Office of Commissioner N.C.R., U.P. Workshop on Water 1 Web: www.ncrup.up.nic.in E-mail: [email protected]
16

Workshop on Waterncrpb.nic.in/latest_news/Govt of UP Presentation 21.11.12.pdf · Slow progress of flood protection Irrigation project proposed between Yamuna and Hindon. Site identification

Aug 05, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Workshop on Waterncrpb.nic.in/latest_news/Govt of UP Presentation 21.11.12.pdf · Slow progress of flood protection Irrigation project proposed between Yamuna and Hindon. Site identification

NATIONAL CAPITAL REGION PLANNING BOARDOffice of Commissioner N.C.R., U.P.

Workshop on Water

1

Web: www.ncrup.up.nic.inE-mail: [email protected]

Page 2: Workshop on Waterncrpb.nic.in/latest_news/Govt of UP Presentation 21.11.12.pdf · Slow progress of flood protection Irrigation project proposed between Yamuna and Hindon. Site identification

NATIONAL CAPITAL REGION PLANNING BOARDOffice of Commissioner N.C.R., U.P. 2

WATERWATER

Objectives Provide access to 24X7 potable drinking water as per norms.

Provide quality water free of contamination To provide adequate water for industrial use as per norms and to

Reduce, Recycle and Reuse to zero discharge. (ie. 45 kl/ ha. /day) To reduce water footprint in agriculture through green irrigation and

better rain fed cultivation. Social inclusiveness and Ecological sustainability.

Population size Desirable quantity (lpcd) as per CPHEEO

Desirable quantity (lpcd) as per NCRPB

Town of 1 Lac and above 150 200Town of below 1 Lac 130 135Rural Areas 70 70

Page 3: Workshop on Waterncrpb.nic.in/latest_news/Govt of UP Presentation 21.11.12.pdf · Slow progress of flood protection Irrigation project proposed between Yamuna and Hindon. Site identification

NATIONAL CAPITAL REGION PLANNING BOARDOffice of Commissioner N.C.R., U.P. 3

Current Status: Depth of water table in UP Sub-region is falling The Water availability is reducing in UP Sub-region. There are several dark and

critical blocks. The bulk supply and water quality has to be improved. Gap/ Shortfalls Industrial demand and agriculture water demand for 2031 are 486.63 mld and

5240.99 MCM respectively. The demand has to be calculated district wise as per norms.

How Rational use of various sources of water ie. Ground Water and Surface Water. To prevent water wastages. Augmentation of underground water resources through rain water harvesting

and recharge. Protection of catchment areas of natural drainage system through landuse

norms.

Page 4: Workshop on Waterncrpb.nic.in/latest_news/Govt of UP Presentation 21.11.12.pdf · Slow progress of flood protection Irrigation project proposed between Yamuna and Hindon. Site identification

NATIONAL CAPITAL REGION PLANNING BOARDOffice of Commissioner N.C.R., U.P. 4

Outcomes/ Expectations:

Integrated rational plan for water uses in different areas should be prepared town wise and District wise.Action Plan with physical and financial targets for upstream reservoirs, inter basin transfers, area under water bodies and Rain water harvesting structures.

Page 5: Workshop on Waterncrpb.nic.in/latest_news/Govt of UP Presentation 21.11.12.pdf · Slow progress of flood protection Irrigation project proposed between Yamuna and Hindon. Site identification

NATIONAL CAPITAL REGION PLANNING BOARDOffice of Commissioner N.C.R., U.P. 5

DRAINAGEDRAINAGEObjectives: Environmental flows of the rivers in the entire UP Sub-region should

be part of the Comprehensive Drainage Plan. Keeping in view the ecological sensitivity of the rivers, the settlements along them should be considered based on rivers existing capacity, maximum carrying capacity, estimated inflows and proposed outflows

Discharging into the rivers drainage system has to be regulated stringently.

How The regulation for any activity in the flood plains of Ganga and

Yamuna which falls in ecological sensitive zone should be as persuggested environmental norms.

The recharge structure should be made in the flood plains of therivers for water recharge.

Page 6: Workshop on Waterncrpb.nic.in/latest_news/Govt of UP Presentation 21.11.12.pdf · Slow progress of flood protection Irrigation project proposed between Yamuna and Hindon. Site identification

NATIONAL CAPITAL REGION PLANNING BOARDOffice of Commissioner N.C.R., U.P. 6

Current Status: Present Status:

There are encroachments in the natural drains in the Sub Region specially in the towns which results in excessive extraction of water. Untreated waste and industrial effluent are diminishing the water quality. The flow of river has been reduced due to reduction of flood plains.

Gap/ Shortfalls: Unsatisfactory status of YAP and GAP projects. Slow progress of flood protection Irrigation project proposed between Yamuna

and Hindon. Site identification of River Recharge bore wells in Ganga and Yamuna not done.

S.NQuantity of un-used flood water share in BCM/ year

Name of the sub-basin1 Ganga basin Yamuna basin Kali-Hindon basin Total

6.9815 0.0497 0.4695 7.501

Page 7: Workshop on Waterncrpb.nic.in/latest_news/Govt of UP Presentation 21.11.12.pdf · Slow progress of flood protection Irrigation project proposed between Yamuna and Hindon. Site identification

NATIONAL CAPITAL REGION PLANNING BOARDOffice of Commissioner N.C.R., U.P. 7

Outcomes/ Expectations:Project proposed under YAP and GAP to be completed on time.

Flood protection Irrigation project proposed between Yamuna and

Hindon to be completed on time.

Site identification of River Recharge bore wells in Ganga and Yamuna

flood plains should be done and project should be made.

Page 8: Workshop on Waterncrpb.nic.in/latest_news/Govt of UP Presentation 21.11.12.pdf · Slow progress of flood protection Irrigation project proposed between Yamuna and Hindon. Site identification

NATIONAL CAPITAL REGION PLANNING BOARDOffice of Commissioner N.C.R., U.P. 8

SEWERAGESEWERAGE

Objectives 100% Twin soak pit pour and flush toilets to enforced in rural and small

settlement so as to abolish manual scavenging in time bound manner as per Abolition of Manual Scavenging Act.

Separate covered Storm water and sewerage system to be installed in all Towns as per an Action Plan.

100% treatment of sewage generated and recycling for no drinking purposes.

How Storm water to be used for recharge of Ground water through rain water

harvesting structures and to be designed for max. rainfall of 5 yrs. for internal and 10 yrs. for major drains.

STPs should be installed. Purchasing Cleaning equipments for cleaning of sewers to avoid scavengers

deaths. Sewerage Master Plan will have to be prepared for each town.

Page 9: Workshop on Waterncrpb.nic.in/latest_news/Govt of UP Presentation 21.11.12.pdf · Slow progress of flood protection Irrigation project proposed between Yamuna and Hindon. Site identification

NATIONAL CAPITAL REGION PLANNING BOARDOffice of Commissioner N.C.R., U.P. 9

Outcomes/ Expectations:Action plan to be made to enforce use of Twin soak pit pour and flush toilets and to abolish open defecation and manual scavenging along with public awareness campaigns for cleanliness.STPs should be installed as per requirements in all towns and under YAP and GAP.100% saturation in rural areas through WATSAN program.

Current Status: Present Status: Sewage largely is being discharged through open drains. Underground sewerage system is available only for some parts of Metro and

Regional Centres; that too for only parts of towns. Sewerage system is absent in rural areas hence, pour flush latrines, schemes

and campaigns for cleanliness and hygiene needs to be encouraged.

Gap/ Shortfalls 20 STPs are proposed along Yamuna and Hindon under YAP.

Page 10: Workshop on Waterncrpb.nic.in/latest_news/Govt of UP Presentation 21.11.12.pdf · Slow progress of flood protection Irrigation project proposed between Yamuna and Hindon. Site identification

NATIONAL CAPITAL REGION PLANNING BOARDOffice of Commissioner N.C.R., U.P. 10

SOLID WASTE MANAGEMENTSOLID WASTE MANAGEMENTObjectives To keep our towns clean through scientific Solid Waste Management Proper disposal of Hazardous and Medical waste.

How Proper segregation of waste into organic and inorganic at source. Primary and Secondary collection should be done through placing of

garbage bins at appropriate distance. Sites to be identified in Master Plan/Development Plan in each town

for Solid Waste Disposal facility or on sharing basis. Alternative technologies for waste disposal such as incineration for

energy, composting, waste to energy and pelletisation.

Page 11: Workshop on Waterncrpb.nic.in/latest_news/Govt of UP Presentation 21.11.12.pdf · Slow progress of flood protection Irrigation project proposed between Yamuna and Hindon. Site identification

NATIONAL CAPITAL REGION PLANNING BOARDOffice of Commissioner N.C.R., U.P. 11

Current Status: Present Status: Amongst all Metro, Regional, Sub-regional and Service centres, Meerut

has the highest Solid Waste generation rate of 0.54 kg/capita/day. Average Solid waste generation ranges between 0.26 kg/capita/day in

service centres to 0.49 kg/capita/day in Metro Centres.

Gap/ Shortfalls Partial and inadequate collection and disposal

Outcomes/ Expectations:Enforcement of MoEF guidelines (Municipal Solid Waste (Management and Handling) Rules, 2000)

Page 12: Workshop on Waterncrpb.nic.in/latest_news/Govt of UP Presentation 21.11.12.pdf · Slow progress of flood protection Irrigation project proposed between Yamuna and Hindon. Site identification

NATIONAL CAPITAL REGION PLANNING BOARDOffice of Commissioner N.C.R., U.P. 12

Objectives To protect and preserve natural bio-diversity and man made heritage

sites to enhance the aesthetical appreciation of the environment.

How Protection and conservation of various sites from encroachment,

pollution and over exploitation. Balanced, comprehensive Development Plans and Projects which are

based on land suitability analysis and environmental carrying capacities.

ENVIRONMENTENVIRONMENT

Page 13: Workshop on Waterncrpb.nic.in/latest_news/Govt of UP Presentation 21.11.12.pdf · Slow progress of flood protection Irrigation project proposed between Yamuna and Hindon. Site identification

NATIONAL CAPITAL REGION PLANNING BOARDOffice of Commissioner N.C.R., U.P. 13

Current Status: Present Status: The carrying capacity of Sub-region is stretched due to urbanization

and industrialization which results in reduced forest cover, contaminated ground water and decreased quality of life.

Gap/ Shortfalls Inadequate infrastructure services and solid management system Non compliance of Acts and Plans

Outcomes/ Expectations: The provisions of all the existing Acts and policies of Centre and

State should be strictly implemented and monitored Efforts should be made to increase and preserve the forest cover

and water bodies. Cause wise and sector wise analysis of pollution should be done

and specific solutions should be suggested.

Page 14: Workshop on Waterncrpb.nic.in/latest_news/Govt of UP Presentation 21.11.12.pdf · Slow progress of flood protection Irrigation project proposed between Yamuna and Hindon. Site identification

NATIONAL CAPITAL REGION PLANNING BOARDOffice of Commissioner N.C.R., U.P. 14

Objectives To make land available for industrial, residential and urbanization

purposes by rationalizing its use and saving agricultural land.

How Improving the present land utilization pattern so as to prevent

indiscriminate land acquisition. Redeveloping land and maximizing its use.

SUBSUB-- REGIONAL LAND USEREGIONAL LAND USE

Existing Landuse Map

Proposed Landuse Map

Page 15: Workshop on Waterncrpb.nic.in/latest_news/Govt of UP Presentation 21.11.12.pdf · Slow progress of flood protection Irrigation project proposed between Yamuna and Hindon. Site identification

NATIONAL CAPITAL REGION PLANNING BOARDOffice of Commissioner N.C.R., U.P. 15

Current Status: Present Status: Built up area is increasing at the cost of agricultural, forest land and

water bodies.

Gap/ Shortfalls Large scale conversion of agricultural land to non-agricultural

purposes. Unauthorized conversion of Land use Unplanned/haphazard growth in environmentally sensitive areas Encroachment on green belts/ green wedges

Outcomes/ Expectations: Future development should be of compact vertical manner Enhanced forest cover and water body area Full use of wasteland

Page 16: Workshop on Waterncrpb.nic.in/latest_news/Govt of UP Presentation 21.11.12.pdf · Slow progress of flood protection Irrigation project proposed between Yamuna and Hindon. Site identification

NATIONAL CAPITAL REGION PLANNING BOARDOffice of Commissioner N.C.R., U.P. 16

List of the Projects which have been sent to State Government by Different

Departments for In-principal Approval for financing through NCR Planning

Board:

SN Name of Departments No. of Projects

Estimated Cost (Cr.)

1 Public Works Department (PWD), UP 09 4250.0

2 UP Power Transmission Corporation Ltd. 23 4396.0

3 UP Jal Nigam 31 4400.73

4 UP Tourism 04 200.0

Total 67 13246.73