WYDOT presents Fixed Asset Management System meets The Balanced Scorecard
17

WYDOT presents

Jan 22, 2018

Download

Documents

Jacknickelson
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: WYDOT presents

WYDOTpresents

Fixed Asset Management System

meets The Balanced Scorecard

Page 2: WYDOT presents
Page 3: WYDOT presents

Fixed Asset Management System (FAMS)

• Consists of:– Pavement – Bridge– Safety– Maintenance– Congestion

Materials Lab

Bridge

HwySafety

Traffic Mgt CenterDistricts

PMS

BMS

SMS

MMS CMS

Page 4: WYDOT presents

Top Down/Bottom Up “Meet in the Middle”

Approach• Complex• Going from project specific

projects to system thinking • Measuring everything to

measuring what counts• Making well informed and

documented decisions at all levels • Communicating an understanding

of why those decisions were made

Page 5: WYDOT presents

WYDOT’s BSC Development (Phase I – III)

I n d v l P e r f o r m a n c e A p p r a i s a l sE m p l o y e e s

I n d v l P e r f o r m a n c e A p p r a i s a l sE m p l o y e e s

I n d v l P e r f o r m a n c e A p p r a i s a l sE m p l o y e e s

P r o g r a m L e v e l B S C s :D E s , P a t r o l , A e r o , H w y D e v , M V S , D S , e t c

I n d v l P e r f o r m a n c e A p p r a i s a l sE m p l o y e e s

I n d v l P e r f o r m a n c e A p p r a i s a l sE m p l o y e e s

I n d v l P e r f o r m a n c e A p p r a i s a l sE m p l o y e e s

P r o c e s s L e v e l B S C s :F i x e d A s s e t M g t a n d P M S , B M S , S M S , e t c

O v e r a l l B S C( E x e c u t i v e S t a f f ' s P e r f o r m a n c e M e a s u r e s )

Phase I:Strategic Plan

Phase II:BSCsTo be completed 2007-08

Phase III:

Appraisals

To be completed 2008-09

Completed 2006

Page 6: WYDOT presents

Top Down - Phase I

• Strategic Plan and Overall BSC developed 2006– Overall Performance Measures

(PMs) Established – Those PMs that affect the FAMS

• Fatality and Crash Rates• Asset Conditions • Customer Satisfaction

Page 7: WYDOT presents

Top Down - Phase II• Performance Measures

– Process and Program Level • Example: Materials Lab and PMS

• Systematic – what targets are we all shooting for

Materials Lab

PMS

Districts

MMS

Bridge

BMS

HwySafety

SMS

Traffic Mgt Center

CMS

Page 8: WYDOT presents

BSC Goal 49% roads good or excellent

Interstate NHS Other Rural Non NHS Rural Urban

Pavement CrackingIndex > 85

International Ride Index > 90

Rut<0.30”

Friction > 35

FunctionalClass

PavementServiceabilityRating

Page 9: WYDOT presents

FATALITIES < 1.46 per 100 mvmCrash Rate < 136.19 per mvm

Roadway Departure crashes

Impaired Driving Speeding Seat Belt Usage

On System Off System

Rumble strips - shoulder and centerlineEnhanced pavement markingsRegulatory, warning and guide signs, and delineatorsGuardrail and bridge-railSnowfencesHighway lightingBreakaway sign supportsRoadside hazard removalMinor safety grading at high hazard locations

Page 10: WYDOT presents

Bottom Up – Process Level• At this level, each management

system (PMS, BMS, etc) puts together their recommended priorities:– Year-by-Year– Benefit-to-Cost Ratio– Budget Limit

• Priorities given to FAMS Program Manager

Page 11: WYDOT presents

“Meet in the Middle”

• FAMS Program Manager:– Analyzes priorities from each

management system– Chooses the optimum projects:

• Software for this analysis is currently being developed for WYDOT

• Trade-off analysis • Perform coherence checks• Timeframes are feasible• Inject political or otherwise suggested

projects

Page 12: WYDOT presents

Decision Making

• Level 3 – Executive Level (Top)– Judgement (aligned with vision) – Policy and Strategic level

• Level 2 – Fixed Asset Management Level (Middle) – Analysis – System level

• Level 1 – Program Level (Bottom)– Quantitative– Project level

Page 13: WYDOT presents

3 Levels of Consideration

Cross-Program Scenarios and Tradeoffs

Safety Project Priorities

Pavement Project

Priorities

Bridge Project

Priorities

Level 1

Level 2

Level 3 High-level Strategic Options and Decision Making

Page 14: WYDOT presents

“Wrap up”• Well-defined performance measures guide

the way for both the BSC and Fixed Asset Management process

• WYDOT has taken the following approach – Top down– Bottom up– Meet in the Middle

• Excited about the possibilities the BSC and FAMS will bring to WYDOT and the way we do business in the future!

Page 15: WYDOT presents

Questions on BSC:

Questions on FAMS:

Page 16: WYDOT presents

Thank you!

Page 17: WYDOT presents

Top DownPMs: Target and Actual

(Overall Performance Measures)

Performance Measures:

• Fatality Rate (on system)

• Crash Rate

• Road Condition Ratings

• Bridge Condition Ratings (on NHS)

• Rest Area Condition Ratings

• Overall Customer Satisfaction Survey Rating

Targets: Actual:

1.68 2.20

114.69 150.25

49% 49%

TBD 96%

82% 80%

80% 75%