1 World Bank Support TFSCB STATCAP Monitoring systems / Core Welfare Indicators Questionnaire (CWIQ) Readiness Assessment
21

World Bank Support

Jan 20, 2016

Download

Documents

juro

World Bank Support. TFSCB STATCAP Monitoring systems / Core Welfare Indicators Questionnaire (CWIQ) Readiness Assessment. TFSCB. Multi-donor trust fund set up in 1999 Closely coordinated with PARIS21 - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: World Bank  Support

1

World Bank Support

TFSCB STATCAP Monitoring systems / Core Welfare

Indicators Questionnaire (CWIQ) Readiness Assessment

Page 2: World Bank  Support

2

TFSCB Multi-donor trust fund set up in 1999 Closely coordinated with PARIS21 Goal is to help reduce poverty by

strengthening the evidence-base for decision making at all levels

Shared vision with PARIS21 - to develop effective and efficient national statistical systems and to promote a culture of evidence-based decision-making

Page 3: World Bank  Support

3

Focus of Activities Main objective is to strengthen national

statistical systems But also allows for regional and global

actions where these are justified Small grants, maximum of $400,000

with a maximum implementation period of three years

Page 4: World Bank  Support

4

TFSCB funded activities can be

Country-specific– NSDS– Support for PRSP monitoring– Improvement in macro/or sectoral statistics;– Improvement of statistical infrastructure– Training

Regional– Workshops, seminars etc, regional

coordination.

Global– Research, PARIS21 initiatives, etc

Page 5: World Bank  Support

5

TFSCB Application Process

Country Management

Unit

Task Team Leader

Recipient Country

TFSCB Administration

Unit

TFSCB Steering

CommitteeGrant Agreement

Supervision

Page 6: World Bank  Support

6

Project Implementation Preferred model is for country

implementation Statistical agencies gain experience in

project management and implementation

Bank implementation is allowed, but must be justified

For some projects, spilt implementation has worked well

Page 7: World Bank  Support

7

Some Outcomes Leverage in projects: donor funds have

been matched by other resources – including scarce resources from recipients

Follow-on investments: TFSCB has stimulated larger investment projects (e.g. Kenya, Burkina Faso, Nigeria)

Leadership: countries are often prepared to fund activities themselves, but look to PARIS21 and TFSCB for technical guidance

Page 8: World Bank  Support

8

Some Lessons Linkage of the Trust Fund with a strong global

partnership is vital With small grants, need to focus on those

projects which leverage further investments Need flexibility to respond to priority needs Processes need to be streamlined but must

still be rigorous Need for a good advocacy strategy

Page 9: World Bank  Support

9

STATCAP

National statistical systems under pressure– Under-investment and a vicious cycle of

poor performance and inadequate resources

Need to focus on both demand and supply

Need for a long-term approach But focus on results and outputs

Page 10: World Bank  Support

10

How will STATCAP work?

A new WB lending instrument for statistical capacity building– System wide or focused on particular areas

An Adaptable Program Loan (APL), based on a sector wide approach– National projects will be phases of the APL– But projects may have several stages

Designed to be a simple, user-friendly lending facility

Page 11: World Bank  Support

11

How will STATCAP work?

Based on a Project Appraisal Document (PAD).

PAD will be based on a Statistical Master Plan (SMP) for the country

The SMP will cover the entire national statistical system, even if the project is to finance SCB in only one area

Page 12: World Bank  Support

12

Statistical Master Plan

Based on national strategies for statistical development – Identify strengths and weaknesses, – Propose an action plan

Includes– Statistical policy and the regulatory

framework, management and organization– Statistical infrastructure– Statistical operations and procedures– Physical infrastructure and equipment.

Page 13: World Bank  Support

13

What will StatCap finance?

Improving statistical policy and regulatory framework

Development of statistical infrastructure Upgrading and developing statistical

operations and procedures Human resource development Investment in physical infrastructure

and equipment

Page 14: World Bank  Support

14

Assessing progress

NSDS will set strategic objectives Each stage of country project will have

specific goals and targets Make use of new assessment tools:

– GDDS, DQAF and statistical capacity building indicators

Page 15: World Bank  Support

15

WORLD BANK SUPPORT

More information

www.worldbank.org/data

Page 16: World Bank  Support

16

How does a country get started?

Funding – CWIQ Trust Fund– Assistance for pilot & 2 annual national surveys– Part of annual household survey prog.– Covers pilot, TA, equip., dissemination– $400,000 limit

Technical Assistance– Cadre of African consultants– Two regional training centres, EASTC & ENSEA

Product Development– National ‘light’ monitoring survey– Very large samples– Community of practice

Page 17: World Bank  Support

17

Page 18: World Bank  Support

18

Monitoring Systems

InformationCollection

Analysis

Evidence based decision making

Page 19: World Bank  Support

19

Monitoring systems

Lessons learnt• Institutional arrangements are the key but no

blueprint• System should be simple & flexible• Build on existing processes• Ultimate goal is to feed back into policy making

M & E Action Plans for National Strategies

Page 20: World Bank  Support

20

Readiness Assessment

To set the context for the development of M&E Action Plans for National Strategies• Incentives & Demands• Roles & responsibilities• Capacity building requirements

Page 21: World Bank  Support

21

Readiness Assessment

Further reading:

10 Steps to a Results-Based Monitoring & Evaluation System

– Jody Kusek & Ray Rist