PROCUREMENT PLAN WATER RESOURCES AND SECTOR MANAGEMENT PROGRAM (WISMP) LOAN IBRD 4711 -IND SATUAN KERJA DINAS PENGAIRAN PROVINSI SUMATERA UTARA RENCANA PENGADAAN T A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ure Authorized
15
Embed
World Bank Documentdocuments.worldbank.org/curated/en/768001468038711784/pdf/584210V10... · No Kode Nama Paket Estimasi Biaya (Rp) Estimasi Biaya eqv(US$) Metode Pengadaan Post
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PROCUREMENT PLAN
WATER RESOURCES AND SECTOR MANAGEMENT PROGRAM (WISMP)LOAN IBRD 4711 -IND
SATUAN KERJA DINAS PENGAIRAN PROVINSI SUMATERA UTARA
RENCANA PENGADAAN T A
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
RENCANA PENGADAAN/PROCUREMENT PLAN TA 2010
Unit Kerja DINAS Pengairan Provinsi Sumatera Utara
No Kode Nama PaketEstimasi Biaya
(Rp)
Estimasi Biaya
eqv(US$)
Metode Pengadaan
Post/ Prior Review
Pengumuman Pengadaan
Pemasukan Penawaran
Eval/ NegoPenandatangana
n Kontrak
Jangka Waktu Kontrak (Hari
Kalender)
Keterangan: Permasalahan/
1 2 3 4 5 6 7 8 9 10 11 12 13
I KEGIATAN YANG DIBIAYAI LOAN
12
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)Perbaikan peralatan dan kendaraan 20,000,000
TOTAL KEGIATAN I (Loan) - -TOTAL KEGIATAN II (GOI-PF/APBD) 20,000,000 -
M J K P AK S KD P P S U
I S M S DIPL HEPNIP
Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen A
Status : April 2010
Goods (Category 2)
RENCANA PENGADAAN/PROCUREMENT PLAN TA 2009
Unit Kerja DINAS Pengairan Provinsi Sumatera Utara
No Kode Nama PaketEstimasi Biaya
(Rp)
Estimasi Biaya
eqv(US$)
Metode Pengadaan
Post/ Prior Review
Pengumuman Pengadaan
Pemasukan Penawaran
Eval/ NegoPenandatangana
n Kontrak
Jangka Waktu Kontrak (Hari
Kalender)
Keterangan: Permasalahan/
1 2 3 4 5 6 7 8 9 10 11 12 13
I KEGIATAN YANG DIBIAYAI LOAN
C.3.2. PELAKSANAAN REHABILITASI DENGAN METODA PARTISIPATIF
A. DI. Javakolonisasi/ Purbogondo ( 1030 Ha )
1 W10-B-DIN- Paket I ( 100 Ha ) 150,000,000 17,647 SW Post Juni-09 Juli-09 Aug-09 Sept-09 60terkontrak/data kontrak belum
masuk2 W11-B-DIN- Paket II ( 100 Ha ) 150,000,000 17,647 SW Post Juni-09 Juli-09 Aug-09 Sept-09 60
3 W12-B-DIN- Paket III ( 100 Ha) 150,000,000 17,647 SW Post Juni-09 Juli-09 Aug-09 Sept-09 60
B. DI. RAJA MALIGAS (1000 HA)
4 W13-B-DIN- Paket I ( 150 Ha ) 200,000,000 23,529 SW Post Juni-09 Juli-09 Aug-09 Sept-09 60
C. DI. BAH KORAH II/NEGERI BOSAR (2700 HA)
5 W14-B-DIN- Paket I ( 150 Ha ) 200,000,000 23,529 SW Post Juni-09 Juli-09 Aug-09 Sept-09 60
6 W15-B-DIN- Paket I ( 150 Ha ) 200,000,000 23,529 SW Post Juni-09 Juli-09 Aug-09 Sept-09 60
D. DI. PEKAN KEMIS (1100 HA)
7 W16-B-DIN- Paket I ( 100 Ha ) 150,000,000 17,647 SW Post Juni-09 Juli-09 Aug-09 Sept-09 60
E. DI. PEKAN DOLOK (1050 HA)
8 W17-B-DIN- Paket I ( 100 Ha ) 150,000,000 17,647 SW Post Juni-09 Juli-09 Aug-09 Sept-09 60
F. DI. SUMBER REJO LAMA (2064 HA)
9 W18-B-DIN- Paket I ( 100 Ha ) 150,000,000 17,647 SW Post Juni-09 Juli-09 Aug-09 Sept-09 60
10 W19-B-DIN- Paket II ( 100 Ha ) 150,000,000 17,647 SW Post Juni-09 Juli-09 Aug-09 Sept-09 60
G. DI. LANGAU (2300 HA)
11 W20-B-DIN- Paket I ( 100 Ha ) 150,000,000 17,647 SW Post Juni-09 Juli-09 Aug-09 Sept-09 60
12 W21-B-DIN- Paket II ( 100 Ha ) 150,000,000 17,647 SW Post Juni-09 Juli-09 Aug-09 Sept-09 60
G. DI. LANGAU (2300 HA)
13 W22-B-DIN- Paket I ( 100 Ha ) 150,000,000 17,647 SW Post Juni-09 Juli-09 Aug-09 Sept-09 60
14 W23-B-DIN- Paket II ( 100 Ha ) 150,000,000 17,647 SW Post Juni-09 Juli-09 Aug-09 Sept-09 60
H. DI. NAMURAMBE (1036 HA)
15 W24-B-DIN- Paket I ( 100 Ha ) 400,000,000 47,059 NCB Prior Juni-09 Juli-09 Aug-09 Sept-09 60
16 W25-B-DIN- Paket II ( 100 Ha ) 400,000,000 47,059 NCB Prior Juni-09 Juli-09 Aug-09 Sept-09 60
Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B