www.seattle.gov/transportation/YeslerBridge.htm Yesler Bridge Rehabilitation Project May 2015 P R E F O N T A I N E P L S P R E F O N T A I N E P L S Yesler Way Bridge Vicinity 5 JEFFERSON ST JEFFERSON ST TERRACE ST JAMES ST YESLER WAY YESLER WAY S WASHINGTON ST S WASHINGTON ST 4TH AVE 5 TH AVE 6TH AVE 3RD A VE 2ND A VE 4TH AVE 5TH AVE 5TH AVE 6TH AVE 4TH AVE 3RD AVE City Hall Park Prefontaine Place King County Courthouse Prefontaine Building King County Administration Building PIONEER SQUARE TRANSIT STATION Yesler Building Seattle Passport Agency City of Seattle Fire Station King County Chinook Building D I L L I N G W A Y • Built in 1910 as one of the first steel roadway bridges in the City • Being rehabilitated to improve safety and reliability while preserving its principal historical elements • Vital in connecting residents, commuters, workers and businesses in the surrounding area and neighborhoods Project overview Schedule 60% Design 90% Design Final Design Begin Construction Project Complete October 2014 April 2015 Spring 2016 September 2015 Fall 2017 We are here Project area
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
www.seattle.gov/transportation/YeslerBridge.htm
Yesler Bridge Rehabilitation Project
May 2015
PREFONTAINE PL S
PREFONTAINE PL S
Yesler Way Bridge Vicinity
5
JEFFERSON ST
JEFFERSON ST
TERRACE ST
JAMES ST
YESLER WAY YESLER WAY
S WASHINGTON STS WASHINGTON ST
4TH AVE
5TH AVE
6TH AVE
3RD AVE
2ND AVE
4TH AVE
5TH AVE
5TH AVE
6TH AVE
4TH AVE
3RD
AVE
City Hall Park
Prefontaine Place
King County Courthouse
PrefontaineBuilding
King County Administration
Building
PIONEER SQUARETRANSIT STATION
Yesler Building
Seattle Passport Agency
City of Seattle Fire Station
King County
ChinookBuilding
DILLIN
G WAY
• Built in 1910 as one of the first steel roadway bridges in the City
• Being rehabilitated to improve safety and reliability while preserving its principal historical elements
• Vital in connecting residents, commuters, workers and businesses in the surrounding area and neighborhoods
Project overview
Schedule
60% Design
90% Design
Final Design
Begin Construction
Project Complete
October 2014
April 2015
Spring 2016
September2015
Fall 2017
We arehere
Project area
www.seattle.gov/transportation/YeslerBridge.htm
Yesler Bridge Rehabilitation Project
May 2015
Proposed bridge design
Pedestrian Railing
Single Span Superstructure
West Abutment WallEast Abutment Wall
Fascia Girder
Design• Remove interior steel columns to form a single
span superstructure• Rehabilitate east abutment wall and replace west abutment wall• Refurbish north and south fascia girders and pedestrian railings
Pedestrian improvements • Improve intersection design to reduce crosswalk distance,
accommodate ADA and increase user safety
PREFONTAINE PL S
PREFONTAINE PL S
JEFFERSON ST
4TH AVE
4TH AVE
City Hall Park
PrefontaineBuilding
TERRACE ST
YESLER WAY
Yesler Building
PREFONTAINE PL S
PREFONTAINE PL S
S WASHINGTON ST
4TH AVE City of Seattle
Fire Station
LEGENDSidewalk Crosswalk
4TH AVE
City Hall Park
PrefontaineBuilding
Yesler Building
YESLER WAY
TERRACE ST
LEGENDSidewalk Crosswalk
Before After
4TH AVE
City Hall Park
PrefontaineBuilding
Yesler Building
YESLER WAY
TERRACE ST
DILLING WAY
LEGENDSidewalk Crosswalk
4TH AVE
City Hall Park
PrefontaineBuilding Yesler Building
YESLER WAY
TERRACE ST
DILLING WAY
LEGENDSidewalk Crosswalk
Design rendering
www.seattle.gov/transportation/YeslerBridge.htm
Yesler Bridge Rehabilitation Project
May 2015
Construction impactsStreet closures• Yesler Way will be closed in both directions between
3rd Ave and midway between 5th Ave and 6th Ave • Terrace St will be closed to through traffic, open to
local access• 4th Ave will have ongoing lane closures and occasional
full nighttime and weekend closures• Sidewalks on either side of 4th Ave will have
alternating closures
Vehicle and sidewalk closures
PREFONTAINE PL S
PREFONTAINE PL S
5
Road Closure
Sidewalk Closure
JEFFERSON ST
JEFFERSON ST
TERRACE ST
JAMES ST
YESLER WAY YESLER WAY
S WASHINGTON STS WASHINGTON ST
4TH AVE
5TH AVE
6TH AVE
3RD AVE
2ND AVE
4TH AVE
5TH AVE
5TH AVE
6TH AVE
4TH AVE
3RD
AVE
Prefontaine Place
King County Courthouse
PrefontaineBuilding
King County Administration
Building
PIONEER SQUARETRANSIT STATION
Yesler Building
Seattle Passport Agency
City of Seattle Fire Station
King County
ChinookBuilding
CHERRY ST
City Hall Park
DILLIN
G WAY
www.seattle.gov/transportation/YeslerBridge.htm
Yesler Bridge Rehabilitation Project
May 2015
Construction impacts
PREFONTAINE PL S
6TH AVE Road Closure
Sidewalk Closure
Metro Route 27 Detours
Metro 5th Ave Detours
Community Transit
5
JEFFERSON ST
JEFFERSON ST
TERRACE ST
YESLER WAY YESLER WAY YESLER WAY
S WASHINGTON ST
4TH AVE
5TH AVE
6TH AVE
3RD AVE
2ND AVE
4TH AVE
5TH AVE 6TH AVE
4TH AVE
3RD
AVE
Prefontaine Place
King County Courthouse
PrefontaineBuilding
King County Administration
Building
Harborview Medical
PIONEER SQUARETRANSIT STATION
Yesler Building
Seattle Passport Agency
Seattle Housing
Assistance Group
City of Seattle Fire Station
King County
ChinookBuilding
Occidental Park
MunicipalCourthouse
CHERRY ST
COLUMBIA ST
MARION ST
2ND AVE
JEFFERSON ST
ALDER ST
8TH
AVE
JAMES ST
9TH AVE
8TH AVE
TERRY AVE
Harborview Park
S MAIN ST
JAMES ST
PREFONTAINE PL S
YESLER WAY
S WASHINGTON ST
5TH AVE
6TH AVE
8TH
AVE
9TH AVE
PREFONTAINE PL S
JAMES ST
Kobe Terrace Park
City Hall Park
3RD
AVE
4TH AVE
4TH AVE
DILLIN
G WAY
4TH AVE
3RD AVE
6TH AVE
Transit detour routesTransit impacts • Some transit routes
may be affected during construction, including:
° King County Metro routes: 27, 111, 114, 212, 214, 217, 304, 355