1

WRITING SPECIFICATIONS (I)WRITING SPECIFICATIONS (I)

Dr. Hani ObeidAssoc. Prof. EE, SMIEEE, MNYAS, P. Eng.

Page 2: Writing Specifications Presentation(I)-Revised

2

Main Objective

The main objective of specification writing is to get Project done with as little cost growth As possible.

Cost growth shows up as:

1. Engineering Change Proposals ECP2. Request for Equitable Adjustments (claims)3. Modifications to recently bought items (mods)

Some ECP & mods arise legitimately from Changingmission requirements.

Page 3: Writing Specifications Presentation(I)-Revised

3

When a project goes sour, the most likely the Contractor’s lawyers will do is to examine the Specifications and to find a number of errors & Inconsistencies in them they claim to have Mislead their clients.

The party responsible for losses is the party Who drafted the defective specifications.

Such responsibility is a fundamental principle Law.

Page 4: Writing Specifications Presentation(I)-Revised

4

•Assume design knowledge

Design leader in a design team must be responsible for not only the Tender Drawings but all of the Tender Documents including Specifications

Page 5: Writing Specifications Presentation(I)-Revised

5

التاريخ في مواصفات أول

مساكن واجعله قطراني خشب من تابوتا لك إصنعواطله

. طوله ذراع مائة ثالث بالقارب خارج ومن داخل من . وتجعل سمكه ذراعا وثالثون عرضه ذراعا وخمسون

واجعل فوق من تكمله ذراع حد والى للتابوت طاقاباب

وثوالث وثواني سفلى ومساكن جانبه في التابوتتصنعه.

..........................

. فعل هكذا به الله امره ما كل بحسب نوح فعمل

Page 6: Writing Specifications Presentation(I)-Revised

6

Chief Specification Writer

1. Keep the design office master up to date2. Collection & analysis of technical & product

information.

Assistant Specification Writer for Each Discipline:

ELECTRICAL, MECHANICAL STRUCTURAL,ARCHITECTURAL

Page 7: Writing Specifications Presentation(I)-Revised

7

HISTORY

1830 – Condition of Contract began to appearAt the beginning of the specifications.

1870 – Royal Institute of British Architect (RIBA)& London Builders Society: produced a Form of Contract.

1903 – Form of Contract was agreed between RIBA, The Institute of Builders & National Federation of Building Trades Employers NFBTE (don’t obtain General acceptance).

1909 – RIBA Form of Contract was successful

Page 8: Writing Specifications Presentation(I)-Revised

8

1928 – RIBA Form of Contract was fully approved & 1931Edition was fully accepted. Joint Contracts Tribunal JCTWas formed.

1939 – next edition was produced by JCT, further editions Followed in 1963 & 1980.

1945 – Standard Conditions of Contract were issued by the Institution of Civil Engineers ICE.

1950, 1955 & 1973 – Revisions.

1957 – 1st Edition of Conditions of Contract for Works ofCivil Engineering Construction was issued by FIDIC(Federation of Consulting Engineers).

Page 9: Writing Specifications Presentation(I)-Revised

9

1984 – Association of Consultant Architects (ACA) British Property Federation BPF brought out their form of Building Agreement.

1991 – Sixth Edition.

.

Page 10: Writing Specifications Presentation(I)-Revised

10

MASTER FORMAT

Before 1960 standard specifications formats didn’t exist.

In 1962 CSI developed the concept of divisions & sections within each division .

In 1963 16- division CSI Format was announced MF95 was issued in 1995

MF04 – new Master Format was issued in 2004

Page 11: Writing Specifications Presentation(I)-Revised

11

SPECIFICATIONS

are

part

of

Construction Documents

(USA)

Contract Documents

(Europe)

Page 12: Writing Specifications Presentation(I)-Revised

12

Bill of Quantities

Until 17th Century Completed works. Measurements are based

on actual costs incurred by builders.

In 1774 Thomas Skaife Designer’s Drawings

Page 13: Writing Specifications Presentation(I)-Revised

13

For specification we need a format to be Used for:

-Uniform system for construction specs.

-Data filing

-Cost accounting

Page 14: Writing Specifications Presentation(I)-Revised

14

Reasons for Specifications

A specification should state what an element of construction should consist of and how it should be installed in sufficient detail so that it can be constructed.

If there was no specification, the designer should specify each element on the drawing.

Workmanship & construction methods is Difficult to specify.

Page 15: Writing Specifications Presentation(I)-Revised

15

SPECIFICATION CRITERIA

Minimum error.

Easy and economic to produce.

Easy to use

Page 16: Writing Specifications Presentation(I)-Revised

16

PROBLEMS

Omissions

Repetitions

Inconsistencies

To avoid problems Check List

Page 17: Writing Specifications Presentation(I)-Revised

17

Types of Specification Section

Two basic types of specification:

Prescriptive: defines materials, products and workmanship. But do not define the end result.

Performance: defines the end result. This is done by specifying Design criteria but not material and products.

The Contractor will be responsible for design as well as Construction.

Page 18: Writing Specifications Presentation(I)-Revised

18

SOURCES OF INFORMATION

Technical data in the design office

Product data regarding similar products

Trade association guides

Government publications from professional institutions

Commercial master guides

Page 19: Writing Specifications Presentation(I)-Revised

19

CSI Standards for Specifications

The criteria for good specification must follow thefollowing standards:

Masterlist Section format Specification language Page format

CSI Standards are modified for use with FIDICConditions and local practice.

Page 20: Writing Specifications Presentation(I)-Revised

20

The Common Arrangement of Work Sections CAWS

In 1987 the Building Project Information Committee BPIC Published a Master List Named

CAWS

Page 21: Writing Specifications Presentation(I)-Revised

21

CAWS

The Common Arrangement at Work Sections

Page 22: Writing Specifications Presentation(I)-Revised

22

Common Arrangement of Work Section (CAWS)

Groups (Divisions) – 24 Groups

Sections – Three Types

1. Broad scope section: for small projects, one section per Division.

2. Medium scope section: for more complex projects. A number of sections of more limited scope.

3. Narrow scope section: for more specialist work, section of extremely limited scope.

Page 23: Writing Specifications Presentation(I)-Revised

23

Example

Broad scope Section: Metal joists (CAWS G12)

Medium scope sections: under “metal Joists”

•Steel joists •Aluminium joists•Composite joist system

Narrow scope section: under steel joist

•Hot rolled steel members•Castellated steel members•Lattice steel members•Purpose made girds.

Page 24: Writing Specifications Presentation(I)-Revised

24

LIST OF CAWS GROUPS

GROUP A: Preliminaries/General Conditions

Description of existing site, description of works, site procedures, temporary facilities, temporary works, nominated subcontractors.

Page 25: Writing Specifications Presentation(I)-Revised

25

GROUP B:

Complete Building

Page 26: Writing Specifications Presentation(I)-Revised

26

GROUP C:

Demolition/Alteration/Maintenance

Demolition, alteration work, repairs and renovation

Page 27: Writing Specifications Presentation(I)-Revised

27

GROUP D: Groundwork

Ground investigation, soil stabilization, site dewatering, excavation, filling, piling, diaphragm walling, underpinning

Page 28: Writing Specifications Presentation(I)-Revised

28

GROUP E: In Situ Concrete/Large Precast Concrete

In situ concrete, gun applied concrete, formwork, reinforcement, precast concrete, composite concrete decking.

Page 29: Writing Specifications Presentation(I)-Revised

29

GROUP F: Masonry

Brick, block and stone walling, small precast concrete units.

Page 30: Writing Specifications Presentation(I)-Revised

30

GROUP G: Structural/Carcassing Metal/Timber

Structural steel framing, structural aluminium framing, metal decking, timber decking, wood wool decking.

Page 31: Writing Specifications Presentation(I)-Revised

31

GROUP H: Cladding/Covering

Patent glazing, curtain walling, concrete roof lights, concrete pavement lights, sheet cladding, timber weather boarding, concrete cladding, stone cladding, roof tiling, flashing.

Page 32: Writing Specifications Presentation(I)-Revised

32

GROUP J: Waterproofing

Waterproof rendering, asphalt rendering, asphalt coating, liquid applied coating, flexible sheets.

Page 33: Writing Specifications Presentation(I)-Revised

33

GROUP K: Lining/Sheathing/Dry Partitioning

Plasterboard lining, rigid sheet sheathing and lining, timber boarding, dry partitions and linings, suspended ceilings and access floors.

Page 34: Writing Specifications Presentation(I)-Revised

34

GROUP L: Windows/Doors/Stairs

Windows, roof lights, screens, louvers, doors, shutters, hatches, stairs, galleries, balustrades, glazing.

Page 35: Writing Specifications Presentation(I)-Revised

35

GROUP M: Surface Finishes

Screeds, plastering, tiling, flexible sheet coverings, painting

Page 36: Writing Specifications Presentation(I)-Revised

36

GROUP N: Furniture/Equipment

General purpose, special purpose, site and street furniture, signs, notices.

Page 37: Writing Specifications Presentation(I)-Revised

37

GROUP P: Building Fabric Sundries

Sundry insulation, cavity wall insulation, trims and skirtings, ironmongery, sealant joints.

Page 38: Writing Specifications Presentation(I)-Revised

38

GROUP Q: Paving/Planting/Fencing/ Site furniture

Edgings, bases, site surfacing, site planting, fencing.

Page 39: Writing Specifications Presentation(I)-Revised

39

GROUP R: Disposal Systems

Drainage, sewerage and refuse disposal

Page 40: Writing Specifications Presentation(I)-Revised

40

GROUP S: Piped Supply Systems

Water supply, gas supply, petrol/oil lubrication, vacuum and steam supply, water fire fighting, gas/foam fire fighting

Page 41: Writing Specifications Presentation(I)-Revised

41

GROUP T: Mechanical Heating/Cooling/Refrigeration Systems

Heat source, primary distribution, heat distribution with water and air, heat recovery, refrigeration.

Page 42: Writing Specifications Presentation(I)-Revised

42

GROUP U: Ventilation/Air Conditioning Systems

Ventilation and fume extract, air conditioning, air curtains.

Page 43: Writing Specifications Presentation(I)-Revised

43

GROUP V: Electric Supply/Power/Lighting System

HV and LV distribution, special types of distribution, special lighting, electric heating.

Page 44: Writing Specifications Presentation(I)-Revised

44

GROUP W: Communication/Security/Control Systems

Speech, audio visual, data, security, protection, control.

Page 45: Writing Specifications Presentation(I)-Revised

45

GROUP X: Transport Systems

Transport systems for people, goods, maintenance and documents.

Page 46: Writing Specifications Presentation(I)-Revised

46

GROUP Y: Services Reference SpecificationGROUP Y: Services Reference Specification

GROUP Z: Building Fabric Reference Specification

Page 47: Writing Specifications Presentation(I)-Revised

47

Master Format

Master format has gained acceptance as an Industrystandard in USA & Canada.

16 divisions published by CSI as part of “CSI Format for Construction Specifications In 1963”.

It is a basic format for:

- Uniform System for Construction Specs.- Data filing- Cost accounting.

Page 48: Writing Specifications Presentation(I)-Revised

48

Master Format

Master Format doesn’t establish design discipline

Master Format doesn’t establish trade jurisdiction

Master Format doesn’t provide product classifications

Page 49: Writing Specifications Presentation(I)-Revised

49

Master Format 1995

16 Divisions

Page 50: Writing Specifications Presentation(I)-Revised

50

List of Master Format Divisions

Division 1: General Requirements

General and administrative requirements, Procedural matters, and temporary facilities and controls that apply to all other sections in the Technical Specification.

Page 51: Writing Specifications Presentation(I)-Revised

51

Division 2: Site Work

Work and materials pertaining to the site and preparation, including demolition, earthworks, piped utilities, paving and surfacing.

Division 3: Concrete

Concrete including forms, reinforcement and precast items.

Page 52: Writing Specifications Presentation(I)-Revised

52

Division 4: Masonry

Brick, stone, concrete and other masonry units and associated mortars and accessories.

Division 5: Metals

Structural metal framing, metal decks, metal fabrications, and ornamental metal

Page 53: Writing Specifications Presentation(I)-Revised

53

Division 6: Wood and Plastics

Carpentry, structural plastics and plastic fabrications and laminates.

Division 7: Thermal and Moisture Protection

Work and materials associated with the thermal and moisture protection of the Building envelope, including waterproofing, insulation, cladding, roofing, flashing, sheet metal, sealants and roof accessories.

Page 54: Writing Specifications Presentation(I)-Revised

54

Division 8: Doors and Windows

Metal and timber doors and windows, special doors and windows, shop fronts, glazed curtain walling, ironmongery and glazing

Division 9: Finishes

Finishing work and materials such as plaster,Plasterboard, tile, carpet, painting, wall coverings and associated treatments.

Page 55: Writing Specifications Presentation(I)-Revised

55

Division 10: Accessories (specialties)

Miscellaneous prefabricated items such as toilet partitions and accessories, lookers, Signs, fireplaces and blackboards.

Division 11: Equipment

Specialized building equipment such as Security, catering, stage, laboratory, medical, and water and sewage treatment.

Page 56: Writing Specifications Presentation(I)-Revised

56

Division 12: Furnishings

Furniture, curtains, blinds, art works, multiple seating and interior plants

Division 13: Special Construction

Construction components serving specialized purposes, including prefabricated buildings, air supported structures, integrated ceilings, swimming pools, gas storage tanks, utility control systems, solar energy systems and fire suppression systems

Page 57: Writing Specifications Presentation(I)-Revised

57

Division 14: Conveying systems

Lifts, cranes, escalators and other powered transportation systems

Division 15: Mechanical

Equipment and systems involved in plumbing, drainage, heating, ventilating, air conditioning and fire sprinkler systems

Page 58: Writing Specifications Presentation(I)-Revised

58

Division 16: Electrical

Electrical work, including lighting, power distribution, communications, controls and installation.

Page 59: Writing Specifications Presentation(I)-Revised

59

Section Format

Definition

A specification Section Format is a set of standard clause and paragraph headings.

Every paragraph of specification text therefore has a predetermined position in the section.

Page 60: Writing Specifications Presentation(I)-Revised

60

Master Format Sections

Each broad scope & medium scope section is given a five digit number, first digits refers one of the 16 divisions.

Broad scope titles are emphasized in the Master Format by use of capital letters & bold type.

Narrow scope sections are titled but unnumbered to allow users the flexibility to add additional titles.

Page 61: Writing Specifications Presentation(I)-Revised

61

The Three Section Parts

PART 1: GENERAL

PART 2: MATERIALS (PRODUCTS)

PART 3: WORKMANSHIP (EXECUTION)

Page 62: Writing Specifications Presentation(I)-Revised

62

Definitions

Part: a method of organizing a specification section into three distinct groupings of related information.

Clause: a major subject within a part of a specification section consisting of related paragraphs and subparagraphs.

Paragraph: one or more sentences, dealing with a particularitem or point, separated from the preceding text by beginning on a new line. Groups of paragraphs of related information constitute a clause.

Subparagraph: one or two sentences related to and lower than A paragraph. Groups of paragraphs and subparagraphsrelate similar information under an appropriate clause title.paragraphs are separated from the preceding text by beginning on new line.

Page 63: Writing Specifications Presentation(I)-Revised

63

Functions of Section Parts

Part 1: General.

Describes the specific administrative and procedural

Requirements unique to the section.

Part 1 is an extension of the General Requirements

Subjects which amplify information unique to the Section.

Page 64: Writing Specifications Presentation(I)-Revised

64

Part 2: Materials and Products

Describes in detail, the materials, products, equipment, systems or assemblies that are required for incorporation into the works.

These items include base materials or products and will include shop manufacture, fabrication or level of quality required.

Page 65: Writing Specifications Presentation(I)-Revised

65

Part 3: Execution:

Describes, in detail, preparatory actions and how the Products are to be incorporated into the works. These will also include items built on site or products or systems manufactured on site.

Page 66: Writing Specifications Presentation(I)-Revised

66

Clause and Paragraph Arrangement

Each part of a section is divided into clauses and thence into paragraphs.

The sequence of clause and paragraph headings in the Standard Section Format should be followed. But the Specification writer should decide what to omit or to Consider.

That depends on the complexity of the project.

Page 67: Writing Specifications Presentation(I)-Revised

67

Summary of Prescriptive Section Format Standard

Part 1: General

SUMMARY: Section includes:Construction elements supplied but not installed under this Section.Construction elements installed but not supplied under this Section.Related sections.

REFERENCES

DEFINITIONS

Page 68: Writing Specifications Presentation(I)-Revised

68

Design requirementsPerformance requirements

SUBMISSIONS

Product dataShop drawings SamplesQuality assurance/control submissionDesign data, test reports, certificates, manufacturer’s instructions,Manufacturer’s site reports.Submission at completion

SYSTEM DESCRIPTION

Page 69: Writing Specifications Presentation(I)-Revised

69

QUALITY ASSURANCE

QualificationsStatutory design requirementsCertificates of complianceSite samples mock-upsPre-installation meetings

DELIVERIND, STORING AND HANDLING

Packing, transporting, handling and unloading acceptance at site storage and protection

Page 70: Writing Specifications Presentation(I)-Revised

70

Environmental requirementsExisting conditions site measurements

SEQUENCING

PROGRAMMING

GUARANTEESSpecial guarantees

MAINTENANCEExtra materialsMaintenance service

PROJECT AND SITE CONDITIONS

Page 71: Writing Specifications Presentation(I)-Revised

71

PART 2: MATERIALS AND PRODUCTS

MANUFACTURERS

EXISTING CONSTRUCTION

MATERIALS

MANUFACTURED UNITS

EQUIPMENT

COMPONENTS

Page 72: Writing Specifications Presentation(I)-Revised

72

MIXES

FABRICATIONShop assembly

FINISHESShop primingShop finishing

SOURCE QUALITY CONTROLFabrication tolerancesTests, inspectionVerification of performance

ACCESSORIES

Page 73: Writing Specifications Presentation(I)-Revised

73

PART 3: EXECUTION

ACCEPTANCE INSTALLERS

EXAMINATIONSite verification of condition

PREPARATIONProtectionSurface preparation

ERECTION

INSTALLATION

Page 74: Writing Specifications Presentation(I)-Revised

74

CONSTRUCTIONSpecial techniquesInterface with other workSequences of operationSite tolerances

REPAIR/RESTORATION

RE-INSTALLATION

SITE QUALITY CONTROLSite tests and inspectionManufacturer’s site services

APPLICATION

Page 75: Writing Specifications Presentation(I)-Revised

75

AdjustingCleaningDemonstrationInstructing Employer’s personnel

PROTECTION

SCHEDULES