www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012
31

Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

Dec 16, 2015

Download

Documents

Madeline Bailey
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

www.aoc.gov

Architect of the Capitol (AOC) Presentation to American Council of

Engineering Companies of Metropolitan Washington

February 16, 2012

Page 2: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

2www.aoc.gov

Capitol Campus

Page 3: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

3www.aoc.gov

AOC Organizational Chart

Page 4: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
Page 5: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
Page 6: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
Page 7: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

West Refrigeration Plant

SUPREME COURT MODERNIZATION

U.S. CAPITOL VISITOR CENTER

Page 8: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

west refrigeration Project DOME SKIRT POST-ELECTION MOVESBartholdi Fountain Restoration

Page 9: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

9www.aoc.gov

Procurement Overview(Conducting Business with the AOC)

Page 10: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

10

www.aoc.gov

Authority for the AOC

• Permanent authority for maintenance and care of the U.S. Capitol given to the AOC by Congress on August 15, 1876

• Procurement authority is generally found in Titles 2 and 41 of the United States Code

Page 11: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

11

www.aoc.gov

Competition Requirements

• Competition required for all procurements > $5,000

• General exceptions– Only one source available– Emergencies

www.aoc.gov11

Page 12: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

12

www.aoc.gov

Advertising Requirements

• Requirements > $100,000 are advertised and posted on FedBizOpps (FBO)

• Search under “Agencies” for “Architect of the Capitol”

www.aoc.gov

Page 13: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

13

www.aoc.gov

AOC and the Federal Acquisition Regulation (FAR)

• The FAR was developed for use by the Executive Branch

• AOC is not subject to the FAR, but generally aligns with the FAR

www.aoc.gov13

Page 14: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

14

www.aoc.gov

Upcoming Major Projects

Dome Rehabilitation Phase II:• Complete restoration of the exterior and

interior of the cast iron shell • Replacement of essential systems • Restoration of the inner dome rotunda area• Solicitation anticipated in summer 2012

Page 15: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

15

www.aoc.gov

Upcoming Major Projects

Refrigeration Plant Revitalization, Phases I and II:• Relocation of existing chillers• Installation of new chillers and cooling towers • Modification of chilled water and condenser water piping • Installation of associated pumps, controls and electrical

components • Solicitation anticipated in spring 2012

Page 16: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

16

www.aoc.gov

Upcoming Major Projects

• Cannon Renewal– Replace infrastructure– Compliance with building codes and standards– Enhance effectiveness – Preserve historic character– Improve security– Meet sustainability goals

• CMa and CMc solicitations underway

Page 17: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

17

www.aoc.gov

Cannon Building – Physical Features

• Completed in 1908

• 678,791 gross square feet (excluding garage)

• 490,300 occupiable square feet (excluding garage)

• 6 levels (including basement)

• 142 Member suites

• 4 Committee Hearing Rooms

• 316 underground parking spaces

• Monumental Rotunda has historically served as the main building entry and defining feature of the interior

Page 18: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

18

www.aoc.gov

Cannon Potential Areas for Improvement

Replace Outdated Systems

• Provide energy efficient and code compliant building systems

• Improve size and accessibility of utility rooms

Page 19: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

19

www.aoc.gov

Improve Energy Efficiency

• Upgrade exterior building envelope

• Replace building systems

Cannon Potential Areas for Improvement

Page 20: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

20

www.aoc.gov

Address Life Safety

• Modernize systems• Fire alarm• Emergency communications • Sprinklers

• Improve Rotunda code compliance

• Address hazardous materials

Cannon Potential Areas for Improvement

Page 21: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

21

www.aoc.gov

Improve Accessibility

• Address building access• Upgrade toilet rooms• Expand elevator platforms

• Provide hearing room access

Cannon Potential Areas for Improvement

Page 22: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

22

www.aoc.gov

Enhance Member Suites

• Upgrade Multi-function center bay• Provide more efficient staff areas

Cannon Potential Areas for Improvement

Page 23: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

23

www.aoc.gov

Improve Elevator Service • Car capacities/

configurations• Fifth Floor service• Single dedicated freight

car

Cannon Potential Areas for Improvement

Page 24: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

24

www.aoc.gov

Cannon Potential Building System Upgrades

Upgrade Mechanical Systems• Upgrade utility rooms• Utilize center court distribution tunnel

Page 25: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

25

www.aoc.gov

Cannon Potential Building System Upgrades

Reuse Existing Shafts

Page 26: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

26

www.aoc.gov

Upgrade Electrical Systems

• Establish dedicated closets on each wing and on each floor

• Upgrade switchgear, network transformers and network protectors

• Add emergency generators

• Provide central lighting controls

Cannon Potential Building System Upgrades

Page 27: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

27

www.aoc.gov

Cannon Proposed Structural Systems Modifications

Address Structural Elements

• Add new elevator hoistways

• Provide new vertical shafts for utility distribution

• Raise fifth floor wall and roof structure

• Create basement utility rooms through removal of bearing walls

• Meet seismic requirements

Page 28: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

28

www.aoc.gov

Cannon Exterior Preservation

Renew Exterior Envelope

• Reconstruct Independence Avenue

terrace wall

• Repair stone modillions

• Repair center courtyard façades

Page 29: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

29

www.aoc.gov

Cannon Exterior Preservation

Renew Exterior Envelope

• Clean, repair and stabilize stone • Provide bird deterrence

Page 30: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

30

www.aoc.gov

Cannon Exterior Preservation

Renew Exterior Envelope• Restore original windows and one

original door• Replace remainder of exterior

doors

Preserve Historic Landscape

• Retain specimen trees and planting around site

Page 31: Www.aoc.gov Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.

31

www.aoc.gov

Thank You!