Top Banner
7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 1/48 ZXPOS CNT Introduction ZTE University
48

Wpo-31 Zxpo_ppt-48s Cnt Introduction

Apr 14, 2018

Download

Documents

Sudhanshu Kumar
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 1/48

ZXPOS CNT Introduction

ZTE University

Page 2: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 2/48

Objectives

 At the end of this course, you will be able to: Know the functions of ZXPOS CNT

Know the operation of ZXPOS CNT

Page 3: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 3/48

Content

Overview

Preparation

Coverage test

CS service testPS service test

Indoor coverage test

Page 4: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 4/48

Overview

Radio network optimization (RNO) is the important step innetwork construction. RNO adjust the planning and designreasonably , improve the network coverage, increase thenetwork capacity, improve the network service quality andresource utilization ratio. Make the network operation morestably , and provide excellent service.

Data collection is the necessary premise of analysis andadjustment. Optimization data including:Driving test data(DT),Call quality test data(CQT),OMC performancedata, Customer’s complains, Alarm data , signaling dataand other data.

ZXPOS CNT ( UMTS Edition, Short for CNT) is theprofessional network optimization test software developedby ZTE . CNT helps the RNO engineer to do the test andanalysis. Locate network problem and evaluate networkquality and capacity, constitute the optimization solution.

Page 5: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 5/48

Content

Overview

Preparation

Coverage test

CS service testPS service test

Indoor coverage test

Page 6: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 6/48

Preparation

Edit the site information table Create map and design testing route

UE driver installation

Software installation Hardware license driver installation and upgrade

Connect the equipment

Build the test environment

Page 7: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 7/48

Preparation

Edit the site information table CNT can support Excel format site information table load and unload,

the detailed content you can check the attachment: 

The requirement of the site information table, at least must including 9parameters as follows:

Page 8: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 8/48

Preparation

Create map and designtesting route

2 methods to create map: 

1. Import the MapInfoformat map

2. Use MapInfo convert

JPG or BMP format file toTab format file.

Steps of convert JPG or BMP format file to Tabformat file: 

1. Download the city map

via the accessorial software( for exampleSupperget2000series ).

2. Use MapInfo open themap

Figure① 

Page 9: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 9/48

Preparation

Create map and design testing route

Steps of convert JPG or BMP format file to Tab format file:  3.Click <Register> on figure 2 to calibrate the map。 

4. Select 3-5 points from Google earth or by GPS test, Click <Add>,Enter 

the right longitude and latitude as figure 3 and figure 4.

5.Click <OK>,the software will generate map automatic, then the

calibration is finished.

Figure② 

F i   g

 ur  e

Page 10: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 10/48

Preparation

Create map and design testing route

Steps of convert JPG or BMP format file to Tab format file : 

Method to design the testing route:  Some times you need prepare the testing route at first, The

method to design the route in MapInfo as follows: 1. Open MapInfo, open the map file. Click <New Table>, Create a

new layer on the map layer. The detailed setting see figure 6 and 7.

Figure④ 

Figure⑤ 

Page 11: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 11/48

Preparation

Create map and design testing route

Method to design the testing route: 

2. Save the file to certain folder 

3.Click [Map →Layer Control], select the pop-window from layer controlwindow, add the new layer just now created. The detailed setting seefigure 8

Figure⑥ Figure⑦ 

Page 12: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 12/48

Preparation

Create map and design testing route

Method to design the testing route: 

4. Now the new layer is displayed in the status bar, Select the

drawing tools to design the testing route. See figure 9.

5.Save the route.

Figure⑧ 

Figure⑨ 

Page 13: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 13/48

Preparation

UE driver installation

UE driver installation:

Here the test equipment is ZTE T6 mobile phone Double click

setup. exe to install.

Page 14: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 14/48

Preparation

Software installation CNT/CAN software installation: 

Double click to install.

Page 15: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 15/48

Hardware license driver install and upgrade

First plug the USB dog, if inform “find new hardware”,click <cancel>.Click [ Start →Program→ZTE WiNOM →ZXPOS CNT-UMTS →Micro

Dog Install Driver ], Open the install window.

Select install USB dog driver to install.

Page 16: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 16/48

Connect the equipment

The figure shows how to connect the equipment,List the equipmentfor test, such as GPS, GPS antenna, RS-232 cable, Test Mobile phone,

Mobile cable, CNT hardware license, Laptop

Page 17: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 17/48

Build Test Environment

1. Connect all equipment 2. Start the software. In the left of the window,

add mobile and GPS.

Parameter description

Build In: (1)Sim Navigator :Simulate a GPS,when no

GPS connect to computer, software will simulate a

GPS, will generate location information randomly

(2)Indoor Navigator :If do the indoor test,selection this option

COM:The port connect the equipment

APT File:load or unload test data.

CellSite File:load or unload site information

Page 18: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 18/48

Build Test Environment

3. Click[ My computer →Management→ Devicemanagement→ port(COM and LPT)], Check

the port information.

4. Right click to detect GPS and UE. Then right

click test phone, select<Test Mode> to active test.Select a folder to save the test data in the pop-

window.

Page 19: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 19/48

Build Test Environment

Page 20: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 20/48

Build Test Environment

5. Load map and testing routeButton to show map window. Button to add map and testing route. 

Page 21: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 21/48

Build Test Environment

6.Load site information. Click [ File->Load Cell Site…] to load site information. 

Notice:Click [ File->Unload Cell Site ] can unload the site information. If 

already load site information, then you add other site information table,

former will be unload.

Page 22: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 22/48

Build Test Environment

Display style setting: 1.Click button,Set the Active Set and Monitor Set Line color and

cell site label parameters

Page 23: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 23/48

Build Test Environment

Display style setting2.Click to set the Theme

Page 24: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 24/48

Content

OverviewPreparation

Coverage test

CS service testPS service test

Indoor coverage test

Page 25: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 25/48

Overview

The aim of coverage test is to know the cellcoverage, relationship between capacity and

coverage, and whether it is uplink or downlink

limited.

Page 26: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 26/48

Pilot Coverage Test

In CNT click shortcut icon to open pilot set window

Page 27: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 27/48

Drive Test Replay

CNT can save the drive test data in “apt” format, and support replay. 

Page 28: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 28/48

Content

OverviewPreparation

Coverage test

CS service testPS service test

Indoor coverage test

Page 29: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 29/48

Overview

CNT supports voice automatic redial test. Thedetails as follows:

Powerful service planning sequence function. You

can define the auto-test plan flexibly.

Support WCDMA/GSM mode test

Locate the call failure reason through layer 3

message, offer the call statistic information.

Record the time information during call test.

Page 30: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 30/48

CS Service Test Procedure

Step 1. Click [View → Phone→ Voice Call Test] 

Page 31: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 31/48

CS Service Test Procedure

Step 2. Set the parameters and click “Apply”, and then click “Start Call” 

Page 32: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 32/48

CS Service Test Parameter Description

Plan Name

Call Number, for example, 10010

Service Option, normally select CS12.2K

Call Pattern: select Origination or Termination

Continuous Call: select it for continuous call

Redial On Drop: On Continuous Call mode,redial after call drop

Call Count

For discontinuous call, the following parameter will be valid,

Setup Time: Maximum time for call setup

Call Time: Conversation duration

Tear Down Time: Maximum time for radio link release

Idle Time: Idle duration between two conversations

Page 33: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 33/48

CS Service Test Call Statistics

It includes call procedure, time and statisticinformation.

Page 34: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 34/48

Call statistic parameter description

Current Call column shows all information as follows Phone Modal Phone State: Service status

Setup Time

Conversation Time

Tear Down Time

Idle Time

Current Plan column shows all the statistic information as follows Call Success: Call success time and ratio

Call Block:Time and ratio

Call Drop:Time and ratio

Call Fail:Time and ratio Link Error :Call error and link fault because of UE link broken

Call Prerelease

Call Remain:Conversation duration

Call Count: Call times

Page 35: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 35/48

CS Service Test Time Statistics

In Time Statistics window, record all the time statistic message during

conversation, including access request count, call setup time, call time,

teardown time, and Idle time.

Page 36: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 36/48

Content

OverviewPreparation

Coverage test

CS service testPS service test

Indoor coverage test

Page 37: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 37/48

PS Service Test Procedure

Step 1. Click [View → Phone→ Data Call Test] 

Page 38: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 38/48

PS Service Test Procedure

Step 2. Click , to add or delete a test item, and set

parameters

Page 39: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 39/48

Plan parameter description

1. Connection test Connect is used to establish the dial-up connection automatically, so that

no need to dial up manually. It’s recommend to be the first item. 

2. PPP service test The same setting as connection test.

3. FTP service test Host

Port PASV:Setup the connection on passive mode of not

User Name

Password

 Anonymous

Timeout

Direction: Upload or download

Restore:Restore the connection when it’s fault. 

Local File

Remote File

Page 40: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 40/48

Plan parameter description

4. Http service test URL Direction: Upload or download

Timeout

Local File

5. Ping service test Host

Packet Size (bytes)

Timeout (ms)

Ping Count

Delay (ms): Timing interval between to test.

6. TCP/UDP service test

Down Link,

Up Link TCP,UDP

Server Address

Port

Datagrams Length (bytes)

Speed (KBits/s)

、 

Page 41: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 41/48

Message

Step 3. Click <Apply>,Then <Start Call>.

Page 42: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 42/48

Throughput

Step 4.Click <Throughput> to check the throughput, status of data

transmit and statistic message.

Page 43: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 43/48

Transfer Information

(1)Color  Different to identify different service.

(2)Right click menu Update 500ms

Update 1000ms

Update 1500ms

Show In Kbytes

Option:Color and style of the throughput line

(3) Transfer information Service Type

Status

Total Data(Kbytes): Totally data size will be transmit.

Load Data(Kbytes):

Transmitted data size. Direction: Upload or download

Percent:Progress

Duration:Transmit duration

 Avg Throughput(Kbps)

Page 44: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 44/48

Content

OverviewPreparation

Coverage test

CS service testPS service test

Indoor coverage test

Page 45: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 45/48

Overview

Indoor coverage test will record the test datawithout GPS. You can input the location

information according to the map information, and

define the test route, using “Click and walk”

method to do indoor drive test.

Page 46: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 46/48

Indoor coverage test

Page 47: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 47/48

Button Instruction

Page 48: Wpo-31 Zxpo_ppt-48s Cnt Introduction

7/30/2019 Wpo-31 Zxpo_ppt-48s Cnt Introduction

http://slidepdf.com/reader/full/wpo-31-zxpoppt-48s-cnt-introduction 48/48