Xinxiang Huayin Renewable Energy Equipment Co., Ltd Add: Kang cun Train Station Industry Zone, Xinxiang City, Henan Province, China Tel: 0086-371-55917087 Fax: 0086-371-55917067 Mobile: +86-15037123067 Contact Person: Sunny Email: [email protected]12Ton capacity waste plastic pyrolysis plant details Pyrolysis Plant Details Working process Loading waste plastic is so different with loading waste tires. Loading tires 10 tons one time can fully inside the reactor. But loading waste plastic is continuous, as the plastic melt so fast, so 12tons totally need load 4-5 times. When we loading plastics into reactor, the reactor is rotate also. If the plastic is dry, then loading needs 7 hours, if the plastic is wet, then needs more hours to finish loading. Why? Because if the plastic is wet, when pyrolysis first the water become water vapor to come out then plastic begin to melt. That is why wet plastic need longer times. So at beginning the reactor plays like a dryer, first dries the plastic then pyrolysis. Hope u understand. After loading finish, if the plastic is dry, after 6-8 hours the plastic oil gas come out, this will last 12-14 hours. That means after 12-14 hours the oil gas ran out. During heating period, the oil gas temperature (there is a thermal couple to test the oil gas temperature) needs to control 270-300 Celsius degree, which is the best temperature. But if lower temperature (lower than 270), the oil quality will be better, but it needs longer time (longer than 12-14 hours). If temperature higher than 300, will be fast (shorter than 12-14 hours), but oil quality not good than lower temperature. At same time, there are some gas (CH4, C2H6, C3H8, C4H10 and H2) cannot be cooled under normal pressure; they will be recycled back to combustion system to burn as energy. After the oil gas running out then 2 hours cooling we can discharge the carbon black.
8
Embed
Xinxiang Huayin Renewable Energy Equipment Co., Ltdf03.s.alicdn.com/kf/HTB1vVy3FpXXXXbfXVXX.PRXFXXXQ.pdfXinxiang Huayin Renewable Energy Equipment Co., Ltd Add: Kang cun Train Station
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Xinxiang Huayin Renewable Energy Equipment Co., Ltd
Add: Kang cun Train Station Industry Zone, Xinxiang City, Henan Province, China