AGENDA
• Background on NTMWD
• Overview of Wylie Treatment Plant facilities
• Existing control room out of date – more space and upgrades needed
• Importance of operations and location selected
• New facility plans‒ Layout‒ On-site activities‒ Landscaping‒ Road improvements
• Questions
2
HISTORY OF NTMWD
10 Original Member Cities
3
Farmersville, Forney, Garland, McKinney, Mesquite, Plano,Princeton, Rockwall, Royse City, and Wylie
“We decided we were all in this together. We couldn’t do it separately.”_
• 1951 – Created by Texas Legislature to Provide Water Service• 1956 – Began Providing Treated WATER to Member Cities• 1970s – Expanded to WASTEWATER Service• 1973 – Richardson added as Member City• 1980s – Expanded to SOLID WASTE Service• 1998 – Allen added as Member City• 2001 – Frisco added as Member City
REGIONAL PROVIDER: WATER, WASTEWATER, SOLID WASTE
4
60 YEARS OF WATER TREATMENT AND DELIVERY
5
Wylie WTP I (70 MGD)Built in 3 Phases: 1956-1965
Wylie WTP II (280 MGD)Built in 4 Phases: 1972-1988
Wylie WTP III (280 MGD)Built in 3 Phases: 1995-2003
Wylie WTP IV (140 MGD)Built in 2008Expansion underway
Tawakoni (30 MGD)Bonham (6 MGD)
Total capacity = 806 MGD
WYLIE WTP - PLANT IV EXPANSION
6
CONTROL ROOM UPGRADES NEEDED
• Existing facility vintage 1956
• Built to treat water for 32,000 people not 1.7 million
• Technology upgrades require modern wiring and enough space for computer equipment and monitoring screens
• Not enough space to work and not ADA-compliant
• Need hardened facility to maintain operations 24/7 during major storms (ex. hail or tornado)
Current control room in 1950s building
Rendering of new control room
WHAT AND WHY
• WHAT: Heart of regional water system operations. From here, operators control:
‒ pipelines, pumps, valves and tanks for water coming in from various sources;
‒ water flowing between plants and multiple steps of treatment process; and
‒ distribution of treated water to city storage tanks.
• WHY: Security is critical factor. A building on perimeter allows easy access for operators, public and first responders without compromising plant security.
‒ Existing utilities nearby (power, water, fiber optic network)
‒ This site was the preferred location of the 7 evaluated
8
Looking Northwest from entrance at Forrest Ross Road & Spencer Lane
NEW OPERATIONS CENTER LOCATION & RENDERING
• 14,343 square feet
• One-story building occupied by 30 employees (office capacity for 45)
• Most employees 8 AM to 5 PM; About 6 employees overnight
• Anticipate monthly training (30 people) and quarterly visitor tours (25 people) during business hours
• Emergency generator enclosed in sound walls designed to meet noise ordinance
• Small water quality testing room
NEW WATER SYSTEM OPERATION CENTER
Water Quality Testing Room• Room size = 24’ x 25‘
(600 sq.ft.)
• Area for operators to quickly test samples to optimize treatment
• Limited chemicals in small quantities (no bulk storage – most containers 1 liter)
• Fraction of amounts found at local hardware or pool supply stores
• Delivered by UPS/FedEx
• Bulk of daily testing for water and wastewater compliance is done at lab on Brown Street
NEW WATER SYSTEM OPERATION CENTER
LANDSCAPING AND BUILDING EXTERIOR
• Designed to demonstrate water efficient landscaping and rain water collection
• Landscaping and trees to provide natural screening from roadway – will improve current view
• Downward facing outdoor lighting
• Most parking at front of building to be labeled for visitors, work vehicles to park in back
• One story building not designed to support second floor
NEW OPS BUILDING
EMPL
OYE
E PA
RK
ING
ROAD AND PUBLIC SAFETY IMPROVEMENTS
Eubanks LaneNTMWD to Pay 80% of Construction Cost Approx. $1,244,000
Hwy 78 Deceleration LaneNTMWD to Pay 100% of CostApprox. $75,000
Lynda Lane ExtensionNTMWD to Pay 100% of CostMore than $500,000