bull Quickly and Easily Appliedbull No Downhole Interventionbull Reduced Riskbull Simplified Decision Makingbull Demonstrated Results
bull The coil is not cut so that full well control is maintained and associated costsare eliminated
bull The coil is not worked over the gooseneck so coil fatigue damage is mini-mized
bull Wireline services along with the attendant risks are not neededbull The operation is conducted from surface utilizing equipment suspended
above the wellborebull The coil unit remains in place to assist the vibration operation as well as to
immediately recover the coil when it becomes freebull Pipe vibration can be quickly applied with very little preparationbull Typical job duration is less than one daybull Pipe vibration is low risk with respect to further deteriorating the
situationbull Results are often immediate and thus considerable expense and risk can be
A crane or workover rig is requiredto support and handle the oscillatorand coil string Oscillator to coil at-tachment is accomplished by use offriction clamps
Crane should have at least 80 tonslift capacity boom working height ofat least 80 feet and be equipped witha weight indicator
A personnel basket or lift is requiredin order to allow work at the top ofor above the coil injector head
Vibration Technology offers aunique and demonstrated superior ap-proach to resolving a stuck coil situ-ation It is easy to apply can be donevery quickly and oftenproduces instant results The CoilString does not have to be cutin order to apply the vibrationprocess
Pipe vibration is a proven approachfor resolving stuck coil situations Itoffers many advantages to cutting thecoil and proceeding conventionallyBeen there Done that
Vibration Technology hassuccessfully recovered stuck pipe andtools from depths of 100 to 18000 ft
Vibration Technology a subsidiary of Layne ChristensenCompany specializes in providing pipe vibration services Thecompany operates proprietary equipment designed specificallyfor oilfield use and features compact mobile equipment that iseasily transportable quick to rig-up and highly effective inproviding an efficient oilfield service
Vibration Technologyrsquos equipment has been designed tooperate efficiently within a range of acceptable operationalparameters Our oscillators are designed to induce standingwave resonance that is effective in all down hole situationsOur equipment and methods leverage all aspects of the tech-nology and our innovative coil tubing bail provides for work-ing stuck coil without cutting the coil or causing fatigue weardue to working over the gooseneck
For more information on the application of pipe vibration in youroilfield situation or for more detail about the technologyrsquos principlesplease call us
Vibration Technology IncTelephone (432) 689-3351 Fax (432) 689-33522319 E CR 123 MidlandTX 79706
copy Copyright 2016 Vibration Technology Inc All rights reserved
Selected Job Results
Vibration Technology
WellLocation Type Sticking Mode Well
GeometryWell Depth Freepoint
Workstring ndashBHA Detail
PriorAction
VibrationResults Subsequent Action
Davis OKHarris County
TXRio Grande City
TXKern County
CAHarrison
County TXFreestone
County TXGregg County
TXSmith County
TXIberia Parish
LAClaiborneParish LA
Kern County CAPanola County
TXMarion County
TXGregg County
TXHendersonCounty TXConcordiaParish LADenton TX
OCSG 2103
Liberal KSLiberal KS
Mobile CountyAL
Cameron ParishLA
Morton CountyKS
Harris CountyTX
Harris CountyTX
Fort BendCounty TX
Webb CountyTX
Victoria CountyTX
Harris CountyTX
Liner
Coil Tubing
Coil Tubing
Liner
Coil Tubing
Completion
Coil Tubing
DrillingScreen and
Washover Pipe
Sucker RodsLiner
Tubing
Coil Tubing
Coil Tubing
Coil TubingTubing with
RodsPacker
Coil TubingTubing and
Submersible PumpTubing
Coil TubingMud Stuck
Tubing
Sucker Rods
Drilling
Screen
Bridge PlugJar and
Washover Pipe
Coil TubingPacker andSand screen
Liner set in shale
Sand stuck coil tubingShale sand due
to clean-out
Gravel Packed ScreenComposite plug and frac
sand due to clean-out4 Perforatinggun in sand
Sand plug clean-out
Hole Collapse
GP sand
SandGP Liner
Sand
Sand
Sand junk
Sand junk
Formation SandShale
Junk
SandSalt
Junk
Mud Stuck
SandShale Centralizer
Friction
Gravel Pack Screen
Sand Scale
Sand Salt
Sand
Gravel Pack
Horizontal
Deviated 20 deg
Vertical
Vertical
Vertical
Vertical
Vertical
Vertical
Vertical
VerticalVertical
Vertical
Vertical
Vertical
Vertical
VerticalVertical
Vertical
VerticalVertical
Vertical
Vertical
Vertical
Vertical
Vertical
Vertical
Vertical
Vertical
Vertical
2370 1844 Ft
10500 8500 Ft
12000 Ft
1500 Ft
9200 Ft
10700 10200 Ft
8700 8100 Ft7132 2900 Ft
top of DC
3000 Ft
10360 Ft~1000 Ft
10000 8000 Ft
9300 8000 Ft
6000 Ft
10500 Ft
3250 Ft6100 Ft
1000 Ft
5000 Ft2000 Ft
18423 Ft 18440 Ft
12300 Ft 7500 Ft
2000 Ft12200
13200 Ft
5200 Ft
112 Ft
9400 Ft
11400 Ft
5200 Ft
3-12 CS Tubing spear1 12 coil with
wash tool - 105001 14 coil with
wash tool - 12000
3-12-1550 drill pipe1 34 CT withmotor and mill2-78 Hyd CS15 Ft perf gun
Mill hipp-tripper1-12 CT
4-12 DP
2-78 PH-634 and 78 combinationSR string in 2-78 tubing
3-12 DP
1-14 Hyd CS
1-12 CT
1-14 CT
1-14 CT
2-78 EUE1-12 IJ with C-1 Packer
1-14 CT2-38 EUE with submersible
pump and REDA cable2-38 EUE
1-14 CT
2-38 Hyd tubing2-38 EUE with
SR inside3-12 amp 2-78 DP
2-78 Liner3-12 EUE Sand Screen
9-58 RetrievableBridge Plug
2-38 EUE
1-14 CT
2-78 EUE N-80
Pulled 120000 lbs3 days working coil
over gooseneck
3 days with CT unit
None1 day working
with coil injector
Jar on fish 2 days1 day working
with coil injector
Using Surface JarWashover andWP twist offWork string
with rigNone
5 days workwith rig
2 days withCT unit
1 day with CT unit
1 day with CT unit2 days working
with rigOne day with rig
1 day with CT unit
One day with rigOne day with rig2 days with CT unitActuated Disconnect
None
NoneAttempt to run linerand stuck for 3 days
noneWork one day
with rig
Jarred for 5 days1 day withCT unit
none
Successful - 4 hoursSuccessful - 30
minutes operationfull recovery
2 hrs operationMoved pipe 40 Ft rig
pulled after that
Successful in lt 1 Hr
Successful in lt4 Hr
Successful in lt 6 HrNo movement3 Hr operationFull Recovery
2 minutes operationParted pump plungerin 1-12 Hr operation
Recovered Liner
Worked freeFull recovery through
1700 of sand
Full recovery
Full recovery lt 30 min
Recovered tubing and rodsFree in lt 1 Hr POOH
Free in lt 1 Hr Pulled outof Coil Connector
Pulled 2 Jts tubing Cableremained in place
Recovered full string next dayFree in lt 2 Hr
CT parted at 18350Moved FP ~ 2000
Ft downhole
Recover RodsRan 2-78 Liner ~1000 Ft to bottom
Recover lt 6minutes operationRecover in lt 30
minutes operationRecover oil jar and
12 Jts Washover Pipe
Broke circulation POOHFull recovery lt 30minutes operation
Reset Liner
Continued washing operation
Put on production
Continued workover operations
Continued washing operation
Continue perforation and fracture
Put well on production
Jar free immediately with Surface Jar
Recomplete
Pull tubing without stripping rodsRecomplete
POOH
POOH
POOH
Continued Cleanout
Test casingRecomplete
POOH Fish Conventional for BHA
Fish ConventionalRecomplete
POOH
Fish Conventional
Fish Conventional for Tubing
Complete Well
Recomplete
Continue workover
Continue Workover
Continue Workover
Recomplete