GILBERT V. INANDAN Tel.#: +63 437064244 Mob: +63 9204416501(Main Contact) Email: [email protected]Resume 002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 1 Rev 6 (03-Feb-09) Summary A highly skilled Construction Engineer / Supervisor / Inspector in Civil, Structural & Mechanical, Modular Construction with 15 years multi-discipline experience in oil & gas, mining, refinery and chemical projects, phosphate project, LNG, desalination project, petrochemical project, power plant project, pipeline projects(metals & non-metallic, HDPE, GRE/GRP/FRP/RTR materials). Significant experience and expertise with infrastructure project such as Airport & Taxiway, housing facilities, buildings, roads & highway, bridges, railways, waste/water treatment & drainage system, Ports & harbor and Facilities. Skills and experience Engineering Supervision, Construction Management, Quality Management, Design & Review, Planning & Scheduling, Material tracking & Monitoring Inspection, Surveillance and monitoring the quality performance in Civil, Structural, Mechanical, Welding/Piping inspection, Surveillance and Auditing. Handle multiple task such as: Site Construction Manager , Engineer, Supervisor, Quality Engineer and Inspector including Piping and welding, NDT inspection Multi-task ability in running a large-scale projects Effective time management and reporting/monitoring skills Able to bring a project to completion on/under budget Complete projects on time Manage responsibilities in a multi-discipline scenario of constructions in compliance with technical client specifications, quality standards, work procedure plans and international safety practices Computer Literate: Primavera – 6 (Planning & Scheduling); Six Sigma Minitab Software, AutoCAD; STAAD Pro; MS Word; MS Excel, Sketch-up Familiar with international standard; ACI, PCI, ASTM, ASME, BSI, UBC, ANSI, API, ROK, GOST, SNIP’s and projects specification. Achievements Completed a Multi-Million & Billion US Dollar projects in behalf of Saudi Mining Company Closed a detailed engineering on time and issued all approval for construction drawings to EPC contractors prior to start of construction stage Managed the completion of all drawing reviews and documents required during construction and as-built Supervised finishing all Civil, Electro-mechanical, Structural and Architectural tasks during construction of projects Administered completion of all Quality Plan and Inspection Test Plan, review Procedures/Method Statement approved prior to implementation of the projects Directed and monitored all EPC contractors in construction activities to meet milestones and prevent the delays on schedules All activities were completed without Lost Injuries / accident Awarded as Employee of the Month and a 5-Year Service Award on a multibillion dollar project with several thousand personnel.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Engineering Supervision, Construction Management, Quality Management, Design & Review, Planning & Scheduling, Material tracking & Monitoring
Inspection, Surveillance and monitoring the quality performance in Civil, Structural, Mechanical, Welding/Piping inspection, Surveillance and Auditing.
Handle multiple task such as: Site Construction Manager , Engineer, Supervisor, Quality Engineer and Inspector including Piping and welding, NDT inspection
Multi-task ability in running a large-scale projects
Effective time management and reporting/monitoring skills
Able to bring a project to completion on/under budget
Complete projects on time
Manage responsibilities in a multi-discipline scenario of constructions in compliance with technical client specifications, quality standards, work procedure plans and international safety practices
Computer Literate: Primavera – 6 (Planning & Scheduling); Six Sigma Minitab Software, AutoCAD; STAAD Pro; MS Word; MS Excel, Sketch-up
Familiar with international standard; ACI, PCI, ASTM, ASME, BSI, UBC, ANSI, API, ROK, GOST, SNIP’s and projects specification.
Achievements
Completed a Multi-Million & Billion US Dollar projects in behalf of Saudi Mining Company
Closed a detailed engineering on time and issued all approval for construction drawings to EPC contractors prior to start of construction stage
Managed the completion of all drawing reviews and documents required during construction and as-built
Supervised finishing all Civil, Electro-mechanical, Structural and Architectural tasks during construction of projects
Administered completion of all Quality Plan and Inspection Test Plan, review Procedures/Method Statement approved prior to implementation of the projects
Directed and monitored all EPC contractors in construction activities to meet milestones and prevent the delays on schedules
All activities were completed without Lost Injuries / accident
Awarded as Employee of the Month and a 5-Year Service Award on a multibillion dollar project with several thousand personnel.
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 3
Rev 6 (03-Feb-09)
Resolve technical quality issues regarding Civil, Structural, and Architectural and Piping works.
Provide construction materials testing and inspection on soils, concrete, asphalt, etc. to support FGP/WPMP projects.
Reviewing Contractor’s Quality documentation, method of statement and vendor documents.
Assist of materials certification, inspection documentation system specific to the requirements of the Republic of Kazakhstan (ROK). Preparing and reviewing of testing & Inspection forms for test methods used per ITP, ROK & SNIP’s.
Analyzing the functionality of forms already created for improvements and/or consolidation of test methods.
Review of in-coming test data for validation and provide site visits to laboratories to witness testing methods.
Witness and surveillance monitoring the daily inspections and closed the inspections activities per project Inspection Test & Plan (ITP), project specification and local legislation rules of Kazakhstan.
Assuring all quality activities are been documented like NCR, CAR and surveillance report.
Review, witness and guide the contractor’s for WPS/ BPS/ PQR procedural welding qualification and WQT activities including NDE and hydro-testing requirement.
Attending project quality meeting, construction progress meeting and TCO quality meeting.
Assuring that safety procedures are followed and making safety observations and entering BBS safety reports.
09/02/ 2014 to 15/08/2014 AG&P / JKC JV- Philippines
Manages construction fabrication & installation of piping and structural modules for Fluor-DOW Chemical Project
Manages the construction supervisor and staff of up to 475 personnel for day to day activities
Full monitoring and supervision on daily activities and progress
Allocates manpower for the priority work schedule and maintains/exceeds 30% progress and leading the progress against dayshift on day to day activities with limited manpower and resources.
Tracks all the materials, tools and equipment to ensure the availability onsite same through with materials delivery monitoring
Ensures safety and implements safety requirements all-times onsite
Guarantees quality requirements and quality of work in-place from fabrication to erection and pre-commissioning
Assures availability of QC documentation in-place and updates inspection & testing from time to time
Ensures QC inspection and testing requirement is in compliance to IT&P, MST, Specification and Procedures.
Interacts on a daily basis with the Technical Staff, Contractor's Field Staff, QA and QC Inspection Staff, and Safety and Environmental staff.
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 5
Rev 6 (03-Feb-09)
01/06/ 2013 to 31/10/2013 JG Summit Petrochemical Corporation
JGS Naphtha Cracker Project
5-months Simlong, Batangas; Philippines
Construction Supervisor – Piping
Company & Project Background: Multi-Million dollar expansion plant of Naphtha Petrochemical
project providing construction, installation and pre-commissioning.
Key Roles and Technical Skills:
Reports to Construction Manager
Allocates manpower for the priority work schedule and maintains progress on day to day activities
Interacts on a daily basis with the Technical Staff, Contractor's Field Staff, QA and QC Inspection Staff, and Safety and Environmental staff
Works-out Test Package, arranges test pack documentation requirement, gathers and files necessary record test report like NDT Report, Mechanical Reports like flanges, valves, Torque Inspection Report, Serration Reports, Hydro-testing/ Pneumatic Reports
Ensures that tests and inspections are performed, witnessed, and documented in accordance with the approved procedures
Close coordination to Quality Staff for punch listing items, immediate rectification and corrective action prior for closure of punch list item
Assures the re-instatement and restoration of valves, gasket and accessories are done after the hydro testing and blowing activities of pipelines.
Reviews the Test Packages Report to ensure that pipelines are completed prior to submittal and sign-off by the client
Performs checking of piping line after construction installation, before Hydro-Testing/Pneumatic testing and pre-instatement of piping lines
Reviews and interprets ISO drawings and P&ID.
Monitors material procurement and deliveries to ensure timeliness in support to construction activities and schedules within the Piping discipline.
Maintains a daily log for permanent record of project construction as well as discipline data for the final project turnover and report.
Witnesses the NDT Testing, Hydro testing and Pneumatic test, PWHT per ITP plans.
Checks and monitors the painting works and installation of insulation and cladding of piping line.
Guarantees that all activities & testing performed are in compliance with the specification, Standard and procedure or method of statement.
Company & Project Background: Project Management Team of Multi-billion dollar infrastructure
projects to manage the construction and developing of infrastructures and facility projects of
Saudi Arabian Mining Company:
Projects:
Raz Al Kair Village Housing Phase 2 Project (Including Infrastructure services – HDPE water pipeline system, U/G power line & Telecommunication line, Power Distribution System(OHL, RMU & Substation), Storm & Waste Water piping line
system(Non Metallic FRP Pipes) and Non-metallic FRP water tank supply system) Ma’aden Riyadh Headquarter Office Building(Phase-2) Fuel Petroleum Station and Facilities (Including U/G HDPE fuel piping line and
non-metallic U/G Tank storage)
Key Roles and Technical Skills:
Reports to Project Manager and Project Directors
Provides construction management and engineering technical input and supports the Project Manager in administering the construction contract, including review and processing of submittals, monthly pay requests, pay estimates, Requests for Information (RFIs), Requests for Proposals (RFPs), and change orders)
Assists Project Manager with setup and maintenance of the formal projects files and project closeout upon completion
Makes recommendations to the Project Manager regarding interpretation of contract document and the resolution of disputes
Ensures that tests and inspections are performed, witnessed, and documented in accordance with approved procedures
Reports recognizably unsafe conditions to the Contractor when observed
Collaborates with the Contractor to eliminate any hazards associated to work that may adversely affect the environment or the safety or health of employees
Reviews and interprets discipline design drawings and specifications to ensure current revision level and correct technical execution of the work
Provides resolution for technical engineering problems within the assigned discipline; coordinates application of solutions
Monitors discipline construction schedules and assists in progress appraisal.
Provides schedule and progress appraisal data to the Project Manager
Monitors material procurement and deliveries to ensure timeliness in support of construction activities and schedule within the assigned discipline.
Maintains a daily log for permanent record of project construction, as well as discipline data for the final project turnover and report.
Maintains construction technical catalogs, supplier data, and other literature pertaining to the project.
Assists field construction management in portions of larger, more complex activities as
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 7
Rev 6 (03-Feb-09)
directed
Knowledge in using Primavera P6 version 7.1 for Planning and scheduling, AutoCadd and well familiar in International standard such as UBC, PCI, ASTM, ASME, ACI, BSI including Project specification.
Company & Project Background: Project Management Team; This Project was valued at $5.4 Billion US Dollar and included the development of facilities to exploit Ma’aden phosphate reserves, with a beneficiation plant at Al-Jalamid, and a chemical complex at Ras al Khair comprising:
Ammonia plant.
Sulfuric plant.
Phosphoric plant.
Power & desalination plant.
Di-ammonia plant.
Infrastructure’s Services(U/G GAS pipelines & Non-Metallic Pipe
lines-RTR/FRP, HDPE Water & Fuel pipe lines, U/G Water Intake pipe
Responsible for the establishment of a fully documented project quality system in line with the Contract requirements and ISO 9001:2008 covering Installation and Pre-/Commissioning
Ensures that work is carried out fully in accordance with the project quality standards specified in the contract and the procedures laid down in the Project Quality Plan to follow the standards
Establishes field inspection, testing procedures and monitors quality control activities on construction site in line with the established quality control program.
Supervises a project dedicated team of multidiscipline QC Engineers and Inspectors performing inspections and testing, compiling records and reporting with regard to all inspections.
Authorizes inspection and test reports to be submitted to client and coordinates to external inspection agencies when required.
Maintains a project quality audit schedule to ensure effectiveness of the project quality system.
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 9
Rev 6 (03-Feb-09)
Keeps a close liaison to the Owner with regard to all site QA/QC issues during all phases of project execution.
Checks purchase, sub-contract requisitions and evaluates vendors and Sub-Contractor’s quotation with regard to inspection matters, as applicable.
Evaluates NCR’s and maintains Project NCR Register / log.
Reports the Project Quality Audit Results to PM and QHSE Management Team Manager.
Communicates with Company for project Quality concerns.
Reviews and approves project control and management procedures
Checks engineering deliverables and construction method statement documents.
Prepares and evaluates construction subcontractor QA requirement.
Prepares Project Quality Dossier including Quality Records.
Responsible in providing awareness training for project quality system within project organization.
Knowledge on Quality Management System ISO 9001:2008 and well familiar in International standard such as UBC, PCI, ASTM, ASME, ACI, BSI including Project specification.
03/2006 – 12/2006 Japan Gas Company-ME FZE. /DOLPHIN ENERGY LTD.,
Qatar
QC Welding / Piping & Structural Company & Project Background: Project Management Team; A multi-billion project for
Construction of Downstream Oil & Gas Refinery, Infrastructures, Pipelines, Tanks and Steel Structure and other facility projects.
Key Roles and Technical Skills:
Reports to Quality Supervisor / Manager.
Responsible to the adherence of all production and inspection activities of QA/QC, NDT and construction procedures, and clients’ specifications.
Responsible for all inspection and testing on piping system, pipelines, equipment and tanks, floating roof tank, spherical type and dome type.
Performs and witnesses all testing activities that required by NDE and Visual inspection of all welds as per require Inspection and Test Plan
Responsible for documentation and project procedures review such as (WPS) Welding procedures spec, (ITP) Inspection test plan review, QC Manual (Implementation). Perform (PQR) procedure qualification records, review, witness and material traceability inspection
Performs visual and dimensional check, confirms compliance to inspection specification, bending strength ratio.
Performs welding qualification & testing (welders) WQT, approves and witness of Hydro testing, leak test and Valve Test. Monitoring and document review of NDT technician personnel.
Hooks up piping installation Inspection and performs inspection of structural modification, installation, tubular structures, jackets and platforms.
Reviews and closes out all QA/QC final dossier, work pack, documents completion and comments such as: mechanical, structural, piping installation and components, sand blasting,
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 11
Rev 6 (03-Feb-09)
work, Land Escaping and Finishing works.
Ensures and implements the safeness at all times per HSE plan and Military/Security procedures.
06/2004 – 12/2004 Keppel Shipyard, Phil.
QC Structural / Welding / NDE
Company Background: Construction and maintenance of tank, piping works.
Installation of equipment, instrument and its foundation support, repair of ship and port facilities
Key Roles and Technical Skills:
Reports to Quality Manager and Project Service Manager.
Responsible for inspection and testing, or witnessing the inspection and testing by others, as laid down in the Inspection and Test Plan, including the release of company nominated Hold Points.
Ensures and verifies corrective action is taken when non-conformance work is identified.
Responsible in preparation of ITP‘s, closes-out of non-conformance report, corrective and preventive action reports.
Performs verification and certification of test results and supporting documents.
Supervises and monitors all welding activities, welding parameters.
Reviews and interprets the radiographic film. Analyze the welding defect & its Structure.
Performs NDT Inspection (RT, UT, PT, MT, VT). Perform UT lamination, scanning of weldments for Plates, Pipe, Tanks and etc. Makes daily welded report & Request NDT/ PWHT/Hardness Inspection.
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 12
Rev 6 (03-Feb-09)
Witnesses and monitors in pneumatic and hydro test testing.
Performs walk down for re-statement of all line that cover test packages.
09/2003 – 01/2004 Tuboscope Vetco LTD, KSA
Plant Inspector (Structural/Welding/NDE),
Company Background: Plant Inspection, corrosion monitoring and surveillance
for all the equipment’s, pipelines and Tank storage of
Saudi Petrochemical Co.(SADAF-SABIC)
Key Roles and Technical Skills:
Reports to Quality Manager and Plant Service Manager.
Assists classification of piping Systems per API-570 Code and SADAF procedure SEI-3.1.
Responsible in developing and marking-up of mechanical flow diagrams in P&ID by assigning system numbers for classified piping systems that requires corrosion monitoring and/or periodic visual Inspections.
Performs visual inspection on all classified piping systems throughout the plant at a determined frequency.
Performs RISK BASED INSPECTION for all equipments of plant in all facilities of Sadaf.
Responsible for the maintenance NDT Field Inspection Crew and Equipment used in corrosion monitoring and piping system.
Uses Radiographic(Gamma Ray) and Ultrasonic Testing USN-25, Panametric (Epoch 1,2,3) & DMS Equipment for Thickness gauging, Lamination Checking ,Scanning of weldments. Conduct Magnetic Particle Testing as well as Dye Penetrant Testing in all equipment and piping that requires the said methods. Conduct MFL for tank inspection.
Responsible in preparation of accomplishment report and drawing of inspected, evaluates indications, processes and interprets radiographs as per applicable codes, standards and procedures.
Company Background: Plant Inspection, 3rd Party Inspection Services for Oil & Gas,
Petrochemical Refinery Including Fabrication.
Project assigned on local Onshore: Caltex refinery, Shell refinery, Petron refinery, CBI fabrication, Cape east fabrication, Keppel shipyard, Bobcock Hitachi Phil., Phil. National Oil Co., EEI fabrication, Phil. Geothermal Plant, National Power Corp, First Gas Sta Rita Phil Power Plant CGT-500MWATT, Ilijan Power Plant, LMG, Cocochem Phil.,
Project assigned on local Offshore: Halliburton Malampaya Shell – Concrete Gravity Structure platform Barge at Palawan; Phil.
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 13
Rev 6 (03-Feb-09)
Key Roles and Technical Skills:
Reports to Quality Representative and Plant Service Manager.
Responsible for all non-destructive testing techniques to be performed such as radiographic testing, Ultrasonic testing, Magnetic Testing and Penetrant Testing.
Uses Equipment for NDE Inspection are RT-Gamma ray, UT-stresstel, kruatkarmer (US K6, USN 50, USN 52, and USN 25), MT-Magnetic yoke.
Responsible for preparations of radiographic report, loading of film, developing of film, Set-up the equipment in gamma and X-Ray and implementing of many techniques in NDT.
Performs interpretation of film X-Ray result and Holiday Detector for paint coating.
04/2001 – 04/2002 OPHIR Construction Corp., Phil.
Civil Engineer
Company Background: Construction and development of Eastwood City(Quezon City) Lafayette Project:
3-High Rise Hotel Building(29,30 & 31 Storey Hotel Buildings)
Roads and Utilities.
Landscaping.
Key Roles and Technical Skills:
Reports to Construction Manager
Responsible for project supervision of work phases as per specified plan and project specification
Monitors the daily/weekly progress of work in accordance to the given time table on project planning schedule
Responsible for the review of drawing and makes estimate and program of work for propose construction project
Prepares and updates materials take-off from drawing and compare to site installation or progress works
Performs quantitative & site measurement for civil, mechanical works
Prepares monthly progress report for billing purposes
Responsible for securing field data to make As-built Drawing & some Sketches for back-up of progress claim.
Performs the inspection and testing or witnessing the inspection and testing by others, as laid down in the Inspection and Test Plan.
Certification & Core Qualification:
Registered Civil Engineer License #: 0092994 Philippine Government Licensure Exam Date Issued: 21 May 2002
Certified Six Sigma Yellow Belt Certification #: PT-SS03-070 Pera-Neville Clark, Philippines Date Issued: 21 Oct. 2011
Basic Safety Training Personal Survival Technique (IMO Model Course 1.19) Fire Prevention & Fire Fighting (IMO Model Course 1.20) Elementary First Aid (IMO Model Course 1.13)