Dec 14, 2015
IST Concertation Meeting 04.10.2006 — 2 www.ist-muse.eu
Consortium
System vendors
SME Aarhus BB society
Operators Research Inst. & UniversitiesIBBTInriaTU EindhovenBudapest University (BUTE)ICCS/NTUAHHILund Institute of Technology (LTH)ACREOUniv. Carlos III de MadridUniversity of Essex
Component vendors
Phase I: 2004-2005Phase II: 2006-200736 partners -100 PY/year
(*) (*)
(*)
(**)
(*) Only in phase I
(**) Only in phase II
IST Concertation Meeting 04.10.2006 — 3 www.ist-muse.eu
Key Results
CustomerPremises
MobileService Provider
Network Service Provider
Internet Service Provider
Application Service Provider
Network Access Provider
Access Node
ResidentialGateway
Edge NodeAggregation network
First Mile
Phase I: 2004-2005 Ethernet/IP access architecture
from end-user terminals to edge Multi-Service capability Open, multi-provider environment Low cost first mile solutions
Phase II: 2006-2007 Access architecture matured +
forwarded to standardisation MM service enablers FMC from fixed network viewpt. Novel first mile concepts
IST Concertation Meeting 04.10.2006 — 4 www.ist-muse.eu
BB Access Lab trials
SPB (Service Plane, MM) at DT Berlin
SPB (Distr. SBC) at TID HuescaVia IST MUPBED
SPC (FMC) at TNO Delft
SPC (FMC) at ACREO Kista
SPD (Distr. content & control ) at PTI Aveiro
SPE (XL-PON) at BT Ipswich
IST Concertation Meeting 04.10.2006 — 5 www.ist-muse.eu
MUSE by numbers (2004-2007)
> 104 Deliverables
> 100 Co-ordinated standard contributions• (DSL Forum, Home Gateway Initiative, ETSI, ITU-T)
> 300 Publications
> 8 MUSE Summer/Winter Schools
> 10 Public demos
> 15 GBytes of working documents
> 300 Different people involved