Page 1 KERALA PUBLIC WORKS KOTTAYAM ROADS D PROGRESS FOR THE MONTH Sl.No LA Constituency Name of Project Estimate Amount A.S No. Date & Amount Name of Contractor 1 2 3 4 6 7 8 9 10 11 I BUDGET WORKS 2007-08 1 Kanjirappally 2008-09 2 Ettumanoor 2009-10 3 Puthuppally 4 Kanjirappally KSCC .Ltd 5 170 Kaduthuruthy 193.5 lakhs 2010-2011 6 Poonjar 7 Kaduthuruthy, Pala, 8 Vaikom 2011-12 Budget Page no.& item no Budget Provisions in lakhs T.S No. Date & Amount Agt.No & Date Construction of Kanjirappally Bye-pass G.O(Rt) No.1998/2008 PWD dtd.28/711/2008 Rs.925 L GO(RT)1173/2014 PWD DT 6.8.15 Constn. Of a bridge at Pulikuttissery across Meenachil river in Kottayam District GO(RT)1044/09pwd. DT.14-07-09, 230 L CE/R&B/10554/09/ KTM dt.01-12-2009 235 L 59/ SESC/ 10-11 dtd- 17/05/2 010 A.P.Rajapp an ,Hope Constructi on, Constn. Of Kampanikkadavu Bridge across Meenachil river in Ettumanoor Ayarkunnam road in Kottayam District GO(RT)NO.1044/2009/pwd. Dtd.14-07- 2009 1000 L CE/R&B/5081/KTM/ 2009 dtd 20/02/2014 Raju Chacko Impts.to Elamkadu- Valiyentha-Kolahalamedu-Vagamon road ch.0/00 to 8/065 (Work terminated, Balance schedule submitted for re-tender) G.O(Rt) No.1045/2009 PWD dtd.14/7/2009 Rs.1875 L 931/CE/12/2009- 10/955 342/ SESC/ 2009-10 dtd.29/ 3/10 Impts. to PK road Providing Drainage Facilities and Foot path construction at Peruva Jn. GO(Rt)No.1045/2009/PWD dt.14/07/2009 Rs. 170.00 lakhs 138/CE/R/ 14- 15/138 for Rs.176 L dt. 24.02.2015 42/ SESC/ 15-16 dated13 /08/201 5. Sri. Manoj Krishna Constn. Of Thenpuzha Bridge across Pullakayar connecting Kottayam and Idukki districts GO(RT)1222/2010/pwd. Dt.28-07- 2010 200 L Improvements to Kidangoor - Kadaplamattom - Uzhavoor - Veliyannoor - Koothattukulam road ch: 0/000 to 22/000 (Dr. K.R. Narayanan memorial road) Balance work G.O.(Rt) No. 750/2010/PWD dt. 05.05.10 for Rs. 2550 Lakhs No. KTM/2016- 17/2016/1490, Dated 7.1.17, Rs.215.2 L (Final TS, IVth) VKJ & Company Constn. Of Valayil Bridge in Murinjapuzha Kunnel Peedika road in Chempu Grama Panchayath GO(RT)1222/10/pwd. Dt.28-07-2010 Rs. 726 L
92
Embed
keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1
KERALA PUBLIC WORKS DEPARTMENT KOTTAYAM ROADS DIVISION
PROGRESS FOR THE MONTH OF OCTOBER 2017
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13I BUDGET WORKS
2007-08
1 Kanjirappally
2008-09
2 Ettumanoor
2009-10
3 Puthuppally
4 Kanjirappally KSCC .Ltd
5 170 Kaduthuruthy 193.5 lakhs 17219803 18385008
2010-2011
6 Poonjar
7 Kaduthuruthy, Pala,
8 Vaikom
2011-12
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
Construction of KanjirappallyBye-pass
G.O(Rt)No.1998/2008
PWD dtd.28/711/2008Rs.925 L
GO(RT)1173/2014 PWD DT 6.8.15
Constn. Of a bridge at Pulikuttissery across
Meenachil river in Kottayam District
GO(RT)1044/09pwd. DT.14-07-09, 230 L
CE/R&B/10554/09/KTM
dt.01-12-2009 235 L
59/SESC/10-11 dtd-
17/05/2010
A.P.Rajappan ,Hope Constructi
on,
Constn. Of Kampanikkadavu Bridge across Meenachil river in Ettumanoor Ayarkunnam road
in Kottayam District
GO(RT)NO.1044/2009/pwd. Dtd.14-07-2009 1000 L
CE/R&B/5081/KTM/2009 dtd 20/02/2014
Raju Chacko
Impts.to Elamkadu-Valiyentha-Kolahalamedu-
Vagamon road ch.0/00 to 8/065(Work terminated,Balance schedule
submitted for re-tender)
G.O(Rt)No.1045/2009
PWD dtd.14/7/2009Rs.1875 L
931/CE/12/2009-10/955
342/SESC/2009-
10dtd.29/
3/10
Impts. to PK road Providing Drainage Facilities and Foot
Providing drainage facilities in Ettumanoor-Poonjar road near Bishop House to St. Thomas School. Ch:14/000 to 14/500
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SR 2017 -18 Reconstruction of culvert @ ch. 7/000km of Ampara - Mankombu road
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Providing drainage facilities in Pala-Mevida road Ch:4/000 to 4/600
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Providing drainage facilities to Ampara - Mankombu road Ch.10/000 to 10/100km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Providing drainage facilities to Ettumanoor - Poonjar SH ways Ch 11/800 (Andoor Jn)
CE/R&B /TF/KTM/2017-18 dt29.05.2017
S.R, 17 - 18, Providing D.R Masonry Retaining wall, Surface drain for widening of narrow wide road and provide Crashbarrier for traffic safety for dangerous curve in Chamappara - Vellani Road @ ch 2/000 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
R.P, 2017 -18, Providing 20 mm Close Graded Bit Chipping carpet to Pravithanam – Alanadu - Edappady Road Road @ ch 3/800 to 4/500 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Providing drainage facilities to vakakkadu - Thazhackavayal - Njandukallu road Ch. 2/800 to 3/200km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Page 26
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
9
Pala
10
Pala
11
Pala
12
Pala
13
Pala
14
Pala
15
Pala
16
Pala
17
Pala
18
Pala
19
Pala
Urgent patch work repairs to Kochukuttaram - Pachathodu road Ch 0/000 to 1/400
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Constructing retaining wall and drainage facilities to Anthinadu - Melukavu road Ch:0/200 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Rectification & Drainage facilities to the damaged surface at General Hospital Jn to parallel road and in Ettumanoor - Poonjar SH way at Pala
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SR 17-18 .Construction of retaining wall in Neloor-Njallikunnu road Ch:0/500 to 2/000.
Providing drainage facilties & Berm concreting bet Ch 4/000 to 4/800 and 1/200 Pala - Kozha road
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Page 27
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
20
Pala
21
Pala
22
Pala
23
Pala
24
Pala
25
Poonjar
26
Poonjar
27
Poonjar
28
Poonjar
R.P, 2017 -18, Providing 20 mm bit Chipping carpet to Valavoor - Chakkampuzha road bet Km 0/000 to 2/700
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs to Cherukara - Mankombu road 0/000 to 5/000
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs to Teekoy - Thalanadu - Moonilavu Road @ ch 1/000 to 3/800 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs to Ellumpuram - Nelloor road @ ch.1/500 to 3/500km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs to Kanjiram kavala mechal Nellappara Narimattom road km 5/00 - 10/000
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF - O.R, 2017 -18, Providing 20 mm Close Graded Bit Chipping carpet to Poonjar - Adivaram Road @ ch 3/000 to 3/800 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF-OR-17-18-Providing Urgent Patch work repairs to Parathodu-Pazhoomala-Chanakakulam road ch :0/000-3/800 (Except ch:1/000-2/500 Km)
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF-RP 17-18 Providing 20mm CC to Parathodu-Kalluvely-Vengathanam
road ch.2/000-3/100kmCE/R&B /KTM/ Substitution -
1/2017-18 dt25.10.2017
SLTF-RP 17-18 Providing DR Prtotection wall at Ch: 4/900 & resurfacing work at
Ch: 3/200 -3/650 of Parathodu-Kalluvely-Vengathanam road
CE/R&B /KTM/ Substitution -1/2017-18 dt25.10.2017
Page 28
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
29
Poonjar
30
Poonjar
31
Poonjar
32
Poonjar
33
Poonjar
34
Poonjar
35
Poonjar
36
Poonjar
37
Poonjar
38
Poonjar
39
Poonjar
40
Poonjar
SLTF-OR-17-18-Providing Urgent Patch work repairs to Thenpuzha-Elamkkadu road ch -3/000-5/850Km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF - O.R, 2017 - 18, Ordinary Repairs to Thidanadu - Pathazha Kondoor - Aruvinthura Road. Ch. 1/500 t o 3/300 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF-O.R 17-18 Providing 20mm CC to Mookanpetty - Angel Valley Road ch.4/000-6/600km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF-O.R 17-18 Providing 20mm CC to Karinilam - Pachima Road ch.0/000-7/000km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF-RP 17-18 Providing 20mm CC to Chittady-Inchiyani-Vattakkavu road ch.2/000-3/000km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF-OR 17-18 Providing Urgent patch work repairs to Edakkunnam-Vattakkavu road ch.3/000-4/600km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF - O.R, 2017 -18, Providing 20 mm Close Graded Bit Chipping carpet to Poonjar - Adivaram Road @ ch 5/000 to 5/800 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF - O.R, 2017 - 18, Providing 20mm thick chipping carpet to Poonjar - Kochuveetilpeedika - Chennadu road @ ch. 0/000 to 3/500 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF - O.R, 2017 - 18, Using 20 mm open graded Premix Chipping carpet provide Urgent Patch Work Repairs to Malayinchipara - Mannam - Chotti Road @ ch 1/700 to 3/000 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF-OR-17-18-ProvidinG Urgent patch work repairs to Mycology road ch 0/000-3/650 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF - OR-17-18-ProvidinG Urgent patch work repairs to Karinilam - Punchavayal - 504 colony - Kuzhimavu Road ch 0/000 - 8/000 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF - OR-17-18-Providin urgent Patch work repairs to Karithode-Vayanasala- Mattannoorkara- Nedumkavayal Road ch:0/000-7/500 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Page 29
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
41
Poonjar
42
Poonjar
43
Poonjar
44
Poonjar
45
Poonjar
46
Poonjar
47
Poonjar
48
Kanjirappally
49
Kanjirappally
50
Kanjirappally
51
Kanjirappally
52
Kanjirappally
53
Kanjirappally
54
Kanjirappally
SLTF-OR- 17-18 Providing urgent patch work repairs to Mundakkayam-Koottickal Road ch.2/500-4/750 & 5/400-6/500
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF-OR-17-18-ProvidinG Urgent patch work repairs to 26th Mile Hospital jn-Palampra-Karikulam Church road ch 0/000-4/500km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF - O.R, 2017 - 18, Ordinary Repairs to Kaduvamoozhy - Thelliyamattom - Plassanal - Inchiyalakavu Road Ch. 0/000 to 3/000 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF - O.R, 2017 - 18, Poonjar - Kunnoni - Alumthara u Road Ch. 3/000 to 4/000 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF-SR-2017-18-Providing drainage facilities at ch: 6/500 of Mnimala-
SLTF-FDR-17-18- Providing Protection wall at Ch-5/020 of Kanjirappally-Erumely road .
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF-SR-2017-18-Side protection work:-Construction of DR Masonry Retaining wall in Almannar Byepass Road.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF RP-17-18-Providing 20 mm CC to Kappadu -Elikkulam road ch: 2/250-2/900 & 4/000-5/000 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF RP-17-18-Providing 20 mm CC to Ponkunnam-Kappadu road ch:4/000-4/900 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF RP-17-18-Providing 20 mm CC to Nedumkunnam-Attakkulam Road ch:0/000- 1/3000 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF RP-17-18-Providing 20 mm CC to Pampady-Nedumkunnam road ch:5/5000-7/000 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF RP-17-18-Providing Bit CC to changanassery - Vazhoor Road ch 15/000 to 22/000
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF RP-17-18-Providing 20 mm CC to Poovam- Cheruvally-Ullayam-Kanam road ch:6/825-8/850 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF RP-17-18-Providing 20 mm CC to Kanam -Chamampathal road ch: 0/000-2/850 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Page 30
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
55
Kanjirappally
56
Kanjirappally
57
Kanjirappally
58
Kanjirappally
59
Kanjirappally
60
Kanjirappally
61
Vaikom
62
Vaikom
63
Vaikom
64
Vaikom
65
Vaikom
66
Vaikom
SLTF RP-17-18-Providing 20 mm CC to Charuvelly- Poovatholy-Valiyamthottam- Cheruvally Road ch:1/100-3/100 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF OR--17-18-Providing 20 mm bit CC to Charuvelly- Poovatholy-Valiyamthottam- Cheruvally Road ch:3/200-6/600 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF OR--17-18-Providing 20 mm bit CC to Kalaketty-Aalurumpu- road ch: 1/000-2/500 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Reconstruction of damaged culvert and approach road at ch:2/000 & ch:2/900 km of 13/600 CW Road to Pathanad
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF RP-17-18-Providing 20 mm CC to Kalluthekkel=Sasthamkavu road ch: 0/000-1/400 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF OR--17-18-Providing 20 mm CC to Nedumkunnam- Attakulam road ch: 2/900-5/180 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 2017-18 - Surface repairs and allied works to Aiyerkulam - Kavarappady road and Aiyerkulam Chettimangalam Road
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 2017-18 - Surface repairs and allied works to Aiyerkulam - Arattukulam road and Aiyarkulam - Valiyanappuzha road
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 2017-18- Jungle clearing, stripping elevated berms, surface repairs and allied works in Vadakkenada road, Vaikom town Link road, Chalaparambu road
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 2017-18 - Urgent bit repairs and allied works to Indamthuruthyppadi -Kovilakathum kadavu Road 0/000 - 0/710
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 2017-18 - Urgent bitumen patchwork repairs and allied works to Thekkenada Road 0/000 to 0/500km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 2017-18 Urgent bitumen patch work repairs to VadayarKallattipuramMuttuchira Road ch. 0/000 – 6/000 km
CE/R&B /KTM/ Substitution -1/2017-18 dt25.10.2017
Page 31
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
67
Vaikom
68
Vaikom
69
Vaikom
70
Vaikom
71
Vaikom
72
Vaikom
73
Vaikom
74
Vaikom
75
Vaikom
76
Vaikom
OR 2017-18 - Urgent bitumen patchwork repairs and allied works to East of BHS Road 0/000 to 0/600 & North of BHS Road 0/000 to 0/600 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 2017-18 - Urgent bitumen patchwork repairs to E V Road ch 0/600 to 1/200 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 2017-18 - Urgent bitumen patchwork repairs and allied works to K.V. Canal South bank Road ch. 0/000 to 0/600 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
O.R. 2017-18 - Urgent bitumen patch work repairs and allied works to KV Kanal North Bank road ch:0/000-1/600
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patchwork repairs to Vadayar chandhapalam Mulakkulam Road ch 0/000 to 0/400 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 2017-18-Urgent bit patch repairs and allied works to Elamkavu temple road ch. 0/000 to 1/900 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 -Urgent bitumen patchwork repairs to Krishnaswami temple Road ch 0/050 to 3/100km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Providing bit patch repairs and allied works to Vadayar-Chandhapalam- Mulakkulam Road ch 3/100 to 5/000 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 2017-18-Urgent bit patch repairs and allied works to Moothedathukavu-Kalpakasserry Temple road 1st & 2nd reach ch: 0/000 to 4/050
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patchwork repairs and allied works to Keezhoor Temple Pothi hospital Road ch 0/000 to 1/500 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Page 32
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
77
Vaikom
78
Vaikom
79
Vaikom
80
Vaikom
81
Vaikom
82
Vaikom
83
Vaikom
84
Vaikom
85
Vaikom
86
Vaikom
OR 2017-18-Providing bit CGPC and allied works to Painumkal-Chemmanathukara-Kottarappally-T.V.Puram Road ch 0/000 to 3/000
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 2017-18 Urgent bitumen patchwork repairs to Velloor police station Enthunkalppadi Road ch 0/000 to 1/500 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 2017-18-Urgent bit patch repairs and allied works to Kunneparambu - Murinjapuzha Road ch 0/000 to 1/800
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 2017-18-Urgent bit patch repairs and allied works to Cherikkal-Chemmanathukara-Valiyathara Road ch 0/000 to 2/000
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 2017-18-Urgent bitumen patchwork repairs and allied works to Chembangady-Chembkassery kadavu-Brammangalam Road ch 2/000 to 3/000
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 2017-18-Urgent bit patch repairs and allied works to Neerpara-Thattaveli - Alinchuvadu Road ch 0/000 to 4/000
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 2017-18-Cuttingof branches of trees, eviction, maintenance of various roads under Vaikom Section.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Providing bit 20mm Open Graded Premix and allied works to Vadayar-Chandhapalam- Mulakkulam Road ch 6/500 to 8/500 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch repairs and allied works to Kalambukadu-Kallara road ch:0/000-2/500
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch repairs and allied works to Thalayolaparambu market-Palamkadavu road ch:0/000-0/900
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Page 33
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
87
Vaikom
88
Vaikom
89
Vaikom
90
Vaikom
91
Vaikom
92
Vaikom
93
Vaikom
94
Kaduthuruthy
95
Kaduthuruthy
96
Kaduthuruthy
97
Kaduthuruthy
OR 17-18 Urgent bitumen patch repairs and allied works to Ambathanam-Kallumkalkkadavu road ch:0/000-1/500
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch repairs and allied works to Karthyayani Temple road ch:0/000-1/000
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch repairs and allied works to Vettikkattumukku Timber Depo road ch:0/000-0/600
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bit patch repairs and allied works toTV Puram- Moothedathukavu road road ch:0/000-0/400
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bit patch repairs and allied works toAttuvelakadavu- Udayanapuram road ch:0/000-0/400
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bit patch repairs and allied works toValiyarambathu - Manamelkadavu road road ch:0/000-0/400
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent BC patchwork repairs to Kalambukad Kallara Road ch 0/000 to 2/500 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Providing BC and allied works to Kuruppanthara - Kalambukadu road 0/000 to 2/500 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Adithyapuram Manvettom road 1/500 to 2/600 Km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to kanakkary vempally road 0/000 to 2/000 Km and MC road Kanakkary Vempally Link road ch. 0/000 to 0/200 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Kanakkary - Thottuva road 0/000 to 4/200 km and Eluveli Munduveli road ch 0/000 to 1/500 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Page 34
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
98
Kaduthuruthy
99
Kaduthuruthy
100
Kaduthuruthy
101
Kaduthuruthy
102
Kaduthuruthy
103
Kaduthuruthy
104
Kaduthuruthy
105
Kaduthuruthy
106
Kaduthuruthy
OR 17-18 Urgent bitumen patch works and allied works to Vempally - Kothanalloor road ch. 0/000 to 2/500 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Kuruppanthara - Neendoor road ch. 3/000 to 4/300 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to OLD EE road Kaduthuruthy Town Link road ch. 0/000 to 2/000 km and Valachira seed farm railway gate MM ITC road ch 0/000 to 1/000 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Kuzhikkattupadi jayagiri Kalluveli road 0/000 to 2/000 Km and vilayamkodu Thottakkutty Rubberfactory Road ch 0/000-0/500 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Manjoor south Poovassery Manvettom 0/500 to 2/500 Km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Kappumthala Kuruppanthara road 0/000 to 2/000 Km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Kaduthuruthy - Appuzha road ch. 1/500 to 2/850 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Mangattukavala Pulikoottummel madathiparambu road 0/000 to 2/500 Km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Muttuchira Hospital - Kunnasserrikkavu - Govindapuram - Thaliyil Mahadev Temple road ch. 0/000 to 1/500 km and 7/2 EE road to Ayamkudi ch. 0/000 to 1/000 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Page 35
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
107
Kaduthuruthy
108
Kaduthuruthy
109
Kaduthuruthy
110
Kaduthuruthy
111
Kaduthuruthy
112
Kaduthuruthy
113
Kaduthuruthy
114
Kaduthuruthy
115
Kaduthuruthy
116
Kaduthuruthy
OR 17-18 Urgent bitumen patch works and allied works to Nambiakulam parepally road 0/000 to 1/500 Km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Madhuraveli Rationkada - Pulithuruthu - Ezhumanthuruthu road ch. 1/500 to 3/000 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to muttuchira Kurisinmood Vallikanjiram Alphonsabhavan Link road 0/000 to 1/500 Km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Ayamkudi Puthusserrikkara Valachira Seed farm road ch. 0/000 to 2/000 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Kothanelloor Thuvanisa Kunampuram Manjapetti Colony Road ch. 2/000 to 4/000 Km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Kothanalloor - Pallithazham railwaygate Chammakkala road 0/000 to 1/800 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Vellasseri Koothattukulam road Ch. 0/000-3/000km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Arunassery - Kuravilangad road Ch. 0/000-2/000km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Parollikkal Muttappally road Ch. 0/000-3/000km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Kappu - Thuruthippally road Ch. 0/000-3/900km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Page 36
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
117
Kaduthuruthy
118
Kaduthuruthy
119
Kaduthuruthy
120
Kaduthuruthy
121
Kaduthuruthy
122
Kaduthuruthy
123
Kaduthuruthy
124
Kaduthuruthy
125
Kaduthuruthy
126
Kaduthuruthy
127
Kaduthuruthy
OR 17-18 Urgent bitumen patch works and allied works to Nambiakulam Vedagiri road Ch. 0/000-2/800km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent sholder maintenance and strengthening works to Meenachil- Kaduthuruthy road , Ch. 2/000 to 3/500 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Vayala - Myladumpara - Marangattupilli raod Ch -3/500 to 5/740 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Kadaplamattom -Vempally raod Ch -1/000 to 6/900 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Kuriyanadu -Veliyanoor raod Ch -0/000 to 4/800 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Madayakunnu -Claret Bhavan raod Ch -0/000 to 1/000 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 16-17 Urgent bitumen patch works and allied works to Kappukala piosmount 0/00-2/800 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Poovathunkal -Maniyakkumpara -Mundiyanippuram raod Ch -0/000 to 2/850 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Uzhavoor -Pulppara -Kudakkachira raod Ch -0/000 to 3/640 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Uzhavoor -Sasthakullam raod Ch -0/000 to 1/490 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Pulluvettam -Kurichithanam raod Ch -0/000 to 3/200 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Page 37
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
128
Kaduthuruthy
129
Kaduthuruthy
130
Kaduthuruthy
131
Kaduthuruthy
132
Kaduthuruthy
133
Kaduthuruthy
134
Kaduthuruthy
135
Kaduthuruthy
136
Kaduthuruthy
137
Kaduthuruthy
OR 17-18 Urgent bitumen patch works and allied works to Arreekara -Keeripemala -Koodappulam raod Ch -0/000 to 2/400 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Chenkallel -Komakki raod Ch -0/000 to 2/000 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Monipilli -Kuzhipilli -Pious Mount raod Ch -0/000 to 2/500 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Elackadu - Kuravilangadu Pallithazhem - Madayakunnu road Ch -0/000 to 2/500 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Jawan Santhoshkumar road (Pattithanam - Chettiparambu road) Ch -0/000 to 1/500 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Kadaplamattom - Andoor limit road Ch -0/000 to 2/420 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Kadappoor Temple - Kanjirappara road Ch -0/000 to 2/000 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Kulangara - Chundelikattupady road Ch -0/000 to 1/300 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Nellikunnu - Kattampally - Madayakunnu road Ch -0/000 to 2/200 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Pattithanam Ebenzer School - Kuriachira - Malola road Ch -0/000 to 2/000 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Page 38
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
138
Kaduthuruthy
139
Kaduthuruthy
140
Kaduthuruthy
141
Kaduthuruthy
142
Kaduthuruthy
143
Kaduthuruthy
144
Kaduthuruthy
145
Kaduthuruthy
146
Kaduthuruthy
147
Kaduthuruthy
OR 17-18 Urgent bitumen patch works and allied works to Pattithanam Pally - Muthirakalapady road Ch -0/000 to 1/000 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Ramapuram - Kadampanattuvathil - Kizhithiri road Ch -0/000 to 2/100 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Thavalakuzhy - Clamattom - Kadappoor road Ch -0/000 to 1/500 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Koodalloor road Ch -0/000 to 2/200 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Muttunkal - Mukkuvalakunnu road Ch -0/000 to 1/900 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Uzhavoor Chettukulam road Ch -0/000 to 2/900 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patch works and allied works to Puthuveli Veliyannoor Thamarakkadu Anichuvadu Poovakkulam Karamala road Ch -6/000 to 7/670 Km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Providing 20mm bitumen CC to Mutholapuram - Achikkal road ch. 0/000-1/000km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 - Providing Providing 20 mm CC to Marangattupally - Alakkapally Road Ch. 0/000-1/500
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 - Providing Providing 20 mm CC to Koovalloor - Valiyamaruthu - Kunukkumpara -Elakkdu Harigen colony RoadC.0/000-2/500
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Page 39
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
148
Kaduthuruthy
149
Kaduthuruthy
150
Kaduthuruthy
151
Kaduthuruthy
152
Kaduthuruthy
153
Kaduthuruthy
154
Kaduthuruthy
155
Kaduthuruthy
156
Kaduthuruthy
157
Kaduthuruthy
158
Kaduthuruthy
OR 17-18 - Providing Providing 20 mm CC to Cherpunkal - Andoor Road Ch.1/500-3/800
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Eviction and maintenance of various roads under Thalayolaparambu section
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 -Urgent bitumen patchwork repairs to Peruva-Monippally Road ch 5/200 to 9/060 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 -Urgent bitumen patchwork repairs to Kozha- Njeehzoor Road ch 0/000 to01/200km and 03/800 to 06/100 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18-Urgent bitumen patchwork repairs to Peruva - Chethikatumala - Santhipuram Road ch 2/700 to 3/300 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 2017-18-Urgent bitumen patchwork repairs and drainage facilities to Keezhoor Pulluvettathumala Road ch 0/000 to 1/000 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patchwork repairs to 8/7 TK road to Njeezhoor Market Road ch 0/000 to 5/550 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18-Providing bit 20mm Open Graded Premix , and allied works to Santhipuram Elanji Road ch 0/000 to 2/000 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patchwork repairs to Kunnappally Kanjiramattom road ch 0/00 to 2/00 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patchwork repairs to Vadayar Chandhappalam Mulakkulam road ch 10/100 to 11/700 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patchwork repairs to Arunassery Kuravilangadu Road ch 2/000 to 4/200 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Page 40
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
159
Kaduthuruthy
160
Kaduthuruthy
161
Kaduthuruthy
162
Kaduthuruthy
163
Kaduthuruthy
164Puthupally
165
Puthupally
166Puthupally
167
Puthupally
168Puthupally
169Puthuppally
170Puthuppally
171
Puthuppally
172
Puthuppally
173Puthuppally
OR 17-18 Urgent bitumen patchwork repairs and allied works to Manikavu Vateedhikkal Road ch 0/000 to 1/400 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Surface repairs and allied works to Njeezhoor Kattampath Mukkavalakkunnu Road ch 0/000 to 1/700 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patchwork repairs to Kudakkachira HS Panthanmavu Road ch 0/000 to 2/000 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patchwork repairs and allied works to Kurichithanam LPS Kudakkachira Road ch 0/000 to 1/000 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent bitumen patchwork repairs and allied works to Kurichithanam village office Nellithanathmala Road ch 0/000 to 1/000 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
repairs to Manarkadu - Kidagoor in Ch 0/00 to 0/200
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Reconstruction of damaged culvert near Padinjatukara Jn Ch 5/450 in Puthuppally- Vennimala road
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Bit BC to Pampady - Kooroppada 0/00 to 4/200 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Bit BC to Thiruvanchoor -Chengalam road at Ch 00/00 to 11/500
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Bit Bc to Oravackal - Koorali road at ch 00/00 to 13/550
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Bit Bc to Manarkadu - Kidagoor in Ch 0/200 to 4/00
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Providing Bit BC to Manarcadu Thenganal road 0/00 to 4/00
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Reconstruction of broken side wall near Chelikuzhy in Vazhoor puliyannoor road
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Providing 20 mm CC to Puthuppally Puthussery road 0/00 to 1/800
CE/R&B /TF/KTM/2017-18 dt29.05.2017
patch work in Diet pady -Muriankalpady ch 6/00 to 8/00
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Page 41
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
174Puthuppally
175
Puthuppally
176
Puthuppally
177
Puthuppally
178
Puthuppally
179Puthuppally
180
Puthupally
181
Puthupally
182Puthupally
183
Puthupally
184
Puthupally
185
Puthupally
186
Puthupally
187
Puthupally
188
Puthupally
works repairs to Tharakkunnu - Pallikkathodu in Ch 0/00 to 1/300
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent Patch works repairs to Kuttikkattukavala - Munduvalelkone in Ch 7/00 to 9/00
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repaires to Payappady- Ayarkunnam road in Ch 3/00 to 5/00
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patchwork repairs to Elamkavu Mooleppedika road elamkavu to arattukavala
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 2017-18 urgent patch work repairs to Arumanoor road 4/00 to 7/00
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repaires to Areepparampu- Pampady road
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repaires to Pulinchuvadu - Moscow road in Ch 3/700 to 6/00
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Padinjattinkara bridge handrails construction and Lining concrete to Manjamattam- Kezhuvankulam road at Ch 1/500
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Patch workto Mundakappady Nellikkunnu road 0/0 to 1/500 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
urgent patchwork repairs to thannikkappady eruthupuzha road final reach from eruthupuzha to Lakattoor
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work and Bit CC to Puthuppally Vennimala Road 0/0 to 3/100 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Providing 20 mm CC to Thottakkadu Kuttikkal road 0/0 to 1/500
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repaires , Drainage facilities and damaged parapets renewal to Kavungumpalam - Naiplavu in Ch Anicadu Church-Chngalam Hospital
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Reconstruction of damaged culvert near Podimattam Jn in Areepparampu- Pampady road
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent pach work repairs and parapet reconstrction in various chainages to Kaniparampu -Thachilangadu road
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Page 42
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
189
Puthupally
190Puthupally
191
Puthupally
192
Puthupally
193
Puthupally
194
Changanassery
195
Changanassery
196
Changanassery
197
Changanassery
198
Changanassery
199
Changanassery
200
Changanassery
201
Changanassery
Urgent patch work repairs and bit CC to Manarcadu Keechel road 0/00 to 2/210 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
urgent bit BC ro Manarcadu Kidangoor road 4/00 to 10/00
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patchwork repairs toMundakappady Nellikkunnu road1/500 to 3/183 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent Patch work repairs to Vennimala temple road 0/0 to 1/207
CE/R&B /TF/KTM/2017-18 dt29.05.2017
urgent patch work repairs to Thottakkadu Azapathrypady Checkenchirakkavala ezhukunnelpady ezhuthupally road 0/0 to 5/00
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF 2017-18 Urgent patch work reairs to Changanacherry - Wazhoor road Ch. 0/000 - 1/300 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF 2017-18 Urgent patch work reairs to Changanacherry - Wazhoor road Ch. 1/000 -2/170 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF 2017-18 Urgent patch work reairs to Changanacherry - Wazhoor road Ch. 2/170 - 3/600 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF 2017-18 Urgent patch work reairs and bit CC in Ezhuvanthanam - Kochupally road Ch. 0/000 - 4/600 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF 2017-18 Urgent patch work reairs and bit CC in Nadakkappadam - Venkotta road Ch. 0/000 - 1/200 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF 2017-18 Urgent patch work reairs and bit CC in Nadakkappadam - Venkotta road Ch. 1/200 - 2/450 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF 2017-18 Urgent patch work reairs and bit CC in Thalakkulam - Venkotta road ( Ezholikkal kurisupally- Azhakathupady) Ch. 0/000 - 2/880 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF 2017-18 Urgent patch work reairs to Kurichy - Pathamuttam road Ch. 0/000 - 2/910 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Page 43
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
202
Changanassery
203
Changanassery
204
Changanassery
205
Changanassery
206
Changanassery
207
Changanassery
208
Changanassery
209
Kottayam
210
Kottayam
211Kottayam
212
Kottayam
213
Kottayam
214
Kottayam
SLTF 2017-18 Urgent patch work and allied works in Venkotta - Santhipuram r road Ch. 0/000 - 2/300 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF 2017-18 Urgent patch work reairs to Kannanperoor - Chethippuzha road Ch. 0/000 - 3/000 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF 2017-18 Urgent patch work reairs and bit CC in Pathikkamukku - Enachira road Ch. 0/000 - 2/300 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF 2017-18 Urgent patch work reairs and bit CC in 82nd Mile MC roar - 5th Mile CW road Ch. 0/480 - 8/190 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF 2017-18 Urgent patch work reairs to Changanacherry - Wazhoor road Ch. 10/000 - 15/000 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF 2017-18 Urgent patch work reairs and bit CC inPerumpanachy - Thottakkadu road Ch. 0/000 - 3/000 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF 2017-18 Urgent patch work reairs and bit CC in 7th Mile CW road to Mallappally road Ch. 0/000 - 2/200 km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs and bit BC to Kottayam Karapuzha road Ch 0/000 to 1/895
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patchwork repairs and side protection works to Vadavathoor road Ch 0/000 to0/900
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patchwork repairs to Pallom- Puthuppally 0/00 - 0/900
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Providing road furniture and thermoplastering painting works to various roads in Kottayam town.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Providing bit BC patch work repairs to Kanjikuzhy-Iranjal-Thiruvanchoor road ch. 0/000 to 6/190km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs, bit BC and improvement works to Boat Jetty road Ch 0/000 to 0/465 except ch 0/150-0/250
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Page 44
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
215
Kottayam
216
Kottayam
217
Kottayam
218
Kottayam
219
Kottayam
220
Kottayam
221
Kottayam
222
Kottayam
223
Kottayam
224
Kottayam
225
Kottayam
226
Kottayam
227
Kottayam
228
Kottayam
229
Ettumanoor
Urgent patch work repairs to Pullarikunnu road at ch. 0/000 to 2/000km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs to Kurichy-Pathamuttam road at ch. 0/000 to 2/910km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs to Kuzhimattom road at ch. 0/000 to 1/640km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs to Puthanangadi-Aruthootty road ch. 0/000 to 0/600km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs to Pallom-Thottakkadu road at ch. 6/000 to 9/000 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs to 2nd mile CW road to Pallom-Thottakkadu road at ch. 0/000 to 8/776km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs to Parakkulam- Ennacherrykadavu- Thrikothamangalam-Kadamuri-Chakkanchira-Thattakadu road at ch. 0/000 to 6/850km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs to Thiruvatta-Nattasserry road at ch. 0/000 to 1/550km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs and allied works to Sub jail road ch. 0/000 to 0/400km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs and allied works to Temple road ch. 0/000 to 0/565 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs and allied works to Veloor road ch. 0/000 to 2/082km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs to SH Mount road at ch. 0/000 to 1/600km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Parakkulam-Ennacherrykadavu-Thrikkothamangalam-Kadamuri -Chakkanchira-Thottakadu ch. 0/000 to 1/200km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs to Puthuppally-Puthusserry road at ch. 0/000 to 4/200km.
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF SR 2017-18 Improvements to Thiruvatta- Kallumada road at ch 0/00-0/200km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Page 45
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
230
Ettumanoor
231
Ettumanoor
232
Ettumanoor
233
Ettumanoor
234Ettumanoor
235
Ettumanoor
236
Ettumanoor
237
Ettumanoor
238
Ettumanoor
239
Ettumanoor
240
Ettumanoor
241
Ettumanoor
242
Ettumanoor
243
Ettumanoor
SLTF SR 2017-18 Improvements to Thiruvatta- Kallumada road at ch 1/00-1/500km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Rp Providing 20mm CC to Approach road to Kumarakom HS & its extension 0/000 to 1/950km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs to Kochupalam-Kochambalam road 0/000 to 0/850km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF - O.R. 2017-18 - Urgent patch work repairs to Thavalakkuzhy Clamattom Kadapoor Road from Ch:1/200 to 4/000 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs to River bank road 3/400 to 5/400km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs to Kottayam- Parippu road 3/000 to 7/000km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF R/P 2017-18 - Providing bit CC to Ambady- Chamathara Jayanthy road at ch 3/00km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Urgent patch work repairs to Nazrethpally road 0/000 to 2/100km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Babu Chazhikkadan Road Ch: 0/000 to 1/600 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Parolickal Muttappally Road Ch: 0/000 to 2/650 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Pattithanam Chumaduthangi Mangarakalingu Road Ch: 0/000 to 1/500 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Athirampuzha Nalpathimala Ottakanjiram Ch: 0/000 to 2/400 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Punnathura Tile Factory Road Ch: 0/000 to 3/100 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Mannanam Kaipuzha Road from Ch: 0/000 to 0/900 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Page 46
LA C
onst
itue
ncy
Name of Project
Esti
mat
e Am
ount
A.S No. Date & Amount
Nam
e of
Con
trac
tor
Esti
mat
e PA
C
Agre
ed. P
AC
1 2 3 4 6 7 8 9 10 11 12 13
Sl.No
Budget Page no.&
item no
Budg
et P
rovi
sion
s in
la
khs T.S No. Date &
AmountAgt.No & Date
244
Ettumanoor
245
Ettumanoor
246
Ettumanoor
247
Ettumanoor
248
Ettumanoor
249
Ettumanoor
250
Ettumanoor
251
Ettumanoor
252
Ettumanoor
253
Ettumanoor
254
Ettumanoor
O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Athirampuzha Liesue Kaippuzha Road from Ch: 0/000 to 3/300 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Thiruvatta Kallumada Road from Ch: 0/000 to 2/870 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Thiruvatta Kudamaloor Road from Ch: 0/000 to 0/700 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Mannanam Pulikkuttissery Road Ch: 0/000 to 4/500 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Adichira - Mannanam Road from Ch: 0/000 to 2/000 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Arumanoor Road from Ch: 0/000 to 0/700 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
SLTF - O.R. 2017-18 - Urgent patch work repairs to Alphonsa Bhavan Manaleppally Road from Ch:0/000 to 1/000 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Thiruvatta Kallumada Road from Ch: 0/300 to 0/900 and 1/600 to 2/870 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
O.R. 2017-18 -Providing bit CC and urgent patch work repairs to Chengalam-Enadi road at ch. 0/000 to 1/760km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent BC patchwork repairs to Anamala Kurumalloor Road ch 2/000 to 3/700 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
OR 17-18 Urgent BC patchwork repairs to Onamthuruthu Kurumalloor Road ch 0/000 to 2/000 km
CE/R&B /TF/KTM/2017-18 dt29.05.2017
Page 47
KERALA PUBLIC WORKS DEPARTMENT KOTTAYAM ROADS DIVISION
PROGRESS FOR THE MONTH OF OCTOBER 2017
Actu
al D
OC
Present Status of works
14 15 16 17 18 19 20BUDGET WORKS
2007-08
2008-09
18 month 22-03-2010 9/21/2011
2009-10
Tender Sanction awaited
18 Month 16/4/10 18/9/11 12/31/2015 90%
8 months 22/8/2015 21/04/2016applied for TOC up to30/09/2017 works in progress 65%
2010-2011
Initial level reported Initial level reported
2011-12
Peri
od o
f Co
mpl
etio
n in
m
onth
s
Dat
e of
sit
e ha
ndin
g ov
er
Dat
e of
com
plet
ion
as p
er a
gree
men
t
Exte
nded
dat
e of
co
mpl
etio
n
Phys
ical
Pro
gres
s (%
)
File Handed over to the G.M ,roads &Bridges
Deve.Corp.of Kerala Ltd Kochi,RBDCK
L.A in progress
Extended up to 30-05-2012 then extended upto
30-12-2013(with fine Rs.115000/-)
Bridge proper completed(2 span). Construction of
retaining wall completed .Approach road filling 50% completed. Work
stand still. Notice issued to the Contractor
Terminated on 17/3/16 vide Order No.DB.14(9)/6309/09 of
SE,R&B,South Circle,Tvm. Formation completed Black
topping for 2.KM completed. .Sub base metal
supply (partly) reported to CTE.
Proposel submitted to include the work in KIIFB
Page 48
Actu
al D
OC
Present Status of works
14 15 16 17 18 19 20
Peri
od o
f Co
mpl
etio
n in
m
onth
s
Dat
e of
sit
e ha
ndin
g ov
er
Dat
e of
com
plet
ion
as p
er a
gree
men
t
Exte
nded
dat
e of
co
mpl
etio
n
Phys
ical
Pro
gres
s (%
)
Work completed 100%
60%
18 Month 10/3/2015 4/2/2017 85%
12months 15/03/2016 14/1/2017 1st Reach work in progress 60%
Retaining wall construction completed. Initial levels preparation ongoning
LMR Submitted Price ID 2016/7804,
work started Price ID 2016/7799,
Price ID 2016/8260, LMR Submitted
All works except tarring work completed.
Page 61
Actu
al D
OC
Present Status of works
14 15 16 17 18 19 20
Peri
od o
f Co
mpl
etio
n in
m
onth
s
Dat
e of
sit
e ha
ndin
g ov
er
Dat
e of
com
plet
ion
as p
er a
gree
men
t
Exte
nded
dat
e of
co
mpl
etio
n
Phys
ical
Pro
gres
s (%
)
Agreement Executed
Work to be started
Agreement Executed
work in progress
40% work started
DR work and filling work in progress
Agreement executed TS ID NO. 2016/8299
work in progress (Opening Dt. 08.05.2017) ID 2016/8350
Qoutation invited no response ID Estimate Changed
2016/8336
Agreement executed PriceID NO. 2016/8385
Agreement executed ID 2016/ 8357
Agreement executed ID - 2016/8297
Agreement executed ID 2016/7863
Page 62
Actu
al D
OC
Present Status of works
14 15 16 17 18 19 20
Peri
od o
f Co
mpl
etio
n in
m
onth
s
Dat
e of
sit
e ha
ndin
g ov
er
Dat
e of
com
plet
ion
as p
er a
gree
men
t
Exte
nded
dat
e of
co
mpl
etio
n
Phys
ical
Pro
gres
s (%
)
Levels in progress
Selection notice issued
3 Months Work in progress
3 Months Work in progress
3 Months Agreement executed
TS to be obtained.
12 Months Work tendered.
LMR Submitted, Price ID 2016/7686,
LMR Submitted, Price ID 2016/7736,
work tendered, Price ID 2016/7681,
AS Obtained. Estimate resubmitted for obtaining
TSpending in CE office
Page 63
Actu
al D
OC
Present Status of works
14 15 16 17 18 19 20
Peri
od o
f Co
mpl
etio
n in
m
onth
s
Dat
e of
sit
e ha
ndin
g ov
er
Dat
e of
com
plet
ion
as p
er a
gree
men
t
Exte
nded
dat
e of
co
mpl
etio
n
Phys
ical
Pro
gres
s (%
)
Revised AS to be obtained
2017-18
Tendered
NABARD
16+months 7/15/2014 11/14/2015 10/31/2016 60%
9months 10/1/2015 6/30/2016 100% Work completed
12 months 5/24/2013 5/23/2014 4/30/2015 100% Work completed
Estimate submitted in price after incorporating CTE
directions. Now after rate revision, the estimate was returned for limitting the
estimate to AS amount. Now the estimate was corrected and
submitted for TS through price
Special sanction to be obtained. Detailed design to be obtained
from design wing. Request submitted. Soil Investigation
work tendered
Work Replaced by another one and is recorded
Work in progress.Formation 80% completed
Page 64
Actu
al D
OC
Present Status of works
14 15 16 17 18 19 20
Peri
od o
f Co
mpl
etio
n in
m
onth
s
Dat
e of
sit
e ha
ndin
g ov
er
Dat
e of
com
plet
ion
as p
er a
gree
men
t
Exte
nded
dat
e of
co
mpl
etio
n
Phys
ical
Pro
gres
s (%
)
18 months 2/15/2016 8/14/2017 50%
18 month 2/6/2016 8/5/2017
(30 months) 2/7/2013
18 Months 07.04.2017 06.10.2018 Nil Work ongoing 12/30/1899
KIIFB
2016-17
DPR submitted
DPR submitted soon2017-18
Formation work&Protection work in progress
A1-P1, P1-P2 Beam & Slab completed. Beam & Slab work
P2-P3 and P3- A2 in progress.Retaining wall nearing
completion.
01-01-2016 Extension applied up
to 31.05.2017.
Side drain work in progress. Spreading of WMM completed.
Investigation work completed, report to be obtained. Alignment to be approved.Investigation work completed, report to be obtained.Investigation work completed, report to be obtained.
Investigation work in progress
Investigation work completedInvestigation and survey work completed. DPR Under preparation.