owned enterprises.

• Continue the efforts for an agreement with PERTAMINA, the state-owned oil and gas company

Page 22: Yogyakarta Bus Replacement Project Martha Maulidia Pelangi Indonesia August 25-27, 2004, Santiago, Chile.

www.pelangi.or.id

www.southsouthnorth.org

[email protected]