www.floodrisk.o rg.uk EPSRC Grant: EP/FP202511/1 Predicting Breach Formation Mark Morris HR Wallingford The Science of Asset Management London – 9 th December 2011
Jan 15, 2016
www.floodrisk.org.uk EPSRC Grant: EP/FP202511/1
Predicting Breach Formation
Mark MorrisHR Wallingford
The Science of Asset ManagementLondon – 9th December 2011
“An overview of current options, practice and future direction for predicting breach formation”
1. What are we talking about?
2. Current options / Latest developments
3. Practice
4. Future direction
5. Research gaps
[1] What are we talking about?
What are we talking about?
What are we talking about?
Why do we need to predict breach?
The way and rate at which an embankment breaches can affect the timing of the breach, the rate and magnitude of the flood water released and the size of the breach itself.
Therefore, breach affects the analysis of flood risk (ie. FRAs) and can change the way in which flood events might be managed.
Understanding the degree of uncertainty within the process and any prediction is a very important aspect of using breach predictions
Why do we need to predict breach?
Consider that different aspects of breach prediction are important for different users:
Flood risk assessmentPlanning
Scheme design
Emergency planning
Flood event management
Emergency repairs
Peak discharge? Flood volume? Rate of flooding?
Time to catastrophic failure? Size of breach?
Different types of breach processes
The stages in breach development comprise:• Initiation
– Surface protection (grass) cover fails, soil starts to erode
• Formation – Significant erosion of material through embankment body and
down to base
• Growth (widening)– Open breach; flow continues to widen the breach
Can be driven by wave overtopping, water overflowing or seepage through
Different types of breach processes
Soil type and state affects the soil erodibility
Soil erodibility affects the overall physical process
...which (for external erosion) may be headcut erosion or surface erosion (or a combination / transition between the two).
Typically:• Sandy, non cohesive soil = surface erosion• Cohesive, clayey soil = headcut
[not forgetting that soil state significantly affects the process...]
Different breach processes
Different breach processes
Photos: Greg Hanson - USDA-ARS
What’s the point here?
1. Rate of flow through a breach is controlled by the upstream crest level– Breach formation occurs when this control erodes since flow
can then increase, so increasing erosion– The timing of crest erosion for headcut or surface erosion
varies– Hence the nature of flood hydrograph depends upon the form
of erosion, hence the soil erodibility, hence soil type and state
What’s the point here?
2. The nature of the flood hydrograph also depends upon the reservoir stage/volume relationship and the soil erodibility– Assuming the crest erodes (surface erosion)– Hydrograph shape = function of rate crest erosion and
reservoir surface area• Can the reservoir level drop to match the rate of crest
erosion? Effect of Soil Erodibility on Breach - Outflow
0
10
20
30
40
50
60
70
80
90
100
0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000
Time (Seconds)
Flo
w (
m3
/s)
M1 - Kd=0.2M1 - Kd=18M1 - Kd=0.9M1 - Kd=35M1 - Kd=3.5M1 - Kd=88M1 - Kd=17.7M1 - Kd=177
[2a] Current options for predicting breach
Different methods include:
1.Judgement (guess work?)
2.Simple predictive equations
3.Simple predictive models
4.More complex predictive models
5.Integrated breach and flow models
6.Probabilistic breach models
Current options for predicting breach
1. Judgement (guess work?)– Can vary from reasonable judgement to a blind guess hence
can be highly inaccurate– Use of historic records from same catchment / soil / structure
type helps
2. Simple predictive equations– Typically developed for dams or non cohesive soils– Regression analysis on limited data (and hence specific
conditions)– Can have large uncertainties– Typically give peak discharge, maybe breach width – not
hydrograph
Current options for predicting breach
3. Simple predictive models– Predefines and simplifies the breach process
• Is the simplification acceptable?
4. More complex predictive models– Greater complexity – less uncertainty – typically a slower model
5. Integrated breach and flow models– Allows for drowning of breach – important but don’t overlook
what the model actually does
6. Probabilistic breach models– Gives more information regarding range of possible behaviour
[2b] Some recent developments in predicting breach
i. Advances in rapid simulation – FRMRC2
ii. Conclusions from the DSIG breach modelling project
iii. Advances in more detailed modelling – HR BREACH
iv. Advances in understanding soil erodibility
WP4.4 (University of Oxford and HR Wallingford): Rapid breach assessment - will develop simplified equations for the rapid prediction of breach size for a limited range of embankment structures. The methods will be directly applicable to practicing engineers and will replace the default and very approximate breach modelling methods currently included within the RASP family of tools.
Researcher = Myron van Damme – University of Oxford
[i] Advances in rapid simulation: FRMRC2 WP4.4 research
Goal of the research
In summary...
Myron has:
1.Reviewed breaching processes and models
2.Chosen to develop simple, physically based equations– NOT regression analysis; Not emulating other models
3.Equations simulate average erosion rates for the different types of breach process (surface / headcut / internal erosion)
4.Assumes predefined physical processes for breach
5.Validated the model [AREBA] using HR BREACH and DSIG case study data [ builds upon international best]
General assumptions
1D flow behaviour
Rectangular spatially constant cross section breach
No equilibrium transport conditions
Constant soil erodibility
Instantaneous failure grass cover
No erosion below the foundation level of the embankment
Widening rate is proportional to the downward erosion rate
Underlying assumptions (1/4)
Assumptions surface erosion
Landside slope remains equal to the initial slope gradient
Depth along landside slope approaches the normal depth starting from the critical depth
Landside slope retreats at a spatially averaged erosion rate
Crest erodes downward while landside slope retreats
Underlying assumptions (2/4)
Assumptions headcut erosion
No downward erosion due to flow over the crest
Headcut starts at the top of landside slope
Underlying assumptions (3/4)
Assumptions piping
An initial pipe diameter widens in an equal rate due to the flow through the pipe
After slumping of the soil above the pipe, potential further failure of the embankment is described by the surface erosion failure process
The grass cover is assumed to have failed with failure of the pipe
Underlying assumptions (4/4)
• AREBA - A Rapid Embankment Breach Assessment• AREBA gives promising results when being bench marked
against HR BREACH• Validating AREBA against the DSIG data showed that the model
prediction lie within the bounds of uncertainty following from the uncertainty in the input parameters
• Run speed AREBA is approximately 0.2s per run.
Performance and validation
• AREBA predicts breach through simple, homogeneous embankments– Does not simulate composite or complex structures– But speed of simulation does allow the user to ‘play’
• AREBA requires definition of:– Upstream load (time varying water level)– Embankment geometry– Embankment soil erodibility, Kd– Assumed failure mode (surface, headcut, internal erosion)– Downstream volume / stage (time varying water level)
Data Requirements / Applicability
• International project – dam owners – industry needs focus• Breach model review 3 selected for evaluation (as greatest
potential for industry uptake) = SIMBA / HR BREACH / FIREBIRD• Data review to assist model performance validation
– USDA ARS data / IMPACT project data / 2 dam failures
• FIREBIRD eventually rejected due to lack of usability and hence testing
[ii] Conclusions from the DSIG breach modelling project
• SIMBA = Headcut; HR BREACH = surface erosion• Performance of both models against the various test cases
varied, but neither was consistently better or worse• Conclusions:
– Still to be formally reported by PM (Tony Wahl – USBR) ( not formal conclusions)
– Develop an industry model using both headcut and surface erosion processes (ie SIMBA + HR BREACH)
– Modeller understanding and ability with the models is important• For example, models simulate breach through simple structures; expertise is needed
to know how to apply the models to more complex, real structures
– Available data to support research and model validation is limited– Uncertainty / lack of knowledge in soil erosion processes / simulation
DSIG Conclusions (Cont.)
[iii] Advances – HR BREACH model
• HR Wallingford programme of research over past decade– National / EU / International projects plus company R&D
HR BREACH model – Mohamed (2002); Integrated InfoWorks (Wallingford Software
Innovyze); Morris (2011)
• 1D flow; sections through embankment; 2D section erosion plus block failure
• Focus here on one area of advance – breach formation through zoned flood embankments / embankment dams
Trying to predict breach through real rather than idealised structures
How significant is this for flood risk assessment and hence asset management practice?
Zoned embankments
Representing zones in the model
1
2
1
2
3
4
1 32
1
2
1
2
3
4
1
2
1
2
3
4
1
2
1
2
3
4
Effect of Kd versus As• Soil erodibility versus reservoir stage area
Homogeneous embankment breach – two different erodibilities
Peaky
Hydrograph
Flat
Hydrograph
Effect of zoned embankment (2 layers)• 2 flat layers – different erodibility (also fn of reservoir area)• Extremes show peaky versus flat hydrograph (trends in-between)
Homogeneous embankment breach – two layers with different erodibilities
Erodible top layer
Resistant top layer
Effect of layers on outflow hydrograph• 2 layers – different erodibility
Advances – HR BREACH model
Conclusions:• The combined effects of zoning and soil erodibility
can significantly affect the breach flood hydrograph• Layering can provide significant degrees of protection
against more erodible material beneath– Ie. the Dutch / German embankment design
• Erodibility plus reservoir area affects flood hydrograph
• Each of these points is significant for design / construction / maintenance / risk assessment
Greg Hanson
[iv] Advances in understanding soil erodibility
[4] Industry Practice
Industry practice: • Often guesswork / judgement or simple equations
Why?• Confusion over choice of best (appropriate) method?• Avoid the cost
– By avoiding perceived complexity of analysis– By avoiding purchase of software
• Blame uncertainty
Systems analysis:• Risk models run many thousands of simulations need
simple and / or fast methods of prediction
[5] Future Direction1. Industry versus academic solutions – the challenges are
different– Fast – simple Complex – slow(er)?
2. Need to integrate flow, with soil erosion, with structure response / behaviour– Complex / significant interdependencies– Can reduce the uncertainty from flow by moving to a 2D, 3D flow
model (using existing models and improved computer power)– Need to keep a balance in terms of analysis accuracy & relevance
for different processes
3. Need to improve understanding of soil erodibility
[5] Future Direction4. Need to improve understanding of natural and man
made variability in soils / structures in order to assess likely erosion / failure processes
5. Different soils erode by head cut or surface erosion – currently as separate models merge into a single model with analysis sufficient to determine and flip between processes
[5] Future Direction
5. Putting model speed aside, use more accurate flow models combined with a better analysis of soil behaviour... merge a soils analysis model (ie. Levee stability analysis) with a breach model to provide the complete assessment of levee response and failure
6. Given the uncertainty in soil parameters / distribution, consider how this may be done probabilistically as well as deterministically
[6] Research Gaps
(i) Soil Erodibility:
1. Understand which parameters affect erodibility (close)
2. Understand how those parameters vary in-situ and under climate change conditions
3. Link parameters to field observations for asset management
4. Link parameters to design and construction specifications
[6] Research Gaps
(ii) Breach model:
1. Meshing headcut and surface erosion, with analysis to flip between processes
2. Meshing ‘geotechnical analysis’ model with a ‘breach’ model
3. Dealing with uncertainty distribution?
[6] Research Gaps
(iii) Data:
We always seem to be chasing better data!
1. Despite the frequency of dam and levee failure there remains very little high quality, field scale data against which the different processes can be studied and models validated. Solution?
2. Soil erodibility data – If we accept process dependence upon soil erodibility, and we build models using measures of erodibility, how can we provide best guidance on value selection?
The EU FP6 Integrated Project – FLOODsite - Tasks 4 & 6:
www.floodsite.net/html/work_programme2.asp?taskID=4
www.floodsite.net/html/work_programme2.asp?taskID=6
The CEATI Dam Safety Interest Group breach modelling project:
www.ceati.com/collaborative-programs/generation/dam-safety
The FRMRC II project website: www.floodrisk.org.uk
Contact: Mark Morris [email protected]
More information on breach? Website information