Top Banner
YBI West-Side Bridges Seismic Retrofit Construction Manager / General Contractor Contract Award Agenda Item 8 SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY October 16, 2018
15

YBI West-Side Bridges Seismic Retrofit · YBI West-Side Bridges Project Delivery 12 Construction of West-Side Bridges Project is being coordinated with completion of the Southgate

Jul 31, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: YBI West-Side Bridges Seismic Retrofit · YBI West-Side Bridges Project Delivery 12 Construction of West-Side Bridges Project is being coordinated with completion of the Southgate

YBI West-Side Bridges Seismic Retrofit

Construction Manager /

General Contractor

Contract Award

Agenda Item 8

SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY

October 16, 2018

Page 2: YBI West-Side Bridges Seismic Retrofit · YBI West-Side Bridges Project Delivery 12 Construction of West-Side Bridges Project is being coordinated with completion of the Southgate

YBI I-80 West-side Bridges

2

Location

Page 3: YBI West-Side Bridges Seismic Retrofit · YBI West-Side Bridges Project Delivery 12 Construction of West-Side Bridges Project is being coordinated with completion of the Southgate

YBI I-80 West-side Bridges

3

Seismic Strategy:

Retrofit 5 Bridges

Replace 3 Bridges

Construction

Estimate: $55M

Funding: Federal,

State, TIDA

Page 4: YBI West-Side Bridges Seismic Retrofit · YBI West-Side Bridges Project Delivery 12 Construction of West-Side Bridges Project is being coordinated with completion of the Southgate

YBI I-80 West-side Bridges

4

Environmental

Complete

Preliminary

Engineering at

30%

Construction Start

Date: Mid 2020

Page 5: YBI West-Side Bridges Seismic Retrofit · YBI West-Side Bridges Project Delivery 12 Construction of West-Side Bridges Project is being coordinated with completion of the Southgate

YBI I-80 West-side Bridges

5

Site Conditions – Land Slides

Page 6: YBI West-Side Bridges Seismic Retrofit · YBI West-Side Bridges Project Delivery 12 Construction of West-Side Bridges Project is being coordinated with completion of the Southgate

YBI I-80 West-side Bridges

6

Site Conditions – Steep Terrain, Limited Access

Page 7: YBI West-Side Bridges Seismic Retrofit · YBI West-Side Bridges Project Delivery 12 Construction of West-Side Bridges Project is being coordinated with completion of the Southgate

YBI I-80 West-side Bridges

7

Site Conditions – Above the Bay

CABLE HOUSE

Page 8: YBI West-Side Bridges Seismic Retrofit · YBI West-Side Bridges Project Delivery 12 Construction of West-Side Bridges Project is being coordinated with completion of the Southgate

Procurement Overview

8

Jan-Feb 2018 – Evaluated Design-Bid-Build vs CM/GC

March 2018 - Board Approved CM/GC Delivery Method

RFQ 17/18-18 was issued on July 10, 2018

August 2018 - 6 Statement of Qualifications received:

Golden State Bridge/Obayashi Joint Venture

Kiewit Infrastructure West Co.

Myers/DeSilva Gates Joint Venture

Shimmick Construction Company/California

Engineering Contractors, Inc. Joint Venture

Granite Construction Company

Flatiron West, Inc.

Page 9: YBI West-Side Bridges Seismic Retrofit · YBI West-Side Bridges Project Delivery 12 Construction of West-Side Bridges Project is being coordinated with completion of the Southgate

Evaluation Overview

9

Evaluation committee - SFCTA, TIDA, US Coast Guard,

Contra Costa Transportation Authority and Caltrain

Caltrans and FHWA staff participated as observers

Key evaluation criteria:

Firm Experience and Past Performance

Proposer’s Organization and Key Personnel

Project Understanding and Approach

CAL-OSHA Safety Record

Page 10: YBI West-Side Bridges Seismic Retrofit · YBI West-Side Bridges Project Delivery 12 Construction of West-Side Bridges Project is being coordinated with completion of the Southgate

Recommended CM/GC Contract Award

10

Based on RFQ evaluation criteria listed below,

evaluation committee recommends contract be

awarded to Golden State Bridge/Obayashi Joint Venture

Highest qualified Project Manager

Most relevant YBI seismic retrofit project experience

Good track record of minimizing delays/claims

Strongest project understanding and solid safety record

Page 11: YBI West-Side Bridges Seismic Retrofit · YBI West-Side Bridges Project Delivery 12 Construction of West-Side Bridges Project is being coordinated with completion of the Southgate

Recommendation

11

Approve an 18-month professional services contract

with Golden State Bridge/Obayashi Joint Venture in an

amount not to exceed $675,000 for Construction

Manager/General Contractor preconstruction services

for the YBI West-Side Bridges Project

Authorize the Executive Director to negotiate contract

terms and conditions

Page 12: YBI West-Side Bridges Seismic Retrofit · YBI West-Side Bridges Project Delivery 12 Construction of West-Side Bridges Project is being coordinated with completion of the Southgate

YBI West-Side Bridges Project Delivery

12

Construction of West-Side Bridges Project is being

coordinated with completion of the Southgate Road

Project and reconstruction of MaCalla Road

Environmental clearance completed

Project design at 30% complete, ready to proceed with

final design phase

With CM/GC selected, it is an appropriate time to

assess the remaining design effort required for the

Project

WMH Corporation is providing design services for the

West-Side Bridges Project

Page 13: YBI West-Side Bridges Seismic Retrofit · YBI West-Side Bridges Project Delivery 12 Construction of West-Side Bridges Project is being coordinated with completion of the Southgate

YBI West-Side Bridges Project Delivery

13

WMH Corporation’s DBE participation: 12%

Total of 5 DBE firms:

ABA

David J. Powers and Associates, Inc.

Haygood & Associates Landscape Architects

Earth Mechanics Inc.

CVS & Associates, Inc.

Page 14: YBI West-Side Bridges Seismic Retrofit · YBI West-Side Bridges Project Delivery 12 Construction of West-Side Bridges Project is being coordinated with completion of the Southgate

Recommendation

14

Increase the amount of the professional services

contract with WMH Corporation by $4,000,000 for a

total of $15,300,000 to complete final Plans,

Specifications, and Estimates for the YBI West-Side

Bridges Project

Authorize the Executive Director to modify contract

terms and conditions

Page 15: YBI West-Side Bridges Seismic Retrofit · YBI West-Side Bridges Project Delivery 12 Construction of West-Side Bridges Project is being coordinated with completion of the Southgate

SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY

Questions?