Page 1:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

Answers for energy.

www.siemens.com/middleeast

Powering ambition

Page 2:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

Power transmission and distribution.

2

Page 3:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

Products Systems Solutions Services

3

Page 4:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

The availability of energy is the key to growth.

4

Page 5:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

5

Page 6:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

Thriving regions depend on optimal power grids.

6

Page 7:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

7

Page 8:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

The challenge is to keep pace with growing demand.

8

Page 9:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

Being local – the capacity to make a difference

Siemens has a proven track record in project delivery

in the Middle East. The company’s commitment to

building a local framework throughout the region

with branch offices and operational units, including

manufacturing and assembly facilities, helps improve

the competitiveness of the region and creates value

for local businesses.

Backed by its global technology network, Siemens

in the Middle East provides all necessary skills and

expertise to fully manage even the most complex

projects. Siemens has proven its reliability as a

trusted partner that delivers only the highest quality

over many decades.

From extra-high to low voltage, Siemens’ portfolio

for efficient power transmission and distribution

includes everything it takes to support the region’s

energy infrastructure in keeping pace with the rap-

idly growing demand for electricity.

>2,000regional

transmission and distribution staff

>9,000Siemens high-voltage

switchgear bays operating in the region

9

Page 10:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

This is how

10

Page 11:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

we do it.

15

Page 12:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

Turnkey experience

Training

Maintenance and after-sales service

Turnkey responsibility

Supply, con- struction, and commissioning

ManufacturingDesign and engineering

Project management

Analysis

Financing

System planning and consulting

Customer

11

Page 13:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

Committed to a strong local presence

Air-insulated switchgear (AIS)

Automation, control, and protection

Power transformer

Gas-insulated high-voltage transmission lines (GIL)

12

Page 14:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

Committed to a strong local presence

Medium-voltage switchgear 245-kV-gas-insulated switchgear (GIS)

400-kV-gas-insulated switchgear (GIS) Turnkey substations

13

Page 15:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

Products Systems Turnkey projects Services

High-voltage components

Medium and low- voltage products

Transformers, reactors

Protective relaying

High-voltage GIS/GIL systems

Power factor correction systems

Distributed medium and low-voltage power supply systems

Medium-voltage switchgear substations

Load-centre substations

Power systems control

Substation control systems

Protection systems, IT solutions for power producers, network operators, utilities, and energy traders

Complete turnkey installations

Transformer substations

HVDC systems

Power distribution systems, secondary distribution networks

Installation in special building arrangements

Network consultancy, analysis, and planning

Operation

Maintenance and repair

Modernization (retrofits and upgrades)

Metering services

System management

Training

Customer support around the clock

and highest quality

14

Page 16:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

Just like its economy, Qatar’s electricity sector is

experiencing double-digit growth rates. In the West

Bay area, a newly developed neighborhood of Qatar’s

capital Doha, Siemens delivered the power supply for

more than 100 high-rise buildings. To meet the particular

challenge of inte grating the sub stations into the sur-

rounding cityscape, Siemens developed a bespoke

architectural solution that fully satisfied the customer.

16

Page 17:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

Within only 18 months, Siemens built and commissioned

two high-voltage substations for Kahramaa (Qatar General

Electricity and Water Corporation) that cover the 220-kV,

66-kV, and 11-kV voltage levels and another station at

the 66-kV/11-kV voltage levels. The substations, which

are equipped with compact and modular gas-insulated

Siemens switchgear, are perfectly integrated in the sur-

rounding area and virtually “invisible”.

The benefits for the customer:

The substations, that provide power to Kahramaa’s

customers, are considered to be the most advanced

and aesthetic constructed in Qatar from an electrical

and architectural point of view.

Siemens has already made several major contributions

to the development of Qatar’s energy infrastructure with

more than 1,200 switchgear bays in operation.

Aesthetic masterpiecesDoha, Qatar

220kilovolts safely

switched by Siemens GIS within a multi-

story car park

18completion time for

three visually compel-ling substations in Qatar, in months

17

Page 18:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

18

With over 25 million consumers of power, Egypt’s

demand for energy is one of the highest in the region.

Shortages of electricity during peak load times are an

ongoing challenge for providers, and immediate solutions

are required. Siemens took on this challenge and com-

pleted a high-voltage substation for the new Al-Shabab

power plant in less than one year that set a new bench-

mark for such projects.

18

Page 19:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

While the delivery of a 220-kV turnkey GIS substation

usually takes about 18 months, Siemens delivered

Al-Shabab in less than one year. The scope of supply

comprised design, construction, testing, and commission-

ing of the substation. It included, among others, the gas-

insulated switchgear, the protection and substation con-

trol systems as well as the communication and security

systems.

The benefits for the customer:

The new substation made it possible to meet the urgent

demand for more power in less than one year. It con-

tributes to grid stability and helps make power supply in

Egypt noticeably more reliable.

Siemens’ installed base in the Egyptian high-voltage

transmission grid comprises more than 400 switchgear

bays altogether. This figure underlines the strong

presence of Siemens in Egypt since 1901.

Fast track

1,000additional megawatts made available to the

Egyptian grid by El-Shabab substation

7time from the design to the commissioning

of El-Shabab sub- station, in months

Ismailiya, Egypt

19

Page 20:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

20

Dubai has seen spectacular growth and an economy

diversifying at a fast pace. The densely urbanized land-

scape of the city demands space-saving solutions that

maximize efficiency. Focusing on a reduced footprint,

Siemens designed and built Car Complex, a 400-kV high-

voltage substation that uses advanced gas-insulated

switchgear technology. Small but powerful, this

sub station supplies electricity not only to Dubai Inter-

national Airport but also to several residential and

commercial areas.

20

Page 21:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

Reduced footprint

The Dubai Electricity and Water Authority (DEWA)

appointed Siemens to perform all supply, installation,

testing and commissioning tasks as well as associated

work of the 400/132-kV Car Complex substation. The

scope of supply included 12 bays of 400-kV as well as

29 bays of 132-kV gas-insulated switchgear, four 505 MVA

power transformers, and three 40 MVAr shunt reactors.

The benefits for the customer:

Compared to substations with air-insulated switchgear,

a substation with gas-insulated technology requires only

one-quarter of the space. Siemens’ compact GIS solutions

help the client to provide reliable power and minimizes

space requirements as well as maintenance efforts.

Siemens’ expertise in project management and engineer-

ing, backed by proven methods and processes, supported

the successful delivery of more than 850 high-voltage

switchgear bays in Dubai.

29number of 132-kV switchgear bays at Car Complex

substation

12number of 400-kV switchgear bays at Car Complex

substation

Dubai, United Arab Emirates

21

Page 22:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

22

Estimates are that Saudi Arabia’s population will increase

from 28 million to 40 million within the next ten years.

To meet the significant rise in power demand, the installed

capacity will have to double. It will be necessary to build

new power plants with a combined capacity of at least

4,000 MW every year. This is why the Kingdom is making

major investments in the expansion of power-supply

capacities.

22

Page 23:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

1,000MVA of firm power

transmission capacity added to the

Saudi Arabian grid

40years of Siemens

partnership with SEC on numerous electrical projects in the Kingdom

Thanks to its full-range portfolio of high-voltage products,

systems, and solutions including turnkey substations and

power transformers, Siemens provided a harmonized grid

solution for a 380-kV substation in the Al Qassim province

in Saudi Arabia. The substation adds 1,000 MVA of firm

power transmission capacity to the Saudi Arabian grid.

The benefits for the customer:

As turnkey partner, Siemens provided technical solutions

at all stages of the design, construction, installation, test-

ing, and commissioning process.

Siemens has installed more than 2,500 high- voltage

switchgear bays in Saudi Arabia. This number is expected

to increase in line with the growing demand for energy in

the Kingdom.

Turnkey excellenceAl Qassim, Saudi Arabia

23

Page 24:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

The cluster pumping station near Basra was one of ten

such stations that Siemens rehabilitated after it was

badly damaged in the Second Gulf War. The reconstruc-

tion of already existing pumping stations was one of the

most important measures necessary to rebuild Iraq’s

infrastructure. Siemens completed the complex turn-

key project in a very short time to the full satisfaction

of the client.

24

Page 25:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

Immediate action

Immediately after the Second Gulf War, Siemens stepped

in to help rebuild crucial oil and gas infrastructure in Iraq.

By rehabilitating the 132/7.2-kV cluster pumping network

of the North Rumaila oil field, Siemens enabled the cus-

tomer to significantly increase the production of oil.

Carried out under challenging conditions, this was one

of the largest electricity projects ever delivered in Iraq.

The project comprised the design, installation, and com-

missioning of 58 feeder bays of 132-kV air-insulated

switchgear at ten different project sites across the Rumaila

region.

The benefits for the customer:

Siemens proved its reliability as a trusted partner that

is committed to action. The company demonstrated

that large-scale projects can be delivered at any time.

2completion time

for the turnkey project in Basra, in years

10substations installed at the North Rumaila

oil field

Basra, Iraq

25

Page 26:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

It is estimated that Kuwait will require an additional

18,000 MW of generation capacity by 2020. Projects

such as the Siddeq substation are an example of how

innovative engineering solutions can meet the challenges

of a growing transmission grid. Siemens designed and

delivered a 300-kV substation in an area that is congested

with cables and underground services. By using gas-

insulated bus ducts instead of standard oil-filled cables,

the client is now able to safely supply 1,200 MVA of power

to the network.

26

Page 27:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

Innovative solutions

Siemens completed a significant high-voltage substation

project in Kuwait: the design and construction of a

300/132/11 kV substation in the Siddeq area. The total

order included the delivery and installation of gas-insu-

lated switchgear for the high and medium-voltage levels,

power transformers, shunt reactors, all the low-, medium-,

and high-voltage cabling, and the design as well as the

construction of the substation buildings.

The benefits for the customer:

The customer decided for a new technology that has

never been used before in Kuwait’s transmission network.

This technology was efficiently adopted by the customer,

who is now ensured of easier maintenance through

the years. The customer also saved costs thanks to the

Siemens gas-insulated bus duct solution.

Siemens has a large installed base in the high-voltage

transmission grid in Kuwait. The company has already

constructed more than 120 high- and medium-voltage

substations in Kuwait and demonstrated its outstanding

expertise in the field of power transmission

and distribution.

1,200power transformation

performance of the Siddeq substation,

in MVA.

300voltage level of the

grid the Siddeq sub station connects to,

in kilovolts

Kuwait City, Kuwait

27

Page 28:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

The Karachi Electric Supply Company’s upgraded load dis-

patch centre in Karachi is Pakistan’s first state-of-the-art

facility of this kind. It serves the power utility in providing

electricity to more than 16 million people in Karachi.

Effective load management now makes it possible to mini-

mize power outages and load shedding in the network.

This has improved the overall working and social life of

electricity consumers in Karachi city.

2828

Page 29:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

Operating efficiency

Siemens delivered a state-of-the-art load dispatch centre

upgrade for the Karachi Electric Supply Company (KESC).

The project included the construction of the complete

load dispatch centre, which incorporates a SCADA energy

management system for 56 grid stations, the remote

terminal unit, and adaptation works, as well as the tele-

communications infrastructure.

A central control system based on Siemens SINAUT

Spectrum was installed in the KESC load dispatch centre

to monitor and control the entire transmission network.

The benefits for the customer:

The installed equipment reduces the switching time

re quired to control the overall system load, thus mini-

mizing outages and load shedding. The central control

system ensures efficient load management in addition

to providing other network control features, such as net-

work planning, modelling, fault analysis, unit commit-

ment, contingency analysis, load forecasting, and

energy management.

16number of people

re liably supplied with electricity through the Karachi load dispatch

centre, in millions

56number of substations

controlled by the SCADA system of the Karachi load dispatch

centre

Karachi, Pakistan

29

Page 30:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

Masdar City is a unique development project currently

under construction in Abu Dhabi. The target is to build

one of the world’s most sustainable cities for 40,000

working inhabitants. Most of the power will be generated

from renewable energy sources. Siemens, as a technology

partner, ensures that this power will be used in the most

efficient way by implementing a pioneering distribution

grid that enables real-time control.

30

Page 31:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

Smart grids

Siemens developed a pioneering Smart Grid concept and

energy management system that will be implemented in

order to integrate innovative technologies and equipment.

The system will serve to distribute electrical power. As the

central element of active energy management, it will pro-

vide full grid transparency. Furthermore, the Smart Grid

will be a key enabler of future-oriented urban concepts,

such as electromobility and smart buildings.

The benefits for the customer:

The Siemens Smart Grid concept will enable large-scale

distributed generation, the interaction of generation,

storage, and consumption, and of energy savings. It will

also provide the basis for the development of new

applications in the fields of energy efficiency and smart

buildings.

40planned population

of Masdar City, in thousands

7renewable energy

share target of Abu Dhabi

by 2020, in percent

Abu Dhabi, United Arab Emirates

31

Page 32:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

No matter what the challenge is, our answers will convince you.

32

Page 33:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

33

Page 34:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

Always close to you

DamascusBeirut

Cairo

AmmanAmman

Tripoli

Afghanistan

KabulSiemens AGAfghanistan BranchHouse Nr. 2/3, Street Nr. 3Darul Aman Road,Kartahe SeehKabulTel.: + 93 20 2 500640Fax: + 93 20 2 500641

Egypt

CairoSiemens S.A.E.55, El Nakhil & El Aenab StreetP.O. Box 775/11511Cairo-MohandessinTel.: Call Center 16610Fax: + 202 3 3333661

Iraq

BaghdadSiemens AG Branch Office IraqMaghrib Street – Main StreetKawakib Building, 2nd floorBaghdadTel.: + 964 7435319848 + 964 7435301761Fax: + 964 1 4251038

ErbilSiemens AG Branch Office Iraq60th Street (Steeny Street)Sheikh BarzanjiDistrict 340 – 6699ErbilTel.: + 964 66 22356 58Fax: + 964 66 22356 59

Jordan, Lebanon, Syria

AmmanSiemens AG Jordan BranchZina Center, 6th FloorQueen Noor Street, AbdaliP.O. Box 941452Amman 11194Tel.: + 962 6 5621303Fax: + 962 6 5621302

Libya

TripoliSiemens AG Libya BranchHai Al-Andalus, P.O. Box 91531TripoliTel.: + 218 21 447 8733/35Fax: + 218 21 447 2891

Pakistan

KarachiSiemens Pakistan Engineering Co. Ltd.B-72, Estate Avenue, S.I.T.E.P.O. Box 7158Karachi 75700Tel.: + 92 21 32574910/19Fax: + 92 21 32563563

Saudi Arabia

RiyadhSiemens LimitedThadeq StreetP.O. Box 9510Riyadh 11423Tel.: + 966 1 4765930Fax: + 966 1 4775979

Al-KhobarAl-Raja Tower, Khobar-Dammam ExpresswayP.O. Box 719 Al Khobar 31952Tel.: + 966 3 865 9666

+ 966 3 865 9777Fax: + 966 3 865 9661

JeddahSiemens LimitedP.O. Box 4621Jeddah 21412Tel.: + 966 2 6618857Fax: + 966 2 6619017

United Arab Emirates

Abu DhabiSiemens LLC16th Floor, Al Otaiba TowerSheikh Zayed II Street P.O. Box 47015Abu DhabiTel.: + 971 2 6165100Fax: + 971 2 6393444

DubaiSiemens LLC The Galleries, Building 2Downtown Jebel AliP.O. Box 2154DubaiTel.: + 971 4 3660000Fax: + 971 4 3660500

Yemen

Sana’aC/O Siemens LLC DubaiThe Galleries, Building 2Downtown Jebel AliP.O. Box 2154DubaiTel.: + 971 4 3660000Fax: + 971 4 3660500

Bahrain

ManamaSiemens WLLUnitag House 150, Government Avenue 315P.O. Box 830ManamaTel.: + 973 17 225501Fax: + 973 17 225503

Kuwait

KuwaitSiemens Electrical and Electronic Services K.S.C.C.P.O. Box 4990Safat 13050KuwaitTel.: + 965 2 4646000Fax: + 965 2 2498944

Oman

MuscatSiemens LLCAl Mashriq BuildingNorth AzaibaWay number 16P.O. Box: 1206Al AthaibaTel.: + 968 2 4529900Fax: + 968 2 4491585

Qatar

DohaSiemens WLLAl Wakra Tower7th FloorCorniche AreaP.O. Box: 21757Doha, QatarTel.: + 974 4456 0222Fax: + 974 4441 3652

34

Page 35:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

Dubai

Kabul

Kuwait

Kabul

Kuwait

Baghdad

Erbil

Sana’a

Al-Khobar

Riyadh

Al-Khobar

Riyadh

Jeddah

Doha

Manama

Muscat

DohaDohaDoha

Muscat

ErbilErbilErbil

KarachiKarachiKarachi

Afghanistan

KabulSiemens AGAfghanistan BranchHouse Nr. 2/3, Street Nr. 3Darul Aman Road,Kartahe SeehKabulTel.: + 93 20 2 500640Fax: + 93 20 2 500641

Egypt

CairoSiemens S.A.E.55, El Nakhil & El Aenab StreetP.O. Box 775/11511Cairo-MohandessinTel.: Call Center 16610Fax: + 202 3 3333661

Iraq

BaghdadSiemens AG Branch Office IraqMaghrib Street – Main StreetKawakib Building, 2nd floorBaghdadTel.: + 964 7435319848 + 964 7435301761Fax: + 964 1 4251038

ErbilSiemens AG Branch Office Iraq60th Street (Steeny Street)Sheikh BarzanjiDistrict 340 – 6699ErbilTel.: + 964 66 22356 58Fax: + 964 66 22356 59

Jordan, Lebanon, Syria

AmmanSiemens AG Jordan BranchZina Center, 6th FloorQueen Noor Street, AbdaliP.O. Box 941452Amman 11194Tel.: + 962 6 5621303Fax: + 962 6 5621302

Libya

TripoliSiemens AG Libya BranchHai Al-Andalus, P.O. Box 91531TripoliTel.: + 218 21 447 8733/35Fax: + 218 21 447 2891

Pakistan

KarachiSiemens Pakistan Engineering Co. Ltd.B-72, Estate Avenue, S.I.T.E.P.O. Box 7158Karachi 75700Tel.: + 92 21 32574910/19Fax: + 92 21 32563563

Saudi Arabia

RiyadhSiemens LimitedThadeq StreetP.O. Box 9510Riyadh 11423Tel.: + 966 1 4765930Fax: + 966 1 4775979

Al-KhobarAl-Raja Tower, Khobar-Dammam ExpresswayP.O. Box 719 Al Khobar 31952Tel.: + 966 3 865 9666

+ 966 3 865 9777Fax: + 966 3 865 9661

JeddahSiemens LimitedP.O. Box 4621Jeddah 21412Tel.: + 966 2 6618857Fax: + 966 2 6619017

United Arab Emirates

Abu DhabiSiemens LLC16th Floor, Al Otaiba TowerSheikh Zayed II Street P.O. Box 47015Abu DhabiTel.: + 971 2 6165100Fax: + 971 2 6393444

DubaiSiemens LLC The Galleries, Building 2Downtown Jebel AliP.O. Box 2154DubaiTel.: + 971 4 3660000Fax: + 971 4 3660500

Yemen

Sana’aC/O Siemens LLC DubaiThe Galleries, Building 2Downtown Jebel AliP.O. Box 2154DubaiTel.: + 971 4 3660000Fax: + 971 4 3660500

Bahrain

ManamaSiemens WLLUnitag House 150, Government Avenue 315P.O. Box 830ManamaTel.: + 973 17 225501Fax: + 973 17 225503

Kuwait

KuwaitSiemens Electrical and Electronic Services K.S.C.C.P.O. Box 4990Safat 13050KuwaitTel.: + 965 2 4646000Fax: + 965 2 2498944

Oman

MuscatSiemens LLCAl Mashriq BuildingNorth AzaibaWay number 16P.O. Box: 1206Al AthaibaTel.: + 968 2 4529900Fax: + 968 2 4491585

Qatar

DohaSiemens WLLAl Wakra Tower7th FloorCorniche AreaP.O. Box: 21757Doha, QatarTel.: + 974 4456 0222Fax: + 974 4441 3652

Abu Dhabi

35

Page 36:   Powering ambition · PDF filePowering ambition. Power transmission ... of El-Shabab sub- station, in months Ismailiya, Egypt 19. 20 ... (DEWA) appointed Siemens to

Published by and copyright © 2012: Siemens LLC Al Otaiba Tower Sheikh Zayed II Street P.O. Box 47015, Abu Dhabi

Siemens LLC The Galleries, Building 2 Downtown Jebel Ali P.O. Box 2154, Dubai

For more information, please contact our regional Customer Support Center. E-mail: [email protected]

Order No. E50001-D600-A104-X-4A00 Printed in the United Arab Emirates fb 4082 WS 04121.0

Printed on elementary chlorine-free

bleached paper.