XIAOLANGDI MULTIPURPOSE DAM, INTAKE & OUTLET STRUCTURES, TUNNELS Facts Project Description The Xiaolangdi Multipurpose Dam is located on the Yellow River. The channel of the river upstream of the dam site is a narrow valley of 500 to 800 m wide. Intake & outlet structures, 10 tunnels for water & sediment discharge, tunneling for flood spillway. INTAKE TOWERS: 4,535,000 m³ - open excavation 825,450 m³ - concrete 34,100 tons - steel reinforcement TUNNELS: 3 diversion / orifice tunnels: 14.5 m int. diameter, total length 3,408 m 3 sediment tunnels: 6.5 m int. diameter, total length 3,084 m 3 free-flow tunnels: 10.0 m inside widht, total length 3,019 m 1 irrigation tunnel : 250.0 m length, 3.5 m int. diameter 6 power tunnels: 50.0 m each, total length of 300 m, 7.8 m int. diameter SERCICE SPILLWAY AND PLUNGE POOL: 10,968,000 m³ - excavation 877,800 m³ - concrete 5,830 tons - steel reinforcement 1,000 m - drainage tunnels OPEN EXCAVAITION Unclassified and rock excavation: 18,200,000 m³ Intake structures: 4,500,000 m³ Outlet structures: 5,500,000 m³ Outlet channel: 5,000,000 m³ Open channels: 3,200,000 m³ CONCRETE: 2,500,000 m³ Intake structures: 1,100,000 m³ Outlet structures: 660,000 m³ Open channels: 150,000 m³ Tunnel and shaft lining: 590,000 m³ City/Country Luoyang/Henan / China Client Yellow River Water & Hydropower Development Corp., Zhengzhou, Henan Province Architect Xiaolangdi Engineering Cons. Company Contract Value € 655,96 Mio. Construction Period 7/1994 - 6/2003 (108 months) .
1

XIAOLANGDI MULTIPURPOSE DAM, INTAKE & …...XIAOLANGDI MULTIPURPOSE DAM, INTAKE & OUTLET STRUCTURES, TUNNELS Facts Project Description The Xiaolangdi Multipurpose Dam is located on

Jan 05, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: XIAOLANGDI MULTIPURPOSE DAM, INTAKE & …...XIAOLANGDI MULTIPURPOSE DAM, INTAKE & OUTLET STRUCTURES, TUNNELS Facts Project Description The Xiaolangdi Multipurpose Dam is located on

XIAOLANGDI MULTIPURPOSE DAM,INTAKE & OUTLET STRUCTURES,TUNNELS

Facts Project DescriptionThe Xiaolangdi Multipurpose Dam is located on the Yellow River. The channel of the riverupstream of the dam site is a narrow valley of 500 to 800 m wide. Intake & outletstructures, 10 tunnels for water & sediment discharge, tunneling for flood spillway.

INTAKE TOWERS:4,535,000 m³ - open excavation 825,450 m³ - concrete 34,100 tons - steel reinforcementTUNNELS:3 diversion / orifice tunnels: 14.5 m int. diameter, total length 3,408 m3 sediment tunnels: 6.5 m int. diameter, total length 3,084 m3 free-flow tunnels: 10.0 m inside widht, total length 3,019 m1 irrigation tunnel : 250.0 m length, 3.5 m int. diameter6 power tunnels: 50.0 m each, total length of 300 m, 7.8 m int. diameterSERCICE SPILLWAY AND PLUNGE POOL:10,968,000 m³ - excavation 877,800 m³ - concrete 5,830 tons - steel reinforcement 1,000 m - drainage tunnelsOPEN EXCAVAITIONUnclassified and rock excavation: 18,200,000 m³Intake structures: 4,500,000 m³Outlet structures: 5,500,000 m³Outlet channel: 5,000,000 m³Open channels: 3,200,000 m³CONCRETE: 2,500,000 m³Intake structures: 1,100,000 m³Outlet structures: 660,000 m³Open channels: 150,000 m³Tunnel and shaft lining: 590,000 m³

City/Country

Luoyang/Henan / China

Client

Yellow River Water & HydropowerDevelopment Corp., Zhengzhou, HenanProvince

Architect

Xiaolangdi Engineering Cons. Company

Contract Value

€ 655,96 Mio.

Construction Period

7/1994 - 6/2003 (108 months)

.