WP6: Mechanical Studies LCFI collaboration meeting 19/9/2006 Erik Johnson CCLRC Rutherford Appleton Laboratory
12

WP6: Mechanical Studies LCFI collaboration meeting 19/9/2006 Erik Johnson CCLRC Rutherford Appleton Laboratory.

Dec 28, 2015

Download

Documents

Cecil Hodge
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: WP6: Mechanical Studies LCFI collaboration meeting 19/9/2006 Erik Johnson CCLRC Rutherford Appleton Laboratory.

WP6: Mechanical Studies

LCFI collaboration meeting 19/9/2006Erik Johnson

CCLRC Rutherford Appleton Laboratory

Page 2: WP6: Mechanical Studies LCFI collaboration meeting 19/9/2006 Erik Johnson CCLRC Rutherford Appleton Laboratory.

Erik Johnson, RAL LCFI Collaboration meeting 19/9/2006

Recent Activities at RAL

• In the Lab– Measurement of ladders with the upgraded

LASS– Acquainting myself with the Cooling test rig

• In the Office– Silicon Stress studies simulation– Ladder construction concept

Page 3: WP6: Mechanical Studies LCFI collaboration meeting 19/9/2006 Erik Johnson CCLRC Rutherford Appleton Laboratory.

Erik Johnson, RAL LCFI Collaboration meeting 19/9/2006

Ladder Measurement

• Had two ladders already constructed– RVC-1, carbon foam core sandwiched by thin

silicon (damaged in construction)– SiC-1, Silicon carbide substrate with silicon

“floating above it” attached by adhesive pillars– Both cycled in temperature, from room

temperature down to approx. -50 degrees C

• Upgraded Lass working well– No longer seeing ripples generated by the

measurement system

Page 4: WP6: Mechanical Studies LCFI collaboration meeting 19/9/2006 Erik Johnson CCLRC Rutherford Appleton Laboratory.

Erik Johnson, RAL LCFI Collaboration meeting 19/9/2006

Page 5: WP6: Mechanical Studies LCFI collaboration meeting 19/9/2006 Erik Johnson CCLRC Rutherford Appleton Laboratory.

Erik Johnson, RAL LCFI Collaboration meeting 19/9/2006

Page 6: WP6: Mechanical Studies LCFI collaboration meeting 19/9/2006 Erik Johnson CCLRC Rutherford Appleton Laboratory.

Erik Johnson, RAL LCFI Collaboration meeting 19/9/2006

Results

Page 7: WP6: Mechanical Studies LCFI collaboration meeting 19/9/2006 Erik Johnson CCLRC Rutherford Appleton Laboratory.

Erik Johnson, RAL LCFI Collaboration meeting 19/9/2006

Page 8: WP6: Mechanical Studies LCFI collaboration meeting 19/9/2006 Erik Johnson CCLRC Rutherford Appleton Laboratory.

Erik Johnson, RAL LCFI Collaboration meeting 19/9/2006

Silicon stress studies

• Current work to date has not come up with a reasonable reason for the magnitude and direction of curl– Assumes an homogenous layers of material deposited on the

silicon• In reality the material deposited is in strips

• Simulation of this is required and may give us the

explanation we need

Page 9: WP6: Mechanical Studies LCFI collaboration meeting 19/9/2006 Erik Johnson CCLRC Rutherford Appleton Laboratory.

Erik Johnson, RAL LCFI Collaboration meeting 19/9/2006

Construction concept

• Started a plan for building a RVC ladder– Made a cartoon

strip for the construction process

• Naturally lead to a concept for the end of a ladder

Page 10: WP6: Mechanical Studies LCFI collaboration meeting 19/9/2006 Erik Johnson CCLRC Rutherford Appleton Laboratory.

Erik Johnson, RAL LCFI Collaboration meeting 19/9/2006

Other ongoing work

• Plans for other testing of ladders– Hydrothermal aging, radiation damage etc

• Informal discussions with Lola Composites about alternative uses of carbon fibre structures, eg carbon fibre barrels

Page 11: WP6: Mechanical Studies LCFI collaboration meeting 19/9/2006 Erik Johnson CCLRC Rutherford Appleton Laboratory.

Erik Johnson, RAL LCFI Collaboration meeting 19/9/2006

Work in Oxford

Page 12: WP6: Mechanical Studies LCFI collaboration meeting 19/9/2006 Erik Johnson CCLRC Rutherford Appleton Laboratory.

Erik Johnson, RAL LCFI Collaboration meeting 19/9/2006

Work in Oxford