This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
348 EQIP Dam, Diversion (No.)324 EQIP Deep Tillage (Ac.)356 EQIP Dike (Ft.)362 EQIP Diversion (Ft.)647 EQIP Early Successional Habitat Development/Man592 EQIP Feed Management (Au)382 EQIP Fence (Ft.)382 EQIP Fence (Ft.)382 EQIP Fence (Ft.)382 EQIP Fence (Ft.)382 EQIP Fence (Ft.)386 EQIP Field Border (Ft.)386 EQIP Field Border (Ft.)386 EQIP Field Border (Ft.)386 EQIP Field Border (Ft..)393 EQIP Filter Strip (Ac.)393 EQIP Filter Strip (Ac.)393 EQIP Filter Strip (Ac.)393 EQIP Filter Strip (Ac.)394 EQIP Fire Break (Ft.)396 EQIP Fish Passage (Mi.)396 EQIP Fish Passage (Mi.)396 EQIP Fish Passage (Mi.)396 EQIP Fish Passage (Mi.)396 EQIP Fish Passage (Mi.)396 EQIP Fish Passage (Mi.)396 EQIP Fish Passage (Mi.)396 EQIP Fish Passage (Mi.)511 EQIP Forage Harvest Management (Ac.)106 EQIP Forest t Management Activity Plan (Ea.)106 EQIP Forest t Management Activity Plan (Ea.)106 EQIP Forest t Management Activity Plan (Ea.)106 EQIP Forest t Management Activity Plan (Ea.)384 EQIP Forest Slash Treatment (Ac.)384 EQIP Forest Slash Treatment (Ac.)384 EQIP Forest Slash Treatment (Ac.)384 EQIP Forest Slash Treatment (Ac.)384 EQIP Forest Slash Treatment (Ac.)666 EQIP Forest Stand Improvement (Ac.)666 EQIP Forest Stand Improvement (Ac.)666 EQIP Forest Stand Improvement (Ac.)666 EQIP Forest Stand Improvement (Ac.)666 EQIP Forest Stand Improvement (Ac.)666 EQIP Forest Stand Improvement (Ac.)666 EQIP Forest Stand Improvement (Ac.)666 EQIP Forest Stand Improvement (Ac.)666 EQIP Forest Stand Improvement (Ac.)666 EQIP Forest Stand Improvement (Ac.)666 EQIP Forest Stand Improvement (Ac.)666 EQIP Forest Stand Improvement (Ac.)666 EQIP Forest Stand Improvement (Ac.)666 EQIP Forest Stand Improvement (Ac.)666 EQIP Forest Stand Improvement (Ac.)666 EQIP Forest Stand Improvement (Ac.)
655 EQIP Forest Trails and Landings (Ac.)383 EQIP Fuel Break (Ac.)383 EQIP Fuel Break (Ac.)383 EQIP Fuel Break (Ac.)410 EQIP Grade Stabilization Structure (No.)410 EQIP Grade Stabilization Structure (No.)410 EQIP Grade Stabilization Structure (No.)412 EQIP Grass Waterway (Ac.)548 EQIP Grazing Land Mechanical Treatment (Ac.)561 EQIP Heavy Use Area Protection (Ac.)561 EQIP Heavy Use Area Protection (Ac.)561 EQIP Heavy Use Area Protection (Ac.)422 EQIP Hedgerow Planting (Ft.)603 EQIP Herbaceous Wind Barriers (Ft.)320 EQIP Irrigation Canal or Lateral (Ft.)388 EQIP Irrigation Field Ditch (Ft.)464 EQIP Irrigation Land Leveling (Ac.)552 EQIP Irrigation Regulating Reservoir (No.)436 EQIP Irrigation Storage Reservoir (No.)441 EQIP Irrigation System, Micro irrigation (Ac.)441 EQIP Irrigation System, Micro irrigation (Ac.)441 EQIP Irrigation System, Micro irrigation (Ac.)441 EQIP Irrigation System, Micro irrigation (Ac.)441 EQIP Irrigation System, Micro irrigation (Ac.)442 EQIP Irrigation System, Sprinkler (Ac.)442 EQIP Irrigation System, Sprinkler (Ac.)442 EQIP Irrigation System, Sprinkler (Ac.)442 EQIP Irrigation System, Sprinkler (Ac.)442 EQIP Irrigation System, Sprinkler (Ac.)442 EQIP Irrigation System, Sprinkler (Ac.)442 EQIP Irrigation System, Sprinkler (Ac.)442 EQIP Irrigation System, Sprinkler (Ac.)442 EQIP Irrigation System, Sprinkler (Ac.)442 EQIP Irrigation System, Sprinkler (Ac.)442 EQIP Irrigation System, Sprinkler (Ac.)447 EQIP Irrigation System, Tailwater Recovery (No.)428A EQIP Irrigation Water Conveyance Concrete Ditch a428B EQIP Irrigation Water Conveyance Flexible Membran430DD EQIP Irrigation Water Conveyance, Pipeline, High-P430DD EQIP Irrigation Water Conveyance, Pipeline, High-P430DD EQIP Irrigation Water Conveyance, Pipeline, High-P430DD EQIP Irrigation Water Conveyance, Pipeline, High-P430DD EQIP Irrigation Water Conveyance, Pipeline, High-P430DD EQIP Irrigation Water Conveyance, Pipeline, High-P430DD EQIP Irrigation Water Conveyance, Pipeline, High-P430DD EQIP Irrigation Water Conveyance, Pipeline, High-P430DD EQIP Irrigation Water Conveyance, Pipeline, High-P430EE EQIP Irrigation Water Conveyance, Pipeline, Low-P430EE EQIP Irrigation Water Conveyance, Pipeline, Low-P430EE EQIP Irrigation Water Conveyance, Pipeline, Low-P430EE EQIP Irrigation Water Conveyance, Pipeline, Low-P430CC EQIP Irrigation Water Conveyance, Pipeline, Nonrei430CC EQIP Irrigation Water Conveyance, Pipeline, Nonrei776 EQIP Irrigation Water Conveyance, Pipeline, On-G
776 EQIP Irrigation Water Conveyance, Pipeline, On-G430FF EQIP Irrigation Water Conveyance, Pipeline, Steel (430FF EQIP Irrigation Water Conveyance, Pipeline, Steel (449 EQIP Irrigation Water Management (Ac.)449 EQIP Irrigation Water Management (Ac.)466 EQIP Land Smoothing (Ac.)468 EQIP Lined Waterway or Outlet (Ft.)468 EQIP Liner Waterway or Outlet (Ft.)634 EQIP Manure Transfer (No.)634 EQIP Manure Transfer (No.)634 EQIP Manure Transfer (No.)634 EQIP Manure Transfer (No.)484 EQIP Mulching (Ac.)484 EQIP Mulching (Ac.)484 EQIP Mulching (Ac.)484 EQIP Mulching (Ac.)484 EQIP Mulching (Ac.)379 EQIP Multi-Story Cropping (Ac.)590 EQIP Nutrient Management (Ac.)590 EQIP Nutrient Management (Ac.)590 EQIP Nutrient Management (Ac.)590 EQIP Nutrient Management (Ac.)512 EQIP Pasture and Hay Planting (Ac.)512 EQIP Pasture and Hay Planting (Ac.)595 EQIP Pest Management (Ac.)595 EQIP Pest Management (Ac.)595 EQIP Pest Management (Ac.)595 EQIP Pest Management (Ac.)595 EQIP Pest Management (Ac.)595 EQIP Pest Management (Ac.)595 EQIP Pest Management (Ac.)595 EQIP Pest Management (Ac.)595 EQIP Pest Management (Ac.)595 EQIP Pest Management (Ac.)595 EQIP Pest Management (Ac.)595 EQIP Pest Management (Ac.)595 EQIP Pest Management (Ac.)516 EQIP Pipeline (Ft.)378 EQIP Pond (No.)378 EQIP Pond (No.)521C EQIP Pond Sealing and Lining, Bentonite Sealant (521A EQIP Pond Sealing or Lining, Flexible Membrane (338 EQIP Prescribed Burning (Ac.)338 EQIP Prescribed Burning (Ac.)338 EQIP Prescribed Burning (Ac.)338 EQIP Prescribed Burning (Ac.)338 EQIP Prescribed Burning (Ac.)528 EQIP Prescribed Grazing (Ac.)528 EQIP Prescribed Grazing (Ac.)528 EQIP Prescribed Grazing (Ac.)533 EQIP Pumping Plant (No.)533 EQIP Pumping Plant (No.)533 EQIP Pumping Plant (No.)533 EQIP Pumping Plant (No.)
533 EQIP Pumping Plant (No.)533 EQIP Pumping Plant (No.)533 EQIP Pumping Plant (No.)533 EQIP Pumping Plant (No.)533 EQIP Pumping Plant (No.)550 EQIP Range Planting (Ac.)550 EQIP Range Planting (Ac.)550 EQIP Range Planting (Ac.)550 EQIP Range Planting (Ac.)550 EQIP Range Planting (Ac.)550 EQIP Range Planting (Ac.)345 EQIP Residue Management, Mulch Till (Ac.)329 EQIP Residue Management, No-Till/Strip Till/Direct329 EQIP Residue Management, No-Till/Strip Till/Direct329 EQIP Residue Management, No-Till/Strip Till/Direct643 EQIP Restoration and Management of Declining hab643 EQIP Restoration and Management of Declining hab391 EQIP Riparian Forest Buffer (Ac.)391 EQIP Riparian Forest Buffer (Ac.)391 EQIP Riparian Forest Buffer (Ac.)391 EQIP Riparian Forest Buffer (Ac.)390 EQIP Riparian Herbaceous Cover (Ac.)390 EQIP Riparian Herbaceous Cover (Ac.)654 EQIP Road Trail Landing Closure (Ft.)654 EQIP Road Trail Landing Closure (Ft.)555 EQIP Rock Barrier (Ft.)558 EQIP Roof Runoff Structure (No.)350 EQIP Sediment Basin (No.)646 EQIP Shallow Water Mgt. for Wildlife (Ac.)381 EQIP Silvopasture Establishment (Ac.)572 EQIP Spoil Spreading (Ac.)572 EQIP Spoil Spreading (Ac.)574 EQIP Spring Development (No.)578 EQIP Stream Crossing (No.)578 EQIP Stream Crossing (No.)578 EQIP Stream Crossing (No.)578 EQIP Stream Crossing (No.)578 EQIP Stream Crossing (No.)578 EQIP Stream Crossing (No.)580 EQIP Streambank and Shoreline Protection (ft.)580 EQIP Streambank and Shoreline Protection (ft.)395 EQIP Stream Habitat Improvement and Managemen587 EQIP Structure for Water Control (No.)587 EQIP Structure for Water Control (No.)587 EQIP Structure for Water Control (No.)587 EQIP Structure for Water Control (No.)587 EQIP Structure for Water Control (No.)587 EQIP Structure for Water Control (No.)587 EQIP Structure for Water Control (No.)587 EQIP Structure for Water Control (No.)587 EQIP Structure for Water Control (No.)587 EQIP Structure for Water Control (No.)587 EQIP Structure for Water Control (No.)587 EQIP Structure for Water Control (No.)
587 EQIP Structure for Water Control (No.)606 EQIP Subsurface Drain (Ft.)607 EQIP Surface Drainage, Field Ditch (Ft.)608 EQIP Surface Drainage, Main or Lateral (Ft.)912 EQIP TA APPLICATION (No.)913 EQIP TA CHECK-OUT (No.)911 EQIP TA DESIGN (No.)910 EQIP TA PLANNING (No.)600 EQIP Terrace (Ft.)600 EQIP Terrace (Ft.)600 EQIP Terrace (Ft.)490 EQIP Tree & Shrub Site Preparation (Ac.)490 EQIP Tree & Shrub Site Preparation (Ac.)490 EQIP Tree & Shrub Site Preparation (Ac.)490 EQIP Tree & Shrub Site Preparation (Ac.)490 EQIP Tree & Shrub Site Preparation (Ac.)490 EQIP Tree & Shrub Site Preparation (Ac.)490 EQIP Tree & Shrub Site Preparation (Ac.)490 EQIP Tree & Shrub Site Preparation (Ac.)490 EQIP Tree & Shrub Site Preparation (Ac.)612 EQIP Tree/Shrub Establishment (Ac.)612 EQIP Tree/Shrub Establishment (Ac.)612 EQIP Tree/Shrub Establishment (Ac.)660 EQIP Tree/Shrub Pruning (Ac.)660 EQIP Tree/Shrub Pruning (Ac.)660 EQIP Tree/Shrub Pruning (Ac.)620 EQIP Underground Outlet (Ft.)620 EQIP Underground Outlet (Ft.)645 EQIP Upland Wildlife Habitat Management (Ac.)645 EQIP Upland Wildlife Habitat Management (Ac.)645 EQIP Upland Wildlife Habitat Management (Ac.)635 EQIP Vegetated Treatment Area (Ac.)601 EQIP Vegetative Barriers (Ft.)367 EQIP Waste Facility Cover (No.)367 EQIP Waste Facility Cover (No.)367 EQIP Waste Facility Cover (No.)313 EQIP Waste Storage Facility (No.)313 EQIP Waste Storage Facility (No.)313 EQIP Waste Storage Facility (No.)313 EQIP Waste Storage Facility (No.)313 EQIP Waste Storage Facility (No.)313 EQIP Waste Storage Facility (No.)313 EQIP Waste Storage Facility (No.)313 EQIP Waste Storage Facility (No.)313 EQIP Waste Storage Facility (No.)629 EQIP Waste Treatment (No.)359 EQIP Waste Treatment Lagoon (No.)633 EQIP Waste Utilization (Ac.)633 EQIP Waste Utilization (Ac.)638 EQIP Water and Sediment Control Basin (No.)638 EQIP Water and Sediment Control Basin (No.)642 EQIP Water Well (No.)614 EQIP Watering Facility (No.)614 EQIP Watering Facility (No.)
Forest Trails and Landings AcreFuel Break-Light AcreFuel Break-Medium AcreFuel Break-Heavy AcreGrade Stabilization, Structural Ft.Grade Stabilization, Bioengineering Ft.Grade Stabilization, Gabion CuYdGrass Waterway AcreChiseling, Scalping or Pitting AcreHeavy Use Protection, Paved SqFtHeavy Use Protection, Gravel SqFtSingle Lane, Paved LnFtHedgerow Planting Ft.Herbaceous Wind Barrier AcreIrrigation Canal CuYdIrrigation Field Ditch CuYdLand Leveling CuYdIrrigation Regulating Reservoir CuYdIrrigation Storage Reservoir CuYdDrip/Trickle/Micro Spray AcreSpecialty Seed Crop Mobile AcreDrip & Sand Media Filter > 10ac AcreDrip & Sand Media Filter <= 10ac AcreNon Filter Supply AcreCenter Pivot AcreWheel Line AcreK-Line PodLinear Move AcreBig Gun, Traveler EachBig Gun Pasture, Small EachBig Gun Pasture, Medium EachBig Gun Pasture, Large EachHand Line StickSolid Set AcreIn-Line Filters GPMTailwater Recovery System CuYdConcrete Field Ditch LnFtMembrane Field Ditch SqFtHigh Pressure, HDPE, 6-8" Ft.High Pressure, HDPE, 10-12" Ft.High Pressure, HDPE, 15-18" Ft.High Pressure, HDPE, 24-36" Ft.High Pressure, PVC, 1-3" Ft.High Pressure, PVC, 4-6" Ft.High Pressure, PVC, 8-10" Ft.High Pressure, PVC, 12-15" Ft.High Pressure, PVC, >15" Ft.Low Pressure, PVC, 8-10" Ft.Low Pressure, PVC, 12-15" Ft.Low Pressure, PVC, 18-24" Ft.Low Pressure, PVC, >24" Ft.Nonreinforced Concrete Pipe 6-8" Ft.Nonreinforced Concrete Pipe 10-12" Ft.Aluminum Mainline, 5-6" Ft.
Aluminum Mainline, 8-12" Ft.Steel Pipeline, 4-8" Ft.Steel Pipeline, 10"+ Ft.IWM, Intense AcreIWM, Non-intense AcreLand Smoothing CuYdConcrete Lined Waterway LnFtMembrane Lined Waterway SqFtManure Transfer Pump EachAgitator EachManure Separator EachConcrete Curbing or Slab CuYdMulch, Tree Rows, Straw SqFtMulch, Tree Rows, Fabric SqFtMulch, Individual Trees, Fabric SqFtMulch, Erosion Control, Straw AcreMulch, Straw, Furrow Irrigation AcreMulti-Story Cropping AcreNutri. Mgt, Cropland/Hay/Pasture - Non Intense AcreNutri Mgt., Cropland/Hay/Pasture - Intense AcreNutri. Mgt., Irr. Crop/high value - Intense AcreNutri. Mgt., Irr. Crop/high value - Non Intense AcreSeedbed Preparation, Seed & Seeding, Non-Nativ AcreSeedbed Preparation, Seed & Seeding, Native AcrePest Mgt, Cropland - Low AcrePest Mgt, Cropland - Moderate AcrePest Mgt, Cropland - High AcrePest Mgt, Irr Cropland/Hayland - Low AcrePest Mgt, Irr Cropland/Hayland - Moderate AcrePest Mgt, Irr Cropland/Hayland - High AcrePest Mgt, Orchard/Vineyard - Low AcrePest Mgt, Orchard/Vineyard - Moderate AcrePest Mgt, Orchard/Vineyard - High AcrePest Mgt, Orchard/Vineyard, NC-OR, Low AcrePest Mgt, Orchard/Vineyard, NC-OR, Moderate AcrePest Mgt, Orchard/Vineyard, NC-OR, High AcreGrazing lands AcrePipeline Ft.Embankment Pond CuYdPit Pond CuYdBentonite/Clay TonPond, Flexible Membrane SqFtFuel Class 1, Burning Short Grass AcreFuel Class 2, Burning Brush/Grass, Open Conifer/ AcreFuel Class 3, Burning Tall Grass AcreFuel Class 6, Burning Savannah AcreCommercial Forest AcrePrescribed Grazing - Non-intense AUMPrescribed Grazing - Intense AUMPrescribed Grazing - Wild Fire Acre1 - 20 HP HP25 - 75 HP HPLivestock Water Pump EachLivestock Water Pump, Electric Each
Pump Station EachVFD 5 - 20 HP HPVFD 2 5 - 75 HP HPWindmill MillFt (blade length)Solar Panel System EachRange Planting, Drill, Introduced AcreRange Planting, Drill, Native AcreRange Planting, Broadcast, Introduced AcreRange Planting, Broadcast, Native AcrePollinator Enhancement - Native AcrePollinator Enhancement - Non Native AcreMulch Till AcreNo Till AcreWestside No Till Difficult AcreStrip Till AcreRestore Declining Habitat Mgt. - Non-intense AcreRestore Declining Habitat Mgt. - Intense AcrePlanting Basic EachPlanting with moisture conservation EachPlanting with wildlife protection EachCuttings EachRiparian Herbaceous Cover, Native AcreRiparian Herbaceous Cover, Non-Native AcreRoad Closure AcreRoad Decommissioning LnFtRock Barrier Ft.Rain Gutters & Downspouts Ft.Sediment Basin CuYdShallow Water Mgt - Impounding and Regulating WAcreSeedbed Preparation, Seed & Seeding AcreSpoil Spreading, On-Site CuYdSpoil Spreading, Off-Site CuYdSpring Development EachBridge Ft.Arch Culver DialnFt Culvert, 12-48" DialnFt Culvert, 49-95" DialnFtCulvert, 96"+ DialnFtCulvert Replacement DialnFtStreambank and Shoreline Protection SqFtGabion EachStream Improvement AcreTurbulent Fountain/bubbler GPMDebris Screens GPMSimple Slide Gate EachScrew Gate EachFlap Gate <24" EachFlap Gate 28-36" EachFlap Gate >48" EachDrop Inlets CFSCulvert CFSRegulation Structure EachSump EachInstream, Rock Chutes CuYd
Water Control, Gabion CuYdTile Line Ft.Field Ditch CuYdMain or Lateral CuYdApplication No.TA Reimbursement, Construction Check-Out No.TA Design No.TA Planning No.Level Terrace Ft.Gradient Terrace Ft.Terrace Rebuilds Ft.Chemical Site Preparation, Light AcreChemical Site Preparation,Medium AcreChemical Site Preparation,Heavy AcreHand Site Preparation, Light AcreHand Site Preparation,Medium AcreHand Site Preparation, Heavy AcreMechanical Site Preparation, Light AcreMechanical Site Preparation, Medium AcreMechanical Site Preparation, Heavy AcreTree/Shrub Est. Basic EachTree/Shrub Est. with moisture conservation EachTree/Shrub Est. with wildlife protection EachTree/Shrub Pruning, Light AcreTree/Shrub Pruning, Medium AcreTree/Shrub Pruning, Heavy AcreInlet/Outlet Structure EachDrop Inlet Pipe, Plastic Ft.Non-Intense Acre Intense AcreTemporary Cover Management (one-time payment AcreWastewater Vegetative Strip FootVegetative Barrier Ft.Flexible Membrane SqFtRigid Facility Cover SqFtRoof SqFtDry Stack CuFtDry Stack, Small Farm CuFtConcrete Curbing or Slab CuYdAbove Ground Tank CuFtWaste collection tank GalAbove/Tidal Tank CuFtAgitator (prop) EachRoof SqFtWaste Storage Pond CuYdLiquid Waste Aerator EachWaste Storage Pond CuYdManure Management, Low Pressure Sprinkler Bar AcreManure Management, Soil Injection AcreWater and Sediment Control Basin, Cropland CuYdWater and Sediment Control Basin, Scabland CuYdWell, Drilled, Cased Ft.Tank or Trough GallonWildlife Watering Guzzler Each
Well Decommissioning Ft.Wetland Creation AcreWetland Enhancement AcreWetland Restoration AcreTemporary Cover Management (one-time payment AcreNon-Intense AcreIntense AcreWB-Tree/Shrub Establishment EachWindbreak/Shelterbreak Renovation Ft.