In theory, the WBS tasks should have technical objectives. In practice, this is not often well
defined. In some cases, the specification requirements are referenced, but may not actually be
what is expected at the point in the program where an early design is analyzed or prototype tested.
The use of TPMs can provide a better linkage as will be described in the following paragraphs.
Critical Path
Basic. The path in a network schedule with the least (or most negative) schedule slack is the
critical path. This concept has long been used for managing the highest risk schedule events on a
project. A project may have more than one equally critical path or management may decide to
track more than just the most critical path. Tracking the three most critical paths addresses the risk
that a problem may appear on a path that is close to critical and overtake the original path without
warning. Figure 2 is from a project where the critical path analysis identified multiple parallel
critical paths leading to fixed events. After identification of this situation, action was taken to
address this significant project risk. In this instance, multiple paths had to be monitored
throughout the program.
Figure 2. Critical Path Analysis Example
Technical Critical Path
Limited References. The term was introduced to this paper by Dr. Yeo of the Nanyang
Technological University during discussions about TPMs, February 19, 2009. It can be found in
various references where it addresses the series of technology developments that are necessary for
a development to be successful. One example is a briefing on planning for advancement in solar
energy by the U.S. Department of Energy (2006), Figure 3.
My Integrated Schedule
Q2 1998 Q3 1998 Q4 1998 Q1 1999 Q2 1999 Q3 1999 Q4 1999 Q1 2000 Q2 2000 Q3 2000 Q4 2000 Q1 2001 Q2 2001 Q3 2001 Q4 2001 Q1 2002 Q2 2002 Q3 2002
Acquisition
Design & Produ ction
Test & Evaluatio n
Implemen tation
Human F actors
RRI/ASE Soft ware Delivery
AR INC VDLM2/ATN fo r ATS+ AC ARS
American Airlin es CPD LC Program
American 767 Program
Rockwell CMU/VDR D evelopment ( need ties to cert)
767 Fligh t Deck Integration Activities (need ties t o cert)
FAA Flig ht Stan dards Tasks [Street er, Do n]
FAA Cert ificatio n Tasks (Steve Van Trees, AIR)
Requirements
Development3 90 days
06/29/19910/30/1990 days
Prep./Review of SIR4 5 days
10/26/19910/30/1990 days
SIR Released5 0 days
10/30/19910/30/1990 days
Bid/Prop osal/AwardActivities 6 45 days
11/02/19901/01/1990 days
Contract Award7 0 days
01/15/19901/15/1990 days
Design U sabilit y Stud y4785 days01/04/19904/30/199
0 days
Controller HCI Results48 0 days04/30/19904/30/199
20.4 days
Build 1 H ost/DL AP S/WDevelopment
9 368 days05/05/19909/29/200311 days
FC A/PC A Complete ( HCSSW /ProATN DL AP)
11 0 days09/29/20009/29/200311 days
Internal F AA Ho stInteroperabilit y Testin g &
Debugging25 86 days
10/02/20001/29/200311 days
Host Soft ware Suitabil it y28 22 days
01/30/20002/28/200311 days
PTR fixes, RegressionTesting, f inal H ostSoft ware Uplevel
29 40 days03/01/20004/25/200311 days
Host A5f 1.2 Co de Cut off20 0 days
04/25/20004/25/200311 days
Host Integratio n/keysit e21 159 days
04/26/20012/04/200311 days
National Delivery A5f1.222 0 days
12/04/20012/04/200311 days
Procedures/Training Stud y49 87 days
07/01/19910/30/1991132 days
CMU/Flig ht DeckPreliminary Design (tie toRockwell/Boein g effor ts)
175360 days09/01/19901/17/200323 days
CMU CPDLC/C M APreliminary Design
122129 days01/01/19906/30/199204 days
Aircraft C onfig uration
Review13264 days
01/01/19903/31/1990 days
B767 Deliveries13367 days
02/01/19905/04/1990 days
TSA Complete1340 days
06/11/19906/11/199201 days
Cockpit Display Definition13513 days
06/14/19906/30/199204 days
Development of CockpitDisplay/W iring Updates
136450 days06/14/19903/02/200200 days
Design U sabilit y Stud y51 85 days
01/04/19904/30/1990 days
Pilot HCI Result s52 0 days
04/30/19904/30/199247 days
Architect ure/H MIDefinitio n Finalized
121 0 days06/30/19906/30/199
204 days
Flight Deck HCI Evaluation53 23 days
08/25/19909/24/199
335 days
An alizeR esults54 33 days
09/27/19911/10/199335 days
Commun it y Co nsensu s55 36 days
11/12/19912/31/199334 days
CMU CPDLC/C M ADevelopment
123325 days07/01/19909/27/200
204 days
High Level Certi ficatio nAp plication172 0 days
01/31/19901/31/1990 days
AGC App roval1621 day
04/15/19904/15/1990 days
Public Co mmen t
16345 days04/20/19906/21/199383 days
Commen t Disp osition16430 days
06/22/19908/02/199383 days
AC 20DC Final
165 0 days08/03/19908/03/199383 days
American develops
certification plan andcomplian ce data
173220 days08/03/19906/05/200383 days
AF M Sup plementsDeveloped17490 days
06/06/20010/09/200966 days
CMU/Flig ht Deck
Preliminary Design
Completed1760 days
01/17/20001/17/200323 days
CMU/Flig ht Deck Detai led
Design (tie to
Rockwell/Boein g effor ts)177160 days
01/18/20008/28/200323 days
CMU/Flig ht Deck Detai ledDesign C omplet e
1780 days08/28/20008/28/200323 days
Operatio nal EnvironmentDefinitio n (F AA-Hritz)
158214 days12/07/19909/30/199560 days
Operatio nal Saf et yAssessment (F AA-Hrit z)
159214 days12/07/19909/30/199560 days
Systems Requirement sand Procedures
160167 days05/03/19912/21/199502 days
AC O app roval ofcertification plan, design
data17980 days
08/29/20012/18/200323 days
VDL Mod e 2 Development117295 days
01/11/19902/25/200357 days
Contract Preparation13174 days
06/01/19901/28/200278 days
Contract Award forCPDLC B uild 1
14 0 days01/30/20001/30/200278 days
Pre-CTS Soft ware Delivery60 0 days
02/07/20002/07/200221 days
AT NSI R RI Delivered1180 days
02/07/20002/07/200221 days
AT NSI R RI Integ/Debu g119151 days
02/23/20009/20/200209 days
CPDLC and CM A ASE'sDelivery61 0 days
02/07/20002/07/200223 days
AC I ASE Delivered1240 days
02/07/20002/07/200223 days
Reqts An alysis t oIntegrate ATNSI RRI and
ASEs15 50 days
03/02/20005/10/200255 days
CMU ACI CPDL C/CM AASE Integ/Debu g
125149 days02/15/20009/08/200217 days
CMU/VD R FunctionalTesting12648 days
09/28/20012/04/200204 days
Avionics/Groun d Syst emTesting and Up dates
(Estimated)12760 days
12/05/20002/26/200204 days
R/L CMU Available1280 days
02/26/20002/26/200204 days
Pro ATN DL AP Accept edand Complete10 0 days
05/11/20005/11/200255 days
Design, Implement, TestAT NSI R RI, ASE
16180 days07/24/20003/30/200203 days
Conduct FinalConfiguration
Au dits/In corporateChanges1723 days
04/02/20005/02/200203 days
FC A/PC A Complete(ATNSI D L AP)18 0 days
05/02/20005/02/200203 days
System D elivered to T &E
Site240 days
05/02/20005/02/200203 days
Internal F AA FinalInteroperabilit y Testin g &
Debugging2640 days
05/14/20007/06/200196 days
FAA HMI Cockp it Survey97 4 days
11/09/19911/12/1990 days
Cockpit Integrat ion H MIprogram with T ech Center
98131 days04/01/19909/30/199
1239 days
Sim Hard wareConfiguration 1
99219 days04/01/19902/01/200
336 days
Sim Hard wareConfiguration F inal
10067 days03/01/20006/01/200316 days
Sim Data Link Provision101120 days
07/03/20012/15/200295 days
AT SS/Pilot/Syst emIntegratio n Plan ning
56382 days05/17/19910/31/200870 days
CPDLC IRD/ICD69130 days
05/28/19911/25/199833 days
Interface bet ween ARINC,FAATC
74 60 days08/09/19910/29/199852 days
Implemen t Test bed GSs
75 60 days08/09/19910/29/199852 days
Demo test/prep
76196 days11/26/19908/25/200
833 days
Support Demon stratio n77 170 days
08/28/20004/20/200833 days
Demonst rate
AT SS/Pilot/Syst emIntegratio n57 86 days
12/18/20004/16/200837 days
R/L VDL Mode 2 VDRAvailable1130 days
10/01/19910/01/199571 days
B/L VDL Mode 2 VDRAvailable
1140 days06/30/20006/30/200376 days
AVLC Testing w/RColl ins65100 days
06/30/20011/16/200944 days
Provision Aircraft for RedLabel avionics137140 days
08/01/20002/12/200214 days
VDL-2/C MU/Flig ht DeckIntegratio n13840 days
03/05/20004/27/200200 days
Cockpit integrat ionComplete1390 days
04/27/20004/27/200200 days
Quick Ch ange ECO's ( tieto out of service testin g)
140153 days07/03/20001/31/200890 days
Integrate ATN D isplaysand CMU in Sim10246 days
04/30/20007/02/200200 days
Review and Upd ateHuman F actors
Requirements andGuidance45 304 days
12/01/19901/28/2001153 days
Human F actors Testin gComplete580 days
04/16/20004/16/200837 days
Procedure Refin ement for
PET AL IIe109133 days
06/01/20012/04/200333 days
Installatio n Insp ection(tied to C MU/flight Deck
completion)18123 days
04/30/20005/30/200229 days
Maintenance & MELManuals Complete
107485 days10/26/19909/01/200422 days
Aircraft and Op eratingManuals Complete
106152 days06/01/20012/31/200337 days
Maintenance CrewTraining & Procedures for
PET AL IIe1080 days
12/31/20012/31/200337 days
AA Approved Training
Program104 451 days
01/08/19909/29/200402 days
AA PET AL II Maastrich tFirst Flig ht182 1 day
05/31/20005/31/200229 days
PET AL II
18360 days07/02/20009/21/200208 days
PET AL II Test R esultAn alysis
18410 days09/24/20010/05/200208 days
CMU Up dates and Release12915 wks
10/08/20001/18/20041.6 wks
Planned B/L CM U Availfor Cert
1300 days01/18/20001/18/200208 days
Ad dress PET AL II TestIssues an d Fix
18515 wks10/08/20001/18/20041.6 wks
Provision Aircraft for
Black Lab el CM US14170 days
01/21/20004/26/200208 days
767's Available f or Miami1420 days
04/26/20004/26/200208 days
AF M Sup plementsCompleted1865 days
01/21/20001/25/200632 days
FAA T yp e Desig nAp proval
187 1 day01/28/20001/28/200632 days
Ground Based ( ServiceProvider/F AA) NetMgt
Description/Req s70 87 days
05/28/19909/27/199489 days
Ops Perf & SuccessCriteria
71 175 days05/28/19901/27/200401 days
AR INC, F AATC G/Ginterop @ F AATC
81 40 days04/06/20005/31/20091 days
Begin Int egratio n Test ing(need Flight Deck inpu t,
sho ws sim option)30 0 days
07/06/20007/06/200196 days
Integratio n Test ing
31 55 days07/09/20009/21/200196 days
Acceptab ilit y Testing
32 44 days09/24/20011/22/200196 days
DL AP PT R Fixes &Regression Test ing
33 50 days11/23/20001/31/200196 days
OT&E Co mplete
34 0 days01/31/20001/31/200196 days
Install production Gro undStation f or testing
79 60 days09/08/20011/30/200657 days
A/G interop test ing wit hRockwell, American fo r
P2E80107 days
12/01/20004/30/200657 days
AR INC, F AATC A/Ginterop @ F AATC
82170 days07/06/20002/28/200609 days
OT&E Su pport83170 days
07/06/20002/28/20066 days
Site Prep, HostImplemen tation,
Installatio n & C heckou t,SAT Activities
36133 days08/01/20002/01/200195 days
Delivery t o Key Site37 10 days
02/04/20002/15/200195 days
Field Familiarization38 63 days
02/18/20005/15/200195 days
SAT Testing Co mplete39 0 days
05/15/20005/15/200195 days
VDL Mod e 2/AT NDevelopment64741 days
06/29/19904/30/200119 days
AT S M2/ATN IOC66 0 days
04/30/20004/30/200119 days
Install VD L Mod e 2/AT N inMiami/op s service syst em
86 120 days10/15/20003/29/2000 days
Pre-operations88 130 days
12/03/20005/31/2000 days
Post-operations89140 days
06/03/20012/13/200403 days
Procedure/Train ingDevelopment/R efinement
for Miami110578 days
03/17/19906/01/200443 days
AGC App roval14544 days
04/15/19906/15/199557 days
Public Co mmen t14623 days
06/16/19907/16/199557 days
AF S Team Approval14768 days
07/19/19910/20/199557 days
AC 120.com Fin al1480 days
11/01/19911/01/199550 days
American DevelopsValidatio n Test Plan
151220 days11/01/19909/01/200550 days
POI Checks Ops ApprovalTest Plan15265 days
09/04/20012/01/200550 days
Validatio n Test15323 days
06/05/20007/05/200419 days
American develops an dsubmits operational
approval plan spec150220 days
11/01/19909/01/200638 days
Operatio nal SpecificationSpec/Operation al
Ap proval Issued ( AFS POI)1540 days
11/01/20011/01/200335 days
Initial Op eratingCapabilit y (IOC)
40 0 days05/15/20005/15/200195 days
Prep. For OperationalRediness Demo nstration
(ORD)41 67 days
05/16/20008/16/200488 days
First OR D42 0 days
08/16/20008/16/200488 days
Flight Standard s DataCollectio n durin g live ops
155360 days06/04/20010/20/200182 days
Svc Level Agreementwit h F AA72 60 days
03/12/20006/01/200260 days
Service for Miami liveoperation s90543 days
06/03/20006/30/2000 days
Data Link Implementat ionReview
92156 days06/01/19901/04/1990 days
Retrofit Plan for AmericanFleet
95 43 days02/01/19903/31/199
1370 days
RTC A 172 VDL Mode 2
MOPS (Son Tran)167296 days
04/15/19906/01/200794 days
AIR-100 T SO
168270 days06/02/20006/14/200794 days
AIR-100 T SO process170143 days
04/15/19911/01/1991217 days
FAA- ARINC Co ntract forBld 1
67 0 days05/28/19905/28/1990 days
Critical Airports/EnRo uteIAGS Dep lo yed
85 0 days12/31/19912/31/1990 days
Host/
DLAP
RRI/AS
E
767
Host Cutoff
Miami
Petal II
Path at or near critical
Key Events
Fixed Events
My Integrated ScheduleQ2 1998 Q3 1998 Q4 1998 Q1 1999 Q2 1999 Q3 1999 Q4 1999 Q1 2000 Q2 2000 Q3 2000 Q4 2000 Q1 2001 Q2 2001 Q3 2001 Q4 2001 Q1 2002 Q2 2002 Q3 2002
Acquisition
Design & Produ ction
Test & Evaluatio n
Implemen tation
Human F actors
RRI/ASE Soft ware Delivery
AR INC VDLM2/ATN fo r ATS+ AC ARS
American Airlin es CPD LC Program
American 767 Program
Rockwell CMU/VDR D evelopment ( need ties to cert)
767 Fligh t Deck Integration Activities (need ties t o cert)
FAA Flig ht Stan dards Tasks [Street er, Do n]
FAA Cert ificatio n Tasks (Steve Van Trees, AIR)
Requirements
Development3 90 days
06/29/19910/30/1990 days
Prep./Review of SIR4 5 days
10/26/19910/30/1990 days
SIR Released5 0 days
10/30/19910/30/1990 days
Bid/Prop osal/AwardActivities 6 45 days
11/02/19901/01/1990 days
Contract Award7 0 days
01/15/19901/15/1990 days
Design U sabilit y Stud y4785 days01/04/19904/30/199
0 days
Controller HCI Results48 0 days04/30/19904/30/199
20.4 days
Build 1 H ost/DL AP S/WDevelopment
9 368 days05/05/19909/29/200311 days
FC A/PC A Complete ( HCSSW /ProATN DL AP)
11 0 days09/29/20009/29/200311 days
Internal F AA Ho stInteroperabilit y Testin g &
Debugging25 86 days
10/02/20001/29/200
Requirements
Development3 90 days
06/29/19910/30/1990 days
Prep./Review of SIR4 5 days
10/26/19910/30/1990 days
SIR Released5 0 days
10/30/19910/30/1990 days
Bid/Prop osal/AwardActivities 6 45 days
11/02/19901/01/1990 days
Contract Award7 0 days
01/15/19901/15/1990 days
Design U sabilit y Stud y4785 days01/04/19904/30/199
0 days
Controller HCI Results48 0 days04/30/19904/30/199
20.4 days
Build 1 H ost/DL AP S/WDevelopment
9 368 days05/05/19909/29/200311 days
FC A/PC A Complete ( HCSSW /ProATN DL AP)
11 0 days09/29/20009/29/200311 days
Internal F AA Ho stInteroperabilit y Testin g &
Debugging25 86 days
10/02/20001/29/200311 days
Host Soft ware Suitabil it y28 22 days
01/30/20002/28/200311 days
PTR fixes, RegressionTesting, f inal H ostSoft ware Uplevel
29 40 days03/01/20004/25/200311 days
Host A5f 1.2 Co de Cut off20 0 days
04/25/20004/25/200311 days
Host Integratio n/keysit e21 159 days
04/26/20012/04/200311 days
National Delivery A5f1.222 0 days
12/04/20012/04/200311 days
Procedures/Training Stud y49 87 days
07/01/19910/30/1991132 days
CMU/Flig ht DeckPreliminary Design (tie toRockwell/Boein g effor ts)
175360 days09/01/19901/17/200323 days
CMU CPDLC/C M APreliminary Design
122129 days01/01/19906/30/199204 days
Aircraft C onfig uration
Review13264 days
01/01/19903/31/1990 days
B767 Deliveries13367 days
02/01/19905/04/1990 days
TSA Complete1340 days
06/11/19906/11/199201 days
Cockpit Display Definition13513 days
06/14/19906/30/199204 days
Development of CockpitDisplay/W iring Updates
136450 days06/14/19903/02/200200 days
Design U sabilit y Stud y51 85 days
01/04/19904/30/1990 days
Pilot HCI Result s52 0 days
04/30/19904/30/199247 days
Architect ure/H MIDefinitio n Finalized
121 0 days06/30/19906/30/199
311 days
Host Soft ware Suitabil it y28 22 days
01/30/20002/28/200311 days
PTR fixes, RegressionTesting, f inal H ostSoft ware Uplevel
29 40 days03/01/20004/25/200311 days
Host A5f 1.2 Co de Cut off20 0 days
04/25/20004/25/200311 days
Host Integratio n/keysit e21 159 days
04/26/20012/04/200311 days
National Delivery A5f1.222 0 days
12/04/20012/04/200311 days
Procedures/Training Stud y49 87 days
07/01/19910/30/1991132 days
CMU/Flig ht DeckPreliminary Design (tie toRockwell/Boein g effor ts)
175360 days09/01/19901/17/200323 days
CMU CPDLC/C M APreliminary Design
122129 days01/01/19906/30/199204 days
Aircraft C onfig uration
Review13264 days
01/01/19903/31/1990 days
B767 Deliveries13367 days
02/01/19905/04/1990 days
TSA Complete1340 days
06/11/19906/11/199201 days
Cockpit Display Definition13513 days
06/14/19906/30/199204 days
Development of CockpitDisplay/W iring Updates
136450 days06/14/19903/02/200200 days
Design U sabilit y Stud y51 85 days
01/04/19904/30/1990 days
Pilot HCI Result s52 0 days
04/30/19904/30/199247 days
Architect ure/H MIDefinitio n Finalized
121 0 days06/30/19906/30/199
204 days
Flight Deck HCI Evaluation53 23 days
08/25/19909/24/199
335 days
An alizeR esults54 33 days
09/27/19911/10/199335 days
Commun it y Co nsensu s55 36 days
11/12/19912/31/199334 days
CMU CPDLC/C M ADevelopment
123325 days07/01/19909/27/200
204 days
High Level Certi ficatio nAp plication172 0 days
01/31/19901/31/1990 days
AGC App roval1621 day
04/15/19904/15/1990 days
Public Co mmen t
16345 days04/20/19906/21/199383 days
Commen t Disp osition16430 days
06/22/19908/02/199383 days
AC 20DC Final
165 0 days08/03/19908/03/199383 days
American develops
certification plan andcomplian ce data
173220 days08/03/19906/05/200383 days
AF M Sup plementsDeveloped17490 days
06/06/20010/09/200966 days
CMU/Flig ht Deck
Preliminary Design
Completed1760 days
01/17/20001/17/200323 days
CMU/Flig ht Deck Detai led
Design (tie to
Rockwell/Boein g effor ts)177160 days
01/18/20008/28/200323 days
CMU/Flig ht Deck Detai ledDesign C omplet e
1780 days08/28/20008/28/200323 days
Operatio nal EnvironmentDefinitio n (F AA-Hritz)
158214 days12/07/19909/30/199560 days
Operatio nal Saf et yAssessment (F AA-Hrit z)
159214 days
204 days
Flight Deck HCI Evaluation53 23 days
08/25/19909/24/199
335 days
An alizeR esults54 33 days
09/27/19911/10/199335 days
Commun it y Co nsensu s55 36 days
11/12/19912/31/199334 days
CMU CPDLC/C M ADevelopment
123325 days07/01/19909/27/200
204 days
High Level Certi ficatio nAp plication172 0 days
01/31/19901/31/1990 days
AGC App roval1621 day
04/15/19904/15/1990 days
Public Co mmen t
16345 days04/20/19906/21/199383 days
Commen t Disp osition16430 days
06/22/19908/02/199383 days
AC 20DC Final
165 0 days08/03/19908/03/199383 days
American develops
certification plan andcomplian ce data
173220 days08/03/19906/05/200383 days
AF M Sup plementsDeveloped17490 days
06/06/20010/09/200966 days
CMU/Flig ht Deck
Preliminary Design
Completed1760 days
01/17/20001/17/200323 days
CMU/Flig ht Deck Detai led
Design (tie to
Rockwell/Boein g effor ts)177160 days
01/18/20008/28/200323 days
CMU/Flig ht Deck Detai ledDesign C omplet e
1780 days08/28/20008/28/200323 days
Operatio nal EnvironmentDefinitio n (F AA-Hritz)
158214 days12/07/19909/30/199560 days
Operatio nal Saf et yAssessment (F AA-Hrit z)
159214 days12/07/19909/30/199560 days
Systems Requirement sand Procedures
160167 days05/03/19912/21/199502 days
AC O app roval ofcertification plan, design
data17980 days
08/29/20012/18/200323 days
VDL Mod e 2 Development117295 days
01/11/19902/25/200357 days
Contract Preparation13174 days
06/01/19901/28/200278 days
Contract Award forCPDLC B uild 1
14 0 days01/30/20001/30/200278 days
Pre-CTS Soft ware Delivery60 0 days
02/07/20002/07/200221 days
AT NSI R RI Delivered1180 days
02/07/20002/07/200221 days
AT NSI R RI Integ/Debu g119151 days
02/23/20009/20/200209 days
CPDLC and CM A ASE'sDelivery61 0 days
02/07/20002/07/200223 days
AC I ASE Delivered1240 days
02/07/20002/07/200223 days
Reqts An alysis t oIntegrate ATNSI RRI and
ASEs15 50 days
03/02/20005/10/200255 days
CMU ACI CPDL C/CM AASE Integ/Debu g
125149 days02/15/20009/08/200217 days
CMU/VD R FunctionalTesting12648 days
09/28/20012/04/200204 days
Avionics/Groun d Syst emTesting and Up dates
(Estimated)12760 days
12/05/20002/26/200204 days
R/L CMU Available1280 days
02/26/20002/26/200204 days
Pro ATN DL AP Accept edand Complete
12/07/19909/30/199560 days
Systems Requirement sand Procedures
160167 days05/03/19912/21/199502 days
AC O app roval ofcertification plan, design
data17980 days
08/29/20012/18/200323 days
VDL Mod e 2 Development117295 days
01/11/19902/25/200357 days
Contract Preparation13174 days
06/01/19901/28/200278 days
Contract Award forCPDLC B uild 1
14 0 days01/30/20001/30/200278 days
Pre-CTS Soft ware Delivery60 0 days
02/07/20002/07/200221 days
AT NSI R RI Delivered1180 days
02/07/20002/07/200221 days
AT NSI R RI Integ/Debu g119151 days
02/23/20009/20/200209 days
CPDLC and CM A ASE'sDelivery61 0 days
02/07/20002/07/200223 days
AC I ASE Delivered1240 days
02/07/20002/07/200223 days
Reqts An alysis t oIntegrate ATNSI RRI and
ASEs15 50 days
03/02/20005/10/200255 days
CMU ACI CPDL C/CM AASE Integ/Debu g
125149 days02/15/20009/08/200217 days
CMU/VD R FunctionalTesting12648 days
09/28/20012/04/200204 days
Avionics/Groun d Syst emTesting and Up dates
(Estimated)12760 days
12/05/20002/26/200204 days
R/L CMU Available1280 days
02/26/20002/26/200204 days
Pro ATN DL AP Accept edand Complete10 0 days
05/11/20005/11/200255 days
Design, Implement, TestAT NSI R RI, ASE
16180 days07/24/20003/30/200203 days
Conduct FinalConfiguration
Au dits/In corporateChanges1723 days
04/02/20005/02/200203 days
FC A/PC A Complete(ATNSI D L AP)18 0 days
05/02/20005/02/200203 days
System D elivered to T &E
Site240 days
05/02/20005/02/200203 days
Internal F AA FinalInteroperabilit y Testin g &
Debugging2640 days
05/14/20007/06/200196 days
FAA HMI Cockp it Survey97 4 days
11/09/19911/12/1990 days
Cockpit Integrat ion H MIprogram with T ech Center
98131 days04/01/19909/30/199
1239 days
Sim Hard wareConfiguration 1
99219 days04/01/19902/01/200
336 days
Sim Hard wareConfiguration F inal
10067 days03/01/20006/01/200316 days
Sim Data Link Provision101120 days
07/03/20012/15/200295 days
AT SS/Pilot/Syst emIntegratio n Plan ning
56382 days05/17/19910/31/200870 days
CPDLC IRD/ICD69130 days
05/28/19911/25/199833 days
Interface bet ween ARINC,FAATC
74 60 days08/09/19910/29/199852 days
Implemen t Test bed GSs
75 60 days08/09/19910/29/199852 days
Demo test/prep
76196 days11/26/19908/25/200
10 0 days05/11/20005/11/200255 days
Design, Implement, TestAT NSI R RI, ASE
16180 days07/24/20003/30/200203 days
Conduct FinalConfiguration
Au dits/In corporateChanges1723 days
04/02/20005/02/200203 days
FC A/PC A Complete(ATNSI D L AP)18 0 days
05/02/20005/02/200203 days
System D elivered to T &E
Site240 days
05/02/20005/02/200203 days
Internal F AA FinalInteroperabilit y Testin g &
Debugging2640 days
05/14/20007/06/200196 days
FAA HMI Cockp it Survey97 4 days
11/09/19911/12/1990 days
Cockpit Integrat ion H MIprogram with T ech Center
98131 days04/01/19909/30/199
1239 days
Sim Hard wareConfiguration 1
99219 days04/01/19902/01/200
336 days
Sim Hard wareConfiguration F inal
10067 days03/01/20006/01/200316 days
Sim Data Link Provision101120 days
07/03/20012/15/200295 days
AT SS/Pilot/Syst emIntegratio n Plan ning
56382 days05/17/19910/31/200870 days
CPDLC IRD/ICD69130 days
05/28/19911/25/199833 days
Interface bet ween ARINC,FAATC
74 60 days08/09/19910/29/199852 days
Implemen t Test bed GSs
75 60 days08/09/19910/29/199852 days
Demo test/prep
76196 days11/26/19908/25/200
833 days
Support Demon stratio n77 170 days
08/28/20004/20/200833 days
Demonst rate
AT SS/Pilot/Syst emIntegratio n57 86 days
12/18/20004/16/200837 days
R/L VDL Mode 2 VDRAvailable1130 days
10/01/19910/01/199571 days
B/L VDL Mode 2 VDRAvailable
1140 days06/30/20006/30/200376 days
AVLC Testing w/RColl ins65100 days
06/30/20011/16/200944 days
Provision Aircraft for RedLabel avionics137140 days
08/01/20002/12/200214 days
VDL-2/C MU/Flig ht DeckIntegratio n13840 days
03/05/20004/27/200200 days
Cockpit integrat ionComplete1390 days
04/27/20004/27/200200 days
Quick Ch ange ECO's ( tieto out of service testin g)
140153 days07/03/20001/31/200890 days
Integrate ATN D isplaysand CMU in Sim10246 days
04/30/20007/02/200200 days
Review and Upd ateHuman F actors
Requirements andGuidance45 304 days
12/01/19901/28/2001153 days
Human F actors Testin gComplete580 days
04/16/20004/16/200837 days
Procedure Refin ement for
PET AL IIe109133 days
06/01/20012/04/200333 days
Installatio n Insp ection(tied to C MU/flight Deck
completion)18123 days
04/30/20005/30/200229 days
Maintenance & MELManuals Complete
107485 days10/26/19909/01/200422 days
833 days
Support Demon stratio n77 170 days
08/28/20004/20/200833 days
Demonst rate
AT SS/Pilot/Syst emIntegratio n57 86 days
12/18/20004/16/200837 days
R/L VDL Mode 2 VDRAvailable1130 days
10/01/19910/01/199571 days
B/L VDL Mode 2 VDRAvailable
1140 days06/30/20006/30/200376 days
AVLC Testing w/RColl ins65100 days
06/30/20011/16/200944 days
Provision Aircraft for RedLabel avionics137140 days
08/01/20002/12/200214 days
VDL-2/C MU/Flig ht DeckIntegratio n13840 days
03/05/20004/27/200200 days
Cockpit integrat ionComplete1390 days
04/27/20004/27/200200 days
Quick Ch ange ECO's ( tieto out of service testin g)
140153 days07/03/20001/31/200890 days
Integrate ATN D isplaysand CMU in Sim10246 days
04/30/20007/02/200200 days
Review and Upd ateHuman F actors
Requirements andGuidance45 304 days
12/01/19901/28/2001153 days
Human F actors Testin gComplete580 days
04/16/20004/16/200837 days
Procedure Refin ement for
PET AL IIe109133 days
06/01/20012/04/200333 days
Installatio n Insp ection(tied to C MU/flight Deck
completion)18123 days
04/30/20005/30/200229 days
Maintenance & MELManuals Complete
107485 days10/26/19909/01/200422 days
Aircraft and Op eratingManuals Complete
106152 days06/01/20012/31/200337 days
Maintenance CrewTraining & Procedures for
PET AL IIe1080 days
12/31/20012/31/200337 days
AA Approved Training
Program104 451 days
01/08/19909/29/200402 days
AA PET AL II Maastrich tFirst Flig ht182 1 day
05/31/20005/31/200229 days
PET AL II
18360 days07/02/20009/21/200208 days
PET AL II Test R esultAn alysis
18410 days09/24/20010/05/200208 days
CMU Up dates and Release12915 wks
10/08/20001/18/20041.6 wks
Planned B/L CM U Availfor Cert
1300 days01/18/20001/18/200208 days
Ad dress PET AL II TestIssues an d Fix
18515 wks10/08/20001/18/20041.6 wks
Provision Aircraft for
Black Lab el CM US14170 days
01/21/20004/26/200208 days
767's Available f or Miami1420 days
04/26/20004/26/200208 days
AF M Sup plementsCompleted1865 days
01/21/20001/25/200632 days
FAA T yp e Desig nAp proval
187 1 day01/28/20001/28/200632 days
Ground Based ( ServiceProvider/F AA) NetMgt
Description/Req s70 87 days
05/28/19909/27/199489 days
Ops Perf & SuccessCriteria
71 175 days05/28/19901/27/200401 days
AR INC, F AATC G/Ginterop @ F AATC
81 40 days
Aircraft and Op eratingManuals Complete
106152 days06/01/20012/31/200337 days
Maintenance CrewTraining & Procedures for
PET AL IIe1080 days
12/31/20012/31/200337 days
AA Approved Training
Program104 451 days
01/08/19909/29/200402 days
AA PET AL II Maastrich tFirst Flig ht182 1 day
05/31/20005/31/200229 days
PET AL II
18360 days07/02/20009/21/200208 days
PET AL II Test R esultAn alysis
18410 days09/24/20010/05/200208 days
CMU Up dates and Release12915 wks
10/08/20001/18/20041.6 wks
Planned B/L CM U Availfor Cert
1300 days01/18/20001/18/200208 days
Ad dress PET AL II TestIssues an d Fix
18515 wks10/08/20001/18/20041.6 wks
Provision Aircraft for
Black Lab el CM US14170 days
01/21/20004/26/200208 days
767's Available f or Miami1420 days
04/26/20004/26/200208 days
AF M Sup plementsCompleted1865 days
01/21/20001/25/200632 days
FAA T yp e Desig nAp proval
187 1 day01/28/20001/28/200632 days
Ground Based ( ServiceProvider/F AA) NetMgt
Description/Req s70 87 days
05/28/19909/27/199489 days
Ops Perf & SuccessCriteria
71 175 days05/28/19901/27/200401 days
AR INC, F AATC G/Ginterop @ F AATC
81 40 days04/06/20005/31/20091 days
Begin Int egratio n Test ing(need Flight Deck inpu t,
sho ws sim option)30 0 days
07/06/20007/06/200196 days
Integratio n Test ing
31 55 days07/09/20009/21/200196 days
Acceptab ilit y Testing
32 44 days09/24/20011/22/200196 days
DL AP PT R Fixes &Regression Test ing
33 50 days11/23/20001/31/200196 days
OT&E Co mplete
34 0 days01/31/20001/31/200196 days
Install production Gro undStation f or testing
79 60 days09/08/20011/30/200657 days
A/G interop test ing wit hRockwell, American fo r
P2E80107 days
12/01/20004/30/200657 days
AR INC, F AATC A/Ginterop @ F AATC
82170 days07/06/20002/28/200609 days
OT&E Su pport83170 days
07/06/20002/28/20066 days
Site Prep, HostImplemen tation,
Installatio n & C heckou t,SAT Activities
36133 days08/01/20002/01/200195 days
Delivery t o Key Site37 10 days
02/04/20002/15/200195 days
Field Familiarization38 63 days
02/18/20005/15/200195 days
SAT Testing Co mplete39 0 days
05/15/20005/15/200195 days
VDL Mod e 2/AT NDevelopment64741 days
06/29/19904/30/200119 days
AT S M2/ATN IOC66 0 days
04/30/20004/30/200119 days
Install VD L Mod e 2/AT N inMiami/op s service syst em
86 120 days10/15/20003/29/2000 days
Pre-operations88 130 days
12/03/20005/31/2000 days
Post-operations89140 days
06/03/20012/13/200403 days
Procedure/Train ingDevelopment/R efinement
for Miami110578 days
03/17/19906/01/200443 days
AGC App roval14544 days
04/15/19906/15/199557 days
Public Co mmen t14623 days
06/16/19907/16/199557 days
AF S Team Approval14768 days
07/19/19910/20/199557 days
AC 120.com Fin al1480 days
11/01/19911/01/199550 days
American DevelopsValidatio n Test Plan
151220 days11/01/19909/01/200550 days
POI Checks Ops ApprovalTest Plan15265 days
09/04/20012/01/200550 days
Validatio n Test15323 days
06/05/20007/05/200419 days
American develops an dsubmits operational
approval plan spec150220 days
11/01/19909/01/200638 days
Operatio nal SpecificationSpec/Operation al
Ap proval Issued ( AFS POI)1540 days
11/01/20011/01/200335 days
Initial Op eratingCapabilit y (IOC)
40 0 days05/15/20005/15/200195 days
Prep. For OperationalRediness Demo nstration
(ORD)41 67 days
05/16/20008/16/200488 days
First OR D42 0 days
08/16/20008/16/200488 days
Flight Standard s DataCollectio n durin g live ops
155360 days06/04/20010/20/200182 days
Svc Level Agreementwit h F AA72 60 days
03/12/20006/01/200260 days
Service for Miami liveoperation s90543 days
06/03/20006/30/2000 days
Data Link Implementat ionReview
92156 days06/01/19901/04/1990 days
Retrofit Plan for AmericanFleet
95 43 days02/01/19903/31/199
1370 days
RTC A 172 VDL Mode 2
MOPS (Son Tran)167296 days
04/15/19906/01/200794 days
AIR-100 T SO
168270 days06/02/20006/14/200794 days
AIR-100 T SO process170143 days
04/15/19911/01/1991217 days
FAA- ARINC Co ntract forBld 1
67 0 days05/28/19905/28/1990 days
Critical Airports/EnRo uteIAGS Dep lo yed
85 0 days12/31/19912/31/1990 days
Host/
DLAP
RRI/AS
E
767
Host Cutoff
Miami
Petal II
Path at or near critical
Key Events
Fixed Events