This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
C.C. O NIT Activo Corriente Total Activos Pasivo Corriente Total Pasivos Capital de Trabajo
1
800.214.880-6 $ 1,466,933,000 $ 1,583,922,000 $ 167,232,000 $ 167,232,000 $ 1,299,701,000 Si 8.7718439054726 Si 0.105580956638016 Si Cumple
12.714.886-7 $ 503,710,000 $ 869,911,000 $ 104,720,000 $ 108,920,000 $ 398,990,000 No 4.8100649350649 Si 0.125208210954914 Si No Cumple
TOTALES $ 1,970,643,000 $ 2,453,833,000 $ 271,952,000 $ 276,152,000 $ 1,698,691,000 Si 7.2462897864329 Si 0.112539035867559 Si Cumple
2
VILLA HERNANDEZ Y CIA SAS 860.048.247-1 $ 14,750,497,541 $ 23,428,538,773 $ 9,479,562,500 $ 11,527,264,275 $ 5,270,935,041 Si 1.5560314667475 Si 0.492018063383641 Si Cumple
INGELAS SAS 891.200.711-1 $ 2,700,594,338 $ 3,310,367,504 $ 1,246,611,550 $ 1,808,305,653 $ 1,453,982,788 Si 2.1663479196868 Si 0.546255257404194 Si Cumple
830.105.084-1 $ 154,119,818 $ 166,019,807 $ 2,927,960 $ 2,927,960 $ 151,191,858 No 52.637268951762 Si 0.017636208913314 Si No Cumple
TOTALES $ 17,605,211,697 $ 26,904,926,084 $ 10,729,102,010 $ 13,338,497,888 $ 6,876,109,687 Si 1.6408839882957 Si 0.495764152867613 Si Cumple
3
892.301.418-3 $ 4,579,990,719 $ 5,854,803,315 $ 1,416,798,650 $ 4,599,429,116 $ 3,163,192,069 Si 3.2326334578311 Si 0.78558217390775 No No Cumple
77,016,082 $ 305,959,354 $ 543,399,042 $ 6,088,122 $ 6,088,122 $ 299,871,232 No 50.255128593021 Si 0.011203777573093 Si No Cumple
TOTALES $ 4,885,950,073 $ 6,398,202,357 $ 1,422,886,772 $ 4,605,517,238 $ 3,463,063,301 Si 3.4338291487047 Si 0.71981425110153 No No Cumple
FONDO FINANCIERO DE PROYECTOS DE DESARROLLO – FONADEDEPARTAMENTO ADMINISTRATIVO PARA LA PROSPERIDAD SOCIAL – DPS
CONVENIO INTERADMINISTRATIVO No. 212017
OFERTA PÚBLICA OPC 059-2013
PRIMERA FASE DE LA CONSTRUCCIÓN PARQUE CONMEMORATIVO OMAYRA SANCHEZ - EN LA CABECERA MUNICIPAL GUAYABAL - DEL MUNICIPIO DE ARMERO - TOLIMA
No. PROPONENT
ENOMBRE DEL PROPONENTE
NOMBRE DE LOS INTEGRANTES DEL
CONSORCIO Y/O UNIÓN TEMPORAL
Cumple Capital de
TrabajoÍndice de Liquidez
Cumple índice de liquidez
Nivel de Endeudamiento
Cumple Nivel Endeudamiento
Cumple índices
Financiero
CONSORCIO ARMERO B.C.
BORNACELLI Y ASOCIADOS LTDA.
CASIMIRO RODRIGUEZ CHINCHIA
CONSORCIO RENACER CONSORCIO COORDINAR
LTDA.
CONSORCIO PARQUE OMASA
VIDAL COTES ARQUITECTOS INGENIEROS SAS
OSCAR ENRIQUE OCHOA ARIZA
4 de 119
Ing. Camilo Becerra document.xls Exp. proponente
EXPERIENCIA DEL PROPONENTE
FECHA MÁXIMA DE CERTIFICACIONES 24-May-2003
IGUAL O SUPERIOR A 2,5 VECES EL VALOR DEL POE 11,443 SMMLV
4,577 4,577
ÁREA CONSTRUIDA MÍNIMA N/A presup.of 2,698,209,213.00
(VILLA HERNANDEZ Y CIA SAS 50% - INGELAS SAS 25% - CONSORCIO COORDINAR LTDA. 25%- 0%- 0%)
No APORTADA POR % en Cto OBJETO Folio VALOR SMMLV OBSERVACIONES
1 15% 2-Sep-10 80 $ 2,708,827,245.00 788.98
2 35% 6-May-07 82 $ 228,166,995.00 184.13
3 OBRA PROPIA 100% 31-Oct-08 85 $ 6,066,133,716.00 13,144.39
TOTAL 0.00 0.00 CUMPLENO CUMPLE
VILLA HERNANDEZ Y CIA SAS 50.0% 13,144.39 V.Bo.INGELAS SAS 25.0% - V.Bo.
CONSORCIO COORDINAR LTDA. 25.0% 973.11 V.Bo.
Proponente 3 CONSORCIO PARQUE OMASA
(VIDAL COTES ARQUITECTOS INGENIEROS SAS 60% - OSCAR ENRIQUE OCHOA ARIZA 40% - - -- 0%- 0%)
No APORTADA POR % en Cto OBJETO Folio VALOR SMMLV OBSERVACIONES
1 0.00 2 0.00 3 0.00 4 0.00 5 0.00
TOTAL 0.00 0.00 CUMPLENO CUMPLE
VIDAL COTES ARQUITECTOS INGENIEROS SAS 60.0% - OSCAR ENRIQUE OCHOA ARIZA 40.0% - V.Bo.
FONDO FINANCIERO DE PROYECTOS DE DESARROLLO – FONADEDEPARTAMENTO ADMINISTRATIVO PARA LA PROSPERIDAD SOCIAL – DPS
CONVENIO INTERADMINISTRATIVO No. 212017
OFERTA PÚBLICA OPC 059-2013
PRIMERA FASE DE LA CONSTRUCCIÓN PARQUE CONMEMORATIVO OMAYRA SANCHEZ - EN LA CABECERA MUNICIPAL GUAYABAL - DEL MUNICIPIO DE ARMERO - TOLIMA
El oferente debe acreditar en su oferta, que cuenta con experiencia específica en:
1. CONSTRUCCIÓN DE EDIFICACIONES Y2. CONSTRUCCIÓN DE ESCENARIOS DEPORTIVOS Y/O PARQUES RECREODEPORTIVOS.
- La experiencia deberá ser acreditada con la ejecución de MÍNIMO UNO (01) Y MÁXIMO CINCO (5) CONTRATOS terminados en los últimos DIEZ (10) años, contados a partir de la fecha establecida para presentar oferta.
- Los contratos aportados deberán sumar, en su conjunto, un valor igual o superior a 2.5 veces el valor del POE, expresado en SMMLV.
- MÍNIMO uno de los contratos aportados, debe ser de valor igual o superior al POE expresado en SMMLV.
- MÍNIMO uno de los contratos aportados, debe acreditar la CONSTRUCCIÓN DE EDIFICACIONES DE 2.170 M2 de área construida.
La experiencia específica podrá acreditarse con contratos de obras ejecutadas en calidad de contratista y/o con obras propias ejecutadas por el oferente individual o por cualquiera de los integrantes del oferente plural. En todo caso, el número de contratos y/o de obras propias ejecutadas con que se pretenda acreditar la experiencia NO PODRÁ SER SUPERIOR al número de contratos señalado en el inciso primero del presente numeral.
IGUAL O SUPERIOR AL PRESUPUESTO OFICIAL ESTIMADO
ÁREA CONSTRUIDA MÍNIMA DE CADA UNO DE LOS PROYECTOS
PROPIETARIO O ENTIDAD
CONTRATANTEFecha de
Terminación ÁREA CONSTRUIDA
MÍNIMA
CONSTRUCCIÓN PROPIA (FINANCIA
BANCO BBVA)
BORNACELLI Y ASOCIADOS
LTDA.
CONSTRUCCIÓN DE LA URBANIZACIÓN VILLA LIGIA "104 SOLUCIONES DE VIVIENDAS UNIFAMILIARES EN DOS (2) PISOS - UBICADO EN LA CALLE 1A CARRERA 24 BARRIO LA ESPERANZA - VALLEDUPAR"
ACCIÓN SOCIAL - PRESIDENCIA DE LA
REPUBLICA
BORNACELLI Y ASOCIADOS
LTDA.
CONTRATO No 033 DE 2004 "CONSTRUCCIÓN DE UN (1) POLIDEPORTIVO TIPO A EN EL MUNICIPIO DE SAN PABLO - BOLÍVAR"
DEPARTAMENTO DEL CESAR
BORNACELLI Y ASOCIADOS
LTDA.
CONTRATO DE OBRA No 432 DE 2006 "CONSTRUCCIÓN DEL NUEVO HOSPITAL SAN MARTIN DEL MUNICIPIO DE ASTREA, CESAR"
BORNACELLI Y ASOCIADOS
LTDA.
CONTRATO No 2053997 "REALIZAR LOS AJUSTES A ESTUDIOS, DISEÑOS TÉCNICOS Y CONSTRUCCIÓN DEL PROYECTO DE INFRAESTRUCTURA ESCOLAR UBICADO EN EL DEPARTAMENTO DEL ATLÁNTICO, MUNICIPIO DE SOLEDAD, ESCUELA PUBLICA DE VILLA MARIA SEDE LA CANDELARIA"
PROPIETARIO O ENTIDAD
CONTRATANTEFecha de
Terminación ÁREA CONSTRUIDA
MÍNIMA
INSTITUTO DISTRITAL DE RECREACION Y
DEPORTE - ALCALDIA MAYOR DE BOGOTA
D.C
CONSORCIO COORDINAR
LTDA
CONTRATO DE OBRA PUBLICA No 111 DE 2009 "CONSTRUCCION DE LAS OBRAS DE LA SEGUNDA ETAPA DEL PARQUE ZONAL DE TINGUA TIBANICA"
INCURSO EN LAS CAUSALES DE RECHAZO A), Y) DEL NUMERAL 2,4,8 DE
LAS REGLAS DE PARTICIPACIÓNSECRETARIA DE MEDIO AMBIENTE - ALCALDIA
DE MEDELLIN
CONSORCIO COORDINAR
LTDA
CONTRATO No 5100003315 DE 2006 "CONSTRUCCION DE LAS OBRAS DE ADECUACION DEL PARQUE AMBIENTAL DE LA CIMA DEL CERRO NUTIBARA"
VILLA HERNADEZ Y
CIA SAS
CONSTRUCCION DEL EDIFICIO BALCONES D´FILIPPO UBICADO EN LA AVENIDA CARRERA 9 No 143-17 URBANIZACION EL CEDRO DE LA LOCALIDAD DE USAQUEN EN BOGOTA D.C"
No cumple ÁREA CONSTRUIDA
MÍNIMA
PROPIETARIO O ENTIDAD
CONTRATANTEFecha de
Terminación ÁREA CONSTRUIDA
MÍNIMA
INCURSO EN CAUSAL DE RECHAZO Y) DEL NUMERAL 2.4.8. DE LAS REGLAS DE
PARTICIPACIÓN
No cumple ÁREA CONSTRUIDA
MÍNIMA
PERSONAL PRINCIPAL REQUERIDO
SMMLV
$ 566,700.00 PRESUP. OF. CARGO SMMLV NÚMERO DE PROYECTOS EXPERIENCIA ESPECÍFICA REQUERIMIENTO PARTICULAR
CARGO NOMBRE PROFESIÓN OBJETO VALOR 0.00 PUNTAJE OBSERVACIONES
DIRECTOR DE OBRA
FONDO FINANCIERO DE PROYECTOS DE DESARROLLO – FONADEINSTITUTO COLOMBIANO DE BIENESTAR FAMILIAR - ICBF
CONVENIO INTERADMINISTRATIVO No. 211048
OFERTA PÚBLICA OPC 193-2012
EJECUCIÓN DE LOS DISEÑOS Y ESTUDIOS TÉCNICOS Y CONSTRUCCIÓN DE UN CENTRO DE DESARROLLO INFANTIL (CDI) EN EL MUNICIPIO DE PALMIRA – VALLE DEL CAUCA PARA 500 CUPOS
FORMACIÓN ACADÉMICA
DIRECTOR DE OBRA
ARQUITECTO O INGENIERO CIVIL
DIRECTOR DE OBRA EN PROYECTOS DE: 1) CONSTRUCCIÓN DE EDIFICACIONES Y 2) CONSTRUCCIÓN DE ESCENARIOS DEPORTIVOS Y/O PARQUES RECREODEPOTIVOS
LA SUMATORIA DE ESTOS DEBE SER MAYOR O IGUAL A DOS VECES EL POE
RESIDENTE DE OBRA
ARQUITECTO O INGENIERO CIVIL
RESIDENTE DE OBRA EN PROYECTOS DE: 1) CONSTRUCCIÓN DE EDIFICACIONES Y 2) CONSTRUCCIÓN DE ESCENARIOS DEPORTIVOS Y/O PARQUES RECREODEPOTIVOS
LA SUMATORIA DE ESTOS DEBE SER MAYOR O IGUAL A DOS VECES EL POE
TARJETA PROFESIONAL
FECHA EXPEDICIÓN
FECHA TERMINACIÓN
CONTRATO
ANDRES BORNACELLI CAMBELL
CONSTRUCCIÓN DE LA URBANIZACIÓN VILLA LIGIA "104 SOLUCIONES DE VIVIENDAS UNIFAMILIARES EN DOS (2) PISOS - UBICADO EN LA CALLE 1A CARRERA 24 BARRIO LA ESPERANZA - VALLEDUPAR"
CONTRATO No 033 DE 2004 "CONSTRUCCIÓN DE UN (1) POLIDEPORTIVO TIPO A EN EL MUNICIPIO DE SAN PABLO - BOLÍVAR"
CONTRATO DE OBRA No 432 DE 2006 "CONSTRUCCIÓN DEL NUEVO HOSPITAL SAN MARTIN DEL MUNICIPIO DE ASTREA, CESAR"
CONTRATO No 2053997 "REALIZAR LOS AJUSTES A ESTUDIOS, DISEÑOS TÉCNICOS Y CONSTRUCCIÓN DEL PROYECTO DE INFRAESTRUCTURA ESCOLAR UBICADO EN EL DEPARTAMENTO DEL ATLÁNTICO, MUNICIPIO DE SOLEDAD, ESCUELA PUBLICA DE VILLA MARIA SEDE LA CANDELARIA"
RESIDENTE DE OBRA
FREDY RAMOS MANJARREZ
CONSTRUCCIÓN DEL CONJUNTO RESIDENCIAL VILLA CONCHA - BARRIO LA ESPERANZA CARRERA 23 CON CALLE 4A - VALLEDUPAR
APOYO AL PLAN COLOMBIA - FIP PARA EL DESARROLLO DE PROGRAMA Y PROYECTOS DE ALTO IMPACTO SOCIAL - CONTRATO 038 "CONSTRUCCIÓN DE UN POLIDEPORTIVO TIPO A CALLE PRINCIPAL SALIDA A YONDO - ANTIOQUIA"
CONSTRUCCIÓN DE 148 DE VIVIENDAS UNIFAMILIARES EN DOS PISOS DEL PROYECTO VILLA LIGIA II ETAPA - VALLEDUPAR
CONSTRUCCIÓN DE 178 DE VIVIENDAS UNIFAMILIARES EN DOS PISOS DEL PROYECTO VILLA LIGIA III ETAPA - VALLEDUPAR
TARJETA PROFESIONAL
FECHA EXPEDICIÓN
FECHA TERMINACIÓN
CONTRATO
INCURSO EN LAS CAUSALES DE RECHAZO A), Y) DEL NUMERAL 2,4,8 DE
LAS REGLAS DE PARTICIPACIÓN
RESIDENTE DE OBRA
INCURSO EN LAS CAUSALES DE RECHAZO A), Y) DEL NUMERAL 2,4,8 DE
LAS REGLAS DE PARTICIPACIÓN
TARJETA PROFESIONAL
FECHA EXPEDICIÓN
FECHA TERMINACIÓN
CONTRATO
INCURSO EN CAUSAL DE RECHAZO Y) DEL NUMERAL 2.4.8. DE LAS REGLAS
DE PARTICIPACIÓN
RESIDENTE DE OBRA
INCURSO EN CAUSAL DE RECHAZO Y) DEL NUMERAL 2.4.8. DE LAS REGLAS
DE PARTICIPACIÓN
INFORME DE EVALUACIÓN Y RECOMENDACIÓN DE ACEPTACIÓN DE LA OFERTA
Oferente Observaciones Determinación del orden
CUMPLE 1
NO CUMPLE -
NO CUMPLE -
FONDO FINANCIERO DE PROYECTOS DE DESARROLLO – FONADEDEPARTAMENTO ADMINISTRATIVO PARA LA PROSPERIDAD SOCIAL – DPS
CONVENIO INTERADMINISTRATIVO No. 212017
OFERTA PÚBLICA OPC 059-2013
PRIMERA FASE DE LA CONSTRUCCIÓN PARQUE CONMEMORATIVO OMAYRA SANCHEZ - EN LA CABECERA MUNICIPAL GUAYABAL - DEL MUNICIPIO DE ARMERO - TOLIMA
OFERTA PÚBLICAOPC 059-2013
Como producto de la revisión del numeral 2.4.7.1 Verificación de los requisitos mínimos de carácter jurídico, técnico y financiero, y término para subsanar, y del numeral 2.4.7.2 Apertura sobres económicos de las Reglas de Participación, el Comité Evaluador informa que a la fecha del presente Informe, el resultado es el siguiente:
Requisitos Mínimos
Puntaje Oferta Económica
CONSORCIO ARMERO B.C. (BORNACELLI Y ASOCIADOS LTDA.
80% - CASIMIRO RODRIGUEZ CHINCHIA 20%)
CUMPLE ($ 2.574.024.077,00)
EL TREINTA Y UNO (31) DE MAYO DE 2013, SE RECIBE DOCUMENTACIÓN CON RADICADO NUMERO 2013-430-035656-2, MEDIANTE LA CUAL EL OFERENTE CONSORCIO ARMERO B.C., REMITE LOS DOCUMENTOS REQUERIDOS POR EL COMITÉ EVALUADOR. UNA VEZ VERIFICADOS LOS REQUISITOS MÍNIMOS, SE ESTABLECE QUE EL OFERENTE CONSORCIO ARMERO B.C. "CUMPLE".
CONSORCIO RENACER (VILLA HERNANDEZ Y CIA SAS 50% - INGELAS SAS 25% - CONSORCIO
COORDINAR LTDA. 25%)
CUMPLE ($ 2.578.099.064,00)
EL OFERENTE NO ATENDIÓ LA SOLICITUD REALIZADA POR EL COMITÉ EVALUADOR MEDIANTE EL ACTA DE FINALIZACIÓN DEL TÉRMINO PARA PRESENTAR OFERTAS PUBLICADO EL DÍA 24 DE MAYO DE 2013, POR LO QUE SE ENCUENTRA INCURSO EN LA CAUSAL DE RECHAZO DEL LITERAL A), DEL NUMERAL 2.4.8. DE LAS REGLAS DE PARTICIPACIÓN, ADICIONALMENTE SE ENCUENTRA INCURSO EN LA CAUSAL DE RECHAZO LITERAL Y) DEL NUMERAL 2.4.8. DE LAS REGLAS DE PARTICIPACIÓN, QUE ESTABLECE:"A. CUANDO EL COMITÉ EVALUADOR HAYA SOLICITADO PRESENTAR ALGÚN DOCUMENTO O SUBSANAR O ACLARAR ALGUNA INFORMACIÓN NECESARIA PARA EL CUMPLIMIENTO DE LOS REQUISITOS MÍNIMOS, Y EL OFERENTE NO APORTE, SUBSANE O ACLARE LO PERTINENTE QUE SEA DETERMINANTE PARA LA EVALUACIÓN, EN LOS PLAZOS Y CONDICIONES SEÑALADOS POR EL COMITÉ EVALUADOR" LO ANTERIOR POR NO HABER PRESENTADO LA GARANTÍA DE SERIEDAD EN FORMATO PARA PARTICULARES DENTRO DEL DÍA HÁBIL SIGUIENTE AL CIERRE DEL PROCESO.“Y. CUANDO LA OFERTA NO CUMPLA, CON CUALQUIERA DE LOS REQUISITOS MÍNIMOS DE CARÁCTER JURÍDICO, TÉCNICO, FINANCIERO, Y DE EXPERIENCIA EXIGIDOS PARA PARTICIPAR EN EL PRESENTE PROCESO” DEBIDO A QUE NO DA CUMPLIMIENTO AL LITERAL D DEL NUMERAL 3.2.3.1. “ACREDITACIÓN Y VERIFICACIÓN DE LA EXPERIENCIA ESPECÍFICA DEL OFERENTE” DE LAS REGLAS DE PARTICIPACIÓN QUE ESTABLECE:
“(…) SI LA EXPERIENCIA ESPECÍFICA ES ACREDITADA POR MÁS DE UNO DE LOS INTEGRANTES DEL CONSORCIO, UNIÓN TEMPORAL, AQUEL QUE APORTE EL MAYOR VALOR EN CONTRATOS, RESPECTO DE LOS OTROS INTEGRANTES, DEBERÁ TENER UNA PARTICIPACIÓN SUPERIOR AL 50% EN EL CONSORCIO, UNIÓN TEMPORAL (…)”
POR LO ANTERIOR EL OFERENTE CONSORCIO RENACER, NO CONTINUA EN EL PRESENTE PROCESO.
CONSORCIO PARQUE OMASA (VIDAL COTES ARQUITECTOS
INGENIEROS SAS 60% - OSCAR ENRIQUE OCHOA ARIZA 40%)
CUMPLE ($ 2.580.862.802,00)
EL TREINTA Y UNO (31) DE MAYO DE 2013, SE RECIBE DOCUMENTACIÓN CON RADICADO NUMERO 2013-430-035653-2, MEDIANTE LA CUAL EL OFERENTE CONSORCIO PARQUE OMASA, REMITE LOS DOCUMENTOS REQUERIDOS POR EL COMITÉ EVALUADOR. UNA VEZ VERIFICADOS LOS REQUISITOS MÍNIMOS, SE ESTABLECE QUE EL OFERENTE CONSORCIO PARQUE OMASA. "NO CUMPLE" Y SE ENCUENTRA INCURSO EN LA CAUSAL DE RECHAZO DEL LITERAL Y DEL NUMERAL 2.4.8. DE LAS REGLAS DE PARTICIPACIÓN QUE ESTABLECE:“Y. CUANDO LA OFERTA NO CUMPLA, CON CUALQUIERA DE LOS REQUISITOS MÍNIMOS DE CARÁCTER JURÍDICO, TÉCNICO, FINANCIERO, Y DE EXPERIENCIA EXIGIDOS PARA PARTICIPAR EN EL PRESENTE PROCESO” TODA VEZ QUE LA OFERTA PRESENTADA NO ESTA DANDO CUMPLIMIENTO A LO SOLICITADO EN EL LITERAL C) DEL NUMERAL 3.2.2. “REQUISITOS DE CARÁCTER FINANCIERO” DE LAS REGLAS DE PARTICIPACIÓN “NIVEL DE ENDEUDAMIENTO DEL OFERENTE PLURAL” ≤ 0.7.POR LO ANTERIOR EL OFERENTE CONSORCIO PARQUE OMASA, NO CONTINUA EN EL PRESENTE PROCESO.
INFORME DE EVALUACIÓN Y RECOMENDACIÓN DE ACEPTACIÓN DE LA OFERTA
FONDO FINANCIERO DE PROYECTOS DE DESARROLLO – FONADEDEPARTAMENTO ADMINISTRATIVO PARA LA PROSPERIDAD SOCIAL – DPS
CONVENIO INTERADMINISTRATIVO No. 212017
OFERTA PÚBLICA OPC 059-2013
PRIMERA FASE DE LA CONSTRUCCIÓN PARQUE CONMEMORATIVO OMAYRA SANCHEZ - EN LA CABECERA MUNICIPAL GUAYABAL - DEL MUNICIPIO DE ARMERO - TOLIMA
OFERTA PÚBLICAOPC 059-2013
De acuerdo al numeral 2.4.4.2 Audiencia de Cierre, el mecanismo de evaluación de las ofertas fue el siguiente:
No. MECANISMO
1 MEDIA GEOMÉTRICA
Así mismo y de conformidad con el numeral 2.4.7.3 Asignación de Puntaje y Determinación del Orden, el orden de las ofertas económicas fue el siguiente:
ORDEN No. OFERENTE
1
Dado en Bogotá D.C., a los cuatro (4) días del mes de junio de 2013
COMITÉ EVALUADOR
(Original Firmado)DIANA CAROLINA BARRAGAN V Abogado Asesora
(Original Firmado) (Original Firmado)MIGUEL ÁNGEL RODRÍGUEZ ROJAS JULIETA MONTENEGRO SOTOProfesional Área de Procesos de Selección Profesional Área de Procesos de Selección
(Original Firmado)PAOLA C. REY CARAZOGerente de Unidad - Área Procesos de Selección
De conformidad con lo antes señalado, se recomienda a la Subgerente de Contratación de Fonade, delegada para tal efecto mediante la resolución 083 del 27 de junio de 2012, modificada mediante las resoluciones 085 y 087 del 27 de junio de 2012 aceptar la oferta presentada por el oferente CONSORCIO ARMERO B.C (R/L: ANDRES BORNACELLI CAMBELL)., toda vez que ha dado cumplimiento a la totalidad de los requisitos y ha ocupado el 1er lugar del orden.
Total costo directo obra Gl 1 1,918,954,776.00 1,918,954,776.00 3.0% IMPREVISTOSAdministración A % 21.26% 407,969,785.00 Imprevistos I % 3.00% 57,568,643.00 Utilidad U % 5.00% 95,947,739.00 Total AIU 561,486,167.00 IVA sobre la utilidad % 15,351,638.00 PGIO (*) 32,657,200.00
Total costo directo obra Gl 1 1,952,523,578.00 1,952,523,578.00 3.0% IMPREVISTOSAdministración A % 21.26% 415,106,513.00 Imprevistos I % 3.00% 58,575,707.00 Utilidad U % 5.00% 97,626,179.00 Total AIU 571,308,399.00 IVA sobre la utilidad % 15,620,189.00 PGIO (*) 32,657,200.00
Total costo directo obra Gl 1 1,948,973,697.00 1,948,973,697.00 3.0% IMPREVISTOSAdministración A % 21.26% 414,351,808.00 Imprevistos I % 3.00% 58,469,211.00 Utilidad U % 5.00% 97,448,685.00 Total AIU 570,269,704.00 IVA sobre la utilidad % 15,591,790.00 PGIO (*) 32,657,200.00
Total costo directo obra Gl 1 1,954,063,355.00 1,954,063,355.00 3.0% IMPREVISTOSAdministración A % 21.26% 415,433,869.00 Imprevistos I % 3.00% 58,621,901.00 Utilidad U % 5.00% 97,703,168.00 Total AIU 571,758,938.00 IVA sobre la utilidad % 15,632,507.00 PGIO (*) 32,657,200.00
Total costo directo obra Gl 1 1,983,991,919.00 1,983,991,919.00 3.0% IMPREVISTOSAdministración A % 21.26% 421,796,682.00 Imprevistos I % 3.00% 59,519,758.00 Utilidad U % 5.00% 99,199,596.00 Total AIU 580,516,036.00 IVA sobre la utilidad % 15,871,935.00 PGIO (*) 32,657,200.00
Total costo directo obra Gl 1 1,939,432,797.00 1,939,432,797.00 3.0% IMPREVISTOSAdministración A % 21.26% 412,323,413.00 Imprevistos I % 3.00% 58,182,984.00 Utilidad U % 5.00% 96,971,640.00 Total AIU 567,478,037.00 IVA sobre la utilidad % 15,515,462.00 PGIO (*) 32,657,200.00
2,555,083,496.00
2,580,862,802.00 CON REDONDEO
7
Gl 1 22,223,540.00 22,223,540.00 3,555,766.00 25,779,306.00 21.26% ADMINISTRACIÓN CON REDONDEO
Total costo directo obra Gl 1 1,934,174,667.00 1,934,174,667.00 3.0% IMPREVISTOSAdministración A % 21.26% 411,205,534.00 Imprevistos I % 3.00% 58,025,240.00 Utilidad U % 5.00% 96,708,733.00 Total AIU 565,939,507.00 IVA sobre la utilidad % 15,473,397.00 PGIO (*) 32,657,200.00
Total costo directo obra Gl 1 1,826,690,891.00 1,826,690,891.00 3.0% IMPREVISTOSAdministración A % 21.26% 388,354,483.00 Imprevistos I % 3.00% 54,800,727.00 Utilidad U % 5.00% 91,334,545.00 Total AIU 534,489,755.00 IVA sobre la utilidad % 14,613,527.00 PGIO (*) 29,392,740.00
Total costo directo obra Gl 1 1,978,916,523.00 1,978,916,523.00 3.0% IMPREVISTOSAdministración A % 21.26% 420,717,653.00 Imprevistos I % 3.00% 59,367,496.00 Utilidad U % 5.00% 98,945,826.00 Total AIU 579,030,975.00 IVA sobre la utilidad % 15,831,332.00 PGIO (*) 31,840,770.00
2,605,619,600.00
2,630,754,428.00
10
Gl 1 22,223,543.00 22,223,543.00 3,555,767.00 25,779,310.00 21.26% ADMINISTRACIÓN CON REDONDEO
Total costo directo obra Gl 1 1,951,179,855.00 1,951,179,855.00 3.0% IMPREVISTOSAdministración A % 21.26% 414,820,837.00 Imprevistos I % 3.00% 58,535,396.00 Utilidad U % 5.00% 97,558,993.00 Total AIU 570,915,226.00 IVA sobre la utilidad % 15,609,439.00 PGIO (*) 32,657,200.00
Total costo directo obra Gl 1 1,890,978,770.00 1,890,978,770.00 3.0% IMPREVISTOSAdministración A % 25.00% 472,744,693.00 Imprevistos I % 3.00% 56,729,363.00 Utilidad U % 2.00% 37,819,575.00 Total AIU 567,293,631.00 IVA sobre la utilidad % 6,051,132.00 PGIO (*) 32,657,200.00
Total costo directo obra Gl 1 1,946,459,618.00 1,946,459,618.00 3.0% IMPREVISTOSAdministración A % 21.26% 413,817,315.00 Imprevistos I % 3.00% 58,393,789.00
FONDO FINANCIERO DE PROYECTOS DE DESARROLLO – FONADEDEPARTAMENTO ADMINISTRATIVO PARA LA PROSPERIDAD SOCIAL – DPS
CONVENIO INTERADMINISTRATIVO No. 212017
OFERTA PÚBLICA OPC 059-2013
PRIMERA FASE DE LA CONSTRUCCIÓN PARQUE CONMEMORATIVO OMAYRA SANCHEZ - EN LA CABECERA MUNICIPAL GUAYABAL - DEL MUNICIPIO DE ARMERO - TOLIMA
VERIFICACIÓN AIUOFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
Utilidad U % 5.00% 97,322,981.00 Total AIU 569,534,085.00 IVA sobre la utilidad % 15,571,677.00 PGIO (*) 32,657,200.00
Total costo directo obra Gl 1 1,927,234,419.00 1,927,234,419.00 3.0% IMPREVISTOSAdministración A % 22.00% 423,991,572.00 Imprevistos I % 3.00% 57,817,033.00 Utilidad U % 5.00% 96,361,721.00 Total AIU 578,170,326.00 IVA sobre la utilidad % 15,417,875.00 PGIO (*) 32,657,200.00
Total costo directo obra Gl 1 1,995,195,560.00 1,995,195,560.00 3.0% IMPREVISTOSAdministración A % 21.26% 424,178,576.00 Imprevistos I % 3.00% 59,855,867.00 Utilidad U % 5.00% 99,759,778.00 Total AIU 583,794,221.00 IVA sobre la utilidad % 15,961,564.00 PGIO (*) 32,657,200.00
Total costo directo obra Gl 1 1,952,218,109.00 1,952,218,109.00 3.0% IMPREVISTOSAdministración A % 21.27% 415,236,792.00 Imprevistos I % 3.00% 58,566,543.00 Utilidad U % 5.00% 97,610,905.00 Total AIU 571,414,240.00 IVA sobre la utilidad % 15,617,745.00 PGIO (*) 32,657,200.00
Total costo directo obra Gl 1 1,960,817,697.00 1,960,817,697.00 3.0% IMPREVISTOSAdministración A % 21.26% 416,869,842.00 Imprevistos I % 3.00% 58,824,531.00 Utilidad U % 5.00% 98,040,885.00 Total AIU 573,735,258.00 IVA sobre la utilidad % 15,686,542.00 PGIO (*) 32,657,200.00
Total costo directo obra Gl 1 1,915,400,754.00 1,915,400,754.00 3.0% IMPREVISTOSAdministración A % 21.26% 407,214,200.00 Imprevistos I % 3.00% 57,462,023.00 Utilidad U % 5.00% 95,770,038.00 Total AIU 560,446,261.00 IVA sobre la utilidad % 15,323,206.00 PGIO (*) 10,000,000.00
Total costo directo obra Gl 1 1,887,600,515.00 1,887,600,515.00 3.0% IMPREVISTOSAdministración A % 22.00% 415,272,113.00 Imprevistos I % 3.00% 56,628,015.00 Utilidad U % 5.00% 94,380,026.00 Total AIU 566,280,154.00 IVA sobre la utilidad % 15,100,804.00 PGIO (*) 32,657,200.00
Total costo directo obra Gl 1 1,960,718,722.00 1,960,718,722.00 3.0% IMPREVISTOSAdministración A % 23.00% 450,965,306.00 Imprevistos I % 3.00% 58,821,562.00 Utilidad U % 3.00% 58,821,562.00 Total AIU 568,608,430.00 IVA sobre la utilidad % 9,411,450.00 PGIO (*) 31,000,000.00
Total costo directo obra Gl 1 1,887,581,578.00 1,887,581,578.00 3.0% IMPREVISTOSAdministración A % 21.26% 401,299,843.00 Imprevistos I % 3.00% 56,627,447.00 Utilidad U % 5.00% 94,379,079.00 Total AIU 552,306,369.00 IVA sobre la utilidad % 15,100,653.00 PGIO (*) 32,000,000.00
2,486,988,600.00
2,512,508,600.00 CON REDONDEO
22
Gl 1 21,279,043.00 21,279,043.00 3,404,647.00 24,683,690.00 21.26% ADMINISTRACIÓN CON REDONDO
Total costo directo obra Gl 1 1,943,408,750.52 1,943,408,751.00 3.0% IMPREVISTOSAdministración A % 21.50% 417,832,881.00 Imprevistos I % 3.00% 58,302,263.00 Utilidad U % 5.00% 97,170,438.00 Total AIU 573,305,582.00 IVA sobre la utilidad % 15,547,270.00 PGIO (*) 31,000,000.00
2,563,261,603.00
2,587,945,293.00 CON REDONDEO
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
Etapa de Verificación Estudios Técnicos y DiseñosIVA sobre estudios técnicos y diseñosTOTAL ESTUDIOS TÉCNICOS Y DISEÑOS
COSTO TOTAL PARA LA ETAPA DE OBRACOSTO TOTAL OFERTA ECONÓMICA
CALCULO DE PORCENTAJE Y PUNTAJE DE LAS PROPUESTAS
Presupuesto Oficial 2,698,209,213.00 100.0%Presupuesto Mínimo 2,428,388,292.00 90.00% BALOTA PROCEDIMIENTO
PUNTAJE MÁXIMO OTORGADO 100 OFERTA MAS BAJA
MAS BAJA ROJO MORADO MEDIAS
MEDIAS 31 Media Aritmética BLANCO 2,575,590,503.23 95.456%2 Media Geométrica MORADO 2,575,119,910.50 95.438% a 2,575,119,910.50 3 Media Alta VERDE 2,614,489,178.61 96.897% Media 2,575,119,910.50 4 Media Baja AZUL 2,501,989,397.61 92.728%
OTROS PROCEDIMIENTOS MEDIA ARITMÉTICA 2,575,590,503.23 Propuesta hábil mas alta= 2,653,387,854.00 MENOR VALOR 2,428,388,292.00 Propuesta hábil mas baja= 2,428,388,292.00 MEDIA ARITMÉTICA BAJA 2,501,989,397.61
Media Geométrica MG =( X1*X2*X3…*XN)^(1/N)
FONDO FINANCIERO DE PROYECTOS DE DESARROLLO – FONADEDEPARTAMENTO ADMINISTRATIVO PARA LA PROSPERIDAD SOCIAL – DPS
CONVENIO INTERADMINISTRATIVO No. 212017
OFERTA PÚBLICA OPC 059-2013
PRIMERA FASE DE LA CONSTRUCCIÓN PARQUE CONMEMORATIVO OMAYRA SANCHEZ - EN LA CABECERA MUNICIPAL GUAYABAL - DEL MUNICIPIO DE ARMERO - TOLIMA
Y1=100+(Pi-a)*1000/(K×Po)
IZQY2=100+(a-Pi)*1000/Po)
DER
CALCULO DE PUNTAJE FINAL DE LAS OFERTAS
No. OFERENTE OFERTA ECONÓMICA Y/O PUNTAJE7 CONSORCIO PARQUE ARMERO B.C. 99.796933 13 CONSORCIO RENACER 98.895879 6 CONSORCIO PARQUE OMASA 97.871591 1 CONSORCIO G&A GUAYABAL 95.871126 22 CONSORCIO DEU CARLO 95.246706 12 UNIÓN TEMPORAL ARMERO 2013 94.484498 19 LUIS OSCAR VARGAS 93.416218 3 CONSORCIO ARMERO CYS 93.272653 20 UNIVERSAL DE CONSTRUCCIONES SA 93.181147 2 CONSORCIO PASQUE OMAYRA SANCHEZ 2013 92.732418 10 CONSORCIO PARQUE OMAIRA SANCHEZ 92.209233 15 CONSTRUCCIONES KYOTO SAS 91.925124 4 CONSORCIO PARQUE ARMERO - MILTO H 91.175173 18 CONSORCIO PARQUES DEL TOLIMA 90.897437 11 CONSTRUCTORA AC CRUZ SAS 90.297293 17 CONSORCIO PARQUE 2013 88.446098 21 LAM CONSTRUCCIONES SAS 88.397618 16 CONSORCIO ANDINO - TOLIMA 87.563568 9 GRAICO LTDA. 79.380947 5 CONSORCIO PARQUE ARMERO 76.847105 8 CONSORCIO PARQUE ARMERO 72.809444 14 CONSORCIO GAMA - RAMIREZ 70.992634
FONDO FINANCIERO DE PROYECTOS DE DESARROLLO – FONADEDEPARTAMENTO ADMINISTRATIVO PARA LA PROSPERIDAD SOCIAL – DPS
CONVENIO INTERADMINISTRATIVO No. 212017
OFERTA PÚBLICA OPC 059-2013
PRIMERA FASE DE LA CONSTRUCCIÓN PARQUE CONMEMORATIVO OMAYRA SANCHEZ - EN LA CABECERA MUNICIPAL GUAYABAL - DEL MUNICIPIO DE ARMERO - TOLIMA
RESUMEN DEL FORMATO 07
ETAPA 1: REVISIÓN, VERIFICACIÓN Y VALIDACIÓN DE LOS DISEÑOS Y ESTUDIOS TÉCNICO
ÍTEM DESCRIPCIÓN UNIDAD DE MEDIDA CANTIDADES VALOR UNITARIO VALOR TOTAL
1 GL 1.00 22,223,540.00 22,223,540.00
22,223,540.00
3,555,766.00
25,779,306.00
ITEM DESCRIPCIÓN CANTIDADES VALOR UNITARIO VALOR TOTAL PARCIAL
1.00 AREA EXTERNA/URBANISMO/PAISAJISMO
1.0 TRABAJOS PRELIMINARES 59,508,904.00
1.1 DESCAPOTE
1.1.1 m2 10,438.00 4,300.00 44,883,400.00
1.1.2 m2 2,250.00 4,300.00 9,675,000.00
1.2 LOCALIZACIÓN Y REPLANTEO
1.2.1 día 10.00 380,808.00 3,808,080.00
1.2.2 día 3.00 380,808.00 1,142,424.00
2.0 RETIRO, DEMOLICIONES Y TALA DE ARBOLES 14,884,991.002.1 RETIROS2.1.1 Retiro, cargue y transporte de malla cerramiento m2 180.00 16,222.00 2,919,960.002.2 DEMOLICIONES
2.2.1 m2 250.00 17,579.00 4,394,750.00
2.3 TALA Y TRASPLANTE DE ÁRBOLES2.3.1 Tala de árbol de 2 a 4 m. incluye retiro un 1.00 77,875.00 77,875.002.3.2 Tala de árbol de 4 a 6 m. incluye retiro un 2.00 160,511.00 321,022.002.3.3 Tala de árbol de 6 a 8 m. incluye retiro un 22.00 325,972.00 7,171,384.003.0 MOVIMIENTOS DE TIERRA 26,532,532.003.1 EXCAVACIÓN Y RETIRO DE MATERIAL3.1.1 Excavación en material común a mano m3 143.49 14,890.00 2,136,566.003.1.2 Retiro de escombros o material sobrante m3 71.75 15,148.00 1,086,793.003.2 RELLENOS3.2.1 Lleno con material común del sitio compactado m3 1,492.96 13,028.00 19,450,283.003.2.2 Lleno con material de préstamo compactado m3 20.00 55,779.00 1,115,580.00
3.2.3 m3 42.75 64,171.00 2,743,310.00
4.0 CONCRETOS 176,505,054.004.1 CONCRETO CIMENTACIÓN4.1.1 Solado de limpieza e:0.05 m m3 6.50 257,853.00 1,676,045.004.1.2 Concreto 3000 psi para zapata m3 39.40 381,880.00 15,046,072.00
FONDO FINANCIERO DE PROYECTOS DE DESARROLLO – FONADEDEPARTAMENTO ADMINISTRATIVO PARA LA PROSPERIDAD SOCIAL – DPS
CONVENIO INTERADMINISTRATIVO No. 212017
OFERTA PÚBLICA OPC 059-2013
PRIMERA FASE DE LA CONSTRUCCIÓN PARQUE CONMEMORATIVO OMAYRA SANCHEZ - EN LA CABECERA MUNICIPAL GUAYABAL - DEL MUNICIPIO DE ARMERO - TOLIMA
REVISIÓN, VERIFICACIÓN Y VALIDACIÓN DE LOS DISEÑOS Y ESTUDIOS TÉCNICO
SUBTOTAL VALOR DE LA ETAPA DE VERIFICACION DE LOS ESTUDIOS Y DISEÑOS
VALOR TOTAL IVA 16% SOBRE LA VERIFICACION DEL VALOR DE LOS ESTUDIOS Y DISEÑOS
VALOR TOTAL (A) DE LA ETAPA A VERIFICACION DE LOS ESTUDIOS Y DISEÑOS
ETAPA 2: PRIMERA FASE DE LA CONSTRUCCIÓN PARQUE CONMEMORATIVO OMAYRA SANCHEZ - EN LA CABECERA MUNICIPAL GUAYABAL - DEL MUNICIPIO DE ARMERO - TOLIMA
UNIDAD DE
MEDIDAVALOR TOTAL POR
CAPITULO
Descapote a mano (0 a 20 cm). Incluye retiro (PARQUE)Descapote a mano (0 a 20 cm). Incluye retiro (ANDENES)
Localización y replanteo comisión de topografia (PARQUE)Localización y replanteo comisión de topografia (ANDEN)
Demolición de mampostería en bloque e:20 cm, incluye retiro
Material granular tipo gravilla para filtros en contenedor de raíces
4.1.3 Concreto 3000 psi para zarpa m3 0.50 412,911.00 206,456.004.2 CONCRETO DE ESTRUCTURA4.2.1 Concreto 3000 psi para viga aerea m3 16.20 524,881.00 8,503,072.004.2.2 Concreto 3000 psi para pedestal antorcha m3 1.50 424,170.00 636,255.004.3 CONCRETO PARA MUROS4.3.1 Concreto 3000 psi para muro color ocre m3 62.00 654,275.00 40,565,050.004.4 CONCRETO SARDINELES Y BORDILLOS
4.4.1 ml 566.00 48,331.00 27,355,346.00
4.4.2 ml 658.00 37,019.00 24,358,502.00
4.4.3 ml 1,085.00 26,308.00 28,544,180.00
4.4.4 ml 658.00 8,542.00 5,620,636.00
4.5 CONCRETOS VARIOS4.5.1 Concreto 3000 psi para alfajia ml 37.46 32,944.00 1,234,082.00
4.5.2 un 38.00 412,565.00 15,677,470.00
4.60 PLATINAS/ANCLAJES4.6.1 Platina corrida de 4" x 1/4" kg 398.12 10,400.00 4,140,448.004.6.2 Anclaje de cuña w.s 3830 un 480.00 6,128.00 2,941,440.005.0 ACERO/MALLAS 10,943,342.005.1 ACERO DE REFUERZO5.1.1 Acero de refuerzo de 60000 psi 420 Mpa kg 2,600.00 2,570.00 6,682,000.005.2 MALLAS5.2.1 Malla electrosoldada D188 m2 621.64 6,855.00 4,261,342.006.00 PISOS 397,139,057.006.10 BASES/SUBBASES6.1.1 Afirmado compactado (ANDEN EXTERIOR) m3 252.00 51,991.00 13,101,732.006.1.2 Afirmado compactado (PARQUE) m3 627.00 51,991.00 32,598,357.006.20 PISOS PREFABRICADOS
6.2.1 m2 596.00 61,070.00 36,397,720.00
6.2.2 ml 540.00 33,033.00 17,837,820.00
6.2.3 Suministro e instalación de Gramoquin m2 288.00 54,320.00 15,644,160.00
6.2.4 un 583.00 24,105.00 14,053,215.00
6.2.5 un 26.00 22,201.00 577,226.00
6.2.6 un 4.00 39,771.00 159,084.00
6.2.7 un 26.00 54,008.00 1,404,208.00
6.2.8 un 28.00 65,389.00 1,830,892.00
6.30 PISOS EN CONCRETO
6.3.1 m2 2,296.00 44,106.00 101,267,376.00
6.3.2 m2 1,001.00 44,106.00 44,150,106.00
6.3.3 ml 107.00 28,833.00 3,085,131.00
6.3.4 m2 540.00 59,524.00 32,142,960.00
6.3.5 m2 59.00 55,064.00 3,248,776.00
6.40 VARIOS PISOS6.4.1 Construcción de piso gravilla lavada (gualanday) m2 120.00 33,024.00 3,962,880.00
6.4.2 Construcción de piso en arena lavada blanca (Silícea) m3 240.00 268,802.00 64,512,480.00
6.4.3 Construcción de piso en polvo de ladrillo m2 852.00 9,792.00 8,342,784.006.4.4 Construcción de piso en piedra bola suelta m3 50.00 56,443.00 2,822,150.007.00 PAISAJISMO 32,721,179.007.10 ARBOLES7.1.1 Suministro y siembra de árbol Acacia amarilla un 4.00 85,682.00 342,728.007.1.2 Suministro y siembra de árbol Acacia roja un 21.00 85,682.00 1,799,322.007.1.3 Suministro y siembra de árbol Almendro un 6.00 85,682.00 514,092.007.1.4 Suministro y siembra de árbol Tulipán Africano un 4.00 85,682.00 342,728.007.1.5 Suministro y siembra de árbol Mango un 16.00 85,682.00 1,370,912.007.1.6 Suministro y siembra de árbol Guayacán Rosado un 8.00 85,682.00 685,456.007.1.7 Suministro y siembra de árbol Guayacán Amarillo un 4.00 85,682.00 342,728.007.1.8 Suministro y siembra de árbol Ebano un 10.00 85,682.00 856,820.007.20 PALMAS7.2.1 Suministro y siembra de Palma Zancona un 32.00 85,682.00 2,741,824.007.2.2 Suministro y siembra de Palma Real un 5.00 85,682.00 428,410.007.30 EMPRADIZACIÓN/JARDINERIA7.3.1 Empradizado con cespedones grama tipo trenza m2 3,160.00 6,331.00 20,005,960.007.3.2 Suministro y siembra de mani forrajero m2 145.00 6,855.00 993,975.00
Construcción de Sardinel en concreto de 3000 psi (ANDEN EXT.)Construcción de Bordillo tipo "A" en concreto de 3000 psi (PARQUE)Construcción de Bordillo tipo "B" en concreto de 3000 psiConstrucción de Bordillo tipo "C" en concreto de 3000 psi (PERGOLA)
Concreto 3000 psi para construcción contenedor de raices (1.5m x 1.5m)
Suministro e instalación de loseta en concreto 6 rayas ref. 135016054 0.40X0.40X0,030 alfa o similar
Suministro e instalación de Loseta Táctil Guia (ANDEN EXT.)
Suministro e instalación de Plaqueta 0.50x0.50 en Concreto de 3000 psiSuministro e instalación de Plaqueta 0.50x0.35 en Concreto de 3000 psiSuministro e instalación de Plaqueta 1.0x0.35 en Concreto de 3000 psiSuministro e instalación de Plaqueta 1.5x0.35 en Concreto de 3000 psiSuministro e instalación de Plaqueta 1.8x0.35 en Concreto de 3000 psi
Construcción de piso ANDEN en concreto de 3000 psi. E:0.10 m (EXTERIOR)Construcción de piso ANDEN en concreto de 3000 psi. E:0.10 m (INTERIOR)Construcción de gradas en concreto de 3000 psi. E:0.10 m (INTERIOR)Placa de concreto de 3000 psi para cancha múltiple e=0.10 m Placa de concreto de 3000 psi para fuente memorial fotográfico e=0.10 m
7.3.3 Suministro y siembra jardín de heliconias m2 201.00 11,424.00 2,296,224.008.00 AMOBLAMIENTO GENERAL 118,007,625.008.10 MOBILIARIO8.1.1 Papelera en acero inoxidable socoda o similar un 12.00 839,236.00 10,070,832.008.1.2 Papelera línea ecológica un 3.00 357,831.00 1,073,493.00
8.1.3 un 14.00 308,035.00 4,312,490.00
8.1.4 Suministro e instalación banca cubo un 109.00 788,510.00 85,947,590.008.1.5 Suministro e instalación de bicicletero un 4.00 788,510.00 3,154,040.008.1.6 Suministro e instalación de columna antorcha un 1.00 2,789,296.00 2,789,296.008.20 GIMNASIO AL AIRE LIBRE8.2.1 Suministro e instalación de barras paralelas un 4.00 334,840.00 1,339,360.008.2.2 Suministro e instalación de Poste Zig-Zag un 4.00 212,125.00 848,500.008.30 JUEGOS INFANTILES8.3.1 Suministro e instalación de Tic Tac un 2.00 621,288.00 1,242,576.008.3.2 Suministro e instalación de Banco Giratorio un 3.00 373,477.00 1,120,431.008.3.3 Suministro e instalación de Juego de Red Telaraña un 1.00 1,142,424.00 1,142,424.008.3.4 Suministro e instalación de Caballo Balanceante un 3.00 402,038.00 1,206,114.008.3.5 Suministro e instalación de Columpio Hexagonal un 1.00 904,419.00 904,419.008.40 DOTACIONES DEPORTIVAS8.4.1 Pórtico deportivo multifuncional un 2.00 1,428,030.00 2,856,060.00
9.00 REDES HIDRÁULICAS/SANITARIAS 177,392,946.009.10 INSTALACION PARA CHORROS LAMINARES
Tuberia PVC presión bajo tierra9.1.1 Tuberia PVC presión 4" ml 30.00 61,807.00 1,854,210.009.1.2 Tuberia PVC presión 3" ml 78.00 43,139.00 3,364,842.009.1.3 Tuberia PVC presión 1/2" ml 12.00 12,448.00 149,376.009.1.4 Tuberia PVC presión 1" ml 27.00 14,357.00 387,639.00
Tuberia acero galvanizado9.1.5 Tuberia acero galvanizado de 4" ml 6.00 100,079.00 600,474.00
Excavación y relleno de brechas9.1.6 Excavacion en material comun m3 36.00 14,890.00 536,040.009.1.7 Relleno con material de la brecha m3 36.00 13,028.00 469,008.00
Valvula de cortina de bronce9.1.8 Valvula de cortina 4" un 1.00 870,096.00 870,096.009.1.9 Valvula de cortina 3" un 4.00 596,994.00 2,387,976.009.1.10 Valvula de cortina 1.1/2" un 2.00 185,213.00 370,426.009.1.11 Valvula de cortina 1" un 18.00 140,568.00 2,530,224.00
Cheque de cortina de bronce 9.1.12 Cheque de cortina de bronce de 4" un 1.00 841,535.00 841,535.00
Valvula de flotador 9.1.13 Valvula de flotador de 1" un 1.00 147,128.00 147,128.00
Equipo de bombeo filtración y boquillas9.1.14 Bomba centrifuga un 1.00 7,294,956.00 7,294,956.00
9.1.15 gl 1.00 45,696,960.00 45,696,960.00
9.20 INSTALACION PARA CHORROS BAJOSTuberia PVC presión RDE 21
Valvula de cortina de bronce9.2.4 Valvula de cortina de bronce de 3" un 1.00 596,994.00 596,994.009.2.5 Valvula de cortina de bronce de 2" un 1.00 185,213.00 185,213.009.2.6 Valvula de cortina de bronce de 1" un 33.00 140,568.00 4,638,744.00
Valvula de flotador 9.2.7 Valvula de flotador de 1" un 1.00 147,128.00 147,128.00
Equipo de bombeo filtración y boquillas9.2.8 Bomba sumergible un 1.00 2,665,656.00 2,665,656.009.2.9 Boquillas de chorros bajos un 32.00 90,442.00 2,894,144.00
9.30
Preliminares9.3.1 Señal preventiva y reglamentaria gl 1.00 95,202.00 95,202.009.3.2 Ubicación y replanteo comisión de topografia gl 1.00 380,808.00 380,808.00
Excavaciones y rellenos9.3.3 Excavación en Zanja - Material Común m3 417.00 14,890.00 6,209,130.00
9.3.4 m3 84.00 12,900.00 1,083,600.00
Tuberias bajo tierra
9.3.5 ml 32.00 46,080.00 1,474,560.00
9.3.6 ml 75.00 68,133.00 5,109,975.00
9.3.7 ml 73.00 79,648.00 5,814,304.00
9.3.8 ml 44.00 96,186.00 4,232,184.00
9.3.9 Suministro/Instalación de tubería pvc sanitaria 3" ml 22.00 31,432.00 691,504.00
Suministro e instalación de banca mixta concreto y madera
Equipo de filtracion y boquillas: Incluye dos filtros de 4.7 l/seg y 17 boquillas de chorros laminares
INSTALACIONES SANITARIAS AGUAS RESIDUALES Y AGUAS LLUVIAS
Evacuación de Escombros/Sobrantes en Vehículo Automotor
Suministro/Instalación de tubería pvc corrugada 4" (100 mm)Suministro/Instalación de tubería pvc corrugada 6" (160 mm)Suministro/Instalación de tubería pvc corrugada 8" (200 mm)Suministro/Instalación de tubería pvc corrugada 10" (250 mm)
9.3.10 Suministro/Instalación de tubería pvc sanitaria 4" ml 238.00 39,312.00 9,356,256.00Pozos de inspección
9.3.10 Cajas de inspeccion cuadradas de 0.8 x 0.8 m un 9.00 633,647.00 5,702,823.009.3.11 Cuerpo pozo de Inspección diametro 1.20 m ml 8.00 546,935.00 4,375,480.00
9.3.12 un 3.00 227,357.00 682,071.00
9.3.13 un 3.00 305,513.00 916,539.00Rellenos Compactados
9.3.14 Rellenos Compactados con material de excavacion m3 334.00 13,028.00 4,351,352.00
9.3.15 m3 84.00 55,312.00 4,646,208.00
9.40
Preliminares9.4.1 Señal preventiva y reglamentaria gl 1.00 76,162.00 76,162.00
Excavaciones y rellenos9.4.2 Excavación en zanja en material común m3 207.00 14,890.00 3,082,230.00
9.4.3 m3 41.40 55,312.00 2,289,917.00
9.4.4 Rellenos compactados con material de excavacion m3 165.60 13,028.00 2,157,437.00Tuberias y accesorios
9.4.5 Suministro/Instalación de tubería pvc presion 3" ml 30.00 43,139.00 1,294,170.00
9.4.6 Suministro/Instalación de tubería pvc presion 2.1/2" ml 72.00 35,500.00 2,556,000.00
9.4.7 Suministro/Instalación de tubería pvc presion 2" ml 123.00 24,017.00 2,954,091.00
9.4.8 Suministro/Instalación de tubería pvc presion 1.1/2" ml 159.00 18,041.00 2,868,519.00
9.4.9 Suministro/Instalación de tubería pvc presion 1" ml 2.00 14,357.00 28,714.009.4.10 Suministro/Instalación de tubería pvc presion 3/4" ml 14.00 12,094.00 169,316.009.4.11 Suministro/Instalación de tubería pvc presion 1/2" ml 132.00 8,210.00 1,083,720.00
Salidas para riego
9.4.12 un 3.00 30,444.00 91,332.00
9.4.13 Valvula de cortina de 1/2" un 3.00 47,542.00 142,626.00Hidrantes y valvulas
9.4.14 Hidrante tipo milan 3" un 1.00 2,101,000.00 2,101,000.009.4.15 Valvula de compuerta elastica 3" un 1.00 272,715.00 272,715.009.4.16 Tee hf 3" un 1.00 144,152.00 144,152.009.4.17 Contador 1.1/2" un 1.00 794,001.00 794,001.009.4.18 Valvulas de cortina 1.1/2" un 2.00 185,213.00 370,426.00
Cuarto de bombas9.4.19 Válvula de flotador 1.1/2" un 1.00 202,897.00 202,897.009.4.20 Valvulas de cortina 2" un 3.00 185,213.00 555,639.009.4.21 Valvulas de cortina 1.1/2" un 1.00 162,463.00 162,463.009.4.22 Valvulas de cortina 1" un 1.00 140,568.00 140,568.009.4.22 Cheques 2" un 2.00 329,672.00 659,344.009.4.23 Cheques 1" un 2.00 159,051.00 318,102.009.4.23 Cheques 1.1/2" un 1.00 215,925.00 215,925.009.4.23 Tuberia HG 1" m 8.00 50,114.00 400,912.009.4.24 Tuberia HG 2" m 12.00 88,399.00 1,060,788.009.4.25 Tuberia HG 2.1/2" m 6.00 100,362.00 602,172.009.4.26 Equipo de presión constante ud 1.00 7,888,381.00 7,888,381.009.4.27 Equipo de presión constante sistema de riesgo ud 1.00 4,481,634.00 4,481,634.0010.00 REDES ELECTRICAS 133,354,346.0010.10 SUB-ESTACIÓN
10.1.1 gl 1.00 6,890,530.00 6,890,530.00
10.1.2 un 1.00 1,656,515.00 1,656,515.00
10.20 RED SECUNDARIA B.T.
10.2.1 ml 30.00 68,227.00 2,046,810.00
10.2.2 un 13.00 380,808.00 4,950,504.00
10.2.3 gl 1.00 395,088.00 395,088.00
10.2.4 un 1.00 452,210.00 452,210.00
Base/Cañuela pozo de Inspección D=1.20 m. Concreto simple Aro - Tapa HF D=0.68 m. p/Cámara de Inspección
Sustituciones con material seleccionado para encamado de tuberías
INSTALACIONES REDES SUMINISTRO DE AGUA POTABLE
Sustituciones con material seleccionado para encamado de tuberías
Puntos hidraulicos para conexión de llave de manguera
Suministro e Instalación de subestación eléctrica aérea incluye transformador de 45 KVA, 13.200/214-123 V aceite, pararrayos, cajas primarias, fusibles, crucetas, pieamigos, puesta a tierra, aisladores de retención, dado, tubo EMT, soldadura exotérmica, cable cobre y de aluminio, accesorios de fijación, etc
Suministro e instalación de poste troncocónico 12m x 1.050 kg, aplomado, transporte
Suministro e instalación de cable cobre 4 No 1/0 awg-thhn para acometida desde transformador a TG
Suministro e Instalación de cámara de paso eléctrica de 0.80 x 0.80 x 1.10 m con tapa de concreto. Ver detalle en plano ELE-06
Suministro e instalación tubo metálico galvanizado 2" desde contador a cámara incluye terminales, unión, cinta band-it, grapas y demás accesorios
10.50 SISTEMA DE VOZ Y DATOSCABLEADO CAT 6A - EQUIPO PASIVO
10.5.1 un 1.00 837,778.00 837,778.00
10.5.2 Barra o platina vertical tierra para rack un 1.00 171,364.00 171,364.00
10.5.3 un 1.00 271,326.00 271,326.00
10.5.4 un 3.00 542,651.00 1,627,953.00
10.5.5 un 1.00 444,022.00 444,022.00
10.5.6 toma doble con jack para RJ 45 cat. 6A un 41.00 45,697.00 1,873,577.0010.5.7 Patch Cord cat. 6A de 1m un 44.00 21,563.00 948,772.0010.5.8 Patch Cord cat. 6A de 2m un 16.00 31,321.00 501,136.0010.5.9 Faceplate 2 Salidas un 41.00 7,711.00 316,151.0010.5.10 Tapas para Faceplate un 27.00 10,853.00 293,031.0010.5.11 Organizador horizontal Doble un 4.00 79,970.00 319,880.0010.5.12 identificación y marcación cables, tomas y rack un 120.00 4,284.00 514,080.0010.5.13 Certificación de punto Cat 6A (39 datos, 16 voz) un 55.00 9,044.00 497,420.0010.5.14 Suministro e instalación de cable S/FTP cat 6A ml 2,500.00 2,047.00 5,117,500.00
10.5.15 ml 5.00 14,507.00 72,535.00
10.5.16 ml 80.00 12,859.00 1,028,720.00
10.5.17 un 1.00 333,207.00 333,207.00
10.5.18 gl 1.00 1,904,040.00 1,904,040.00
10.5.19 un 1.00 3,332,070.00 3,332,070.00
10.5.20 Access Point Cisco 1250 un 1.00 1,428,030.00 1,428,030.00
10.5.21 un 1.00 42,841.00 42,841.00
Suministro e instalación de transformador de corriente 125/5 A, 600V, uso exterior, para medida indirecta, incluye protocolos.
Suministro e instalación de cable multifilamento No 12 awg para conexión medida, desde transformador hasta contador
Suministro e instalación de caja o gabinete en policarbonato, uso exterior, para alojar contador trifásico, incluye cinta bandit 5/8" y hebillas 5/8"
Suministro e instalación tubería conduit 2 x 3" PVC pesado, incluye, curvas, excavación brecha, lleno 0,50 x 1.0 m.
Corte pavimento, afirmado y restitución franja o resane con pavimento a 4.000 psi en calle, 0,50 de ancho x 0,20 m (de espesor concreto existente??).
Suministro de materiales e instalación de malla de tierra 4 varillas de cobre 5/8" X 2.40 m, cable cobre desnudo No 2 AWG, soldadura exotérmica y 2 cámaras de inspección de 30x30 cm según especificaciones.
Suministro e instalación de poste metalico de iluminación con doble brazo sencillo de 1.50 m, 4" x 8 metros para luminarias de 150W/70W sodio. Vías
Suministro e instalación e luminaria de 150 W sodio alta presión, incluye fotocelda. Ref. Calima II de Roy Alpha o similar
Suministro e instalación e luminaria de 70 W sodio alta presión, incluye fotocelda. Ref. Calima I de Roy Alpha o similar
Suministro e instalación de cable cobre 2No 8 + 1No 10 awg-thhn por tuberia PVC 1"Suministro e instalación de tuberia conduit PVC 1", incluye brecha y llenoSuministro e instalación de cable cobre 3No 12 awg-thhn desde cámara hasta luminaria
Suministro e instalación de cámara de paso de 40 x 40 x60 cm con tapa en concreto, para conexión o inspección cableado alumbrado
Suministro e instalación de cámara de paso de 40 x 40 x 60 cm con tapa en concreto, para conexión o inspección cableado alumbrado interior
Rack cerrado de 1,80 m x 0,60 x 0,60 m, Incluye ventiladores
Multitoma para rack horizontal x 5 tomas grado hospitalario 10 salidas con protección de 20 APatch panel de 24 puertos categoria 6A, prearmado (2 para datos, 1 para voz)Patch panel de 24 puertos categoria 5E, prearmado para telefonos
Suministro e instalación de cable telefonico multipar de 20 pares entre patch panel 5E a planta telefonica
Suministro e instalación de cable telefonico multipar de 10 pares entre strip principal de entrada a planta telefonica
Strip telefónico de 10 pares de 40 x 30 x 25 con regletas S66 de 25 Pares, incluye marcación
Suministro e instalación de planta telefónica completa, incluye 1 teléfono conmutador, instalación, programación y puesta en funcionamiento, 10 teléfonos sencillos
Salida de voz y datos en tuberia conduit PVC 3/4", sin alambrar, caja metálica 4x4" con suplemento (en Cafeteria)
10.60 TUBERIA CONDUIT PVC
10.6.1 ml 300.00 10,948.00 3,284,400.00
10.6.2 ml 175.00 5,712.00 999,600.00
10.6.3 ml 200.00 3,808.00 761,600.00
10.70 ACOMETIDAS
10.7.1 ml 100.00 6,379.00 637,900.00
10.7.2 ml 230.00 11,900.00 2,737,000.00
10.7.3 ml 40.00 9,044.00 361,760.00
10.7.4 ml 70.00 27,609.00 1,932,630.00
10.7.5 ml 300.00 8,092.00 2,427,600.00
10.80 TABLEROS DE DISTRIBUCIÓN
10.8.1 un 1.00 361,768.00 361,768.00
10.8.2 un 1.00 42,841.00 42,841.00
10.8.3 un 3.00 80,922.00 242,766.00
10.8.4 un 2.00 80,922.00 161,844.00
10.8.5 un 1.00 80,922.00 80,922.00
10.8.6 un 1.00 428,409.00 428,409.00
10.90 0.00
10.9.1 un 79.00 42,841.00 3,384,439.00
10.9.2 un 63.00 57,121.00 3,598,623.00
10.9.3 un 2.00 42,841.00 85,682.00
10.9.4 un 1.00 47,601.00 47,601.00
10.10 LUMINARIAS
10.10.1 un 1.00 113,671.00 113,671.00
10.10.2 un 38.00 76,809.00 2,918,742.00
Suministro e instalación tubería conduit DE 2" PVC, incluye curvas, terminales, accesorios y brecha y lleno donde corresponda.
Suministro e instalación tubería conduit DE 1" PVC, incluye curvas, terminales, accesorios y brecha y lleno donde corresponda.
Suministro e instalación tubería conduit DE 3/4" PVC, incluye curvas, terminales, accesorios y brecha y lleno donde corresponda.
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: Alambre cobre 3 No 12 AWG-THHN, ramales alumbrado
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: cable 2N° 8+1N° 10 AWG-THHN , ramales de alumbrado a reflectores cancha
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN/600 V por tubería, bandeja o Canaleta: cable 3N° 10+AWG-THHN , ramal de alimentación de Motobomba sumergible para chorros bajos desde tablero TI
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: cable 3N° 6+2N° 10 AWG-THHN, ramal de alimentación a cuarto control de bombas desde TCE a TCB
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta:cable 2N° 10+ 1N° 12 AWG-THHN , ramales de alumbrado exterior
Suministro e instalación de tablero trifásico 5 hilos, CON espacio para totalizador con puerta y cerradura sin interruptores SquareD, Legrand o Similar. TABLERO TG de 24 circuitos
Suministro e instalación de breaker de incrustar en tablero, 10KA/240V. 2x50 A para transfo. de aislamiento
Suministro e instalación de breaker de incrustar en tablero, 10KA/240V. 3x40ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 3x50ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 3x60 A para TCE
Suministro e instalación de interruptor automático, industrial, en caja moldeada, tripolar, 3x125 amp/25KA/240V. Para tablero general TG
SALIDAS DE ALUMBRADO, TOMACORRIENTES E INTERRUPTORES
Suministro e instalación de salida para lámpara fluorescente,led ó tipo bala, sin incluir la lámpara, incluye tubería conduit PVC 1/2", caja plastica 2x4, octogonal o 4x4, alambre cobre No 12 awg-thhn y todos los accesorios de fijación.
Suministro e instalación de salida para lámpara en pérgola, tubería a la vista, sin incluir la lámpara, incluye tubería metálica EMT 1/2", alambre cobre No 12 awg-thhn y todos los accesorios de fijación.
Suministro e instalación de salida para tomacorriente doble con polo de tierra 15 amp; 125 V, con implemento para uso general incluye tubería, caja, alambre. Linea Luminex Arquea blanco o Similar en cuarto control motomombas TCB y motobomba sumergible chorros
Suministro e instalación de salida para Interruptor sencillo sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación Luminaria Incluye cable encauchetado, clavija tripolar. Así:
Luminaria fluorescente 2x32 W, tubo T8, 4.100 K, 15 x 125 cm, cerrada en policarbonato, cierre tipo maleta, de colgar, chasis en PVC. Ref. IT 100A 1X4 /2T83241/EUNV ILTEC o Similar. En cuarto de control motomombas
Lámpara tipo tortuga sellada 60w/120V o bombilla Fluorescente 26W/120V,4.100K, Ref. ITA112/60W/120V ILTEC o Similar. PERGOLA
10.10.3 KIT 10.00 71,402.00 714,020.00
10.10.4 KIT 1.00 52,361.00 52,361.00
10.10.5 un 12.00 347,487.00 4,169,844.00
10.10.6 un 5.00 252,285.00 1,261,425.00
10.10.7 un 28.00 76,162.00 2,132,536.00
10.10.8 un 12.00 357,008.00 4,284,096.00
10.10.9 un 26.00 128,523.00 3,341,598.00
10.10.10 un 3.00 38,081.00 114,243.00
10.10.11 un 5.00 2,094,444.00 10,472,220.00
10.11 CAMARAS DE PASO
10.11.1 un 10.00 190,404.00 1,904,040.00
10.12 OTROS10.12.1 Certificación RETIE (Toda la obra eléctrica ) gl 1.00 2,856,060.00 2,856,060.0010.12.2 Provisionales durante la construcción gl 1.00 2,856,060.00 2,856,060.00
10.12.3 Elaboración planos record, dibujante, plotteo, copias un 10.00 142,803.00 1,428,030.00
10.12.4 gl 1.00 952,020.00 952,020.00
10.12.5 un 1.00 952,020.00 952,020.00
11.00 CERRAMIENTO 22,951,270.0011.10 PALIZADA
11.1.1 un 141.00 50,457.00 7,114,437.00
11.1.2 un 106.00 53,313.00 5,651,178.00
11.1.3 un 41.00 57,121.00 2,341,961.00
11.1.4 un 87.00 59,977.00 5,217,999.00
11.1.5 Suministro e instalación de platina metálica de 5/16" ml 78.80 33,321.00 2,625,695.00
2.00 PORTERÍA
1.0 PRELIMINARES 613,595.001.1.0 Localización y descapote1.1.1 Localización y replanteo comisión de topografia día 1.00 380,808.00 380,808.001.1.2 Descapote a mano (0 a 20 cm). Incluye retiro m2 15.40 4,300.00 66,220.001.5 Cerramiento provisional 1.5.1 Cerramiento en tela de polipropileno h:2m m2 24.60 6,771.00 166,567.002.00 MOVIMIENTOS DE TIERRA 118,560.002.1 Explanación, excavación y llenos2.1.1 Excavación en material común a mano m3 6.30 14,890.00 93,807.002.1.2 Lleno en material comun del sitio compactado m3 1.90 13,028.00 24,753.003.0 CONCRETOS 3,097,983.003.1 Concretos cimentación3.1.1 Afirmado compactado m3 3.08 51,991.00 160,132.003.1.2 Solado de limpieza e:0.05 m m3 0.32 257,853.00 82,513.003.1.5 Concreto de 3000 psi para viga zarpa m3 1.88 412,911.00 776,273.003.2 Concretos estructura3.2.2 Concreto 3000 psi para columna m3 1.06 580,906.00 615,760.00
3.2.3 m3 1.82 416,469.00 757,974.00
3.4 Concretos varios3.4.1 Concreto de 3000 psi para alfajia remate de muro ml 21.41 32,944.00 705,331.00
KIT de tubo fluorescente 4 x 32W/tubo T8, 6,500K, balasto electrónico para 4 tubos. PARA LUZ INDIRECTA INTERIOR MURO.
KIT de tubo fluorescente 2 x 17W/tubo T8, 6,500K, balasto electrónico para 4 tubos. PARA LUZ INDIRECTA INTERIOR MURO.
Bala de piso uso exterior, reflector tipo Terra, 70W/220V, Metal Halide.Poste tipo bolardo de 1.0 m de altura, luz indirecta para sendero, 70W / 220V sodio.
Bala de incrustar en muro, uso exterior, luz penumbra, leds 5W/120V, color ámbar. En cubos de plaza memorial
Reflector rectangular, uso exterior en aluminio inyectado con vidrio, protección IP65, color negro, bombilla 400W/220V metal halide. PARA CANCHA MULTIPLE Y JUEGOS SENSORIALES
Reflectores aplique sodio tipo Wall pack, protección en vidrio templado, para uso exterior IP65. 70w / 220v Ref. ITW 250/70W MH/M2 ILTEC o Similar. PARA PERGOLA Y LUZ LATERAL ACCESO PRINCIPAL
Fotocelda completa con base de 1.000W , multivoltaje 100-270 V para accionamiento alumbrado exterior
Suministro e instalación de poste metálico galvanizado de 10 m, troncocónico, poligonal de 12 caras, con accesorios para 4 proyectores, diámetro base 190 mm, diámetro cima 127 mm, base de 40 x 40 cm x 1/2" con aletas, incluye pernos de anclaje 5/8" x 1 m y plantilla para fundición. Iluminación deportiva
Suministro e instalación de cámara de paso de 40 x 40 x 60 cm con tapa en concreto, para conexión o inspección cableado alumbrado interior en plazoletas
Marcación general tomacorrientes, tableros, ducteria, etcTrámites, aprobaciones, Revisiones instalaciones e instalación contador pago a ENERTOLIMA
Suministro e instalación de tubo circular galvanizado 2" tipo ASuministro e instalación de tubo circular galvanizado 2" tipo BSuministro e instalación de tubo circular galvanizado 2" tipo CSuministro e instalación de tubo circular galvanizado 2" tipo D
Concreto de 3000 psi e=0,12 m para placa de contrapiso
4.0 ACERO/MALLAS/ESTRUCTURA METÁLICA 4,437,469.004.1 Acero de refuerzo4.1.1 Acero de refuerzo de 60000 psi 420 Mpa kg 132.00 2,570.00 339,240.004.2 Estructura metálica4.2.1 Estructura Metálica en perfiles PHR kg 517.78 7,915.00 4,098,229.005.00 MAMPOSTERIA 3,428,355.005,1,0 Muro en bloque5,1,5 Muro en mamposteria reforzada incluye grouting m2 51.00 58,921.00 3,004,971.005,2,0 Muros secos
5.2.4 Tabique en Superboard ancho: 72 cms para bajantes ml 12.00 35,282.00 423,384.00
Marcos y puertas en aluminio7.6.1 Puerta + marco en aluminio P-01 un 2.00 711,540.00 1,423,080.00
Ventaneria en aluminio7.6.2 Ventana en aluminio V-01 D:0.75*1.31 Guillotina un 6.00 280,608.00 1,683,648.007,7,0 Carpinteria metálica
7.7.1 un 1.00 5,474,115.00 5,474,115.00
7.7.2 ml 10.00 428,409.00 4,284,090.00
7.7.3 un 1.00 20,490,136.00 20,490,136.00
7.7.4 Puerta metálica de acceso parque un 1.00 1,325,212.00 1,325,212.008.0 REVOQUES/ENCHAPES/PINTURAS 3,326,921.008,1,0 Revoques
8.1.1 m2 37.10 14,336.00 531,866.00
8.1.2 m2 78.90 14,459.00 1,140,815.00
8.2 Pintura interior8.2.1 Pintura interior vinilo muros m2 37.10 12,782.00 474,212.008.3 Pintura Exterior8.3.1 Pintura tipo koraza sobre muros de fachada m2 78.90 14,956.00 1,180,028.009.0 PISOS 534,725.009.1 Pisos
9.1.1 m2 3.16 105,642.00 333,829.00
9.1.2 Guardaescoba en mortero h:0.08 m ml 12.90 8,886.00 114,629.009.20 Pisos en grano9.2.4 Construcción de bocapuertas en grano pulido ml 1.50 57,511.00 86,267.0011.00 CUBIERTA 5,395,907.00
11.10 m2 39.14 36,142.00 1,414,598.00
11.30 ml 74.22 53,642.00 3,981,309.00
12.00 INSTALACIONES ELECTRICAS 3,665,125.00
12.10
12.1.2 ml 5.00 44,745.00 223,725.00
12.1.3 ml 1.00 5,712.00 5,712.00
12.20
12.2.1 ml 5.00 395,553.00 1,977,765.00
12.30 TABLEROS DE DISTRIBUCIÓN
12.3.2 un 1.00 266,566.00 266,566.00
12.3.8 un 2.00 19,516.00 39,032.00
12.3.9 un 2.00 19,516.00 39,032.00
12.3.11 un 2.00 42,841.00 85,682.00
12.3.12 un 2.00 42,841.00 85,682.00
12.3.13 un 1.00 42,841.00 42,841.00
Suministro e instalación de escalera metálica para Torre MiradorPasamanos en acero inoxidable y vidrio templado 5mm.Torniquete de seguridad mecánico TURNLOCK 15 tipo IVEGAS O SIMILAR
Revoque en muro interior (incl. carteras, filos y dilataciones)Revoque en muro exterior (incl. carteras, filos y dilataciones)
Instalacion de piso en baldosa en grano pulido tipo alfa ref: 135020942 o similar
Suministro e instalación de cubierta termoacústica trapezoidal tipo ajover o similarSuministro e instalación de canal en lámina galvanizada calibre 24 d:0.5 m
BANDEJA PORTA CABLES, CANALETA, TUBERIA PVC
Suministro e instalación de canaleta metálica en lámina de acero galvanizado C.R. Calibre 22, con tapa de atornillar, terminada con pintura electrostática color negra, de 12 x 5 cm. Incluye accesorios de fijación, troqueles, soporte y demás accedsorios, incluye cable cobre N° 10 AWG desnudo en todo el recorrido.
Suministro e instalación tubería conduit PVC de 1 ", incluye curvas, terminales, accesorios y brecha y lleno donde corresponda diámetro, ver planos
ACOMETIDAS/RAMALES DE ALIMENTACION A TABLEROS
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: cable 4N° 8+1N° 10 AWG-THHN , ramales de TG a tableros
Suministro e instalación de tablero trifásico 5 hilos, sin espacio para totalizador con puerta y cerradura sin interruptores SquareD, Legrand o Similar de 18 circuitos
Suministro e instalación de breaker de incrustar en tablero, 10KA/240V. 1x15ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 1x20ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 2x15ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 2x20ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 2x30A
12.40
12.4.1 un 4.00 42,841.00 171,364.00
12.4.3 un 4.00 42,841.00 171,364.00
12.4.7 un 1.00 47,601.00 47,601.00
12.4.8 un 1.00 57,121.00 57,121.00
12.50 LUMINARIAS
12.5.3 un 2.00 112,148.00 224,296.00
12.5.4 un 2.00 113,671.00 227,342.00
3.00 CAFETERÍA Y BAÑOS
1.0 PRELIMINARES 5,726,963.001.1.0 Localización y descapote1.1.1 Localización y replanteo comisión de topografia día 1.00 380,808.00 380,808.001.1.2 Descapote a mano (0 a 20 cm). Incluye retiro m2 80.00 4,300.00 344,000.001.3 Retiros1.3.1 Retiro de escombros o material sobrante m3 60.00 15,148.00 908,880.001.4 Campamento1.4.1 Campamento provisional m2 25.00 136,647.00 3,416,175.001.5 Cerramiento provisional 1.5.1 Cerramiento en tela de polipropileno h:2m m2 100.00 6,771.00 677,100.002.00 MOVIMIENTOS DE TIERRA 176,910.002.1 Explanación, excavación y llenos2.1.1 Excavación en material común a mano m3 9.30 14,890.00 138,477.002.1.2 Lleno en material comun del sitio compactado m3 2.95 13,028.00 38,433.003.0 CONCRETOS 12,483,273.003.1 Concretos cimentación3.1.1 Afirmado compactado m3 16.00 51,991.00 831,856.003.1.2 Solado de limpieza e:0.05 m m3 0.95 257,853.00 244,960.003.1.3 Concreto 3000 psi para zapatas m3 2.52 381,880.00 962,338.003.1.4 Concreto de 3000 psi para vigas de fundación m3 3.34 412,911.00 1,379,123.003.2 Concretos estructura3.2.1 Concreto 3000 psi para viga aérea m3 2.84 525,071.00 1,491,202.003.2.2 Concreto 3000 psi para columna m3 1.83 513,903.00 940,442.00
3.2.3 m3 8.55 416,469.00 3,560,810.00
3.3 Concretos muros3.4 Concretos varios3.4.1 Concreto de 3000 psi para alfajia remate de muro ml 35.00 32,944.00 1,153,040.003.4.2 Concreto de 3000 psi para viga cinta de cuchillas m3 0.47 519,926.00 244,365.003.4.6 Concreto de 3000 psi para meson lavamanos ml 6.45 120,748.00 778,825.00
3.4.7 ml 7.58 110,337.00 836,354.00
3.4.9 ml 1.82 32,944.00 59,958.00
4.0 ACERO/MALLAS/ESTRUCTURA METÁLICA 5,670,080.004.1 Acero de refuerzo4.1.1 Acero de refuerzo de 60000 psi 420 Mpa kg 1,363.86 2,570.00 3,505,120.004.2 Estructura metálica4.2.1 Estructura Metálica en perfiles PHR kg 251.32 7,915.00 1,989,198.004.30 Mallas4.3.1 Malla electrosoldada D-188 m2 25.64 6,855.00 175,762.005.00 MAMPOSTERIA 17,225,789.005,1,0 Muro en bloque
5,1,2 m2 220.00 68,969.00 15,173,180.00
5,1,3 m2 3.64 71,403.00 259,907.00
5,1,4 Chapa tipo catalan de 14*9*30 cm - ancho 0.30 ml 27.30 26,830.00 732,459.00
SALIDAS DE ALUMBRADO, TOMACORRIENTES E INTERRUPTORES
Suministro e instalación de salida para lámpara fluorescente, halógena ó tipo bala, sin incluir la lámpara, incluye tubería conduit PVC 1/2", caja plastica 2x4, octogonal o 4x4, tomacorriente, alambre cobre No 12 awg-thhn y todos los accesorios de fijación.
Suministro e instalación de salida para tomacorriente doble con polo de tierra 15 amp; 125 V, con implemento para uso general incluye tubería, caja, alambre. Linea Luminex Arquea blanco o Similar
Suministro e instalación de salida para Interruptor SENCILLO sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación de salida para Interruptor DOBLE sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación Luminaria fluorescente 2x32w, tubo T8, 4.100 K, abierta de incrustar en cielo raso, 30 x 122 cm, Ref. LFS TB 1X4/2T83241/EU de ILTEC o Similar. PARA PASILLOS CON CIELO RASO
Luminaria fluorescente 2x32 W, tubo T8, 4.100 K, 15 x 125 cm, cerrada en policarbonato, cierre tipo maleta, de colgar, chasis en PVC. Ref. IT 100A 1X4 /2T83241/EUNV ILTEC o Similar.
Concreto de 3000 psi e=0,12 m para placa de contrapiso
Concreto de 3000 psi para meson en barra de atenciónConcreto de 3000 psi para alfajia en calados incluye gotero un lado
Muro en bloque concreto de color ocre tipo Catalan de 14*9*30 cmMuro en bloque calado gris tipo persiana 10x20x20 a la vista
5,2,0 Muros secos
5.2.4 Tabique en Superboard ancho: 72 cms para bajantes ml 12.00 35,282.00 423,384.00
5.2.5 Muro en Superboard doble cara e:11cms m2 8.30 76,730.00 636,859.006.0 APARATOS/GRIFERIA/MUEBLES/MESONES 31,034,643.006.1 Aparatos sanitarios
6.1.1 un 7.00 810,198.00 5,671,386.00
6.1.2 un 5.00 308,840.00 1,544,200.00
6.1.3 Lavamanos de colgar incluye griferia un 1.00 286,563.00 286,563.00
6.1.4 Orinal linea institucional incluye valvula antivandalica un 1.00 412,910.00 412,910.00
6.2.0 Incrustaciones y accesorios
6.2.1 un 7.00 144,136.00 1,008,952.00
6.2.2 un 2.00 104,151.00 208,302.00
6.2.3 un 5.00 107,959.00 539,795.00
6.2.4 un 1.00 206,882.00 206,882.00
6.3 Muebles
6.3.1 un 1.00 8,210,220.00 8,210,220.00
6.3.2 un 1.00 1,275,707.00 1,275,707.00
6.3.3 Barra cafeteria en grano pulido ml 6.92 135,024.00 934,366.006.3.7 Espejos biselado de 4mm. m2 2.60 82,569.00 214,679.006.4 Divisiones en acero inoxidable
6.4.1 m2 21.30 469,346.00 9,997,070.00
6.4.2 un 1.00 523,611.00 523,611.00
7.0 CARPINTERIA ALUMINIO/METALICA/MADERA 19,681,573.007.40 CAFETERIA - WC MODULO DE SERVICIOS
Marcos y puertas en aluminio7.4.1 Puerta + marco en aluminio P-01 un 6.00 627,000.00 3,762,000.007.4.2 Puerta + marco en aluminio P-02 un 1.00 846,346.00 846,346.007.4.3 Puerta + marco en aluminio P-03 un 4.00 1,257,618.00 5,030,472.007.4.4 Puerta + marco en aluminio P-04 un 2.00 2,080,164.00 4,160,328.00
Ventaneria en aluminio7.4.5 Ventana en aluminio V-01 D:0.61*0.60 Fija un 6.00 52,266.00 313,596.007.4.6 Ventana en aluminio V-02 D:0.61*0.90 Celosia un 6.00 141,118.00 846,708.007.4.7 Ventana en aluminio V-03 D:1.35*0.30 Fija un 1.00 57,835.00 57,835.00
9.1.2 Guardaescoba en mortero h:0.08 m ml 15.30 8,886.00 135,956.00
9.1.3 m2 30.62 83,684.00 2,562,404.00
9.20 Pisos en grano9.2.3 Construcción de mediacaña en grano ml 54.30 18,104.00 983,047.009.2.4 Construcción de bocapuertas en grano pulido ml 7.04 57,511.00 404,877.0010.00 CIELORASOS 3,395,079.00
10.20 m2 60.50 56,117.00 3,395,079.00
11.00 CUBIERTA 4,064,633.00
11.10 m2 63.93 36,142.00 2,310,558.00
11.20 ml 12.00 41,124.00 493,488.00
11.30 ml 23.50 53,642.00 1,260,587.00
12.00 INSTALACIONES ELECTRICAS 6,538,057.00
12.10
12.1.3 ml 50.00 4,601.00 230,050.00
12.20
Sanitario con fluxometro linea institucional incluye valvula antivandalicaLavamanos de incrustar linea institucional incluye griferia
Suministro, transporte e instalación de dispensador de papel higiénicoSuministro, transporte e instalación de dispensador de ToallasSuministro, transporte e instalación de dispensador de Jabón SpraySuministro, transporte e instalación de Barra discapacitados en acero inoxidable.
Mueble para cafetería cubierta en acero inoxidable incluye lavaplatos y salpicaderoMueble para cafetería cubierta en acero inoxidable incluye estufa
División en acero inoxidable 304 calibre 20 para baño, tipo socoda o similar.División en acero inoxidable 304 calibre 20 para orinales, tipo socoda o similar.
Ventana en aluminio V-04 D:3.46*1.77 Celosia cuerpos plegables
Enchapes muros en cerámica blanca de 20.5x20.5, tipo corona
Instalacion de piso en baldosa en grano pulido tipo alfa ref: 135020942 o similar
Suministro e instalación de baldosa 30x30 perlato claro para baños
Suministro, transporte y colocación de cielo falso en Superboard de 8 mm
Suministro e instalación de cubierta termoacústica trapezoidal tipo ajover o similarSuministro e instalación de caballete tipo ajover o similarSuministro e instalación de canal en lámina galvanizada calibre 24 d:0.5 m
BANDEJA PORTA CABLES, CANALETA, TUBERIA PVC
Suministro e instalación tubería conduit PVC de 1 ", incluye curvas, terminales, accesorios y brecha y lleno donde corresponda diámetro, ver planos
13.1.1 Tuberia de 3" ml 16.00 17,879.00 286,064.00Tragante de aguas lluvias en bronce
13.1.3 Tragante 5"x 3" un 8.00 28,370.00 226,960.00Tuberia bajo tierra PVC sanitaria
13.1.5 Tuberia 3" sanitaria ml 4.00 31,432.00 125,728.0013.1.6 Tuberia 4" sanitaria ml 16.00 39,312.00 628,992.00
Excavación y rellenos en brecha13.1.7 Excavación en Material común m3 10.00 14,890.00 148,900.0013.1.8 Relleno con material seleccionado m3 2.00 55,779.00 111,558.0013.1.9 Relleno con material de la brecha m3 8.00 13,028.00 104,224.00
Puntos Sanitarios PVC13.1.10 Sanitario de fluxometro un 7.00 57,748.00 404,236.0013.1.11 Lavamanos un 6.00 57,748.00 346,488.0013.1.12 Orinal un 1.00 57,748.00 57,748.00
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: cable 4N° 8+1N° 10 AWG-THHN , ramales de TG a tableros
Suministro e instalación de tablero trifásico 5 hilos, sin espacio para totalizador con puerta y cerradura sin interruptores SquareD, Legrand o Similar de 12 circuitos
Suministro e instalación de breaker de incrustar en tablero, 10KA/240V. 1x15ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 1x20ASALIDAS DE ALUMBRADO, TOMACORRIENTES E INTERRUPTORES
Suministro e instalación de salida para lámpara fluorescente, halógena ó tipo bala, sin incluir la lámpara, incluye tubería conduit PVC 1/2", caja plastica 2x4, octogonal o 4x4, tomacorriente, alambre cobre No 12 awg-thhn y todos los accesorios de fijación.
Suministro e instalación de salida para tomacorriente doble con polo de tierra 15 amp; 125 V, con implemento para uso general incluye tubería, caja, alambre. Linea Luminex Arquea blanco o Similar
Suministro e instalación de salida para tomacorriente doble con polo de tierra 15 A tipo GFCI; 125 V, con implemento incluye tubería, caja, alambre. Linea Luminex Arquea blanco o Similar
Suministro e instalación de salida para Interruptor SENCILLO sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación de salida para Interruptor CONMUTABLE SENCILLO sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación Luminaria fluorescente 2x32W, tubo T8, 4.100 K, abierta de colgar o sobreponer, 30 x 122 cm. Ref. IF SAB 1X4/2T43241/EU ILTEC o Similar. PARA BAÑOS. incluye cable encauchetado, clavija tripolar
Suministro e instalación Luminaria fluorescente 2x32w, tubo T8, 4.100 K, de incrustar, cerrada con acrílico, 30 x 122 cm Ref. LFS PC 1X4/2T83241/EU ILTEC o Similar. PARA COCINETAS Y SALAS DE JUEGOS
Suministro e instalación luminaria aplique pared, decorativo, con bombilla fluorescente 23W/rosca E27, 2.700 K. HALL SALA MULTIPLE, ACCESOS SALA DE JUEGOS
Suministro e instalación Bala fluorescente 2x26W, tubo T4, balasto electrónico, de incrustar en cielo raso, con rejilla en aluminio especular de 4 celdas, Ref. ITD 33 BR/1,5 E4/2T42641/EU ILTEC o Similar. PARA HALL, CIRCULACION, RECEPCION
Suministro e instalación de caja de paso de 15x15x10 cm
Instalaciones sanitarias aguas residuales y aguas lluviasTuberia PVC aguas residuales y aguas lluvias por placas y ductos
13.1.13 Ducha un 2.00 57,748.00 115,496.0013.1.14 Lavaplatos un 2.00 57,748.00 115,496.0013.1.15 Poceta de aseo un 1.00 57,748.00 57,748.0013.1.16 Desagüe de piso 2" un 3.00 57,748.00 173,244.00
13.20
Tuberia PVC presión bajo tierra13.2.1 Tuberia 2 " ml 16.00 24,017.00 384,272.0013.2.4 Tuberia 3/4 " ml 2.00 12,094.00 24,188.0013.2.5 Tuberia 1/2 " ml 2.00 8,210.00 16,420.00
Excavación y relleno de brechas13.2.6 Excavacion en material comun m3 4.00 14,890.00 59,560.0013.2.7 Relleno con material de la brecha m3 4.00 13,028.00 52,112.00
Valvula de cortina de bronce13.2.8 Valvula de 2" un 2.00 185,213.00 370,426.0013.2.11 Valvula 3/4" un 1.00 53,770.00 53,770.0013.2.12 Valvula 1/2" un 1.00 47,542.00 47,542.00
Punto de suministro de agua fria PVC13.2.13 Punto Sanitario de fluxometro un 7.00 57,187.00 400,309.0013.2.14 Punto Lavamanos un 6.00 38,813.00 232,878.0013.2.15 Punto Orinal un 1.00 38,813.00 38,813.0013.2.16 Punto Ducha un 2.00 38,813.00 77,626.0013.2.17 Punto Lavaplatos un 2.00 38,813.00 77,626.0013.2.18 Punto Poceta de aseo un 2.00 38,813.00 77,626.00
Montaje de aparatos sanitarios13.2.19 Sanitario de fluxometro un 7.00 38,813.00 271,691.0013.2.20 Lavamanos un 6.00 38,813.00 232,878.0013.2.21 Orinal un 1.00 38,813.00 38,813.0013.2.22 Ducha un 2.00 38,813.00 77,626.0013.2.23 Lavaplatos un 2.00 38,813.00 77,626.0013.2.24 Salida para poceta un 2.00 21,182.00 42,364.00
Varios13.2.25 Desinfeccion del sistema un 1.00 28,561.00 28,561.0013.2.26 Planos record gl 1.00 47,601.00 47,601.00
4.00 MEMORIAL FOTOGRÁFICO
1.0 PRELIMINARES 2,089,874.001.1.0 Localización y descapote1.1.1 Localización y replanteo comisión de topografia día 1.00 380,808.00 380,808.001.1.2 Descapote a mano (0 a 20 cm). Incluye retiro m2 81.00 4,300.00 348,300.001.3 Retiros1.3.1 Retiro de escombros o material sobrante m3 64.80 15,148.00 981,590.001.5 Cerramiento provisional 1.5.1 Cerramiento en tela de polipropileno h:2m m2 56.00 6,771.00 379,176.002.00 MOVIMIENTOS DE TIERRA 325,305.002.1 Explanación, excavación y llenos2.1.1 Excavación en material común a mano m3 17.56 14,890.00 261,468.002.1.2 Lleno en material comun del sitio compactado m3 4.90 13,028.00 63,837.003.0 CONCRETOS 72,021,511.003.1 Concretos cimentación3.1.1 Afirmado compactado m3 16.20 51,991.00 842,254.003.1.2 Solado de limpieza e:0.05 m m3 0.56 257,853.00 144,398.003.1.4 Concreto de 3000 psi para vigas de fundación m3 7.84 412,911.00 3,237,222.003.2 Concretos estructura
3.2.3 m3 24.20 416,469.00 10,078,550.00
3.3 Concretos muros
3.3.1 m3 86.40 654,275.00 56,529,360.00
3.4 Concretos varios3.4.1 Concreto de 3000 psi para alfajia remate de muro ml 30.00 32,944.00 988,320.00
3.4.5 m3 0.50 402,814.00 201,407.00
4.0 ACERO/MALLAS/ESTRUCTURA METÁLICA 12,694,968.004.1 Acero de refuerzo4.1.1 Acero de refuerzo de 60000 psi 420 Mpa kg 3,617.80 2,570.00 9,297,746.004.2 Estructura metálica4.2.1 Estructura Metálica en perfiles PHR kg 363.60 7,915.00 2,877,894.004.2.5 Platinas Metalicas de Apoyo de 1/4" kg 27.00 10,400.00 280,800.004.2.6 Anclaje en varilla roscada de 5/8" L: 0.30m∅ un 32.00 7,454.00 238,528.006.0 APARATOS/GRIFERIA/MUEBLES/MESONES 5,464,594.006.3 Muebles
6.3.8 un 2.00 2,732,297.00 5,464,594.00
7.0 CARPINTERIA ALUMINIO/METALICA/MADERA 6,530,286.007.50 MEMORIAL FOTOGRAFICO
Marcos y puertas en aluminio7.5.1 Puerta + marco en aluminio P-01 un 2.00 3,108,345.00 6,216,690.00
Instalaciones hidraulicas para suministro de agua potable
Concreto de 3000 psi e=0,12 m para placa de contrapiso
Concreto de 3000 psi para muro color ocre (memorial fotogr.)
Concreto de 3000 psi para muro rampa (acceso memorial)
Suministro e instalación de panel fotográfico 8.0 m. X 4.5 m. (banner)
Ventaneria en aluminio7.5.2 Ventana en aluminio V-01 D:0.61*0.60 Fija un 6.00 52,266.00 313,596.008.0 REVOQUES/ENCHAPES/PINTURAS 6,284,530.008.2 Pintura interior8.2.1 Pintura interior vinilo muros m2 205.00 12,782.00 2,620,310.008.3 Pintura Exterior8.3.1 Pintura tipo koraza sobre muros de fachada m2 245.00 14,956.00 3,664,220.009.0 PISOS 7,230,803.009.20 Pisos en grano9.2.1 Piso en grano N°2 pulido en memorial m2 70.60 96,884.00 6,840,010.00
9.2.2 un 1.00 390,793.00 390,793.00
10.00 CIELORASOS 2,251,358.00
10.10 Suministro y colocación de cielo falso en GYPLAC. m2 70.56 31,907.00 2,251,358.00
11.00 CUBIERTA 4,161,268.00
11.10 m2 81.00 36,142.00 2,927,502.00
11.30 ml 23.00 53,642.00 1,233,766.00
12.00 INSTALACIONES ELECTRICAS 8,279,532.00
12.10
12.1.3 ml 70.00 4,601.00 322,070.00
12.20
12.2.5 ml 30.00 6,379.00 191,370.00
12.2.6 ml 30.00 7,616.00 228,480.00
12.30 TABLEROS DE DISTRIBUCIÓN
12.3.8 un 1.00 12,614.00 12,614.00
12.3.9 un 1.00 12,614.00 12,614.00
12.40
12.4.1 un 14.00 42,841.00 599,774.00
12.4.3 un 8.00 42,841.00 342,728.00
12.4.9 un 2.00 61,881.00 123,762.00
12.4.10 un 2.00 71,402.00 142,804.00
12.50 LUMINARIAS
12.5.14 un 10.00 347,487.00 3,474,870.00
12.5.17 un 28.00 80,922.00 2,265,816.00
12.60 CAJAS DE PASO 0.00
12.6.3 un 2.00 42,841.00 85,682.00
12.70 SISTEMA DE PERIFONEOAUDITORIO SALA MULTIPLE
12.7.1 un 4.00 85,682.00 342,728.00
12.7.14 ml 60.00 1,285.00 77,100.00
12.7.15 un 4.00 14,280.00 57,120.00
5.00 TORRE MIRADOR
Estrella construida en grano N°2 pulido color negro y gris
Suministro e instalación de cubierta termoacústica trapezoidal tipo ajover o similarSuministro e instalación de canal en lámina galvanizada calibre 24 d:0.5 m
BANDEJA PORTA CABLES, CANALETA, TUBERIA PVC
Suministro e instalación tubería conduit PVC de 1 ", incluye curvas, terminales, accesorios y brecha y lleno donde corresponda diámetro, ver planos
ACOMETIDAS/RAMALES DE ALIMENTACION A TABLEROS
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: Alambre cobre 3 No 12 AWG-THHN, ramales alumbrado, tomas
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: Alambre cobre 2N° 10+ 1N° 12 AWG-THHN, ramales de tomas desde Tablero TI
Suministro e instalación de breaker de incrustar en tablero, 10KA/240V. 1x15ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 1x20ASALIDAS DE ALUMBRADO, TOMACORRIENTES E INTERRUPTORES
Suministro e instalación de salida para lámpara fluorescente, halógena ó tipo bala, sin incluir la lámpara, incluye tubería conduit PVC 1/2", caja plastica 2x4, octogonal o 4x4, tomacorriente, alambre cobre No 12 awg-thhn y todos los accesorios de fijación.
Suministro e instalación de salida para tomacorriente doble con polo de tierra 15 amp; 125 V, con implemento para uso general incluye tubería, caja, alambre. Linea Luminex Arquea blanco o Similar
Suministro e instalación de salida para Interruptor CONMUTABLE SENCILLO sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación de salida para Interruptor CONMUTABLE DOBLE sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación bala de piso uso exterior, tipo terra, leds 15W/110VSuministro e instalación Bala redonda de incrustar led de 1 W/110V color ámbar.
Suministro e instalación de caja de paso de 15x15x10 cm
Suministro e instalación de Bafle de techo 60W, con rejilla decorativa de sobreponer.Suministro e Instalación de cable dúplex 2x18 awg. BlindadoSuministro e instalación de salida para paralante en techo, incluye caja
1.0 PRELIMINARES 805,750.001.1.0 Localización y descapote1.1.1 Localización y replanteo comisión de topografia día 1.00 380,808.00 380,808.001.1.2 Descapote a mano (0 a 20 cm). Incluye retiro m2 6.00 4,300.00 25,800.001.3 Retiros1.3.1 Retiro de escombros o material sobrante m3 4.00 15,148.00 60,592.001.5 Cerramiento provisional 1.5.1 Cerramiento en tela de polipropileno h:2m m2 50.00 6,771.00 338,550.002.00 MOVIMIENTOS DE TIERRA 248,098.002.1 Explanación, excavación y llenos2.1.1 Excavación en material común a mano m3 9.68 14,890.00 144,135.002.1.2 Lleno en material comun del sitio compactado m3 7.98 13,028.00 103,963.003.0 CONCRETOS 6,743,645.003.1 Concretos cimentación3.1.1 Afirmado compactado m3 1.20 51,991.00 62,389.003.1.2 Solado de limpieza e:0.05 m m3 0.67 257,853.00 172,762.003.1.3 Concreto 3000 psi para zapatas m3 2.18 381,880.00 832,498.003.1.4 Concreto de 3000 psi para vigas de fundación m3 0.48 412,911.00 198,197.003.2 Concretos estructura3.2.1 Concreto 3000 psi para viga aérea m3 1.61 524,881.00 845,058.003.2.2 Concreto 3000 psi para columna m3 5.42 513,903.00 2,785,354.00
3.2.3 m3 0.47 416,469.00 195,740.00
3.4 Concretos varios
3.4.4 Concreto de 3000 psi para losa balcon (torre del reloj) m3 2.00 705,578.00 1,411,156.00
3.4.9 ml 7.30 32,944.00 240,491.00
4.0 ACERO/MALLAS/ESTRUCTURA METÁLICA 4,486,295.004.1 Acero de refuerzo4.1.1 Acero de refuerzo de 60000 psi 420 Mpa kg 1,745.64 2,570.00 4,486,295.005.00 MAMPOSTERIA 2,439,779.005,1,0 Muro en bloque5,1,1 Muro en bloque de concreto 0.12x 0.19 x 0.39 m2 38.42 28,935.00 1,111,683.00
8.2 Pintura interior8.2.1 Pintura interior vinilo muros m2 69.60 12,782.00 889,627.008.3 Pintura Exterior8.3.1 Pintura tipo koraza sobre muros de fachada m2 69.60 14,956.00 1,040,938.009.0 PISOS 443,696.009.1 Pisos
9.1.1 m2 4.20 105,642.00 443,696.00
10.00 CIELORASOS 134,009.00
10.10 Suministro y colocación de cielo falso en GYPLAC. m2 4.20 31,907.00 134,009.00
11.00 CUBIERTA 430,952.0011.40 Cubierta en concreto de 3000 psi m3 1.09 395,369.00 430,952.0012.00 INSTALACIONES ELECTRICAS 3,666,796.00
12.10
12.1.3 ml 15.00 4,601.00 69,015.00
12.20
12.2.5 ml 50.00 6,379.00 318,950.00
12.2.6 ml 80.00 7,616.00 609,280.00
12.30 TABLEROS DE DISTRIBUCIÓN
12.3.9 un 1.00 12,614.00 12,614.00
12.3.11 un 1.00 42,841.00 42,841.00
12.40
Concreto de 3000 psi e=0,12 m para placa de contrapiso
Concreto de 3000 psi para alfajia en calados incluye gotero un lado
Muro en bloque calado gris tipo persiana 10x20x20 a la vista
Revoque en muro interior (incl. carteras, filos y dilataciones)Revoque en muro exterior (incl. carteras, filos y dilataciones)
Instalacion de piso en baldosa en grano pulido tipo alfa ref: 135020942 o similar
BANDEJA PORTA CABLES, CANALETA, TUBERIA PVC
Suministro e instalación tubería conduit PVC de 1 ", incluye curvas, terminales, accesorios y brecha y lleno donde corresponda diámetro, ver planos
ACOMETIDAS/RAMALES DE ALIMENTACION A TABLEROS
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: Alambre cobre 3 No 12 AWG-THHN, ramales alumbrado, tomas
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: Alambre cobre 2N° 10+ 1N° 12 AWG-THHN, ramales de tomas desde Tablero TI
Suministro e instalación de breaker de incrustar en tablero, 10KA/240V. 1x20ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 2x15ASALIDAS DE ALUMBRADO, TOMACORRIENTES E INTERRUPTORES
12.4.1 un 10.00 42,841.00 428,410.00
12.4.2 un 3.00 52,361.00 157,083.00
12.4.3 un 1.00 42,841.00 42,841.00
12.4.7 un 1.00 47,601.00 47,601.00
12.50 LUMINARIAS
12.5.7 un 8.00 76,809.00 614,472.00
12.5.16 un 3.00 328,447.00 985,341.00
12.5.18 un 1.00 134,235.00 134,235.00
12.5.19 un 1.00 123,191.00 123,191.00
12.5.20 un 1.00 38,081.00 38,081.00
12.60 CAJAS DE PASO
12.6.3 un 1.00 42,841.00 42,841.00
6.00 MÓDULO DE VENTA - AMOBLAMIENTO
2.00 MOVIMIENTOS DE TIERRA 936,009.002.1 Explanación, excavación y llenos2.1.1 Excavación en material común a mano m3 46.99 14,890.00 699,681.002.1.2 Lleno en material comun del sitio compactado m3 18.14 13,028.00 236,328.003.0 CONCRETOS 11,575,989.003.1 Concretos cimentación3.1.1 Afirmado compactado m3 3.63 51,991.00 188,727.003.1.2 Solado de limpieza e:0.05 m m3 2.77 257,853.00 714,253.003.1.5 Concreto de 3000 psi para viga zarpa m3 7.94 412,911.00 3,278,513.003.2 Concretos estructura3.2.1 Concreto 3000 psi para viga aérea m3 0.96 524,881.00 503,886.003.3 Concretos muros
3.3.1 m3 6.00 654,275.00 3,925,650.00
3.4 Concretos varios3.4.1 Concreto de 3000 psi para alfajia remate de muro ml 90.00 32,944.00 2,964,960.004.0 ACERO/MALLAS/ESTRUCTURA METÁLICA 2,981,700.004.1 Acero de refuerzo4.1.1 Acero de refuerzo de 60000 psi 420 Mpa kg 572.53 2,570.00 1,471,402.004.2 Estructura metálica4.2.1 Estructura Metálica en perfiles PHR kg 138.85 7,915.00 1,098,998.004.30 Mallas4.3.2 Malla electrosoldada D-221 m2 60.00 6,855.00 411,300.0011.00 CUBIERTA 2,983,876.00
11.10 m2 48.72 36,142.00 1,760,838.00
11.30 ml 22.80 53,642.00 1,223,038.00
7.00 PÉRGOLA
1.0 PRELIMINARES 10,507,540.001.1.0 Localización y descapote1.1.1 Localización y replanteo comisión de topografia día 5.00 380,808.00 1,904,040.001.1.2 Descapote a mano (0 a 20 cm). Incluye retiro m2 1,000.00 4,300.00 4,300,000.001.3 Retiros1.3.1 Retiro de escombros o material sobrante m3 150.00 15,148.00 2,272,200.001.5 Cerramiento provisional 1.5.1 Cerramiento en tela de polipropileno h:2m m2 300.00 6,771.00 2,031,300.002.00 MOVIMIENTOS DE TIERRA 681,733.00
Suministro e instalación de salida para lámpara fluorescente, halógena ó tipo bala, sin incluir la lámpara, incluye tubería conduit PVC 1/2", caja plastica 2x4, octogonal o 4x4, tomacorriente, alambre cobre No 12 awg-thhn y todos los accesorios de fijación.
Suministro e instalación de salida para Lámpara Especial 220Vac, En Tubería PVC 3/4", sin incluir la lámpara, incluye tubería, caja 2x4, octogonal, 4x4, tomacorriente, alambre cobre No 12 awwg-thhn y todos los accesorios de fijación.
Suministro e instalación de salida para tomacorriente doble con polo de tierra 15 amp; 125 V, con implemento para uso general incluye tubería, caja, alambre. Linea Luminex Arquea blanco o Similar
Suministro e instalación de salida para Interruptor SENCILLO sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación Lámpara tipo tortuga sellada 60w/120V o bombilla Fluorescente 26W/120V,4.100K, Ref. ITA112/60W/120V ILTEC o Similar. PERGOLA
Suministro e instalación Reflector rectangular uso exterior en aluminio inyectado con vidrio, protección IP65, color negro, bombilla 250 W/220V sodio. MIRADOR
Suministro e instalación AVISO DE SALIDA Ref. IT SALIDA ILTEC o SimilarSuministro e instalación Lampara de emergencia 2x5W Ref. IT EXL 950 ILTEC o Similar
Suministro e instalación Fotocelda completa con base de 1.000W , multivoltaje 100-270 V para accionamiento alumbrado exterior
Suministro e instalación de caja de paso de 15x15x10 cm
Concreto de 3000 psi para muro color ocre (memorial fotogr.)
Suministro e instalación de cubierta termoacústica trapezoidal tipo ajover o similarSuministro e instalación de canal en lámina galvanizada calibre 24 d:0.5 m
2.1 Explanación, excavación y llenos2.1.1 Excavación en material común a mano m3 39.24 14,890.00 584,284.002.1.2 Lleno en material comun del sitio compactado m3 7.48 13,028.00 97,449.003.0 CONCRETOS 36,376,543.003.1 Concretos cimentación3.1.1 Afirmado compactado m3 200.00 51,991.00 10,398,200.003.1.2 Solado de limpieza e:0.05 m m3 39.42 257,853.00 10,164,565.003.1.3 Concreto 3000 psi para zapatas m3 19.62 381,880.00 7,492,486.003.1.6 Concreto de 3000 psi para pedestal m3 13.63 610,513.00 8,321,292.004.0 ACERO/MALLAS/ESTRUCTURA METÁLICA 210,401,158.004.1 Acero de refuerzo4.1.1 Acero de refuerzo de 60000 psi 420 Mpa kg 3,575.20 2,570.00 9,188,264.004.2 Estructura metálica
4.2.2 kg 21,594.00 8,899.00 192,165,006.00
4.2.5 Platinas Metalicas de Apoyo de 1/4" kg 245.00 10,400.00 2,548,000.004.2.7 Anclaje en varilla roscada de 3/8" L: 0.30m∅ un 872.00 7,454.00 6,499,888.00
1.00 PRELIMINARES 3,989,358.001.1 Campamento tabla GBL 1.00 894,135.00 894,135.001.2 Localización - replanteo- obra arquitectónica M2 810.00 3,227.00 2,613,870.001.3 Cerramiento tela fib. tejida h 2,10 bord ML 50.00 6,771.00 338,550.001.4 Instalación provisional acueducto MES 1.00 66,641.00 66,641.001.5 Instalación provisional energía MES 1.00 76,162.00 76,162.002.00 ADECUACION PREVIA PISCINA 3,297,010.002.1 Limpieza enchapes M2 374.00 2,388.00 893,112.002.2 limpieza - resane cajas de inspección UND 4.00 29,671.00 118,684.00
ACCESORIOS 15.5 Abrazadera sanitaria de 3" UND 6.00 3,390.00 20,340.0015.6 Sifón sanitario pvc 2" UND 11.00 26,657.00 293,227.0015.7 Limpiador 760 grs (1/4) UND 1.00 22,082.00 22,082.0015.8 Soldadura pvc 900 grs (1/4) UNID 1.00 55,828.00 55,828.00
INSTALACIÓN VARIOS 15.9 Instalación tuberia sanitaria de 2" ML 18.00 2,539.00 45,702.0015.10 Instalación tuberia sanitaria de 4" ML 22.00 3,707.00 81,554.00
PUNTOS SANITARIOS 15.11 Punto sanitario pvc de 2" PTO 10.00 21,182.00 211,820.0015.12 Punto sanitario pvc de 4" PTO 4.00 38,813.00 155,252.00
Perfil tubular colmena 100x100 e=3mm ASTM A-500 grado c
AREA SERVICIOS ZONA HUMEDA Y ADECUACION PISCINA
Excavacion tierra a mano para cimentacion unidad de servicio
Excavacion tierra a mano zanjas para tuberia incluye retiro de sobrantes y disposicion final
Excavacion tierra a mano incluye retiro de sobrantes y disposicion final
Viga cimiento enlace h=20-30 cms concreto de 3.000 psi
16.00 INSTALACIONES HIDRAULICAS 2,499,276.0016.1 Punto agua fría 1/2" PTO 11.00 57,748.00 635,228.0016.2 Adaptador hembra pvc presión 1/2 UND 20.00 977.00 19,540.0016.3 Codo 90 presión pvc 1/2 " UND 15.00 1,183.00 17,745.0016.4 Tee presión pvc 1/2 " UND 24.00 1,366.00 32,784.0016.5 Unión presión pvc 1/2 UNID 15.00 1,014.00 15,210.00
TUBERÍAS 16.6 Tuberia pvc de 1/2 ML 106.00 1,904.00 201,824.0016.7 Tuberia pvc de 1" ML 64.00 4,351.00 278,464.00
ETAPA 1: REVISIÓN, VERIFICACIÓN Y VALIDACIÓN DE LOS DISEÑOS Y ESTUDIOS TÉCNICO
ÍTEM DESCRIPCIÓN UNIDAD DE MEDIDA CANTIDADES VALOR UNITARIO VALOR TOTAL
1 GL 1.00 21,223,484.00 21,223,484.00
21,223,484.00
3,395,757.00
24,619,241.00
ITEM DESCRIPCIÓN CANTIDADES VALOR UNITARIO VALOR TOTAL PARCIAL
1.00 AREA EXTERNA/URBANISMO/PAISAJISMO
1.0 TRABAJOS PRELIMINARES 59,524,400.00
1.1 DESCAPOTE
1.1.1 m2 10,438.00 4,300.00 44,883,400.00
1.1.2 m2 2,250.00 4,300.00 9,675,000.00
1.2 LOCALIZACIÓN Y REPLANTEO
1.2.1 día 10.00 382,000.00 3,820,000.00
1.2.2 día 3.00 382,000.00 1,146,000.00
2.0 RETIRO, DEMOLICIONES Y TALA DE ARBOLES 14,931,609.002.1 RETIROS2.1.1 Retiro, cargue y transporte de malla cerramiento m2 180.00 16,273.00 2,929,140.002.2 DEMOLICIONES
2.2.1 m2 250.00 17,634.00 4,408,500.00
2.3 TALA Y TRASPLANTE DE ÁRBOLES2.3.1 Tala de árbol de 2 a 4 m. incluye retiro un 1.00 78,119.00 78,119.002.3.2 Tala de árbol de 4 a 6 m. incluye retiro un 2.00 161,013.00 322,026.002.3.3 Tala de árbol de 6 a 8 m. incluye retiro un 22.00 326,992.00 7,193,824.003.0 MOVIMIENTOS DE TIERRA 26,491,691.003.1 EXCAVACIÓN Y RETIRO DE MATERIAL3.1.1 Excavación en material común a mano m3 143.49 14,900.00 2,138,001.003.1.2 Retiro de escombros o material sobrante m3 71.75 15,100.00 1,083,350.003.2 RELLENOS3.2.1 Lleno con material común del sitio compactado m3 1,492.96 13,000.00 19,408,480.003.2.2 Lleno con material de préstamo compactado m3 20.00 55,500.00 1,110,000.00
3.2.3 m3 42.75 64,371.00 2,751,860.00
4.0 CONCRETOS 177,028,610.004.1 CONCRETO CIMENTACIÓN4.1.1 Solado de limpieza e:0.05 m m3 6.50 258,600.00 1,680,900.004.1.2 Concreto 3000 psi para zapata m3 39.40 383,000.00 15,090,200.00
FONDO FINANCIERO DE PROYECTOS DE DESARROLLO – FONADEDEPARTAMENTO ADMINISTRATIVO PARA LA PROSPERIDAD SOCIAL – DPS
CONVENIO INTERADMINISTRATIVO No. 212017
OFERTA PÚBLICA OPC 059-2013
PRIMERA FASE DE LA CONSTRUCCIÓN PARQUE CONMEMORATIVO OMAYRA SANCHEZ - EN LA CABECERA MUNICIPAL GUAYABAL - DEL MUNICIPIO DE ARMERO - TOLIMA
REVISIÓN, VERIFICACIÓN Y VALIDACIÓN DE LOS DISEÑOS Y ESTUDIOS TÉCNICO
SUBTOTAL VALOR DE LA ETAPA DE VERIFICACION DE LOS ESTUDIOS Y DISEÑOS
VALOR TOTAL IVA 16% SOBRE LA VERIFICACION DEL VALOR DE LOS ESTUDIOS Y DISEÑOS
VALOR TOTAL (A) DE LA ETAPA A VERIFICACION DE LOS ESTUDIOS Y DISEÑOS
ETAPA 2: PRIMERA FASE DE LA CONSTRUCCIÓN PARQUE CONMEMORATIVO OMAYRA SANCHEZ - EN LA CABECERA MUNICIPAL GUAYABAL - DEL MUNICIPIO DE ARMERO - TOLIMA
UNIDAD DE
MEDIDAVALOR TOTAL POR
CAPITULO
Descapote a mano (0 a 20 cm). Incluye retiro (PARQUE)Descapote a mano (0 a 20 cm). Incluye retiro (ANDENES)
Localización y replanteo comisión de topografia (PARQUE)Localización y replanteo comisión de topografia (ANDEN)
Demolición de mampostería en bloque e:20 cm, incluye retiro
Material granular tipo gravilla para filtros en contenedor de raíces
4.1.3 Concreto 3000 psi para zarpa m3 0.50 414,200.00 207,100.004.2 CONCRETO DE ESTRUCTURA4.2.1 Concreto 3000 psi para viga aerea m3 16.20 526,500.00 8,529,300.004.2.2 Concreto 3000 psi para pedestal antorcha m3 1.50 425,497.00 638,246.004.3 CONCRETO PARA MUROS4.3.1 Concreto 3000 psi para muro color ocre m3 62.00 656,000.00 40,672,000.004.4 CONCRETO SARDINELES Y BORDILLOS
4.4.1 ml 566.00 48,482.00 27,440,812.00
4.4.2 ml 658.00 37,135.00 24,434,830.00
4.4.3 ml 1,085.00 26,390.00 28,633,150.00
4.4.4 ml 658.00 8,568.00 5,637,744.00
4.5 CONCRETOS VARIOS4.5.1 Concreto 3000 psi para alfajia ml 37.46 33,000.00 1,236,180.00
4.5.2 un 38.00 413,800.00 15,724,400.00
4.60 PLATINAS/ANCLAJES4.6.1 Platina corrida de 4" x 1/4" kg 398.12 10,432.00 4,153,188.004.6.2 Anclaje de cuña w.s 3830 un 480.00 6,147.00 2,950,560.005.0 ACERO/MALLAS 10,662,597.005.1 ACERO DE REFUERZO5.1.1 Acero de refuerzo de 60000 psi 420 Mpa kg 2,600.00 2,457.00 6,388,200.005.2 MALLAS5.2.1 Malla electrosoldada D188 m2 621.64 6,876.00 4,274,397.006.00 PISOS 398,161,820.006.10 BASES/SUBBASES6.1.1 Afirmado compactado (ANDEN EXTERIOR) m3 252.00 52,100.00 13,129,200.006.1.2 Afirmado compactado (PARQUE) m3 627.00 52,100.00 32,666,700.006.20 PISOS PREFABRICADOS
6.2.1 m2 596.00 61,261.00 36,511,556.00
6.2.2 ml 540.00 33,136.00 17,893,440.00
6.2.3 Suministro e instalación de Gramoquin m2 288.00 54,490.00 15,693,120.00
6.2.4 un 583.00 24,180.00 14,096,940.00
6.2.5 un 26.00 22,270.00 579,020.00
6.2.6 un 4.00 39,895.00 159,580.00
6.2.7 un 26.00 54,000.00 1,404,000.00
6.2.8 un 28.00 65,600.00 1,836,800.00
6.30 PISOS EN CONCRETO
6.3.1 m2 2,296.00 44,200.00 101,483,200.00
6.3.2 m2 1,001.00 44,200.00 44,244,200.00
6.3.3 ml 107.00 28,900.00 3,092,300.00
6.3.4 m2 540.00 59,710.00 32,243,400.00
6.3.5 m2 59.00 55,236.00 3,258,924.00
6.40 VARIOS PISOS6.4.1 Construcción de piso gravilla lavada (gualanday) m2 120.00 33,127.00 3,975,240.00
6.4.2 Construcción de piso en arena lavada blanca (Silícea) m3 240.00 269,640.00 64,713,600.00
6.4.3 Construcción de piso en polvo de ladrillo m2 852.00 9,800.00 8,349,600.006.4.4 Construcción de piso en piedra bola suelta m3 50.00 56,620.00 2,831,000.007.00 PAISAJISMO 32,820,980.007.10 ARBOLES7.1.1 Suministro y siembra de árbol Acacia amarilla un 4.00 85,950.00 343,800.007.1.2 Suministro y siembra de árbol Acacia roja un 21.00 85,950.00 1,804,950.007.1.3 Suministro y siembra de árbol Almendro un 6.00 85,950.00 515,700.007.1.4 Suministro y siembra de árbol Tulipán Africano un 4.00 85,950.00 343,800.007.1.5 Suministro y siembra de árbol Mango un 16.00 85,950.00 1,375,200.007.1.6 Suministro y siembra de árbol Guayacán Rosado un 8.00 85,950.00 687,600.007.1.7 Suministro y siembra de árbol Guayacán Amarillo un 4.00 85,950.00 343,800.007.1.8 Suministro y siembra de árbol Ebano un 10.00 85,950.00 859,500.007.20 PALMAS7.2.1 Suministro y siembra de Palma Zancona un 32.00 85,950.00 2,750,400.007.2.2 Suministro y siembra de Palma Real un 5.00 85,950.00 429,750.007.30 EMPRADIZACIÓN/JARDINERIA7.3.1 Empradizado con cespedones grama tipo trenza m2 3,160.00 6,350.00 20,066,000.007.3.2 Suministro y siembra de mani forrajero m2 145.00 6,876.00 997,020.00
Construcción de Sardinel en concreto de 3000 psi (ANDEN EXT.)Construcción de Bordillo tipo "A" en concreto de 3000 psi (PARQUE)Construcción de Bordillo tipo "B" en concreto de 3000 psiConstrucción de Bordillo tipo "C" en concreto de 3000 psi (PERGOLA)
Concreto 3000 psi para construcción contenedor de raices (1.5m x 1.5m)
Suministro e instalación de loseta en concreto 6 rayas ref. 135016054 0.40X0.40X0,030 alfa o similar
Suministro e instalación de Loseta Táctil Guia (ANDEN EXT.)
Suministro e instalación de Plaqueta 0.50x0.50 en Concreto de 3000 psiSuministro e instalación de Plaqueta 0.50x0.35 en Concreto de 3000 psiSuministro e instalación de Plaqueta 1.0x0.35 en Concreto de 3000 psiSuministro e instalación de Plaqueta 1.5x0.35 en Concreto de 3000 psiSuministro e instalación de Plaqueta 1.8x0.35 en Concreto de 3000 psi
Construcción de piso ANDEN en concreto de 3000 psi. E:0.10 m (EXTERIOR)Construcción de piso ANDEN en concreto de 3000 psi. E:0.10 m (INTERIOR)Construcción de gradas en concreto de 3000 psi. E:0.10 m (INTERIOR)Placa de concreto de 3000 psi para cancha múltiple e=0.10 m Placa de concreto de 3000 psi para fuente memorial fotográfico e=0.10 m
7.3.3 Suministro y siembra jardín de heliconias m2 201.00 11,460.00 2,303,460.008.00 AMOBLAMIENTO GENERAL 118,355,850.008.10 MOBILIARIO8.1.1 Papelera en acero inoxidable socoda o similar un 12.00 841,000.00 10,092,000.008.1.2 Papelera línea ecológica un 3.00 358,900.00 1,076,700.00
8.1.3 un 14.00 309,000.00 4,326,000.00
8.1.4 Suministro e instalación banca cubo un 109.00 790,900.00 86,208,100.008.1.5 Suministro e instalación de bicicletero un 4.00 790,900.00 3,163,600.008.1.6 Suministro e instalación de columna antorcha un 1.00 2,798,000.00 2,798,000.008.20 GIMNASIO AL AIRE LIBRE8.2.1 Suministro e instalación de barras paralelas un 4.00 335,800.00 1,343,200.008.2.2 Suministro e instalación de Poste Zig-Zag un 4.00 212,700.00 850,800.008.30 JUEGOS INFANTILES8.3.1 Suministro e instalación de Tic Tac un 2.00 623,200.00 1,246,400.008.3.2 Suministro e instalación de Banco Giratorio un 3.00 374,600.00 1,123,800.008.3.3 Suministro e instalación de Juego de Red Telaraña un 1.00 1,146,000.00 1,146,000.008.3.4 Suministro e instalación de Caballo Balanceante un 3.00 403,000.00 1,209,000.008.3.5 Suministro e instalación de Columpio Hexagonal un 1.00 907,250.00 907,250.008.40 DOTACIONES DEPORTIVAS8.4.1 Pórtico deportivo multifuncional un 2.00 1,432,500.00 2,865,000.00
9.00 REDES HIDRÁULICAS/SANITARIAS 177,799,225.009.10 INSTALACION PARA CHORROS LAMINARES
Tuberia PVC presión bajo tierra9.1.1 Tuberia PVC presión 4" ml 30.00 62,000.00 1,860,000.009.1.2 Tuberia PVC presión 3" ml 78.00 43,200.00 3,369,600.009.1.3 Tuberia PVC presión 1/2" ml 12.00 12,400.00 148,800.009.1.4 Tuberia PVC presión 1" ml 27.00 14,400.00 388,800.00
Tuberia acero galvanizado9.1.5 Tuberia acero galvanizado de 4" ml 6.00 100,300.00 601,800.00
Excavación y relleno de brechas9.1.6 Excavacion en material comun m3 36.00 14,900.00 536,400.009.1.7 Relleno con material de la brecha m3 36.00 13,000.00 468,000.00
Valvula de cortina de bronce9.1.8 Valvula de cortina 4" un 1.00 872,900.00 872,900.009.1.9 Valvula de cortina 3" un 4.00 598,863.00 2,395,452.009.1.10 Valvula de cortina 1.1/2" un 2.00 185,800.00 371,600.009.1.11 Valvula de cortina 1" un 18.00 141,000.00 2,538,000.00
Cheque de cortina de bronce 9.1.12 Cheque de cortina de bronce de 4" un 1.00 844,100.00 844,100.00
Valvula de flotador 9.1.13 Valvula de flotador de 1" un 1.00 144,500.00 144,500.00
Equipo de bombeo filtración y boquillas9.1.14 Bomba centrifuga un 1.00 7,317,800.00 7,317,800.00
9.1.15 gl 1.00 45,910,000.00 45,910,000.00
9.20 INSTALACION PARA CHORROS BAJOSTuberia PVC presión RDE 21
Valvula de cortina de bronce9.2.4 Valvula de cortina de bronce de 3" un 1.00 598,900.00 598,900.009.2.5 Valvula de cortina de bronce de 2" un 1.00 185,700.00 185,700.009.2.6 Valvula de cortina de bronce de 1" un 33.00 141,000.00 4,653,000.00
Valvula de flotador 9.2.7 Valvula de flotador de 1" un 1.00 147,600.00 147,600.00
Equipo de bombeo filtración y boquillas9.2.8 Bomba sumergible un 1.00 2,674,000.00 2,674,000.009.2.9 Boquillas de chorros bajos un 32.00 90,725.00 2,903,200.00
9.30
Preliminares9.3.1 Señal preventiva y reglamentaria gl 1.00 95,500.00 95,500.009.3.2 Ubicación y replanteo comisión de topografia gl 1.00 382,000.00 382,000.00
Excavaciones y rellenos9.3.3 Excavación en Zanja - Material Común m3 417.00 14,900.00 6,213,300.00
9.3.4 m3 84.00 12,900.00 1,083,600.00
Tuberias bajo tierra
9.3.5 ml 32.00 46,000.00 1,472,000.00
9.3.6 ml 75.00 68,000.00 5,100,000.00
9.3.7 ml 73.00 79,500.00 5,803,500.00
9.3.8 ml 44.00 96,400.00 4,241,600.00
9.3.9 Suministro/Instalación de tubería pvc sanitaria 3" ml 22.00 31,530.00 693,660.00
Suministro e instalación de banca mixta concreto y madera
Equipo de filtracion y boquillas: Incluye dos filtros de 4.7 l/seg y 17 boquillas de chorros laminares
INSTALACIONES SANITARIAS AGUAS RESIDUALES Y AGUAS LLUVIAS
Evacuación de Escombros/Sobrantes en Vehículo Automotor
Suministro/Instalación de tubería pvc corrugada 4" (100 mm)Suministro/Instalación de tubería pvc corrugada 6" (160 mm)Suministro/Instalación de tubería pvc corrugada 8" (200 mm)Suministro/Instalación de tubería pvc corrugada 10" (250 mm)
9.3.10 Suministro/Instalación de tubería pvc sanitaria 4" ml 238.00 39,400.00 9,377,200.00Pozos de inspección
9.3.10 Cajas de inspeccion cuadradas de 0.8 x 0.8 m un 9.00 635,600.00 5,720,400.009.3.11 Cuerpo pozo de Inspección diametro 1.20 m ml 8.00 548,647.00 4,389,176.00
9.3.12 un 3.00 228,000.00 684,000.00
9.3.13 un 3.00 306,400.00 919,200.00Rellenos Compactados
9.3.14 Rellenos Compactados con material de excavacion m3 334.00 13,000.00 4,342,000.00
9.3.15 m3 84.00 55,400.00 4,653,600.00
9.40
Preliminares9.4.1 Señal preventiva y reglamentaria gl 1.00 76,400.00 76,400.00
Excavaciones y rellenos9.4.2 Excavación en zanja en material común m3 207.00 14,900.00 3,084,300.00
9.4.3 m3 41.40 55,400.00 2,293,560.00
9.4.4 Rellenos compactados con material de excavacion m3 165.60 13,000.00 2,152,800.00Tuberias y accesorios
9.4.5 Suministro/Instalación de tubería pvc presion 3" ml 30.00 43,200.00 1,296,000.00
9.4.6 Suministro/Instalación de tubería pvc presion 2.1/2" ml 72.00 35,600.00 2,563,200.00
9.4.7 Suministro/Instalación de tubería pvc presion 2" ml 123.00 24,000.00 2,952,000.00
9.4.8 Suministro/Instalación de tubería pvc presion 1.1/2" ml 159.00 18,000.00 2,862,000.00
9.4.9 Suministro/Instalación de tubería pvc presion 1" ml 2.00 14,400.00 28,800.009.4.10 Suministro/Instalación de tubería pvc presion 3/4" ml 14.00 12,100.00 169,400.009.4.11 Suministro/Instalación de tubería pvc presion 1/2" ml 132.00 8,200.00 1,082,400.00
Salidas para riego
9.4.12 un 3.00 30,539.00 91,617.00
9.4.13 Valvula de cortina de 1/2" un 3.00 47,691.00 143,073.00Hidrantes y valvulas
9.4.14 Hidrante tipo milan 3" un 1.00 2,107,500.00 2,107,500.009.4.15 Valvula de compuerta elastica 3" un 1.00 273,500.00 273,500.009.4.16 Tee hf 3" un 1.00 144,600.00 144,600.009.4.17 Contador 1.1/2" un 1.00 796,400.00 796,400.009.4.18 Valvulas de cortina 1.1/2" un 2.00 185,700.00 371,400.00
Cuarto de bombas9.4.19 Válvula de flotador 1.1/2" un 1.00 203,200.00 203,200.009.4.20 Valvulas de cortina 2" un 3.00 185,700.00 557,100.009.4.21 Valvulas de cortina 1.1/2" un 1.00 162,900.00 162,900.009.4.22 Valvulas de cortina 1" un 1.00 141,000.00 141,000.009.4.22 Cheques 2" un 2.00 330,700.00 661,400.009.4.23 Cheques 1" un 2.00 159,500.00 319,000.009.4.23 Cheques 1.1/2" un 1.00 216,600.00 216,600.009.4.23 Tuberia HG 1" m 8.00 50,200.00 401,600.009.4.24 Tuberia HG 2" m 12.00 88,600.00 1,063,200.009.4.25 Tuberia HG 2.1/2" m 6.00 100,000.00 600,000.009.4.26 Equipo de presión constante ud 1.00 7,913,000.00 7,913,000.009.4.27 Equipo de presión constante sistema de riesgo ud 1.00 4,495,662.50 4,495,663.0010.00 REDES ELECTRICAS 133,691,650.0010.10 SUB-ESTACIÓN
10.1.1 gl 1.00 6,912,099.00 6,912,099.00
10.1.2 un 1.00 1,661,700.00 1,661,700.00
10.20 RED SECUNDARIA B.T.
10.2.1 ml 30.00 68,441.03 2,053,231.00
10.2.2 un 13.00 382,000.00 4,966,000.00
10.2.3 gl 1.00 396,325.00 396,325.00
10.2.4 un 1.00 453,625.00 453,625.00
Base/Cañuela pozo de Inspección D=1.20 m. Concreto simple Aro - Tapa HF D=0.68 m. p/Cámara de Inspección
Sustituciones con material seleccionado para encamado de tuberías
INSTALACIONES REDES SUMINISTRO DE AGUA POTABLE
Sustituciones con material seleccionado para encamado de tuberías
Puntos hidraulicos para conexión de llave de manguera
Suministro e Instalación de subestación eléctrica aérea incluye transformador de 45 KVA, 13.200/214-123 V aceite, pararrayos, cajas primarias, fusibles, crucetas, pieamigos, puesta a tierra, aisladores de retención, dado, tubo EMT, soldadura exotérmica, cable cobre y de aluminio, accesorios de fijación, etc
Suministro e instalación de poste troncocónico 12m x 1.050 kg, aplomado, transporte
Suministro e instalación de cable cobre 4 No 1/0 awg-thhn para acometida desde transformador a TG
Suministro e Instalación de cámara de paso eléctrica de 0.80 x 0.80 x 1.10 m con tapa de concreto. Ver detalle en plano ELE-06
Suministro e instalación tubo metálico galvanizado 2" desde contador a cámara incluye terminales, unión, cinta band-it, grapas y demás accesorios
10.50 SISTEMA DE VOZ Y DATOSCABLEADO CAT 6A - EQUIPO PASIVO
10.5.1 un 1.00 840,400.00 840,400.00
10.5.2 Barra o platina vertical tierra para rack un 1.00 171,900.00 171,900.00
10.5.3 un 1.00 272,175.00 272,175.00
10.5.4 un 3.00 544,350.00 1,633,050.00
10.5.5 un 1.00 445,412.00 445,412.00
10.5.6 toma doble con jack para RJ 45 cat. 6A un 41.00 45,840.00 1,879,440.0010.5.7 Patch Cord cat. 6A de 1m un 44.00 21,630.00 951,720.0010.5.8 Patch Cord cat. 6A de 2m un 16.00 31,419.50 502,712.0010.5.9 Faceplate 2 Salidas un 41.00 7,735.00 317,135.0010.5.10 Tapas para Faceplate un 27.00 10,887.00 293,949.0010.5.11 Organizador horizontal Doble un 4.00 80,220.00 320,880.0010.5.12 identificación y marcación cables, tomas y rack un 120.00 4,200.00 504,000.0010.5.13 Certificación de punto Cat 6A (39 datos, 16 voz) un 55.00 9,000.00 495,000.0010.5.14 Suministro e instalación de cable S/FTP cat 6A ml 2,500.00 2,050.00 5,125,000.00
10.5.15 ml 5.00 14,550.00 72,750.00
10.5.16 ml 80.00 12,899.00 1,031,920.00
10.5.17 un 1.00 334,250.00 334,250.00
10.5.18 gl 1.00 1,910,000.00 1,910,000.00
10.5.19 un 1.00 3,342,500.00 3,342,500.00
10.5.20 Access Point Cisco 1250 un 1.00 1,432,500.00 1,432,500.00
10.5.21 un 1.00 42,975.00 42,975.00
Suministro e instalación de transformador de corriente 125/5 A, 600V, uso exterior, para medida indirecta, incluye protocolos.
Suministro e instalación de cable multifilamento No 12 awg para conexión medida, desde transformador hasta contador
Suministro e instalación de caja o gabinete en policarbonato, uso exterior, para alojar contador trifásico, incluye cinta bandit 5/8" y hebillas 5/8"
Suministro e instalación tubería conduit 2 x 3" PVC pesado, incluye, curvas, excavación brecha, lleno 0,50 x 1.0 m.
Corte pavimento, afirmado y restitución franja o resane con pavimento a 4.000 psi en calle, 0,50 de ancho x 0,20 m (de espesor concreto existente??).
Suministro de materiales e instalación de malla de tierra 4 varillas de cobre 5/8" X 2.40 m, cable cobre desnudo No 2 AWG, soldadura exotérmica y 2 cámaras de inspección de 30x30 cm según especificaciones.
Suministro e instalación de poste metalico de iluminación con doble brazo sencillo de 1.50 m, 4" x 8 metros para luminarias de 150W/70W sodio. Vías
Suministro e instalación e luminaria de 150 W sodio alta presión, incluye fotocelda. Ref. Calima II de Roy Alpha o similar
Suministro e instalación e luminaria de 70 W sodio alta presión, incluye fotocelda. Ref. Calima I de Roy Alpha o similar
Suministro e instalación de cable cobre 2No 8 + 1No 10 awg-thhn por tuberia PVC 1"Suministro e instalación de tuberia conduit PVC 1", incluye brecha y llenoSuministro e instalación de cable cobre 3No 12 awg-thhn desde cámara hasta luminaria
Suministro e instalación de cámara de paso de 40 x 40 x60 cm con tapa en concreto, para conexión o inspección cableado alumbrado
Suministro e instalación de cámara de paso de 40 x 40 x 60 cm con tapa en concreto, para conexión o inspección cableado alumbrado interior
Rack cerrado de 1,80 m x 0,60 x 0,60 m, Incluye ventiladores
Multitoma para rack horizontal x 5 tomas grado hospitalario 10 salidas con protección de 20 APatch panel de 24 puertos categoria 6A, prearmado (2 para datos, 1 para voz)Patch panel de 24 puertos categoria 5E, prearmado para telefonos
Suministro e instalación de cable telefonico multipar de 20 pares entre patch panel 5E a planta telefonica
Suministro e instalación de cable telefonico multipar de 10 pares entre strip principal de entrada a planta telefonica
Strip telefónico de 10 pares de 40 x 30 x 25 con regletas S66 de 25 Pares, incluye marcación
Suministro e instalación de planta telefónica completa, incluye 1 teléfono conmutador, instalación, programación y puesta en funcionamiento, 10 teléfonos sencillos
Salida de voz y datos en tuberia conduit PVC 3/4", sin alambrar, caja metálica 4x4" con suplemento (en Cafeteria)
10.60 TUBERIA CONDUIT PVC
10.6.1 ml 300.00 10,900.00 3,270,000.00
10.6.2 ml 175.00 5,730.00 1,002,750.00
10.6.3 ml 200.00 3,820.00 764,000.00
10.70 ACOMETIDAS
10.7.1 ml 100.00 6,398.00 639,800.00
10.7.2 ml 230.00 11,900.00 2,737,000.00
10.7.3 ml 40.00 9,000.00 360,000.00
10.7.4 ml 70.00 27,600.00 1,932,000.00
10.7.5 ml 300.00 8,100.00 2,430,000.00
10.80 TABLEROS DE DISTRIBUCIÓN
10.8.1 un 1.00 362,900.00 362,900.00
10.8.2 un 1.00 42,975.00 42,975.00
10.8.3 un 3.00 81,175.00 243,525.00
10.8.4 un 2.00 81,175.00 162,350.00
10.8.5 un 1.00 81,175.00 81,175.00
10.8.6 un 1.00 429,750.00 429,750.00
10.90 0.00
10.9.1 un 79.00 42,975.00 3,395,025.00
10.9.2 un 63.00 57,300.00 3,609,900.00
10.9.3 un 2.00 42,975.00 85,950.00
10.9.4 un 1.00 47,750.00 47,750.00
10.10 LUMINARIAS
10.10.1 un 1.00 114,027.00 114,027.00
10.10.2 un 38.00 77,000.00 2,926,000.00
Suministro e instalación tubería conduit DE 2" PVC, incluye curvas, terminales, accesorios y brecha y lleno donde corresponda.
Suministro e instalación tubería conduit DE 1" PVC, incluye curvas, terminales, accesorios y brecha y lleno donde corresponda.
Suministro e instalación tubería conduit DE 3/4" PVC, incluye curvas, terminales, accesorios y brecha y lleno donde corresponda.
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: Alambre cobre 3 No 12 AWG-THHN, ramales alumbrado
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: cable 2N° 8+1N° 10 AWG-THHN , ramales de alumbrado a reflectores cancha
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN/600 V por tubería, bandeja o Canaleta: cable 3N° 10+AWG-THHN , ramal de alimentación de Motobomba sumergible para chorros bajos desde tablero TI
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: cable 3N° 6+2N° 10 AWG-THHN, ramal de alimentación a cuarto control de bombas desde TCE a TCB
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta:cable 2N° 10+ 1N° 12 AWG-THHN , ramales de alumbrado exterior
Suministro e instalación de tablero trifásico 5 hilos, CON espacio para totalizador con puerta y cerradura sin interruptores SquareD, Legrand o Similar. TABLERO TG de 24 circuitos
Suministro e instalación de breaker de incrustar en tablero, 10KA/240V. 2x50 A para transfo. de aislamiento
Suministro e instalación de breaker de incrustar en tablero, 10KA/240V. 3x40ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 3x50ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 3x60 A para TCE
Suministro e instalación de interruptor automático, industrial, en caja moldeada, tripolar, 3x125 amp/25KA/240V. Para tablero general TG
SALIDAS DE ALUMBRADO, TOMACORRIENTES E INTERRUPTORES
Suministro e instalación de salida para lámpara fluorescente,led ó tipo bala, sin incluir la lámpara, incluye tubería conduit PVC 1/2", caja plastica 2x4, octogonal o 4x4, alambre cobre No 12 awg-thhn y todos los accesorios de fijación.
Suministro e instalación de salida para lámpara en pérgola, tubería a la vista, sin incluir la lámpara, incluye tubería metálica EMT 1/2", alambre cobre No 12 awg-thhn y todos los accesorios de fijación.
Suministro e instalación de salida para tomacorriente doble con polo de tierra 15 amp; 125 V, con implemento para uso general incluye tubería, caja, alambre. Linea Luminex Arquea blanco o Similar en cuarto control motomombas TCB y motobomba sumergible chorros
Suministro e instalación de salida para Interruptor sencillo sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación Luminaria Incluye cable encauchetado, clavija tripolar. Así:
Luminaria fluorescente 2x32 W, tubo T8, 4.100 K, 15 x 125 cm, cerrada en policarbonato, cierre tipo maleta, de colgar, chasis en PVC. Ref. IT 100A 1X4 /2T83241/EUNV ILTEC o Similar. En cuarto de control motomombas
Lámpara tipo tortuga sellada 60w/120V o bombilla Fluorescente 26W/120V,4.100K, Ref. ITA112/60W/120V ILTEC o Similar. PERGOLA
10.10.3 KIT 10.00 71,625.00 716,250.00
10.10.4 KIT 1.00 52,525.00 52,525.00
10.10.5 un 12.00 348,575.00 4,182,900.00
10.10.6 un 5.00 253,075.00 1,265,375.00
10.10.7 un 28.00 76,400.00 2,139,200.00
10.10.8 un 12.00 358,125.00 4,297,500.00
10.10.9 un 26.00 128,925.00 3,352,050.00
10.10.10 un 3.00 38,200.00 114,600.00
10.10.11 un 5.00 2,101,000.00 10,505,000.00
10.11 CAMARAS DE PASO
10.11.1 un 10.00 191,000.00 1,910,000.00
10.12 OTROS10.12.1 Certificación RETIE (Toda la obra eléctrica ) gl 1.00 2,865,000.00 2,865,000.0010.12.2 Provisionales durante la construcción gl 1.00 2,865,000.00 2,865,000.00
10.12.3 Elaboración planos record, dibujante, plotteo, copias un 10.00 143,250.00 1,432,500.00
10.12.4 gl 1.00 955,000.00 955,000.00
10.12.5 un 1.00 955,000.00 955,000.00
11.00 CERRAMIENTO 23,023,140.0011.10 PALIZADA
11.1.1 un 141.00 50,615.00 7,136,715.00
11.1.2 un 106.00 53,480.00 5,668,880.00
11.1.3 un 41.00 57,300.00 2,349,300.00
11.1.4 un 87.00 60,165.00 5,234,355.00
11.1.5 Suministro e instalación de platina metálica de 5/16" ml 78.80 33,425.00 2,633,890.00
2.00 PORTERÍA
1.0 PRELIMINARES 613,040.001.1.0 Localización y descapote1.1.1 Localización y replanteo comisión de topografia día 1.00 382,000.00 382,000.001.1.2 Descapote a mano (0 a 20 cm). Incluye retiro m2 15.40 4,300.00 66,220.001.5 Cerramiento provisional 1.5.1 Cerramiento en tela de polipropileno h:2m m2 24.60 6,700.00 164,820.002.00 MOVIMIENTOS DE TIERRA 118,570.002.1 Explanación, excavación y llenos2.1.1 Excavación en material común a mano m3 6.30 14,900.00 93,870.002.1.2 Lleno en material comun del sitio compactado m3 1.90 13,000.00 24,700.003.0 CONCRETOS 3,106,322.003.1 Concretos cimentación3.1.1 Afirmado compactado m3 3.08 52,100.00 160,468.003.1.2 Solado de limpieza e:0.05 m m3 0.32 258,600.00 82,752.003.1.5 Concreto de 3000 psi para viga zarpa m3 1.88 414,200.00 778,696.003.2 Concretos estructura3.2.2 Concreto 3000 psi para columna m3 1.06 582,700.00 617,662.00
3.2.3 m3 1.82 417,700.00 760,214.00
3.4 Concretos varios3.4.1 Concreto de 3000 psi para alfajia remate de muro ml 21.41 33,000.00 706,530.00
KIT de tubo fluorescente 4 x 32W/tubo T8, 6,500K, balasto electrónico para 4 tubos. PARA LUZ INDIRECTA INTERIOR MURO.
KIT de tubo fluorescente 2 x 17W/tubo T8, 6,500K, balasto electrónico para 4 tubos. PARA LUZ INDIRECTA INTERIOR MURO.
Bala de piso uso exterior, reflector tipo Terra, 70W/220V, Metal Halide.Poste tipo bolardo de 1.0 m de altura, luz indirecta para sendero, 70W / 220V sodio.
Bala de incrustar en muro, uso exterior, luz penumbra, leds 5W/120V, color ámbar. En cubos de plaza memorial
Reflector rectangular, uso exterior en aluminio inyectado con vidrio, protección IP65, color negro, bombilla 400W/220V metal halide. PARA CANCHA MULTIPLE Y JUEGOS SENSORIALES
Reflectores aplique sodio tipo Wall pack, protección en vidrio templado, para uso exterior IP65. 70w / 220v Ref. ITW 250/70W MH/M2 ILTEC o Similar. PARA PERGOLA Y LUZ LATERAL ACCESO PRINCIPAL
Fotocelda completa con base de 1.000W , multivoltaje 100-270 V para accionamiento alumbrado exterior
Suministro e instalación de poste metálico galvanizado de 10 m, troncocónico, poligonal de 12 caras, con accesorios para 4 proyectores, diámetro base 190 mm, diámetro cima 127 mm, base de 40 x 40 cm x 1/2" con aletas, incluye pernos de anclaje 5/8" x 1 m y plantilla para fundición. Iluminación deportiva
Suministro e instalación de cámara de paso de 40 x 40 x 60 cm con tapa en concreto, para conexión o inspección cableado alumbrado interior en plazoletas
Marcación general tomacorrientes, tableros, ducteria, etcTrámites, aprobaciones, Revisiones instalaciones e instalación contador pago a ENERTOLIMA
Suministro e instalación de tubo circular galvanizado 2" tipo ASuministro e instalación de tubo circular galvanizado 2" tipo BSuministro e instalación de tubo circular galvanizado 2" tipo CSuministro e instalación de tubo circular galvanizado 2" tipo D
Concreto de 3000 psi e=0,12 m para placa de contrapiso
4.0 ACERO/MALLAS/ESTRUCTURA METÁLICA 4,430,319.004.1 Acero de refuerzo4.1.1 Acero de refuerzo de 60000 psi 420 Mpa kg 132.00 2,457.00 324,324.004.2 Estructura metálica4.2.1 Estructura Metálica en perfiles PHR kg 517.78 7,930.00 4,105,995.005.00 MAMPOSTERIA 3,437,904.005,1,0 Muro en bloque5,1,5 Muro en mamposteria reforzada incluye grouting m2 51.00 59,104.00 3,014,304.005,2,0 Muros secos
5.2.4 Tabique en Superboard ancho: 72 cms para bajantes ml 12.00 35,300.00 423,600.00
Marcos y puertas en aluminio7.6.1 Puerta + marco en aluminio P-01 un 2.00 713,767.00 1,427,534.00
Ventaneria en aluminio7.6.2 Ventana en aluminio V-01 D:0.75*1.31 Guillotina un 6.00 281,480.00 1,688,880.007,7,0 Carpinteria metálica
7.7.1 un 1.00 5,491,250.00 5,491,250.00
7.7.2 ml 10.00 429,750.00 4,297,500.00
7.7.3 un 1.00 20,554,274.00 20,554,274.00
7.7.4 Puerta metálica de acceso parque un 1.00 1,329,360.00 1,329,360.008.0 REVOQUES/ENCHAPES/PINTURAS 3,333,770.008,1,0 Revoques
8.1.1 m2 37.10 14,300.00 530,530.00
8.1.2 m2 78.90 14,500.00 1,144,050.00
8.2 Pintura interior8.2.1 Pintura interior vinilo muros m2 37.10 12,821.83 475,690.008.3 Pintura Exterior8.3.1 Pintura tipo koraza sobre muros de fachada m2 78.90 15,000.00 1,183,500.009.0 PISOS 536,210.009.1 Pisos
9.1.1 m2 3.16 105,970.00 334,865.00
9.1.2 Guardaescoba en mortero h:0.08 m ml 12.90 8,900.00 114,810.009.20 Pisos en grano9.2.4 Construcción de bocapuertas en grano pulido ml 1.50 57,690.00 86,535.0011.00 CUBIERTA 5,411,861.00
11.10 m2 39.14 36,250.00 1,418,825.00
11.30 ml 74.22 53,800.00 3,993,036.00
12.00 INSTALACIONES ELECTRICAS 3,676,527.00
12.10
12.1.2 ml 5.00 44,885.00 224,425.00
12.1.3 ml 1.00 5,730.00 5,730.00
12.20
12.2.1 ml 5.00 396,791.00 1,983,955.00
12.30 TABLEROS DE DISTRIBUCIÓN
12.3.2 un 1.00 267,400.00 267,400.00
12.3.8 un 2.00 19,560.00 39,120.00
12.3.9 un 2.00 19,560.00 39,120.00
12.3.11 un 2.00 42,975.00 85,950.00
12.3.12 un 2.00 42,975.00 85,950.00
12.3.13 un 1.00 42,975.00 42,975.00
Suministro e instalación de escalera metálica para Torre MiradorPasamanos en acero inoxidable y vidrio templado 5mm.Torniquete de seguridad mecánico TURNLOCK 15 tipo IVEGAS O SIMILAR
Revoque en muro interior (incl. carteras, filos y dilataciones)Revoque en muro exterior (incl. carteras, filos y dilataciones)
Instalacion de piso en baldosa en grano pulido tipo alfa ref: 135020942 o similar
Suministro e instalación de cubierta termoacústica trapezoidal tipo ajover o similarSuministro e instalación de canal en lámina galvanizada calibre 24 d:0.5 m
BANDEJA PORTA CABLES, CANALETA, TUBERIA PVC
Suministro e instalación de canaleta metálica en lámina de acero galvanizado C.R. Calibre 22, con tapa de atornillar, terminada con pintura electrostática color negra, de 12 x 5 cm. Incluye accesorios de fijación, troqueles, soporte y demás accedsorios, incluye cable cobre N° 10 AWG desnudo en todo el recorrido.
Suministro e instalación tubería conduit PVC de 1 ", incluye curvas, terminales, accesorios y brecha y lleno donde corresponda diámetro, ver planos
ACOMETIDAS/RAMALES DE ALIMENTACION A TABLEROS
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: cable 4N° 8+1N° 10 AWG-THHN , ramales de TG a tableros
Suministro e instalación de tablero trifásico 5 hilos, sin espacio para totalizador con puerta y cerradura sin interruptores SquareD, Legrand o Similar de 18 circuitos
Suministro e instalación de breaker de incrustar en tablero, 10KA/240V. 1x15ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 1x20ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 2x15ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 2x20ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 2x30A
12.40
12.4.1 un 4.00 42,975.00 171,900.00
12.4.3 un 4.00 42,975.00 171,900.00
12.4.7 un 1.00 47,750.00 47,750.00
12.4.8 un 1.00 57,300.00 57,300.00
12.50 LUMINARIAS
12.5.3 un 2.00 112,499.00 224,998.00
12.5.4 un 2.00 114,027.00 228,054.00
3.00 CAFETERÍA Y BAÑOS
1.0 PRELIMINARES 5,737,850.001.1.0 Localización y descapote1.1.1 Localización y replanteo comisión de topografia día 1.00 382,000.00 382,000.001.1.2 Descapote a mano (0 a 20 cm). Incluye retiro m2 80.00 4,300.00 344,000.001.3 Retiros1.3.1 Retiro de escombros o material sobrante m3 60.00 15,100.00 906,000.001.4 Campamento1.4.1 Campamento provisional m2 25.00 137,070.00 3,426,750.001.5 Cerramiento provisional 1.5.1 Cerramiento en tela de polipropileno h:2m m2 100.00 6,791.00 679,100.002.00 MOVIMIENTOS DE TIERRA 176,920.002.1 Explanación, excavación y llenos2.1.1 Excavación en material común a mano m3 9.30 14,900.00 138,570.002.1.2 Lleno en material comun del sitio compactado m3 2.95 13,000.00 38,350.003.0 CONCRETOS 12,509,554.003.1 Concretos cimentación3.1.1 Afirmado compactado m3 16.00 52,100.00 833,600.003.1.2 Solado de limpieza e:0.05 m m3 0.95 258,600.00 245,670.003.1.3 Concreto 3000 psi para zapatas m3 2.52 380,000.00 957,600.003.1.4 Concreto de 3000 psi para vigas de fundación m3 3.34 414,200.00 1,383,428.003.2 Concretos estructura3.2.1 Concreto 3000 psi para viga aérea m3 2.84 526,700.00 1,495,828.003.2.2 Concreto 3000 psi para columna m3 1.83 515,500.00 943,365.00
3.2.3 m3 8.55 417,700.00 3,571,335.00
3.3 Concretos muros3.4 Concretos varios3.4.1 Concreto de 3000 psi para alfajia remate de muro ml 35.00 33,000.00 1,155,000.003.4.2 Concreto de 3000 psi para viga cinta de cuchillas m3 0.47 521,000.00 244,870.003.4.6 Concreto de 3000 psi para meson lavamanos ml 6.45 121,000.00 780,450.00
3.4.7 ml 7.58 110,600.00 838,348.00
3.4.9 ml 1.82 33,000.00 60,060.00
4.0 ACERO/MALLAS/ESTRUCTURA METÁLICA 5,518,324.004.1 Acero de refuerzo4.1.1 Acero de refuerzo de 60000 psi 420 Mpa kg 1,363.86 2,457.00 3,351,004.004.2 Estructura metálica4.2.1 Estructura Metálica en perfiles PHR kg 251.32 7,930.00 1,992,968.004.30 Mallas4.3.1 Malla electrosoldada D-188 m2 25.64 6,800.00 174,352.005.00 MAMPOSTERIA 17,227,010.005,1,0 Muro en bloque
5,1,2 m2 220.00 69,100.00 15,202,000.00
5,1,3 m2 3.64 71,500.00 260,260.00
5,1,4 Chapa tipo catalan de 14*9*30 cm - ancho 0.30 ml 27.30 26,000.00 709,800.00
SALIDAS DE ALUMBRADO, TOMACORRIENTES E INTERRUPTORES
Suministro e instalación de salida para lámpara fluorescente, halógena ó tipo bala, sin incluir la lámpara, incluye tubería conduit PVC 1/2", caja plastica 2x4, octogonal o 4x4, tomacorriente, alambre cobre No 12 awg-thhn y todos los accesorios de fijación.
Suministro e instalación de salida para tomacorriente doble con polo de tierra 15 amp; 125 V, con implemento para uso general incluye tubería, caja, alambre. Linea Luminex Arquea blanco o Similar
Suministro e instalación de salida para Interruptor SENCILLO sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación de salida para Interruptor DOBLE sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación Luminaria fluorescente 2x32w, tubo T8, 4.100 K, abierta de incrustar en cielo raso, 30 x 122 cm, Ref. LFS TB 1X4/2T83241/EU de ILTEC o Similar. PARA PASILLOS CON CIELO RASO
Luminaria fluorescente 2x32 W, tubo T8, 4.100 K, 15 x 125 cm, cerrada en policarbonato, cierre tipo maleta, de colgar, chasis en PVC. Ref. IT 100A 1X4 /2T83241/EUNV ILTEC o Similar.
Concreto de 3000 psi e=0,12 m para placa de contrapiso
Concreto de 3000 psi para meson en barra de atenciónConcreto de 3000 psi para alfajia en calados incluye gotero un lado
Muro en bloque concreto de color ocre tipo Catalan de 14*9*30 cmMuro en bloque calado gris tipo persiana 10x20x20 a la vista
5,2,0 Muros secos
5.2.4 Tabique en Superboard ancho: 72 cms para bajantes ml 12.00 35,000.00 420,000.00
5.2.5 Muro en Superboard doble cara e:11cms m2 8.30 76,500.00 634,950.006.0 APARATOS/GRIFERIA/MUEBLES/MESONES 30,983,358.006.1 Aparatos sanitarios
6.1.1 un 7.00 812,000.00 5,684,000.00
6.1.2 un 5.00 300,000.00 1,500,000.00
6.1.3 Lavamanos de colgar incluye griferia un 1.00 285,000.00 285,000.00
6.1.4 Orinal linea institucional incluye valvula antivandalica un 1.00 414,000.00 414,000.00
6.2.0 Incrustaciones y accesorios
6.2.1 un 7.00 144,500.00 1,011,500.00
6.2.2 un 2.00 104,250.00 208,500.00
6.2.3 un 5.00 108,100.00 540,500.00
6.2.4 un 1.00 205,000.00 205,000.00
6.3 Muebles
6.3.1 un 1.00 8,150,000.00 8,150,000.00
6.3.2 un 1.00 1,279,000.00 1,279,000.00
6.3.3 Barra cafeteria en grano pulido ml 6.92 135,400.00 936,968.006.3.7 Espejos biselado de 4mm. m2 2.60 82,800.00 215,280.006.4 Divisiones en acero inoxidable
6.4.1 m2 21.30 470,815.00 10,028,360.00
6.4.2 un 1.00 525,250.00 525,250.00
7.0 CARPINTERIA ALUMINIO/METALICA/MADERA 19,736,343.007.40 CAFETERIA - WC MODULO DE SERVICIOS
Marcos y puertas en aluminio7.4.1 Puerta + marco en aluminio P-01 un 6.00 628,963.00 3,773,778.007.4.2 Puerta + marco en aluminio P-02 un 1.00 848,995.00 848,995.007.4.3 Puerta + marco en aluminio P-03 un 4.00 1,261,555.00 5,046,220.007.4.4 Puerta + marco en aluminio P-04 un 2.00 2,086,675.00 4,173,350.00
Ventaneria en aluminio7.4.5 Ventana en aluminio V-01 D:0.61*0.60 Fija un 6.00 52,000.00 312,000.007.4.6 Ventana en aluminio V-02 D:0.61*0.90 Celosia un 6.00 141,000.00 846,000.007.4.7 Ventana en aluminio V-03 D:1.35*0.30 Fija un 1.00 58,000.00 58,000.00
9.1.2 Guardaescoba en mortero h:0.08 m ml 15.30 8,900.00 136,170.00
9.1.3 m2 30.62 83,900.00 2,569,018.00
9.20 Pisos en grano9.2.3 Construcción de mediacaña en grano ml 54.30 18,000.00 977,400.009.2.4 Construcción de bocapuertas en grano pulido ml 7.04 57,600.00 405,504.0010.00 CIELORASOS 3,400,100.00
10.20 m2 60.50 56,200.00 3,400,100.00
11.00 CUBIERTA 4,051,766.00
11.10 m2 63.93 36,200.00 2,314,266.00
11.20 ml 12.00 41,000.00 492,000.00
11.30 ml 23.50 53,000.00 1,245,500.00
12.00 INSTALACIONES ELECTRICAS 6,574,725.00
12.10
12.1.3 ml 50.00 4,600.00 230,000.00
12.20
Sanitario con fluxometro linea institucional incluye valvula antivandalicaLavamanos de incrustar linea institucional incluye griferia
Suministro, transporte e instalación de dispensador de papel higiénicoSuministro, transporte e instalación de dispensador de ToallasSuministro, transporte e instalación de dispensador de Jabón SpraySuministro, transporte e instalación de Barra discapacitados en acero inoxidable.
Mueble para cafetería cubierta en acero inoxidable incluye lavaplatos y salpicaderoMueble para cafetería cubierta en acero inoxidable incluye estufa
División en acero inoxidable 304 calibre 20 para baño, tipo socoda o similar.División en acero inoxidable 304 calibre 20 para orinales, tipo socoda o similar.
Ventana en aluminio V-04 D:3.46*1.77 Celosia cuerpos plegables
Enchapes muros en cerámica blanca de 20.5x20.5, tipo corona
Instalacion de piso en baldosa en grano pulido tipo alfa ref: 135020942 o similar
Suministro e instalación de baldosa 30x30 perlato claro para baños
Suministro, transporte y colocación de cielo falso en Superboard de 8 mm
Suministro e instalación de cubierta termoacústica trapezoidal tipo ajover o similarSuministro e instalación de caballete tipo ajover o similarSuministro e instalación de canal en lámina galvanizada calibre 24 d:0.5 m
BANDEJA PORTA CABLES, CANALETA, TUBERIA PVC
Suministro e instalación tubería conduit PVC de 1 ", incluye curvas, terminales, accesorios y brecha y lleno donde corresponda diámetro, ver planos
13.1.1 Tuberia de 3" ml 16.00 17,900.00 286,400.00Tragante de aguas lluvias en bronce
13.1.3 Tragante 5"x 3" un 8.00 28,459.00 227,672.00Tuberia bajo tierra PVC sanitaria
13.1.5 Tuberia 3" sanitaria ml 4.00 31,500.00 126,000.0013.1.6 Tuberia 4" sanitaria ml 16.00 39,400.00 630,400.00
Excavación y rellenos en brecha13.1.7 Excavación en Material común m3 10.00 14,900.00 149,000.0013.1.8 Relleno con material seleccionado m3 2.00 55,000.00 110,000.0013.1.9 Relleno con material de la brecha m3 8.00 13,000.00 104,000.00
Puntos Sanitarios PVC13.1.10 Sanitario de fluxometro un 7.00 57,900.00 405,300.0013.1.11 Lavamanos un 6.00 57,900.00 347,400.0013.1.12 Orinal un 1.00 57,900.00 57,900.00
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: cable 4N° 8+1N° 10 AWG-THHN , ramales de TG a tableros
Suministro e instalación de tablero trifásico 5 hilos, sin espacio para totalizador con puerta y cerradura sin interruptores SquareD, Legrand o Similar de 12 circuitos
Suministro e instalación de breaker de incrustar en tablero, 10KA/240V. 1x15ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 1x20ASALIDAS DE ALUMBRADO, TOMACORRIENTES E INTERRUPTORES
Suministro e instalación de salida para lámpara fluorescente, halógena ó tipo bala, sin incluir la lámpara, incluye tubería conduit PVC 1/2", caja plastica 2x4, octogonal o 4x4, tomacorriente, alambre cobre No 12 awg-thhn y todos los accesorios de fijación.
Suministro e instalación de salida para tomacorriente doble con polo de tierra 15 amp; 125 V, con implemento para uso general incluye tubería, caja, alambre. Linea Luminex Arquea blanco o Similar
Suministro e instalación de salida para tomacorriente doble con polo de tierra 15 A tipo GFCI; 125 V, con implemento incluye tubería, caja, alambre. Linea Luminex Arquea blanco o Similar
Suministro e instalación de salida para Interruptor SENCILLO sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación de salida para Interruptor CONMUTABLE SENCILLO sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación Luminaria fluorescente 2x32W, tubo T8, 4.100 K, abierta de colgar o sobreponer, 30 x 122 cm. Ref. IF SAB 1X4/2T43241/EU ILTEC o Similar. PARA BAÑOS. incluye cable encauchetado, clavija tripolar
Suministro e instalación Luminaria fluorescente 2x32w, tubo T8, 4.100 K, de incrustar, cerrada con acrílico, 30 x 122 cm Ref. LFS PC 1X4/2T83241/EU ILTEC o Similar. PARA COCINETAS Y SALAS DE JUEGOS
Suministro e instalación luminaria aplique pared, decorativo, con bombilla fluorescente 23W/rosca E27, 2.700 K. HALL SALA MULTIPLE, ACCESOS SALA DE JUEGOS
Suministro e instalación Bala fluorescente 2x26W, tubo T4, balasto electrónico, de incrustar en cielo raso, con rejilla en aluminio especular de 4 celdas, Ref. ITD 33 BR/1,5 E4/2T42641/EU ILTEC o Similar. PARA HALL, CIRCULACION, RECEPCION
Suministro e instalación de caja de paso de 15x15x10 cm
Instalaciones sanitarias aguas residuales y aguas lluviasTuberia PVC aguas residuales y aguas lluvias por placas y ductos
13.1.13 Ducha un 2.00 57,900.00 115,800.0013.1.14 Lavaplatos un 2.00 57,900.00 115,800.0013.1.15 Poceta de aseo un 1.00 57,900.00 57,900.0013.1.16 Desagüe de piso 2" un 3.00 57,900.00 173,700.00
13.20
Tuberia PVC presión bajo tierra13.2.1 Tuberia 2 " ml 16.00 24,090.00 385,440.0013.2.4 Tuberia 3/4 " ml 2.00 12,100.00 24,200.0013.2.5 Tuberia 1/2 " ml 2.00 8,200.00 16,400.00
Excavación y relleno de brechas13.2.6 Excavacion en material comun m3 4.00 14,900.00 59,600.0013.2.7 Relleno con material de la brecha m3 4.00 13,000.00 52,000.00
Valvula de cortina de bronce13.2.8 Valvula de 2" un 2.00 185,700.00 371,400.0013.2.11 Valvula 3/4" un 1.00 53,500.00 53,500.0013.2.12 Valvula 1/2" un 1.00 47,600.00 47,600.00
Punto de suministro de agua fria PVC13.2.13 Punto Sanitario de fluxometro un 7.00 57,300.00 401,100.0013.2.14 Punto Lavamanos un 6.00 38,900.00 233,400.0013.2.15 Punto Orinal un 1.00 38,900.00 38,900.0013.2.16 Punto Ducha un 2.00 38,900.00 77,800.0013.2.17 Punto Lavaplatos un 2.00 38,900.00 77,800.0013.2.18 Punto Poceta de aseo un 2.00 38,900.00 77,800.00
Montaje de aparatos sanitarios13.2.19 Sanitario de fluxometro un 7.00 38,900.00 272,300.0013.2.20 Lavamanos un 6.00 38,900.00 233,400.0013.2.21 Orinal un 1.00 38,900.00 38,900.0013.2.22 Ducha un 2.00 38,900.00 77,800.0013.2.23 Lavaplatos un 2.00 38,900.00 77,800.0013.2.24 Salida para poceta un 2.00 21,200.00 42,400.00
Varios13.2.25 Desinfeccion del sistema un 1.00 28,600.00 28,600.0013.2.26 Planos record gl 1.00 47,700.00 47,700.00
4.00 MEMORIAL FOTOGRÁFICO
1.0 PRELIMINARES 2,083,980.001.1.0 Localización y descapote1.1.1 Localización y replanteo comisión de topografia día 1.00 382,000.00 382,000.001.1.2 Descapote a mano (0 a 20 cm). Incluye retiro m2 81.00 4,300.00 348,300.001.3 Retiros1.3.1 Retiro de escombros o material sobrante m3 64.80 15,100.00 978,480.001.5 Cerramiento provisional 1.5.1 Cerramiento en tela de polipropileno h:2m m2 56.00 6,700.00 375,200.002.00 MOVIMIENTOS DE TIERRA 325,344.002.1 Explanación, excavación y llenos2.1.1 Excavación en material común a mano m3 17.56 14,900.00 261,644.002.1.2 Lleno en material comun del sitio compactado m3 4.90 13,000.00 63,700.003.0 CONCRETOS 72,214,904.003.1 Concretos cimentación3.1.1 Afirmado compactado m3 16.20 52,100.00 844,020.003.1.2 Solado de limpieza e:0.05 m m3 0.56 258,600.00 144,816.003.1.4 Concreto de 3000 psi para vigas de fundación m3 7.84 414,200.00 3,247,328.003.2 Concretos estructura
3.2.3 m3 24.20 417,700.00 10,108,340.00
3.3 Concretos muros
3.3.1 m3 86.40 656,000.00 56,678,400.00
3.4 Concretos varios3.4.1 Concreto de 3000 psi para alfajia remate de muro ml 30.00 33,000.00 990,000.00
3.4.5 m3 0.50 404,000.00 202,000.00
4.0 ACERO/MALLAS/ESTRUCTURA METÁLICA 12,289,883.004.1 Acero de refuerzo4.1.1 Acero de refuerzo de 60000 psi 420 Mpa kg 3,617.80 2,457.00 8,888,935.004.2 Estructura metálica4.2.1 Estructura Metálica en perfiles PHR kg 363.60 7,930.00 2,883,348.004.2.5 Platinas Metalicas de Apoyo de 1/4" kg 27.00 10,400.00 280,800.004.2.6 Anclaje en varilla roscada de 5/8" L: 0.30m∅ un 32.00 7,400.00 236,800.006.0 APARATOS/GRIFERIA/MUEBLES/MESONES 5,480,000.006.3 Muebles
6.3.8 un 2.00 2,740,000.00 5,480,000.00
7.0 CARPINTERIA ALUMINIO/METALICA/MADERA 6,550,670.007.50 MEMORIAL FOTOGRAFICO
Marcos y puertas en aluminio7.5.1 Puerta + marco en aluminio P-01 un 2.00 3,118,075.00 6,236,150.00
Instalaciones hidraulicas para suministro de agua potable
Concreto de 3000 psi e=0,12 m para placa de contrapiso
Concreto de 3000 psi para muro color ocre (memorial fotogr.)
Concreto de 3000 psi para muro rampa (acceso memorial)
Suministro e instalación de panel fotográfico 8.0 m. X 4.5 m. (banner)
Ventaneria en aluminio7.5.2 Ventana en aluminio V-01 D:0.61*0.60 Fija un 6.00 52,420.00 314,520.008.0 REVOQUES/ENCHAPES/PINTURAS 6,299,000.008.2 Pintura interior8.2.1 Pintura interior vinilo muros m2 205.00 12,800.00 2,624,000.008.3 Pintura Exterior8.3.1 Pintura tipo koraza sobre muros de fachada m2 245.00 15,000.00 3,675,000.009.0 PISOS 7,240,200.009.20 Pisos en grano9.2.1 Piso en grano N°2 pulido en memorial m2 70.60 97,000.00 6,848,200.00
9.2.2 un 1.00 392,000.00 392,000.00
10.00 CIELORASOS 2,257,920.00
10.10 Suministro y colocación de cielo falso en GYPLAC. m2 70.56 32,000.00 2,257,920.00
11.00 CUBIERTA 4,169,600.00
11.10 m2 81.00 36,200.00 2,932,200.00
11.30 ml 23.00 53,800.00 1,237,400.00
12.00 INSTALACIONES ELECTRICAS 8,304,500.00
12.10
12.1.3 ml 70.00 4,615.00 323,050.00
12.20
12.2.5 ml 30.00 6,390.00 191,700.00
12.2.6 ml 30.00 7,640.00 229,200.00
12.30 TABLEROS DE DISTRIBUCIÓN
12.3.8 un 1.00 12,600.00 12,600.00
12.3.9 un 1.00 12,600.00 12,600.00
12.40
12.4.1 un 14.00 42,975.00 601,650.00
12.4.3 un 8.00 42,975.00 343,800.00
12.4.9 un 2.00 62,075.00 124,150.00
12.4.10 un 2.00 71,625.00 143,250.00
12.50 LUMINARIAS
12.5.14 un 10.00 348,575.00 3,485,750.00
12.5.17 un 28.00 81,175.00 2,272,900.00
12.60 CAJAS DE PASO
12.6.3 un 2.00 42,975.00 85,950.00
12.70 SISTEMA DE PERIFONEOAUDITORIO SALA MULTIPLE
12.7.1 un 4.00 85,950.00 343,800.00
12.7.14 ml 60.00 1,280.00 76,800.00
12.7.15 un 4.00 14,325.00 57,300.00
5.00 TORRE MIRADOR
Estrella construida en grano N°2 pulido color negro y gris
Suministro e instalación de cubierta termoacústica trapezoidal tipo ajover o similarSuministro e instalación de canal en lámina galvanizada calibre 24 d:0.5 m
BANDEJA PORTA CABLES, CANALETA, TUBERIA PVC
Suministro e instalación tubería conduit PVC de 1 ", incluye curvas, terminales, accesorios y brecha y lleno donde corresponda diámetro, ver planos
ACOMETIDAS/RAMALES DE ALIMENTACION A TABLEROS
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: Alambre cobre 3 No 12 AWG-THHN, ramales alumbrado, tomas
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: Alambre cobre 2N° 10+ 1N° 12 AWG-THHN, ramales de tomas desde Tablero TI
Suministro e instalación de breaker de incrustar en tablero, 10KA/240V. 1x15ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 1x20ASALIDAS DE ALUMBRADO, TOMACORRIENTES E INTERRUPTORES
Suministro e instalación de salida para lámpara fluorescente, halógena ó tipo bala, sin incluir la lámpara, incluye tubería conduit PVC 1/2", caja plastica 2x4, octogonal o 4x4, tomacorriente, alambre cobre No 12 awg-thhn y todos los accesorios de fijación.
Suministro e instalación de salida para tomacorriente doble con polo de tierra 15 amp; 125 V, con implemento para uso general incluye tubería, caja, alambre. Linea Luminex Arquea blanco o Similar
Suministro e instalación de salida para Interruptor CONMUTABLE SENCILLO sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación de salida para Interruptor CONMUTABLE DOBLE sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación bala de piso uso exterior, tipo terra, leds 15W/110VSuministro e instalación Bala redonda de incrustar led de 1 W/110V color ámbar.
Suministro e instalación de caja de paso de 15x15x10 cm
Suministro e instalación de Bafle de techo 60W, con rejilla decorativa de sobreponer.Suministro e Instalación de cable dúplex 2x18 awg. BlindadoSuministro e instalación de salida para paralante en techo, incluye caja
1.0 PRELIMINARES 803,200.001.1.0 Localización y descapote1.1.1 Localización y replanteo comisión de topografia día 1.00 382,000.00 382,000.001.1.2 Descapote a mano (0 a 20 cm). Incluye retiro m2 6.00 4,300.00 25,800.001.3 Retiros1.3.1 Retiro de escombros o material sobrante m3 4.00 15,100.00 60,400.001.5 Cerramiento provisional 1.5.1 Cerramiento en tela de polipropileno h:2m m2 50.00 6,700.00 335,000.002.00 MOVIMIENTOS DE TIERRA 247,972.002.1 Explanación, excavación y llenos2.1.1 Excavación en material común a mano m3 9.68 14,900.00 144,232.002.1.2 Lleno en material comun del sitio compactado m3 7.98 13,000.00 103,740.003.0 CONCRETOS 6,752,377.003.1 Concretos cimentación3.1.1 Afirmado compactado m3 1.20 52,100.00 62,520.003.1.2 Solado de limpieza e:0.05 m m3 0.67 258,600.00 173,262.003.1.3 Concreto 3000 psi para zapatas m3 2.18 380,000.00 828,400.003.1.4 Concreto de 3000 psi para vigas de fundación m3 0.48 414,200.00 198,816.003.2 Concretos estructura3.2.1 Concreto 3000 psi para viga aérea m3 1.61 526,000.00 846,860.003.2.2 Concreto 3000 psi para columna m3 5.42 515,000.00 2,791,300.00
3.2.3 m3 0.47 417,700.00 196,319.00
3.4 Concretos varios
3.4.4 Concreto de 3000 psi para losa balcon (torre del reloj) m3 2.00 707,000.00 1,414,000.00
3.4.9 ml 7.30 33,000.00 240,900.00
4.0 ACERO/MALLAS/ESTRUCTURA METÁLICA 4,289,037.004.1 Acero de refuerzo4.1.1 Acero de refuerzo de 60000 psi 420 Mpa kg 1,745.64 2,457.00 4,289,037.005.00 MAMPOSTERIA 2,445,940.005,1,0 Muro en bloque5,1,1 Muro en bloque de concreto 0.12x 0.19 x 0.39 m2 38.42 29,000.00 1,114,180.00
8.2 Pintura interior8.2.1 Pintura interior vinilo muros m2 69.60 12,800.00 890,880.008.3 Pintura Exterior8.3.1 Pintura tipo koraza sobre muros de fachada m2 69.60 15,000.00 1,044,000.009.0 PISOS 443,100.009.1 Pisos
9.1.1 m2 4.20 105,500.00 443,100.00
10.00 CIELORASOS 134,400.00
10.10 Suministro y colocación de cielo falso en GYPLAC. m2 4.20 32,000.00 134,400.00
11.00 CUBIERTA 432,185.0011.40 Cubierta en concreto de 3000 psi m3 1.09 396,500.00 432,185.0012.00 INSTALACIONES ELECTRICAS 3,672,977.00
12.10
12.1.3 ml 15.00 4,600.00 69,000.00
12.20
12.2.5 ml 50.00 6,300.00 315,000.00
12.2.6 ml 80.00 7,640.00 611,200.00
12.30 TABLEROS DE DISTRIBUCIÓN
12.3.9 un 1.00 12,600.00 12,600.00
12.3.11 un 1.00 42,900.00 42,900.00
12.40
Concreto de 3000 psi e=0,12 m para placa de contrapiso
Concreto de 3000 psi para alfajia en calados incluye gotero un lado
Muro en bloque calado gris tipo persiana 10x20x20 a la vista
Revoque en muro interior (incl. carteras, filos y dilataciones)Revoque en muro exterior (incl. carteras, filos y dilataciones)
Instalacion de piso en baldosa en grano pulido tipo alfa ref: 135020942 o similar
BANDEJA PORTA CABLES, CANALETA, TUBERIA PVC
Suministro e instalación tubería conduit PVC de 1 ", incluye curvas, terminales, accesorios y brecha y lleno donde corresponda diámetro, ver planos
ACOMETIDAS/RAMALES DE ALIMENTACION A TABLEROS
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: Alambre cobre 3 No 12 AWG-THHN, ramales alumbrado, tomas
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: Alambre cobre 2N° 10+ 1N° 12 AWG-THHN, ramales de tomas desde Tablero TI
Suministro e instalación de breaker de incrustar en tablero, 10KA/240V. 1x20ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 2x15ASALIDAS DE ALUMBRADO, TOMACORRIENTES E INTERRUPTORES
12.4.1 un 10.00 42,975.00 429,750.00
12.4.2 un 3.00 52,525.00 157,575.00
12.4.3 un 1.00 42,975.00 42,975.00
12.4.7 un 1.00 47,750.00 47,750.00
12.50 LUMINARIAS
12.5.7 un 8.00 77,049.40 616,395.00
12.5.16 un 3.00 329,475.00 988,425.00
12.5.18 un 1.00 134,655.00 134,655.00
12.5.19 un 1.00 123,577.00 123,577.00
12.5.20 un 1.00 38,200.00 38,200.00
12.60 CAJAS DE PASO
12.6.3 un 1.00 42,975.00 42,975.00
6.00 MÓDULO DE VENTA - AMOBLAMIENTO
2.00 MOVIMIENTOS DE TIERRA 935,971.002.1 Explanación, excavación y llenos2.1.1 Excavación en material común a mano m3 46.99 14,900.00 700,151.002.1.2 Lleno en material comun del sitio compactado m3 18.14 13,000.00 235,820.003.0 CONCRETOS 11,605,153.003.1 Concretos cimentación3.1.1 Afirmado compactado m3 3.63 52,100.00 189,123.003.1.2 Solado de limpieza e:0.05 m m3 2.77 258,600.00 716,322.003.1.5 Concreto de 3000 psi para viga zarpa m3 7.94 414,200.00 3,288,748.003.2 Concretos estructura3.2.1 Concreto 3000 psi para viga aérea m3 0.96 526,000.00 504,960.003.3 Concretos muros
3.3.1 m3 6.00 656,000.00 3,936,000.00
3.4 Concretos varios3.4.1 Concreto de 3000 psi para alfajia remate de muro ml 90.00 33,000.00 2,970,000.004.0 ACERO/MALLAS/ESTRUCTURA METÁLICA 2,915,787.004.1 Acero de refuerzo4.1.1 Acero de refuerzo de 60000 psi 420 Mpa kg 572.53 2,457.00 1,406,706.004.2 Estructura metálica4.2.1 Estructura Metálica en perfiles PHR kg 138.85 7,930.00 1,101,081.004.30 Mallas4.3.2 Malla electrosoldada D-221 m2 60.00 6,800.00 408,000.0011.00 CUBIERTA 2,990,304.00
11.10 m2 48.72 36,200.00 1,763,664.00
11.30 ml 22.80 53,800.00 1,226,640.00
7.00 PÉRGOLA
1.0 PRELIMINARES 10,485,000.001.1.0 Localización y descapote1.1.1 Localización y replanteo comisión de topografia día 5.00 382,000.00 1,910,000.001.1.2 Descapote a mano (0 a 20 cm). Incluye retiro m2 1,000.00 4,300.00 4,300,000.001.3 Retiros1.3.1 Retiro de escombros o material sobrante m3 150.00 15,100.00 2,265,000.001.5 Cerramiento provisional 1.5.1 Cerramiento en tela de polipropileno h:2m m2 300.00 6,700.00 2,010,000.002.00 MOVIMIENTOS DE TIERRA 681,916.00
Suministro e instalación de salida para lámpara fluorescente, halógena ó tipo bala, sin incluir la lámpara, incluye tubería conduit PVC 1/2", caja plastica 2x4, octogonal o 4x4, tomacorriente, alambre cobre No 12 awg-thhn y todos los accesorios de fijación.
Suministro e instalación de salida para Lámpara Especial 220Vac, En Tubería PVC 3/4", sin incluir la lámpara, incluye tubería, caja 2x4, octogonal, 4x4, tomacorriente, alambre cobre No 12 awwg-thhn y todos los accesorios de fijación.
Suministro e instalación de salida para tomacorriente doble con polo de tierra 15 amp; 125 V, con implemento para uso general incluye tubería, caja, alambre. Linea Luminex Arquea blanco o Similar
Suministro e instalación de salida para Interruptor SENCILLO sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación Lámpara tipo tortuga sellada 60w/120V o bombilla Fluorescente 26W/120V,4.100K, Ref. ITA112/60W/120V ILTEC o Similar. PERGOLA
Suministro e instalación Reflector rectangular uso exterior en aluminio inyectado con vidrio, protección IP65, color negro, bombilla 250 W/220V sodio. MIRADOR
Suministro e instalación AVISO DE SALIDA Ref. IT SALIDA ILTEC o SimilarSuministro e instalación Lampara de emergencia 2x5W Ref. IT EXL 950 ILTEC o Similar
Suministro e instalación Fotocelda completa con base de 1.000W , multivoltaje 100-270 V para accionamiento alumbrado exterior
Suministro e instalación de caja de paso de 15x15x10 cm
Concreto de 3000 psi para muro color ocre (memorial fotogr.)
Suministro e instalación de cubierta termoacústica trapezoidal tipo ajover o similarSuministro e instalación de canal en lámina galvanizada calibre 24 d:0.5 m
2.1 Explanación, excavación y llenos2.1.1 Excavación en material común a mano m3 39.24 14,900.00 584,676.002.1.2 Lleno en material comun del sitio compactado m3 7.48 13,000.00 97,240.003.0 CONCRETOS 36,470,032.003.1 Concretos cimentación3.1.1 Afirmado compactado m3 200.00 52,100.00 10,420,000.003.1.2 Solado de limpieza e:0.05 m m3 39.42 258,600.00 10,194,012.003.1.3 Concreto 3000 psi para zapatas m3 19.62 383,000.00 7,514,460.003.1.6 Concreto de 3000 psi para pedestal m3 13.63 612,000.00 8,341,560.004.0 ACERO/MALLAS/ESTRUCTURA METÁLICA 201,334,066.004.1 Acero de refuerzo4.1.1 Acero de refuerzo de 60000 psi 420 Mpa kg 3,575.20 2,457.00 8,784,266.004.2 Estructura metálica
4.2.2 kg 21,594.00 8,500.00 183,549,000.00
4.2.5 Platinas Metalicas de Apoyo de 1/4" kg 245.00 10,400.00 2,548,000.004.2.7 Anclaje en varilla roscada de 3/8" L: 0.30m∅ un 872.00 7,400.00 6,452,800.00
1.00 PRELIMINARES 3,967,150.001.1 Campamento tabla GBL 1.00 896,900.00 896,900.001.2 Localización - replanteo- obra arquitectónica M2 810.00 3,200.00 2,592,000.001.3 Cerramiento tela fib. tejida h 2,10 bord ML 50.00 6,700.00 335,000.001.4 Instalación provisional acueducto MES 1.00 66,850.00 66,850.001.5 Instalación provisional energía MES 1.00 76,400.00 76,400.002.00 ADECUACION PREVIA PISCINA 3,253,600.002.1 Limpieza enchapes M2 374.00 2,300.00 860,200.002.2 limpieza - resane cajas de inspección UND 4.00 29,700.00 118,800.00
ACCESORIOS 15.5 Abrazadera sanitaria de 3" UND 6.00 3,400.00 20,400.0015.6 Sifón sanitario pvc 2" UND 11.00 26,700.00 293,700.0015.7 Limpiador 760 grs (1/4) UND 1.00 22,100.00 22,100.0015.8 Soldadura pvc 900 grs (1/4) UNID 1.00 56,000.00 56,000.00
INSTALACIÓN VARIOS 15.9 Instalación tuberia sanitaria de 2" ML 18.00 2,540.00 45,720.0015.10 Instalación tuberia sanitaria de 4" ML 22.00 3,700.00 81,400.00
PUNTOS SANITARIOS 15.11 Punto sanitario pvc de 2" PTO 10.00 21,200.00 212,000.0015.12 Punto sanitario pvc de 4" PTO 4.00 39,900.00 159,600.00
Perfil tubular colmena 100x100 e=3mm ASTM A-500 grado c
AREA SERVICIOS ZONA HUMEDA Y ADECUACION PISCINA
Excavacion tierra a mano para cimentacion unidad de servicio
Excavacion tierra a mano zanjas para tuberia incluye retiro de sobrantes y disposicion final
Excavacion tierra a mano incluye retiro de sobrantes y disposicion final
Viga cimiento enlace h=20-30 cms concreto de 3.000 psi
16.00 INSTALACIONES HIDRAULICAS 2,495,046.0016.1 Punto agua fría 1/2" PTO 11.00 57,900.00 636,900.0016.2 Adaptador hembra pvc presión 1/2 UND 20.00 900.00 18,000.0016.3 Codo 90 presión pvc 1/2 " UND 15.00 1,100.00 16,500.0016.4 Tee presión pvc 1/2 " UND 24.00 1,300.00 31,200.0016.5 Unión presión pvc 1/2 UNID 15.00 1,000.00 15,000.00
TUBERÍAS 16.6 Tuberia pvc de 1/2 ML 106.00 1,900.00 201,400.0016.7 Tuberia pvc de 1" ML 64.00 4,300.00 275,200.00
ETAPA 1: REVISIÓN, VERIFICACIÓN Y VALIDACIÓN DE LOS DISEÑOS Y ESTUDIOS TÉCNICO
ÍTEM DESCRIPCIÓN UNIDAD DE MEDIDA CANTIDADES VALOR UNITARIO VALOR TOTAL
1 GL 1.00 22,223,540.00 22,223,540.00
22,223,540.00
3,555,766.00
25,779,306.00
ITEM DESCRIPCIÓN CANTIDADES VALOR UNITARIO VALOR TOTAL PARCIAL
1.00 AREA EXTERNA/URBANISMO/PAISAJISMO
1.0 TRABAJOS PRELIMINARES 59,730,268.00
1.1 DESCAPOTE
1.1.1 m2 10,438.00 4,316.00 45,050,408.00
1.1.2 m2 2,250.00 4,316.00 9,711,000.00
1.2 LOCALIZACIÓN Y REPLANTEO
1.2.1 día 10.00 382,220.00 3,822,200.00
1.2.2 día 3.00 382,220.00 1,146,660.00
2.0 RETIRO, DEMOLICIONES Y TALA DE ARBOLES 14,940,276.002.1 RETIROS2.1.1 Retiro, cargue y transporte de malla cerramiento m2 180.00 16,283.00 2,930,940.002.2 DEMOLICIONES
2.2.1 m2 250.00 17,644.00 4,411,000.00
2.3 TALA Y TRASPLANTE DE ÁRBOLES2.3.1 Tala de árbol de 2 a 4 m. incluye retiro un 1.00 78,164.00 78,164.002.3.2 Tala de árbol de 4 a 6 m. incluye retiro un 2.00 161,106.00 322,212.002.3.3 Tala de árbol de 6 a 8 m. incluye retiro un 22.00 327,180.00 7,197,960.003.0 MOVIMIENTOS DE TIERRA 26,631,912.003.1 EXCAVACIÓN Y RETIRO DE MATERIAL3.1.1 Excavación en material común a mano m3 143.49 14,945.00 2,144,458.003.1.2 Retiro de escombros o material sobrante m3 71.75 15,204.00 1,090,811.003.2 RELLENOS3.2.1 Lleno con material común del sitio compactado m3 1,492.96 13,077.00 19,523,438.003.2.2 Lleno con material de préstamo compactado m3 20.00 55,986.00 1,119,720.00
3.2.3 m3 42.75 64,409.00 2,753,485.00
4.0 CONCRETOS 177,159,843.004.1 CONCRETO CIMENTACIÓN4.1.1 Solado de limpieza e:0.05 m m3 6.50 258,809.00 1,682,259.004.1.2 Concreto 3000 psi para zapata m3 39.40 383,296.00 15,101,862.00
FONDO FINANCIERO DE PROYECTOS DE DESARROLLO – FONADEDEPARTAMENTO ADMINISTRATIVO PARA LA PROSPERIDAD SOCIAL – DPS
CONVENIO INTERADMINISTRATIVO No. 212017
OFERTA PÚBLICA OPC 059-2013
PRIMERA FASE DE LA CONSTRUCCIÓN PARQUE CONMEMORATIVO OMAYRA SANCHEZ - EN LA CABECERA MUNICIPAL GUAYABAL - DEL MUNICIPIO DE ARMERO - TOLIMA
REVISIÓN, VERIFICACIÓN Y VALIDACIÓN DE LOS DISEÑOS Y ESTUDIOS TÉCNICO
SUBTOTAL VALOR DE LA ETAPA DE VERIFICACION DE LOS ESTUDIOS Y DISEÑOS
VALOR TOTAL IVA 16% SOBRE LA VERIFICACION DEL VALOR DE LOS ESTUDIOS Y DISEÑOS
VALOR TOTAL (A) DE LA ETAPA A VERIFICACION DE LOS ESTUDIOS Y DISEÑOS
ETAPA 2: PRIMERA FASE DE LA CONSTRUCCIÓN PARQUE CONMEMORATIVO OMAYRA SANCHEZ - EN LA CABECERA MUNICIPAL GUAYABAL - DEL MUNICIPIO DE ARMERO - TOLIMA
UNIDAD DE
MEDIDAVALOR TOTAL POR
CAPITULO
Descapote a mano (0 a 20 cm). Incluye retiro (PARQUE)Descapote a mano (0 a 20 cm). Incluye retiro (ANDENES)
Localización y replanteo comisión de topografia (PARQUE)Localización y replanteo comisión de topografia (ANDEN)
Demolición de mampostería en bloque e:20 cm, incluye retiro
Material granular tipo gravilla para filtros en contenedor de raíces
4.1.3 Concreto 3000 psi para zarpa m3 0.50 414,442.00 207,221.004.2 CONCRETO DE ESTRUCTURA4.2.1 Concreto 3000 psi para viga aerea m3 16.20 526,827.00 8,534,597.004.2.2 Concreto 3000 psi para pedestal antorcha m3 1.50 425,742.00 638,613.004.3 CONCRETO PARA MUROS4.3.1 Concreto 3000 psi para muro color ocre m3 62.00 656,701.00 40,715,462.004.4 CONCRETO SARDINELES Y BORDILLOS
4.4.1 ml 566.00 48,510.00 27,456,660.00
4.4.2 ml 658.00 37,157.00 24,449,306.00
4.4.3 ml 1,085.00 26,406.00 28,650,510.00
4.4.4 ml 658.00 8,573.00 5,641,034.00
4.5 CONCRETOS VARIOS4.5.1 Concreto 3000 psi para alfajia ml 37.46 33,066.00 1,238,652.00
4.5.2 un 38.00 414,095.00 15,735,610.00
4.60 PLATINAS/ANCLAJES4.6.1 Platina corrida de 4" x 1/4" kg 398.12 10,438.00 4,155,577.004.6.2 Anclaje de cuña w.s 3830 un 480.00 6,151.00 2,952,480.005.0 ACERO/MALLAS 10,670,905.005.1 ACERO DE REFUERZO5.1.1 Acero de refuerzo de 60000 psi 420 Mpa kg 2,600.00 2,459.00 6,393,400.005.2 MALLAS5.2.1 Malla electrosoldada D188 m2 621.64 6,881.00 4,277,505.006.00 PISOS 398,615,263.006.10 BASES/SUBBASES6.1.1 Afirmado compactado (ANDEN EXTERIOR) m3 252.00 52,184.00 13,150,368.006.1.2 Afirmado compactado (PARQUE) m3 627.00 52,184.00 32,719,368.006.20 PISOS PREFABRICADOS
6.2.1 m2 596.00 61,297.00 36,533,012.00
6.2.2 ml 540.00 33,156.00 17,904,240.00
6.2.3 Suministro e instalación de Gramoquin m2 288.00 54,522.00 15,702,336.00
6.2.4 un 583.00 24,195.00 14,105,685.00
6.2.5 un 26.00 22,283.00 579,358.00
6.2.6 un 4.00 39,918.00 159,672.00
6.2.7 un 26.00 54,208.00 1,409,408.00
6.2.8 un 28.00 65,632.00 1,837,696.00
6.30 PISOS EN CONCRETO
6.3.1 m2 2,296.00 44,270.00 101,643,920.00
6.3.2 m2 1,001.00 44,270.00 44,314,270.00
6.3.3 ml 107.00 28,940.00 3,096,580.00
6.3.4 m2 540.00 59,745.00 32,262,300.00
6.3.5 m2 59.00 55,268.00 3,260,812.00
6.40 VARIOS PISOS6.4.1 Construcción de piso gravilla lavada (gualanday) m2 120.00 33,146.00 3,977,520.00
6.4.2 Construcción de piso en arena lavada blanca (Silícea) m3 240.00 269,799.00 64,751,760.00
6.4.3 Construcción de piso en polvo de ladrillo m2 852.00 9,829.00 8,374,308.006.4.4 Construcción de piso en piedra bola suelta m3 50.00 56,653.00 2,832,650.007.00 PAISAJISMO 32,841,107.007.10 ARBOLES7.1.1 Suministro y siembra de árbol Acacia amarilla un 4.00 86,000.00 344,000.007.1.2 Suministro y siembra de árbol Acacia roja un 21.00 86,000.00 1,806,000.007.1.3 Suministro y siembra de árbol Almendro un 6.00 86,000.00 516,000.007.1.4 Suministro y siembra de árbol Tulipán Africano un 4.00 86,000.00 344,000.007.1.5 Suministro y siembra de árbol Mango un 16.00 86,000.00 1,376,000.007.1.6 Suministro y siembra de árbol Guayacán Rosado un 8.00 86,000.00 688,000.007.1.7 Suministro y siembra de árbol Guayacán Amarillo un 4.00 86,000.00 344,000.007.1.8 Suministro y siembra de árbol Ebano un 10.00 86,000.00 860,000.007.20 PALMAS7.2.1 Suministro y siembra de Palma Zancona un 32.00 86,000.00 2,752,000.007.2.2 Suministro y siembra de Palma Real un 5.00 86,000.00 430,000.007.30 EMPRADIZACIÓN/JARDINERIA7.3.1 Empradizado con cespedones grama tipo trenza m2 3,160.00 6,354.00 20,078,640.007.3.2 Suministro y siembra de mani forrajero m2 145.00 6,880.00 997,600.00
Construcción de Sardinel en concreto de 3000 psi (ANDEN EXT.)Construcción de Bordillo tipo "A" en concreto de 3000 psi (PARQUE)Construcción de Bordillo tipo "B" en concreto de 3000 psiConstrucción de Bordillo tipo "C" en concreto de 3000 psi (PERGOLA)
Concreto 3000 psi para construcción contenedor de raices (1.5m x 1.5m)
Suministro e instalación de loseta en concreto 6 rayas ref. 135016054 0.40X0.40X0,030 alfa o similar
Suministro e instalación de Loseta Táctil Guia (ANDEN EXT.)
Suministro e instalación de Plaqueta 0.50x0.50 en Concreto de 3000 psiSuministro e instalación de Plaqueta 0.50x0.35 en Concreto de 3000 psiSuministro e instalación de Plaqueta 1.0x0.35 en Concreto de 3000 psiSuministro e instalación de Plaqueta 1.5x0.35 en Concreto de 3000 psiSuministro e instalación de Plaqueta 1.8x0.35 en Concreto de 3000 psi
Construcción de piso ANDEN en concreto de 3000 psi. E:0.10 m (EXTERIOR)Construcción de piso ANDEN en concreto de 3000 psi. E:0.10 m (INTERIOR)Construcción de gradas en concreto de 3000 psi. E:0.10 m (INTERIOR)Placa de concreto de 3000 psi para cancha múltiple e=0.10 m Placa de concreto de 3000 psi para fuente memorial fotográfico e=0.10 m
7.3.3 Suministro y siembra jardín de heliconias m2 201.00 11,467.00 2,304,867.008.00 AMOBLAMIENTO GENERAL 118,445,107.008.10 MOBILIARIO8.1.1 Papelera en acero inoxidable socoda o similar un 12.00 842,348.00 10,108,176.008.1.2 Papelera línea ecológica un 3.00 359,158.00 1,077,474.00
8.1.3 un 14.00 309,177.00 4,328,478.00
8.1.4 Suministro e instalación banca cubo un 109.00 791,433.00 86,266,197.008.1.5 Suministro e instalación de bicicletero un 4.00 791,433.00 3,165,732.008.1.6 Suministro e instalación de columna antorcha un 1.00 2,799,638.00 2,799,638.008.20 GIMNASIO AL AIRE LIBRE8.2.1 Suministro e instalación de barras paralelas un 4.00 336,081.00 1,344,324.008.2.2 Suministro e instalación de Poste Zig-Zag un 4.00 212,912.00 851,648.008.30 JUEGOS INFANTILES8.3.1 Suministro e instalación de Tic Tac un 2.00 623,592.00 1,247,184.008.3.2 Suministro e instalación de Banco Giratorio un 3.00 374,862.00 1,124,586.008.3.3 Suministro e instalación de Juego de Red Telaraña un 1.00 1,146,660.00 1,146,660.008.3.4 Suministro e instalación de Caballo Balanceante un 3.00 403,529.00 1,210,587.008.3.5 Suministro e instalación de Columpio Hexagonal un 1.00 907,773.00 907,773.008.40 DOTACIONES DEPORTIVAS8.4.1 Pórtico deportivo multifuncional un 2.00 1,433,325.00 2,866,650.00
9.00 REDES HIDRÁULICAS/SANITARIAS 178,051,136.009.10 INSTALACION PARA CHORROS LAMINARES
Tuberia PVC presión bajo tierra9.1.1 Tuberia PVC presión 4" ml 30.00 62,036.00 1,861,080.009.1.2 Tuberia PVC presión 3" ml 78.00 43,299.00 3,377,322.009.1.3 Tuberia PVC presión 1/2" ml 12.00 12,494.00 149,928.009.1.4 Tuberia PVC presión 1" ml 27.00 14,411.00 389,097.00
Tuberia acero galvanizado9.1.5 Tuberia acero galvanizado de 4" ml 6.00 100,450.00 602,700.00
Excavación y relleno de brechas9.1.6 Excavacion en material comun m3 36.00 14,945.00 538,020.009.1.7 Relleno con material de la brecha m3 36.00 13,077.00 470,772.00
Valvula de cortina de bronce9.1.8 Valvula de cortina 4" un 1.00 873,322.00 873,322.009.1.9 Valvula de cortina 3" un 4.00 599,207.00 2,396,828.009.1.10 Valvula de cortina 1.1/2" un 2.00 185,899.00 371,798.009.1.11 Valvula de cortina 1" un 18.00 141,089.00 2,539,602.00
Cheque de cortina de bronce 9.1.12 Cheque de cortina de bronce de 4" un 1.00 844,656.00 844,656.00
Valvula de flotador 9.1.13 Valvula de flotador de 1" un 1.00 147,674.00 147,674.00
Equipo de bombeo filtración y boquillas9.1.14 Bomba centrifuga un 1.00 7,322,005.00 7,322,005.00
9.1.15 gl 1.00 45,866,400.00 45,866,400.00
9.20 INSTALACION PARA CHORROS BAJOSTuberia PVC presión RDE 21
Valvula de cortina de bronce9.2.4 Valvula de cortina de bronce de 3" un 1.00 599,207.00 599,207.009.2.5 Valvula de cortina de bronce de 2" un 1.00 185,899.00 185,899.009.2.6 Valvula de cortina de bronce de 1" un 33.00 141,089.00 4,655,937.00
Valvula de flotador 9.2.7 Valvula de flotador de 1" un 1.00 147,674.00 147,674.00
Equipo de bombeo filtración y boquillas9.2.8 Bomba sumergible un 1.00 2,675,540.00 2,675,540.009.2.9 Boquillas de chorros bajos un 32.00 90,777.00 2,904,864.00
9.30
Preliminares9.3.1 Señal preventiva y reglamentaria gl 1.00 95,555.00 95,555.009.3.2 Ubicación y replanteo comisión de topografia gl 1.00 382,220.00 382,220.00
Excavaciones y rellenos9.3.3 Excavación en Zanja - Material Común m3 417.00 14,945.00 6,232,065.00
9.3.4 m3 84.00 12,948.00 1,087,632.00
Tuberias bajo tierra
9.3.5 ml 32.00 46,251.00 1,480,032.00
9.3.6 ml 75.00 68,386.00 5,128,950.00
9.3.7 ml 73.00 79,943.00 5,835,839.00
9.3.8 ml 44.00 96,543.00 4,247,892.00
9.3.9 Suministro/Instalación de tubería pvc sanitaria 3" ml 22.00 31,548.00 694,056.00
Suministro e instalación de banca mixta concreto y madera
Equipo de filtracion y boquillas: Incluye dos filtros de 4.7 l/seg y 17 boquillas de chorros laminares
INSTALACIONES SANITARIAS AGUAS RESIDUALES Y AGUAS LLUVIAS
Evacuación de Escombros/Sobrantes en Vehículo Automotor
Suministro/Instalación de tubería pvc corrugada 4" (100 mm)Suministro/Instalación de tubería pvc corrugada 6" (160 mm)Suministro/Instalación de tubería pvc corrugada 8" (200 mm)Suministro/Instalación de tubería pvc corrugada 10" (250 mm)
9.3.10 Suministro/Instalación de tubería pvc sanitaria 4" ml 238.00 39,458.00 9,391,004.00Pozos de inspección
9.3.10 Cajas de inspeccion cuadradas de 0.8 x 0.8 m un 9.00 635,997.00 5,723,973.009.3.11 Cuerpo pozo de Inspección diametro 1.20 m ml 8.00 548,963.00 4,391,704.00
9.3.12 un 3.00 228,200.00 684,600.00
9.3.13 un 3.00 306,646.00 919,938.00Rellenos Compactados
9.3.14 Rellenos Compactados con material de excavacion m3 334.00 13,077.00 4,367,718.00
9.3.15 m3 84.00 55,517.00 4,663,428.00
9.40
Preliminares9.4.1 Señal preventiva y reglamentaria gl 1.00 76,444.00 76,444.00
Excavaciones y rellenos9.4.2 Excavación en zanja en material común m3 207.00 14,945.00 3,093,615.00
9.4.3 m3 41.40 55,517.00 2,298,404.00
9.4.4 Rellenos compactados con material de excavacion m3 165.60 13,077.00 2,165,551.00Tuberias y accesorios
9.4.5 Suministro/Instalación de tubería pvc presion 3" ml 30.00 43,299.00 1,298,970.00
9.4.6 Suministro/Instalación de tubería pvc presion 2.1/2" ml 72.00 35,632.00 2,565,504.00
9.4.7 Suministro/Instalación de tubería pvc presion 2" ml 123.00 24,106.00 2,965,038.00
9.4.8 Suministro/Instalación de tubería pvc presion 1.1/2" ml 159.00 18,108.00 2,879,172.00
9.4.9 Suministro/Instalación de tubería pvc presion 1" ml 2.00 14,411.00 28,822.009.4.10 Suministro/Instalación de tubería pvc presion 3/4" ml 14.00 12,138.00 169,932.009.4.11 Suministro/Instalación de tubería pvc presion 1/2" ml 132.00 8,241.00 1,087,812.00
Salidas para riego
9.4.12 un 3.00 30,557.00 91,671.00
9.4.13 Valvula de cortina de 1/2" un 3.00 47,718.00 143,154.00Hidrantes y valvulas
9.4.14 Hidrante tipo milan 3" un 1.00 2,108,790.00 2,108,790.009.4.15 Valvula de compuerta elastica 3" un 1.00 273,726.00 273,726.009.4.16 Tee hf 3" un 1.00 144,687.00 144,687.009.4.17 Contador 1.1/2" un 1.00 796,945.00 796,945.009.4.18 Valvulas de cortina 1.1/2" un 2.00 185,899.00 371,798.00
Cuarto de bombas9.4.19 Válvula de flotador 1.1/2" un 1.00 203,650.00 203,650.009.4.20 Valvulas de cortina 2" un 3.00 185,899.00 557,697.009.4.21 Valvulas de cortina 1.1/2" un 1.00 163,066.00 163,066.009.4.22 Valvulas de cortina 1" un 1.00 141,089.00 141,089.009.4.22 Cheques 2" un 2.00 330,895.00 661,790.009.4.23 Cheques 1" un 2.00 159,641.00 319,282.009.4.23 Cheques 1.1/2" un 1.00 216,725.00 216,725.009.4.23 Tuberia HG 1" m 8.00 50,300.00 402,400.009.4.24 Tuberia HG 2" m 12.00 88,727.00 1,064,724.009.4.25 Tuberia HG 2.1/2" m 6.00 100,734.00 604,404.009.4.26 Equipo de presión constante ud 1.00 7,917,630.00 7,917,630.009.4.27 Equipo de presión constante sistema de riesgo ud 1.00 4,498,252.00 4,498,252.0010.00 REDES ELECTRICAS 133,847,485.0010.10 SUB-ESTACIÓN
10.1.1 gl 1.00 6,916,080.00 6,916,080.00
10.1.2 un 1.00 1,662,657.00 1,662,657.00
10.20 RED SECUNDARIA B.T.
10.2.1 ml 30.00 68,480.00 2,054,400.00
10.2.2 un 13.00 382,220.00 4,968,860.00
10.2.3 gl 1.00 396,553.00 396,553.00
10.2.4 un 1.00 453,886.00 453,886.00
Base/Cañuela pozo de Inspección D=1.20 m. Concreto simple Aro - Tapa HF D=0.68 m. p/Cámara de Inspección
Sustituciones con material seleccionado para encamado de tuberías
INSTALACIONES REDES SUMINISTRO DE AGUA POTABLE
Sustituciones con material seleccionado para encamado de tuberías
Puntos hidraulicos para conexión de llave de manguera
Suministro e Instalación de subestación eléctrica aérea incluye transformador de 45 KVA, 13.200/214-123 V aceite, pararrayos, cajas primarias, fusibles, crucetas, pieamigos, puesta a tierra, aisladores de retención, dado, tubo EMT, soldadura exotérmica, cable cobre y de aluminio, accesorios de fijación, etc
Suministro e instalación de poste troncocónico 12m x 1.050 kg, aplomado, transporte
Suministro e instalación de cable cobre 4 No 1/0 awg-thhn para acometida desde transformador a TG
Suministro e Instalación de cámara de paso eléctrica de 0.80 x 0.80 x 1.10 m con tapa de concreto. Ver detalle en plano ELE-06
Suministro e instalación tubo metálico galvanizado 2" desde contador a cámara incluye terminales, unión, cinta band-it, grapas y demás accesorios
10.50 SISTEMA DE VOZ Y DATOSCABLEADO CAT 6A - EQUIPO PASIVO
10.5.1 un 1.00 840,884.00 840,884.00
10.5.2 Barra o platina vertical tierra para rack un 1.00 171,999.00 171,999.00
10.5.3 un 1.00 272,332.00 272,332.00
10.5.4 un 3.00 544,664.00 1,633,992.00
10.5.5 un 1.00 445,669.00 445,669.00
10.5.6 toma doble con jack para RJ 45 cat. 6A un 41.00 45,866.00 1,880,506.0010.5.7 Patch Cord cat. 6A de 1m un 44.00 21,643.00 952,292.0010.5.8 Patch Cord cat. 6A de 2m un 16.00 31,438.00 503,008.0010.5.9 Faceplate 2 Salidas un 41.00 7,740.00 317,340.0010.5.10 Tapas para Faceplate un 27.00 10,893.00 294,111.0010.5.11 Organizador horizontal Doble un 4.00 80,266.00 321,064.0010.5.12 identificación y marcación cables, tomas y rack un 120.00 4,300.00 516,000.0010.5.13 Certificación de punto Cat 6A (39 datos, 16 voz) un 55.00 9,078.00 499,290.0010.5.14 Suministro e instalación de cable S/FTP cat 6A ml 2,500.00 2,054.00 5,135,000.00
10.5.15 ml 5.00 14,561.00 72,805.00
10.5.16 ml 80.00 12,907.00 1,032,560.00
10.5.17 un 1.00 334,443.00 334,443.00
10.5.18 gl 1.00 1,911,100.00 1,911,100.00
10.5.19 un 1.00 3,344,425.00 3,344,425.00
10.5.20 Access Point Cisco 1250 un 1.00 1,433,325.00 1,433,325.00
10.5.21 un 1.00 43,000.00 43,000.00
Suministro e instalación de transformador de corriente 125/5 A, 600V, uso exterior, para medida indirecta, incluye protocolos.
Suministro e instalación de cable multifilamento No 12 awg para conexión medida, desde transformador hasta contador
Suministro e instalación de caja o gabinete en policarbonato, uso exterior, para alojar contador trifásico, incluye cinta bandit 5/8" y hebillas 5/8"
Suministro e instalación tubería conduit 2 x 3" PVC pesado, incluye, curvas, excavación brecha, lleno 0,50 x 1.0 m.
Corte pavimento, afirmado y restitución franja o resane con pavimento a 4.000 psi en calle, 0,50 de ancho x 0,20 m (de espesor concreto existente??).
Suministro de materiales e instalación de malla de tierra 4 varillas de cobre 5/8" X 2.40 m, cable cobre desnudo No 2 AWG, soldadura exotérmica y 2 cámaras de inspección de 30x30 cm según especificaciones.
Suministro e instalación de poste metalico de iluminación con doble brazo sencillo de 1.50 m, 4" x 8 metros para luminarias de 150W/70W sodio. Vías
Suministro e instalación e luminaria de 150 W sodio alta presión, incluye fotocelda. Ref. Calima II de Roy Alpha o similar
Suministro e instalación e luminaria de 70 W sodio alta presión, incluye fotocelda. Ref. Calima I de Roy Alpha o similar
Suministro e instalación de cable cobre 2No 8 + 1No 10 awg-thhn por tuberia PVC 1"Suministro e instalación de tuberia conduit PVC 1", incluye brecha y llenoSuministro e instalación de cable cobre 3No 12 awg-thhn desde cámara hasta luminaria
Suministro e instalación de cámara de paso de 40 x 40 x60 cm con tapa en concreto, para conexión o inspección cableado alumbrado
Suministro e instalación de cámara de paso de 40 x 40 x 60 cm con tapa en concreto, para conexión o inspección cableado alumbrado interior
Rack cerrado de 1,80 m x 0,60 x 0,60 m, Incluye ventiladores
Multitoma para rack horizontal x 5 tomas grado hospitalario 10 salidas con protección de 20 APatch panel de 24 puertos categoria 6A, prearmado (2 para datos, 1 para voz)Patch panel de 24 puertos categoria 5E, prearmado para telefonos
Suministro e instalación de cable telefonico multipar de 20 pares entre patch panel 5E a planta telefonica
Suministro e instalación de cable telefonico multipar de 10 pares entre strip principal de entrada a planta telefonica
Strip telefónico de 10 pares de 40 x 30 x 25 con regletas S66 de 25 Pares, incluye marcación
Suministro e instalación de planta telefónica completa, incluye 1 teléfono conmutador, instalación, programación y puesta en funcionamiento, 10 teléfonos sencillos
Salida de voz y datos en tuberia conduit PVC 3/4", sin alambrar, caja metálica 4x4" con suplemento (en Cafeteria)
10.60 TUBERIA CONDUIT PVC
10.6.1 ml 300.00 10,989.00 3,296,700.00
10.6.2 ml 175.00 5,733.00 1,003,275.00
10.6.3 ml 200.00 3,822.00 764,400.00
10.70 ACOMETIDAS
10.7.1 ml 100.00 6,402.00 640,200.00
10.7.2 ml 230.00 11,944.00 2,747,120.00
10.7.3 ml 40.00 9,078.00 363,120.00
10.7.4 ml 70.00 27,711.00 1,939,770.00
10.7.5 ml 300.00 8,122.00 2,436,600.00
10.80 TABLEROS DE DISTRIBUCIÓN
10.8.1 un 1.00 363,109.00 363,109.00
10.8.2 un 1.00 43,000.00 43,000.00
10.8.3 un 3.00 81,222.00 243,666.00
10.8.4 un 2.00 81,222.00 162,444.00
10.8.5 un 1.00 81,222.00 81,222.00
10.8.6 un 1.00 429,998.00 429,998.00
10.90 0.00
10.9.1 un 79.00 43,000.00 3,397,000.00
10.9.2 un 63.00 57,333.00 3,611,979.00
10.9.3 un 2.00 43,000.00 86,000.00
10.9.4 un 1.00 47,778.00 47,778.00
10.10 LUMINARIAS
10.10.1 un 1.00 114,093.00 114,093.00
10.10.2 un 38.00 77,094.00 2,929,572.00
Suministro e instalación tubería conduit DE 2" PVC, incluye curvas, terminales, accesorios y brecha y lleno donde corresponda.
Suministro e instalación tubería conduit DE 1" PVC, incluye curvas, terminales, accesorios y brecha y lleno donde corresponda.
Suministro e instalación tubería conduit DE 3/4" PVC, incluye curvas, terminales, accesorios y brecha y lleno donde corresponda.
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: Alambre cobre 3 No 12 AWG-THHN, ramales alumbrado
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: cable 2N° 8+1N° 10 AWG-THHN , ramales de alumbrado a reflectores cancha
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN/600 V por tubería, bandeja o Canaleta: cable 3N° 10+AWG-THHN , ramal de alimentación de Motobomba sumergible para chorros bajos desde tablero TI
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: cable 3N° 6+2N° 10 AWG-THHN, ramal de alimentación a cuarto control de bombas desde TCE a TCB
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta:cable 2N° 10+ 1N° 12 AWG-THHN , ramales de alumbrado exterior
Suministro e instalación de tablero trifásico 5 hilos, CON espacio para totalizador con puerta y cerradura sin interruptores SquareD, Legrand o Similar. TABLERO TG de 24 circuitos
Suministro e instalación de breaker de incrustar en tablero, 10KA/240V. 2x50 A para transfo. de aislamiento
Suministro e instalación de breaker de incrustar en tablero, 10KA/240V. 3x40ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 3x50ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 3x60 A para TCE
Suministro e instalación de interruptor automático, industrial, en caja moldeada, tripolar, 3x125 amp/25KA/240V. Para tablero general TG
SALIDAS DE ALUMBRADO, TOMACORRIENTES E INTERRUPTORES
Suministro e instalación de salida para lámpara fluorescente,led ó tipo bala, sin incluir la lámpara, incluye tubería conduit PVC 1/2", caja plastica 2x4, octogonal o 4x4, alambre cobre No 12 awg-thhn y todos los accesorios de fijación.
Suministro e instalación de salida para lámpara en pérgola, tubería a la vista, sin incluir la lámpara, incluye tubería metálica EMT 1/2", alambre cobre No 12 awg-thhn y todos los accesorios de fijación.
Suministro e instalación de salida para tomacorriente doble con polo de tierra 15 amp; 125 V, con implemento para uso general incluye tubería, caja, alambre. Linea Luminex Arquea blanco o Similar en cuarto control motomombas TCB y motobomba sumergible chorros
Suministro e instalación de salida para Interruptor sencillo sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación Luminaria Incluye cable encauchetado, clavija tripolar. Así:
Luminaria fluorescente 2x32 W, tubo T8, 4.100 K, 15 x 125 cm, cerrada en policarbonato, cierre tipo maleta, de colgar, chasis en PVC. Ref. IT 100A 1X4 /2T83241/EUNV ILTEC o Similar. En cuarto de control motomombas
Lámpara tipo tortuga sellada 60w/120V o bombilla Fluorescente 26W/120V,4.100K, Ref. ITA112/60W/120V ILTEC o Similar. PERGOLA
10.10.3 KIT 10.00 71,666.00 716,660.00
10.10.4 KIT 1.00 52,555.00 52,555.00
10.10.5 un 12.00 348,776.00 4,185,312.00
10.10.6 un 5.00 253,221.00 1,266,105.00
10.10.7 un 28.00 76,444.00 2,140,432.00
10.10.8 un 12.00 358,331.00 4,299,972.00
10.10.9 un 26.00 128,999.00 3,353,974.00
10.10.10 un 3.00 38,222.00 114,666.00
10.10.11 un 5.00 2,102,210.00 10,511,050.00
10.11 CAMARAS DE PASO
10.11.1 un 10.00 191,110.00 1,911,100.00
10.12 OTROS10.12.1 Certificación RETIE (Toda la obra eléctrica ) gl 1.00 2,866,650.00 2,866,650.0010.12.2 Provisionales durante la construcción gl 1.00 2,866,650.00 2,866,650.00
10.12.3 Elaboración planos record, dibujante, plotteo, copias un 10.00 143,333.00 1,433,330.00
10.12.4 gl 1.00 955,550.00 955,550.00
10.12.5 un 1.00 955,550.00 955,550.00
11.00 CERRAMIENTO 23,036,410.0011.10 PALIZADA
11.1.1 un 141.00 50,644.00 7,140,804.00
11.1.2 un 106.00 53,511.00 5,672,166.00
11.1.3 un 41.00 57,333.00 2,350,653.00
11.1.4 un 87.00 60,200.00 5,237,400.00
11.1.5 Suministro e instalación de platina metálica de 5/16" ml 78.80 33,444.00 2,635,387.00
2.00 PORTERÍA
1.0 PRELIMINARES 615,868.001.1.0 Localización y descapote1.1.1 Localización y replanteo comisión de topografia día 1.00 382,220.00 382,220.001.1.2 Descapote a mano (0 a 20 cm). Incluye retiro m2 15.40 4,316.00 66,466.001.5 Cerramiento provisional 1.5.1 Cerramiento en tela de polipropileno h:2m m2 24.60 6,796.00 167,182.002.00 MOVIMIENTOS DE TIERRA 119,000.002.1 Explanación, excavación y llenos2.1.1 Excavación en material común a mano m3 6.30 14,945.00 94,154.002.1.2 Lleno en material comun del sitio compactado m3 1.90 13,077.00 24,846.003.0 CONCRETOS 3,109,468.003.1 Concretos cimentación3.1.1 Afirmado compactado m3 3.08 52,184.00 160,727.003.1.2 Solado de limpieza e:0.05 m m3 0.32 258,809.00 82,819.003.1.5 Concreto de 3000 psi para viga zarpa m3 1.88 414,442.00 779,151.003.2 Concretos estructura3.2.2 Concreto 3000 psi para columna m3 1.06 583,060.00 618,044.00
3.2.3 m3 1.82 418,013.00 760,784.00
3.4 Concretos varios3.4.1 Concreto de 3000 psi para alfajia remate de muro ml 21.41 33,066.00 707,943.00
KIT de tubo fluorescente 4 x 32W/tubo T8, 6,500K, balasto electrónico para 4 tubos. PARA LUZ INDIRECTA INTERIOR MURO.
KIT de tubo fluorescente 2 x 17W/tubo T8, 6,500K, balasto electrónico para 4 tubos. PARA LUZ INDIRECTA INTERIOR MURO.
Bala de piso uso exterior, reflector tipo Terra, 70W/220V, Metal Halide.Poste tipo bolardo de 1.0 m de altura, luz indirecta para sendero, 70W / 220V sodio.
Bala de incrustar en muro, uso exterior, luz penumbra, leds 5W/120V, color ámbar. En cubos de plaza memorial
Reflector rectangular, uso exterior en aluminio inyectado con vidrio, protección IP65, color negro, bombilla 400W/220V metal halide. PARA CANCHA MULTIPLE Y JUEGOS SENSORIALES
Reflectores aplique sodio tipo Wall pack, protección en vidrio templado, para uso exterior IP65. 70w / 220v Ref. ITW 250/70W MH/M2 ILTEC o Similar. PARA PERGOLA Y LUZ LATERAL ACCESO PRINCIPAL
Fotocelda completa con base de 1.000W , multivoltaje 100-270 V para accionamiento alumbrado exterior
Suministro e instalación de poste metálico galvanizado de 10 m, troncocónico, poligonal de 12 caras, con accesorios para 4 proyectores, diámetro base 190 mm, diámetro cima 127 mm, base de 40 x 40 cm x 1/2" con aletas, incluye pernos de anclaje 5/8" x 1 m y plantilla para fundición. Iluminación deportiva
Suministro e instalación de cámara de paso de 40 x 40 x 60 cm con tapa en concreto, para conexión o inspección cableado alumbrado interior en plazoletas
Marcación general tomacorrientes, tableros, ducteria, etcTrámites, aprobaciones, Revisiones instalaciones e instalación contador pago a ENERTOLIMA
Suministro e instalación de tubo circular galvanizado 2" tipo ASuministro e instalación de tubo circular galvanizado 2" tipo BSuministro e instalación de tubo circular galvanizado 2" tipo CSuministro e instalación de tubo circular galvanizado 2" tipo D
Concreto de 3000 psi e=0,12 m para placa de contrapiso
4.0 ACERO/MALLAS/ESTRUCTURA METÁLICA 4,437,832.004.1 Acero de refuerzo4.1.1 Acero de refuerzo de 60000 psi 420 Mpa kg 132.00 2,459.00 324,588.004.2 Estructura metálica4.2.1 Estructura Metálica en perfiles PHR kg 517.78 7,944.00 4,113,244.005.00 MAMPOSTERIA 3,441,045.005,1,0 Muro en bloque5,1,5 Muro en mamposteria reforzada incluye grouting m2 51.00 59,139.00 3,016,089.005,2,0 Muros secos
5.2.4 Tabique en Superboard ancho: 72 cms para bajantes ml 12.00 35,413.00 424,956.00
Marcos y puertas en aluminio7.6.1 Puerta + marco en aluminio P-01 un 2.00 714,178.00 1,428,356.00
Ventaneria en aluminio7.6.2 Ventana en aluminio V-01 D:0.75*1.31 Guillotina un 6.00 281,648.00 1,689,888.007,7,0 Carpinteria metálica
7.7.1 un 1.00 5,494,413.00 5,494,413.00
7.7.2 ml 10.00 429,998.00 4,299,980.00
7.7.3 un 1.00 20,566,112.00 20,566,112.00
7.7.4 Puerta metálica de acceso parque un 1.00 1,330,126.00 1,330,126.008.0 REVOQUES/ENCHAPES/PINTURAS 3,339,311.008,1,0 Revoques
8.1.1 m2 37.10 14,389.00 533,832.00
8.1.2 m2 78.90 14,513.00 1,145,076.00
8.2 Pintura interior8.2.1 Pintura interior vinilo muros m2 37.10 12,829.00 475,956.008.3 Pintura Exterior8.3.1 Pintura tipo koraza sobre muros de fachada m2 78.90 15,012.00 1,184,447.009.0 PISOS 536,708.009.1 Pisos
9.1.1 m2 3.16 106,034.00 335,067.00
9.1.2 Guardaescoba en mortero h:0.08 m ml 12.90 8,919.00 115,055.009.20 Pisos en grano9.2.4 Construcción de bocapuertas en grano pulido ml 1.50 57,724.00 86,586.0011.00 CUBIERTA 5,415,848.00
11.10 m2 39.14 36,276.00 1,419,843.00
11.30 ml 74.22 53,840.00 3,996,005.00
12.00 INSTALACIONES ELECTRICAS 3,678,723.00
12.10
12.1.2 ml 5.00 44,911.00 224,555.00
12.1.3 ml 1.00 5,733.00 5,733.00
12.20
12.2.1 ml 5.00 397,020.00 1,985,100.00
12.30 TABLEROS DE DISTRIBUCIÓN
12.3.2 un 1.00 267,554.00 267,554.00
12.3.8 un 2.00 19,589.00 39,178.00
12.3.9 un 2.00 19,589.00 39,178.00
12.3.11 un 2.00 43,000.00 86,000.00
12.3.12 un 2.00 43,000.00 86,000.00
12.3.13 un 1.00 43,000.00 43,000.00
Suministro e instalación de escalera metálica para Torre MiradorPasamanos en acero inoxidable y vidrio templado 5mm.Torniquete de seguridad mecánico TURNLOCK 15 tipo IVEGAS O SIMILAR
Revoque en muro interior (incl. carteras, filos y dilataciones)Revoque en muro exterior (incl. carteras, filos y dilataciones)
Instalacion de piso en baldosa en grano pulido tipo alfa ref: 135020942 o similar
Suministro e instalación de cubierta termoacústica trapezoidal tipo ajover o similarSuministro e instalación de canal en lámina galvanizada calibre 24 d:0.5 m
BANDEJA PORTA CABLES, CANALETA, TUBERIA PVC
Suministro e instalación de canaleta metálica en lámina de acero galvanizado C.R. Calibre 22, con tapa de atornillar, terminada con pintura electrostática color negra, de 12 x 5 cm. Incluye accesorios de fijación, troqueles, soporte y demás accedsorios, incluye cable cobre N° 10 AWG desnudo en todo el recorrido.
Suministro e instalación tubería conduit PVC de 1 ", incluye curvas, terminales, accesorios y brecha y lleno donde corresponda diámetro, ver planos
ACOMETIDAS/RAMALES DE ALIMENTACION A TABLEROS
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: cable 4N° 8+1N° 10 AWG-THHN , ramales de TG a tableros
Suministro e instalación de tablero trifásico 5 hilos, sin espacio para totalizador con puerta y cerradura sin interruptores SquareD, Legrand o Similar de 18 circuitos
Suministro e instalación de breaker de incrustar en tablero, 10KA/240V. 1x15ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 1x20ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 2x15ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 2x20ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 2x30A
12.40
12.4.1 un 4.00 43,000.00 172,000.00
12.4.3 un 4.00 43,000.00 172,000.00
12.4.7 un 1.00 47,778.00 47,778.00
12.4.8 un 1.00 57,333.00 57,333.00
12.50 LUMINARIAS
12.5.3 un 2.00 112,564.00 225,128.00
12.5.4 un 2.00 114,093.00 228,186.00
3.00 CAFETERÍA Y BAÑOS
1.0 PRELIMINARES 5,748,190.001.1.0 Localización y descapote1.1.1 Localización y replanteo comisión de topografia día 1.00 382,220.00 382,220.001.1.2 Descapote a mano (0 a 20 cm). Incluye retiro m2 80.00 4,316.00 345,280.001.3 Retiros1.3.1 Retiro de escombros o material sobrante m3 60.00 15,204.00 912,240.001.4 Campamento1.4.1 Campamento provisional m2 25.00 137,154.00 3,428,850.001.5 Cerramiento provisional 1.5.1 Cerramiento en tela de polipropileno h:2m m2 100.00 6,796.00 679,600.002.00 MOVIMIENTOS DE TIERRA 177,566.002.1 Explanación, excavación y llenos2.1.1 Excavación en material común a mano m3 9.30 14,945.00 138,989.002.1.2 Lleno en material comun del sitio compactado m3 2.95 13,077.00 38,577.003.0 CONCRETOS 12,529,551.003.1 Concretos cimentación3.1.1 Afirmado compactado m3 16.00 52,184.00 834,944.003.1.2 Solado de limpieza e:0.05 m m3 0.95 258,809.00 245,869.003.1.3 Concreto 3000 psi para zapatas m3 2.52 383,296.00 965,906.003.1.4 Concreto de 3000 psi para vigas de fundación m3 3.34 414,442.00 1,384,236.003.2 Concretos estructura3.2.1 Concreto 3000 psi para viga aérea m3 2.84 527,018.00 1,496,731.003.2.2 Concreto 3000 psi para columna m3 1.83 515,809.00 943,930.00
3.2.3 m3 8.55 418,013.00 3,574,011.00
3.3 Concretos muros3.4 Concretos varios3.4.1 Concreto de 3000 psi para alfajia remate de muro ml 35.00 33,066.00 1,157,310.003.4.2 Concreto de 3000 psi para viga cinta de cuchillas m3 0.47 521,854.00 245,271.003.4.6 Concreto de 3000 psi para meson lavamanos ml 6.45 121,195.00 781,708.00
3.4.7 ml 7.58 110,746.00 839,455.00
3.4.9 ml 1.82 33,066.00 60,180.00
4.0 ACERO/MALLAS/ESTRUCTURA METÁLICA 5,526,647.004.1 Acero de refuerzo4.1.1 Acero de refuerzo de 60000 psi 420 Mpa kg 1,363.86 2,459.00 3,353,732.004.2 Estructura metálica4.2.1 Estructura Metálica en perfiles PHR kg 251.32 7,944.00 1,996,486.004.30 Mallas4.3.1 Malla electrosoldada D-188 m2 25.64 6,881.00 176,429.005.00 MAMPOSTERIA 17,289,706.005,1,0 Muro en bloque
5,1,2 m2 220.00 69,225.00 15,229,500.00
5,1,3 m2 3.64 71,668.00 260,872.00
5,1,4 Chapa tipo catalan de 14*9*30 cm - ancho 0.30 ml 27.30 26,929.00 735,162.00
SALIDAS DE ALUMBRADO, TOMACORRIENTES E INTERRUPTORES
Suministro e instalación de salida para lámpara fluorescente, halógena ó tipo bala, sin incluir la lámpara, incluye tubería conduit PVC 1/2", caja plastica 2x4, octogonal o 4x4, tomacorriente, alambre cobre No 12 awg-thhn y todos los accesorios de fijación.
Suministro e instalación de salida para tomacorriente doble con polo de tierra 15 amp; 125 V, con implemento para uso general incluye tubería, caja, alambre. Linea Luminex Arquea blanco o Similar
Suministro e instalación de salida para Interruptor SENCILLO sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación de salida para Interruptor DOBLE sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación Luminaria fluorescente 2x32w, tubo T8, 4.100 K, abierta de incrustar en cielo raso, 30 x 122 cm, Ref. LFS TB 1X4/2T83241/EU de ILTEC o Similar. PARA PASILLOS CON CIELO RASO
Luminaria fluorescente 2x32 W, tubo T8, 4.100 K, 15 x 125 cm, cerrada en policarbonato, cierre tipo maleta, de colgar, chasis en PVC. Ref. IT 100A 1X4 /2T83241/EUNV ILTEC o Similar.
Concreto de 3000 psi e=0,12 m para placa de contrapiso
Concreto de 3000 psi para meson en barra de atenciónConcreto de 3000 psi para alfajia en calados incluye gotero un lado
Muro en bloque concreto de color ocre tipo Catalan de 14*9*30 cmMuro en bloque calado gris tipo persiana 10x20x20 a la vista
5,2,0 Muros secos
5.2.4 Tabique en Superboard ancho: 72 cms para bajantes ml 12.00 35,413.00 424,956.00
5.2.5 Muro en Superboard doble cara e:11cms m2 8.30 77,014.00 639,216.006.0 APARATOS/GRIFERIA/MUEBLES/MESONES 31,149,706.006.1 Aparatos sanitarios
6.1.1 un 7.00 813,202.00 5,692,414.00
6.1.2 un 5.00 309,985.00 1,549,925.00
6.1.3 Lavamanos de colgar incluye griferia un 1.00 287,625.00 287,625.00
6.1.4 Orinal linea institucional incluye valvula antivandalica un 1.00 414,441.00 414,441.00
6.2.0 Incrustaciones y accesorios
6.2.1 un 7.00 144,670.00 1,012,690.00
6.2.2 un 2.00 104,537.00 209,074.00
6.2.3 un 5.00 108,359.00 541,795.00
6.2.4 un 1.00 207,649.00 207,649.00
6.3 Muebles
6.3.1 un 1.00 8,240,663.00 8,240,663.00
6.3.2 un 1.00 1,280,437.00 1,280,437.00
6.3.3 Barra cafeteria en grano pulido ml 6.92 135,525.00 937,833.006.3.7 Espejos biselado de 4mm. m2 2.60 82,875.00 215,475.006.4 Divisiones en acero inoxidable
6.4.1 m2 21.30 471,086.00 10,034,132.00
6.4.2 un 1.00 525,553.00 525,553.00
7.0 CARPINTERIA ALUMINIO/METALICA/MADERA 19,754,556.007.40 CAFETERIA - WC MODULO DE SERVICIOS
Marcos y puertas en aluminio7.4.1 Puerta + marco en aluminio P-01 un 6.00 629,325.00 3,775,950.007.4.2 Puerta + marco en aluminio P-02 un 1.00 849,484.00 849,484.007.4.3 Puerta + marco en aluminio P-03 un 4.00 1,262,282.00 5,049,128.007.4.4 Puerta + marco en aluminio P-04 un 2.00 2,087,877.00 4,175,754.00
Ventaneria en aluminio7.4.5 Ventana en aluminio V-01 D:0.61*0.60 Fija un 6.00 52,460.00 314,760.007.4.6 Ventana en aluminio V-02 D:0.61*0.90 Celosia un 6.00 141,641.00 849,846.007.4.7 Ventana en aluminio V-03 D:1.35*0.30 Fija un 1.00 58,050.00 58,050.00
9.1.2 Guardaescoba en mortero h:0.08 m ml 15.30 8,919.00 136,461.00
9.1.3 m2 30.62 83,994.00 2,571,896.00
9.20 Pisos en grano9.2.3 Construcción de mediacaña en grano ml 54.30 18,171.00 986,685.009.2.4 Construcción de bocapuertas en grano pulido ml 7.04 57,724.00 406,377.0010.00 CIELORASOS 3,407,663.00
10.20 m2 60.50 56,325.00 3,407,663.00
11.00 CUBIERTA 4,079,689.00
11.10 m2 63.93 36,276.00 2,319,125.00
11.20 ml 12.00 41,277.00 495,324.00
11.30 ml 23.50 53,840.00 1,265,240.00
12.00 INSTALACIONES ELECTRICAS 6,562,316.00
12.10
12.1.3 ml 50.00 4,618.00 230,900.00
12.20
Sanitario con fluxometro linea institucional incluye valvula antivandalicaLavamanos de incrustar linea institucional incluye griferia
Suministro, transporte e instalación de dispensador de papel higiénicoSuministro, transporte e instalación de dispensador de ToallasSuministro, transporte e instalación de dispensador de Jabón SpraySuministro, transporte e instalación de Barra discapacitados en acero inoxidable.
Mueble para cafetería cubierta en acero inoxidable incluye lavaplatos y salpicaderoMueble para cafetería cubierta en acero inoxidable incluye estufa
División en acero inoxidable 304 calibre 20 para baño, tipo socoda o similar.División en acero inoxidable 304 calibre 20 para orinales, tipo socoda o similar.
Ventana en aluminio V-04 D:3.46*1.77 Celosia cuerpos plegables
Enchapes muros en cerámica blanca de 20.5x20.5, tipo corona
Instalacion de piso en baldosa en grano pulido tipo alfa ref: 135020942 o similar
Suministro e instalación de baldosa 30x30 perlato claro para baños
Suministro, transporte y colocación de cielo falso en Superboard de 8 mm
Suministro e instalación de cubierta termoacústica trapezoidal tipo ajover o similarSuministro e instalación de caballete tipo ajover o similarSuministro e instalación de canal en lámina galvanizada calibre 24 d:0.5 m
BANDEJA PORTA CABLES, CANALETA, TUBERIA PVC
Suministro e instalación tubería conduit PVC de 1 ", incluye curvas, terminales, accesorios y brecha y lleno donde corresponda diámetro, ver planos
13.1.1 Tuberia de 3" ml 16.00 17,945.00 287,120.00Tragante de aguas lluvias en bronce
13.1.3 Tragante 5"x 3" un 8.00 28,475.00 227,800.00Tuberia bajo tierra PVC sanitaria
13.1.5 Tuberia 3" sanitaria ml 4.00 31,548.00 126,192.0013.1.6 Tuberia 4" sanitaria ml 16.00 39,458.00 631,328.00
Excavación y rellenos en brecha13.1.7 Excavación en Material común m3 10.00 14,945.00 149,450.0013.1.8 Relleno con material seleccionado m3 2.00 55,986.00 111,972.0013.1.9 Relleno con material de la brecha m3 8.00 13,077.00 104,616.00
Puntos Sanitarios PVC13.1.10 Sanitario de fluxometro un 7.00 57,962.00 405,734.0013.1.11 Lavamanos un 6.00 57,962.00 347,772.0013.1.12 Orinal un 1.00 57,962.00 57,962.00
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: cable 4N° 8+1N° 10 AWG-THHN , ramales de TG a tableros
Suministro e instalación de tablero trifásico 5 hilos, sin espacio para totalizador con puerta y cerradura sin interruptores SquareD, Legrand o Similar de 12 circuitos
Suministro e instalación de breaker de incrustar en tablero, 10KA/240V. 1x15ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 1x20ASALIDAS DE ALUMBRADO, TOMACORRIENTES E INTERRUPTORES
Suministro e instalación de salida para lámpara fluorescente, halógena ó tipo bala, sin incluir la lámpara, incluye tubería conduit PVC 1/2", caja plastica 2x4, octogonal o 4x4, tomacorriente, alambre cobre No 12 awg-thhn y todos los accesorios de fijación.
Suministro e instalación de salida para tomacorriente doble con polo de tierra 15 amp; 125 V, con implemento para uso general incluye tubería, caja, alambre. Linea Luminex Arquea blanco o Similar
Suministro e instalación de salida para tomacorriente doble con polo de tierra 15 A tipo GFCI; 125 V, con implemento incluye tubería, caja, alambre. Linea Luminex Arquea blanco o Similar
Suministro e instalación de salida para Interruptor SENCILLO sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación de salida para Interruptor CONMUTABLE SENCILLO sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación Luminaria fluorescente 2x32W, tubo T8, 4.100 K, abierta de colgar o sobreponer, 30 x 122 cm. Ref. IF SAB 1X4/2T43241/EU ILTEC o Similar. PARA BAÑOS. incluye cable encauchetado, clavija tripolar
Suministro e instalación Luminaria fluorescente 2x32w, tubo T8, 4.100 K, de incrustar, cerrada con acrílico, 30 x 122 cm Ref. LFS PC 1X4/2T83241/EU ILTEC o Similar. PARA COCINETAS Y SALAS DE JUEGOS
Suministro e instalación luminaria aplique pared, decorativo, con bombilla fluorescente 23W/rosca E27, 2.700 K. HALL SALA MULTIPLE, ACCESOS SALA DE JUEGOS
Suministro e instalación Bala fluorescente 2x26W, tubo T4, balasto electrónico, de incrustar en cielo raso, con rejilla en aluminio especular de 4 celdas, Ref. ITD 33 BR/1,5 E4/2T42641/EU ILTEC o Similar. PARA HALL, CIRCULACION, RECEPCION
Suministro e instalación de caja de paso de 15x15x10 cm
Instalaciones sanitarias aguas residuales y aguas lluviasTuberia PVC aguas residuales y aguas lluvias por placas y ductos
13.1.13 Ducha un 2.00 57,962.00 115,924.0013.1.14 Lavaplatos un 2.00 57,962.00 115,924.0013.1.15 Poceta de aseo un 1.00 57,962.00 57,962.0013.1.16 Desagüe de piso 2" un 3.00 57,962.00 173,886.00
13.20
Tuberia PVC presión bajo tierra13.2.1 Tuberia 2 " ml 16.00 24,106.00 385,696.0013.2.4 Tuberia 3/4 " ml 2.00 12,138.00 24,276.0013.2.5 Tuberia 1/2 " ml 2.00 8,241.00 16,482.00
Excavación y relleno de brechas13.2.6 Excavacion en material comun m3 4.00 14,945.00 59,780.0013.2.7 Relleno con material de la brecha m3 4.00 13,077.00 52,308.00
Valvula de cortina de bronce13.2.8 Valvula de 2" un 2.00 185,899.00 371,798.0013.2.11 Valvula 3/4" un 1.00 53,969.00 53,969.0013.2.12 Valvula 1/2" un 1.00 47,718.00 47,718.00
Punto de suministro de agua fria PVC13.2.13 Punto Sanitario de fluxometro un 7.00 57,399.00 401,793.0013.2.14 Punto Lavamanos un 6.00 38,957.00 233,742.0013.2.15 Punto Orinal un 1.00 38,957.00 38,957.0013.2.16 Punto Ducha un 2.00 38,957.00 77,914.0013.2.17 Punto Lavaplatos un 2.00 38,957.00 77,914.0013.2.18 Punto Poceta de aseo un 2.00 38,957.00 77,914.00
Montaje de aparatos sanitarios13.2.19 Sanitario de fluxometro un 7.00 38,957.00 272,699.0013.2.20 Lavamanos un 6.00 38,957.00 233,742.0013.2.21 Orinal un 1.00 38,957.00 38,957.0013.2.22 Ducha un 2.00 38,957.00 77,914.0013.2.23 Lavaplatos un 2.00 38,957.00 77,914.0013.2.24 Salida para poceta un 2.00 21,261.00 42,522.00
Varios13.2.25 Desinfeccion del sistema un 1.00 28,667.00 28,667.0013.2.26 Planos record gl 1.00 47,778.00 47,778.00
4.00 MEMORIAL FOTOGRÁFICO
1.0 PRELIMINARES 2,097,611.001.1.0 Localización y descapote1.1.1 Localización y replanteo comisión de topografia día 1.00 382,220.00 382,220.001.1.2 Descapote a mano (0 a 20 cm). Incluye retiro m2 81.00 4,316.00 349,596.001.3 Retiros1.3.1 Retiro de escombros o material sobrante m3 64.80 15,204.00 985,219.001.5 Cerramiento provisional 1.5.1 Cerramiento en tela de polipropileno h:2m m2 56.00 6,796.00 380,576.002.00 MOVIMIENTOS DE TIERRA 326,511.002.1 Explanación, excavación y llenos2.1.1 Excavación en material común a mano m3 17.56 14,945.00 262,434.002.1.2 Lleno en material comun del sitio compactado m3 4.90 13,077.00 64,077.003.0 CONCRETOS 72,288,554.003.1 Concretos cimentación3.1.1 Afirmado compactado m3 16.20 52,184.00 845,381.003.1.2 Solado de limpieza e:0.05 m m3 0.56 258,809.00 144,933.003.1.4 Concreto de 3000 psi para vigas de fundación m3 7.84 414,442.00 3,249,225.003.2 Concretos estructura
3.2.3 m3 24.20 418,013.00 10,115,915.00
3.3 Concretos muros
3.3.1 m3 86.40 656,701.00 56,738,966.00
3.4 Concretos varios3.4.1 Concreto de 3000 psi para alfajia remate de muro ml 30.00 33,066.00 991,980.00
3.4.5 m3 0.50 404,308.00 202,154.00
4.0 ACERO/MALLAS/ESTRUCTURA METÁLICA 12,305,858.004.1 Acero de refuerzo4.1.1 Acero de refuerzo de 60000 psi 420 Mpa kg 3,617.80 2,459.00 8,896,170.004.2 Estructura metálica4.2.1 Estructura Metálica en perfiles PHR kg 363.60 7,944.00 2,888,438.004.2.5 Platinas Metalicas de Apoyo de 1/4" kg 27.00 10,438.00 281,826.004.2.6 Anclaje en varilla roscada de 5/8" L: 0.30m∅ un 32.00 7,482.00 239,424.006.0 APARATOS/GRIFERIA/MUEBLES/MESONES 5,484,858.006.3 Muebles
6.3.8 un 2.00 2,742,429.00 5,484,858.00
7.0 CARPINTERIA ALUMINIO/METALICA/MADERA 6,554,502.007.50 MEMORIAL FOTOGRAFICO
Marcos y puertas en aluminio7.5.1 Puerta + marco en aluminio P-01 un 2.00 3,119,871.00 6,239,742.00
Instalaciones hidraulicas para suministro de agua potable
Concreto de 3000 psi e=0,12 m para placa de contrapiso
Concreto de 3000 psi para muro color ocre (memorial fotogr.)
Concreto de 3000 psi para muro rampa (acceso memorial)
Suministro e instalación de panel fotográfico 8.0 m. X 4.5 m. (banner)
Ventaneria en aluminio7.5.2 Ventana en aluminio V-01 D:0.61*0.60 Fija un 6.00 52,460.00 314,760.008.0 REVOQUES/ENCHAPES/PINTURAS 6,307,885.008.2 Pintura interior8.2.1 Pintura interior vinilo muros m2 205.00 12,829.00 2,629,945.008.3 Pintura Exterior8.3.1 Pintura tipo koraza sobre muros de fachada m2 245.00 15,012.00 3,677,940.009.0 PISOS 7,257,598.009.20 Pisos en grano9.2.1 Piso en grano N°2 pulido en memorial m2 70.60 97,243.00 6,865,356.00
9.2.2 un 1.00 392,242.00 392,242.00
10.00 CIELORASOS 2,259,684.00
10.10 Suministro y colocación de cielo falso en GYPLAC. m2 70.56 32,025.00 2,259,684.00
11.00 CUBIERTA 4,176,676.00
11.10 m2 81.00 36,276.00 2,938,356.00
11.30 ml 23.00 53,840.00 1,238,320.00
12.00 INSTALACIONES ELECTRICAS 8,310,224.00
12.10
12.1.3 ml 70.00 4,618.00 323,260.00
12.20
12.2.5 ml 30.00 6,402.00 192,060.00
12.2.6 ml 30.00 7,644.00 229,320.00
12.30 TABLEROS DE DISTRIBUCIÓN
12.3.8 un 1.00 12,661.00 12,661.00
12.3.9 un 1.00 12,661.00 12,661.00
12.40
12.4.1 un 14.00 43,000.00 602,000.00
12.4.3 un 8.00 43,000.00 344,000.00
12.4.9 un 2.00 62,111.00 124,222.00
12.4.10 un 2.00 71,666.00 143,332.00
12.50 LUMINARIAS
12.5.14 un 10.00 348,776.00 3,487,760.00
12.5.17 un 28.00 81,222.00 2,274,216.00
12.60 CAJAS DE PASO 0.00
12.6.3 un 2.00 43,000.00 86,000.00
12.70 SISTEMA DE PERIFONEOAUDITORIO SALA MULTIPLE
12.7.1 un 4.00 86,000.00 344,000.00
12.7.14 ml 60.00 1,290.00 77,400.00
12.7.15 un 4.00 14,333.00 57,332.00
5.00 TORRE MIRADOR
Estrella construida en grano N°2 pulido color negro y gris
Suministro e instalación de cubierta termoacústica trapezoidal tipo ajover o similarSuministro e instalación de canal en lámina galvanizada calibre 24 d:0.5 m
BANDEJA PORTA CABLES, CANALETA, TUBERIA PVC
Suministro e instalación tubería conduit PVC de 1 ", incluye curvas, terminales, accesorios y brecha y lleno donde corresponda diámetro, ver planos
ACOMETIDAS/RAMALES DE ALIMENTACION A TABLEROS
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: Alambre cobre 3 No 12 AWG-THHN, ramales alumbrado, tomas
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: Alambre cobre 2N° 10+ 1N° 12 AWG-THHN, ramales de tomas desde Tablero TI
Suministro e instalación de breaker de incrustar en tablero, 10KA/240V. 1x15ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 1x20ASALIDAS DE ALUMBRADO, TOMACORRIENTES E INTERRUPTORES
Suministro e instalación de salida para lámpara fluorescente, halógena ó tipo bala, sin incluir la lámpara, incluye tubería conduit PVC 1/2", caja plastica 2x4, octogonal o 4x4, tomacorriente, alambre cobre No 12 awg-thhn y todos los accesorios de fijación.
Suministro e instalación de salida para tomacorriente doble con polo de tierra 15 amp; 125 V, con implemento para uso general incluye tubería, caja, alambre. Linea Luminex Arquea blanco o Similar
Suministro e instalación de salida para Interruptor CONMUTABLE SENCILLO sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación de salida para Interruptor CONMUTABLE DOBLE sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación bala de piso uso exterior, tipo terra, leds 15W/110VSuministro e instalación Bala redonda de incrustar led de 1 W/110V color ámbar.
Suministro e instalación de caja de paso de 15x15x10 cm
Suministro e instalación de Bafle de techo 60W, con rejilla decorativa de sobreponer.Suministro e Instalación de cable dúplex 2x18 awg. BlindadoSuministro e instalación de salida para paralante en techo, incluye caja
1.0 PRELIMINARES 808,732.001.1.0 Localización y descapote1.1.1 Localización y replanteo comisión de topografia día 1.00 382,220.00 382,220.001.1.2 Descapote a mano (0 a 20 cm). Incluye retiro m2 6.00 4,316.00 25,896.001.3 Retiros1.3.1 Retiro de escombros o material sobrante m3 4.00 15,204.00 60,816.001.5 Cerramiento provisional 1.5.1 Cerramiento en tela de polipropileno h:2m m2 50.00 6,796.00 339,800.002.00 MOVIMIENTOS DE TIERRA 249,022.002.1 Explanación, excavación y llenos2.1.1 Excavación en material común a mano m3 9.68 14,945.00 144,668.002.1.2 Lleno en material comun del sitio compactado m3 7.98 13,077.00 104,354.003.0 CONCRETOS 6,768,652.003.1 Concretos cimentación3.1.1 Afirmado compactado m3 1.20 52,184.00 62,621.003.1.2 Solado de limpieza e:0.05 m m3 0.67 258,809.00 173,402.003.1.3 Concreto 3000 psi para zapatas m3 2.18 383,296.00 835,585.003.1.4 Concreto de 3000 psi para vigas de fundación m3 0.48 414,442.00 198,932.003.2 Concretos estructura3.2.1 Concreto 3000 psi para viga aérea m3 1.61 526,827.00 848,191.003.2.2 Concreto 3000 psi para columna m3 5.42 515,809.00 2,795,685.00
3.2.3 m3 0.47 418,013.00 196,466.00
3.4 Concretos varios
3.4.4 Concreto de 3000 psi para losa balcon (torre del reloj) m3 2.00 708,194.00 1,416,388.00
3.4.9 ml 7.30 33,066.00 241,382.00
4.0 ACERO/MALLAS/ESTRUCTURA METÁLICA 4,292,529.004.1 Acero de refuerzo4.1.1 Acero de refuerzo de 60000 psi 420 Mpa kg 1,745.64 2,459.00 4,292,529.005.00 MAMPOSTERIA 2,448,819.005,1,0 Muro en bloque5,1,1 Muro en bloque de concreto 0.12x 0.19 x 0.39 m2 38.42 29,042.00 1,115,794.00
8.2 Pintura interior8.2.1 Pintura interior vinilo muros m2 69.60 12,829.00 892,898.008.3 Pintura Exterior8.3.1 Pintura tipo koraza sobre muros de fachada m2 69.60 15,012.00 1,044,835.009.0 PISOS 445,343.009.1 Pisos
9.1.1 m2 4.20 106,034.00 445,343.00
10.00 CIELORASOS 134,505.00
10.10 Suministro y colocación de cielo falso en GYPLAC. m2 4.20 32,025.00 134,505.00
11.00 CUBIERTA 432,550.0011.40 Cubierta en concreto de 3000 psi m3 1.09 396,835.00 432,550.0012.00 INSTALACIONES ELECTRICAS 3,680,344.00
12.10
12.1.3 ml 15.00 4,618.00 69,270.00
12.20
12.2.5 ml 50.00 6,402.00 320,100.00
12.2.6 ml 80.00 7,644.00 611,520.00
12.30 TABLEROS DE DISTRIBUCIÓN
12.3.9 un 1.00 12,661.00 12,661.00
12.3.11 un 1.00 43,000.00 43,000.00
12.40
Concreto de 3000 psi e=0,12 m para placa de contrapiso
Concreto de 3000 psi para alfajia en calados incluye gotero un lado
Muro en bloque calado gris tipo persiana 10x20x20 a la vista
Revoque en muro interior (incl. carteras, filos y dilataciones)Revoque en muro exterior (incl. carteras, filos y dilataciones)
Instalacion de piso en baldosa en grano pulido tipo alfa ref: 135020942 o similar
BANDEJA PORTA CABLES, CANALETA, TUBERIA PVC
Suministro e instalación tubería conduit PVC de 1 ", incluye curvas, terminales, accesorios y brecha y lleno donde corresponda diámetro, ver planos
ACOMETIDAS/RAMALES DE ALIMENTACION A TABLEROS
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: Alambre cobre 3 No 12 AWG-THHN, ramales alumbrado, tomas
Suministro e instalación de alimentador en conductor de cobre aislado THHN-THWN / 600 V por tubería, bandeja o Canaleta: Alambre cobre 2N° 10+ 1N° 12 AWG-THHN, ramales de tomas desde Tablero TI
Suministro e instalación de breaker de incrustar en tablero, 10KA/240V. 1x20ASuministro e instalación de breaker de incrustar en tablero, 10KA/240V. 2x15ASALIDAS DE ALUMBRADO, TOMACORRIENTES E INTERRUPTORES
12.4.1 un 10.00 43,000.00 430,000.00
12.4.2 un 3.00 52,555.00 157,665.00
12.4.3 un 1.00 43,000.00 43,000.00
12.4.7 un 1.00 47,778.00 47,778.00
12.50 LUMINARIAS
12.5.7 un 8.00 77,094.00 616,752.00
12.5.16 un 3.00 329,665.00 988,995.00
12.5.18 un 1.00 134,733.00 134,733.00
12.5.19 un 1.00 123,648.00 123,648.00
12.5.20 un 1.00 38,222.00 38,222.00
12.60 CAJAS DE PASO
12.6.3 un 1.00 43,000.00 43,000.00
6.00 MÓDULO DE VENTA - AMOBLAMIENTO
2.00 MOVIMIENTOS DE TIERRA 939,483.002.1 Explanación, excavación y llenos2.1.1 Excavación en material común a mano m3 46.99 14,945.00 702,266.002.1.2 Lleno en material comun del sitio compactado m3 18.14 13,077.00 237,217.003.0 CONCRETOS 11,618,898.003.1 Concretos cimentación3.1.1 Afirmado compactado m3 3.63 52,184.00 189,428.003.1.2 Solado de limpieza e:0.05 m m3 2.77 258,809.00 716,901.003.1.5 Concreto de 3000 psi para viga zarpa m3 7.94 414,442.00 3,290,669.003.2 Concretos estructura3.2.1 Concreto 3000 psi para viga aérea m3 0.96 526,827.00 505,754.003.3 Concretos muros
3.3.1 m3 6.00 656,701.00 3,940,206.00
3.4 Concretos varios3.4.1 Concreto de 3000 psi para alfajia remate de muro ml 90.00 33,066.00 2,975,940.004.0 ACERO/MALLAS/ESTRUCTURA METÁLICA 2,923,735.004.1 Acero de refuerzo4.1.1 Acero de refuerzo de 60000 psi 420 Mpa kg 572.53 2,459.00 1,407,851.004.2 Estructura metálica4.2.1 Estructura Metálica en perfiles PHR kg 138.85 7,944.00 1,103,024.004.30 Mallas4.3.2 Malla electrosoldada D-221 m2 60.00 6,881.00 412,860.0011.00 CUBIERTA 2,994,919.00
11.10 m2 48.72 36,276.00 1,767,367.00
11.30 ml 22.80 53,840.00 1,227,552.00
7.00 PÉRGOLA
1.0 PRELIMINARES 10,546,500.001.1.0 Localización y descapote1.1.1 Localización y replanteo comisión de topografia día 5.00 382,220.00 1,911,100.001.1.2 Descapote a mano (0 a 20 cm). Incluye retiro m2 1,000.00 4,316.00 4,316,000.001.3 Retiros1.3.1 Retiro de escombros o material sobrante m3 150.00 15,204.00 2,280,600.001.5 Cerramiento provisional 1.5.1 Cerramiento en tela de polipropileno h:2m m2 300.00 6,796.00 2,038,800.002.00 MOVIMIENTOS DE TIERRA 684,258.00
Suministro e instalación de salida para lámpara fluorescente, halógena ó tipo bala, sin incluir la lámpara, incluye tubería conduit PVC 1/2", caja plastica 2x4, octogonal o 4x4, tomacorriente, alambre cobre No 12 awg-thhn y todos los accesorios de fijación.
Suministro e instalación de salida para Lámpara Especial 220Vac, En Tubería PVC 3/4", sin incluir la lámpara, incluye tubería, caja 2x4, octogonal, 4x4, tomacorriente, alambre cobre No 12 awwg-thhn y todos los accesorios de fijación.
Suministro e instalación de salida para tomacorriente doble con polo de tierra 15 amp; 125 V, con implemento para uso general incluye tubería, caja, alambre. Linea Luminex Arquea blanco o Similar
Suministro e instalación de salida para Interruptor SENCILLO sin luz piloto, en Tubería PVC por techo y/o Muro, incluye implemento, tubería, caja y alambre. Linea Luminex arquea blanco o similar
Suministro e instalación Lámpara tipo tortuga sellada 60w/120V o bombilla Fluorescente 26W/120V,4.100K, Ref. ITA112/60W/120V ILTEC o Similar. PERGOLA
Suministro e instalación Reflector rectangular uso exterior en aluminio inyectado con vidrio, protección IP65, color negro, bombilla 250 W/220V sodio. MIRADOR
Suministro e instalación AVISO DE SALIDA Ref. IT SALIDA ILTEC o SimilarSuministro e instalación Lampara de emergencia 2x5W Ref. IT EXL 950 ILTEC o Similar
Suministro e instalación Fotocelda completa con base de 1.000W , multivoltaje 100-270 V para accionamiento alumbrado exterior
Suministro e instalación de caja de paso de 15x15x10 cm
Concreto de 3000 psi para muro color ocre (memorial fotogr.)
Suministro e instalación de cubierta termoacústica trapezoidal tipo ajover o similarSuministro e instalación de canal en lámina galvanizada calibre 24 d:0.5 m
2.1 Explanación, excavación y llenos2.1.1 Excavación en material común a mano m3 39.24 14,945.00 586,442.002.1.2 Lleno en material comun del sitio compactado m3 7.48 13,077.00 97,816.003.0 CONCRETOS 36,511,470.003.1 Concretos cimentación3.1.1 Afirmado compactado m3 200.00 52,184.00 10,436,800.003.1.2 Solado de limpieza e:0.05 m m3 39.42 258,809.00 10,202,251.003.1.3 Concreto 3000 psi para zapatas m3 19.62 383,296.00 7,520,268.003.1.6 Concreto de 3000 psi para pedestal m3 13.63 612,777.00 8,352,151.004.0 ACERO/MALLAS/ESTRUCTURA METÁLICA 210,750,639.004.1 Acero de refuerzo4.1.1 Acero de refuerzo de 60000 psi 420 Mpa kg 3,575.20 2,459.00 8,791,417.004.2 Estructura metálica
4.2.2 kg 21,594.00 8,932.00 192,877,608.00
4.2.5 Platinas Metalicas de Apoyo de 1/4" kg 245.00 10,438.00 2,557,310.004.2.7 Anclaje en varilla roscada de 3/8" L: 0.30m∅ un 872.00 7,482.00 6,524,304.00
1.00 PRELIMINARES 4,004,174.001.1 Campamento tabla GBL 1.00 897,451.00 897,451.001.2 Localización - replanteo- obra arquitectónica M2 810.00 3,239.00 2,623,590.001.3 Cerramiento tela fib. tejida h 2,10 bord ML 50.00 6,796.00 339,800.001.4 Instalación provisional acueducto MES 1.00 66,889.00 66,889.001.5 Instalación provisional energía MES 1.00 76,444.00 76,444.002.00 ADECUACION PREVIA PISCINA 3,309,264.002.1 Limpieza enchapes M2 374.00 2,397.00 896,478.002.2 limpieza - resane cajas de inspección UND 4.00 29,781.00 119,124.00
ACCESORIOS 15.5 Abrazadera sanitaria de 3" UND 6.00 3,403.00 20,418.0015.6 Sifón sanitario pvc 2" UND 11.00 26,755.00 294,305.0015.7 Limpiador 760 grs (1/4) UND 1.00 22,164.00 22,164.0015.8 Soldadura pvc 900 grs (1/4) UNID 1.00 56,035.00 56,035.00
INSTALACIÓN VARIOS 15.9 Instalación tuberia sanitaria de 2" ML 18.00 2,548.00 45,864.0015.10 Instalación tuberia sanitaria de 4" ML 22.00 3,721.00 81,862.00
PUNTOS SANITARIOS 15.11 Punto sanitario pvc de 2" PTO 10.00 21,261.00 212,610.0015.12 Punto sanitario pvc de 4" PTO 4.00 38,957.00 155,828.00
Perfil tubular colmena 100x100 e=3mm ASTM A-500 grado c
AREA SERVICIOS ZONA HUMEDA Y ADECUACION PISCINA
Excavacion tierra a mano para cimentacion unidad de servicio
Excavacion tierra a mano zanjas para tuberia incluye retiro de sobrantes y disposicion final
Excavacion tierra a mano incluye retiro de sobrantes y disposicion final
Viga cimiento enlace h=20-30 cms concreto de 3.000 psi
16.00 INSTALACIONES HIDRAULICAS 2,508,500.0016.1 Punto agua fría 1/2" PTO 11.00 57,962.00 637,582.0016.2 Adaptador hembra pvc presión 1/2 UND 20.00 980.00 19,600.0016.3 Codo 90 presión pvc 1/2 " UND 15.00 1,188.00 17,820.0016.4 Tee presión pvc 1/2 " UND 24.00 1,371.00 32,904.0016.5 Unión presión pvc 1/2 UNID 15.00 1,018.00 15,270.00
TUBERÍAS 16.6 Tuberia pvc de 1/2 ML 106.00 1,911.00 202,566.0016.7 Tuberia pvc de 1" ML 64.00 4,367.00 279,488.00