Top Banner
WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT
16

WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.

Jan 13, 2016

Download

Documents

Gerald Reynolds
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.

WSDOT Design Build Contracting – an innovative partnership

Society of American Military EngineersSeptember 16, 2014

Phil Fordyce, P.E.WSDOT

Page 2: WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.

Agenda• Why Design Build?• Preliminary Engineering • Project Goals• Selecting a Design Build team• Design Build Partnerships• Design Build: Design and Construction • Contact Administration• Project Closeout• WSDOT Design Build projects• Questions

Page 3: WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.

Why Design Build for WSDOT?

• Speed of delivery

• Resources

• Early price certainty

• Innovative delivery

Page 4: WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.

Preliminary EngineeringDesign/Contract Development

• Preliminary/Conceptual Design– 15% level of design– Cost estimates

• Right of Way• Utilities• Deviations• Risk • Agency/Stakeholder/Open Houses

– Aesthetics and Noise walls

Page 5: WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.

Project Goals (example)

Congestion Relief - Open the new northbound auxiliary lane to traffic as soon as possible and no later than December 31, 2010.

Excellent Quality - Meet or exceed technical quality requirements for design and construction through implementation of a clear and thorough Quality Management Plan.

Permit Compliance - Meet or exceed environmental requirements with no permit violations by adopting WSDOT’s permitting and environmental compliance standards.

Smooth Start-up - Maximize project development effectiveness through implementation of a well-planned start-up that ensures efficient delivery of the Project and begins construction as soon as possible.

Technical Approach - Utilize technical innovations that provide added value to the project.

Page 6: WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.

Selecting a Design Build Team

Request for Qualifications (RFQ)

•Selection process based on goals•Shortlist 3 to 5 teams•Reference Checks•Philosophy in Scoring•Evaluation Manual•Debrief with firms

Page 7: WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.

Selecting a Design Build Team

Request for Proposal (RFP)

•Meetings with proposers•Q and A’s•ATC’s•Confidentiality•Addendums•Quiet period•Technical score and price

Page 8: WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.

Calculating Best Value Proposal price - Technical score Lowest score is best value

Team Price Technical Credits ScoreA $185,740,751 - 10,660,000 = 175,080,751B $202,874,000 - 11,820,000 = 191,054,000C $157,800,001 - 9,630,000 = 148,170,001D $155,500,001 - 6,500,000 = 149,000,001

Page 9: WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.

Design Build Partnership Keys to Success

• Co-location• Formal and informal

partnering• Discipline task forces• Shifting focus of the

organization– Learning curve for everyone

• WSDOT has oversight

Page 10: WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.

The Design Of Design Build

• Design Builder moves project from 15% conceptual plans to 100% RFC plans.

• Design Builder submits plan sets to WSDOT for review and comment (preliminary and final) – not approval

• Construction starts before design is complete, but not without RFC plans.

• Post design services – Process to get AS-built plans (RFI,FDC, NDC)

Page 11: WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.

WSDOT - Roles and Responsibilities Design

• WSDOT owns Basic Configuration elements• WSDOT provides oversight:

• Most review happens in Task Force meetings through “over the shoulder” reviews

• Ensure design meets the Contract Requirements / Mandatory Standards established

• Manage review comments and resolution; beware of preferences• Do not direct work• Management – tracking (doc. control)

• WSDOT provides design quality audits– DQMP

• WSDOT approves the design at the end of the project

Page 12: WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.

The Construction of Design Build

• Quality Management Plan (QMP)• Design Builder responsible for Quality Control (QC) and

Quality Assurance (QA)– Quality Assurance must be independent from Quality Control

– Quality Manager must report to non-production management

• WSDOT responsible for Quality Verification (QV)– Lab certification and tester qualifications

– Testing asphalt

– Fabrication inspection

• Environmental – WSDOT responsible for permitting

– Design Builder responsible for compliance

• The Design Builder responsible for solutions to problems

Page 13: WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.

Contract Administration Roles and Responsibilities

• Document control• Materials/Record of

Material• Payment• Change orders• RFI/FDC/NDC (post

design services)• As-Builts• Final Records

Page 14: WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.

Project Closeout - Design

Design•Document Control•Develop closeout plan at beginning of project•Define requirements – Design deliverables•For WSDOT: DDP/PF•Importance of early engagement

Page 15: WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.

WSDOT Design Build Projects

• 29 Design-build project to date starting in 2001

• www.wsdot.wa.gov/biz/contaa/DESIGNBUILDCONTRACTS/default.htm