Page 1: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Working JournalWorking Journal

Chad FerneliusChad Fernelius

Page 2: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Dayt ConstructionDayt ConstructionInternship 2006Internship 2006

Projects: Projects:

Huish Detergents (converted a Huish Detergents (converted a warehouse into a production facility)warehouse into a production facility)

Farmington Greens subdivisionFarmington Greens subdivision

Salt Lake avenues basement remodelSalt Lake avenues basement remodel

High priced homesHigh priced homes

Korloff Jewelers at the GatewayKorloff Jewelers at the Gateway

Parker International new officeParker International new office

Page 3: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

DAYT- Huish jobDAYT- Huish job

Prepared and painted floor with Prepared and painted floor with epoxy coatingepoxy coating

Page 4: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

DAYT- Huish jobDAYT- Huish job

Created, installed, and used small Created, installed, and used small scale concrete forming for exterior scale concrete forming for exterior and interior utility padsand interior utility pads

Page 5: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

DAYT- Huish jobDAYT- Huish job

Installed door closersInstalled door closers

Page 6: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

DAYT- South Weber DAYT- South Weber homehome

Installed Installed

Trex deckingTrex decking

Page 7: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

DAYT- miscellaneousDAYT- miscellaneous

Framed drops, fireplace hearths, and Framed drops, fireplace hearths, and other change orders.other change orders.

Supervised a basement remodelSupervised a basement remodel Poured sidewalks and drivewaysPoured sidewalks and driveways Paint- touchups and the Parker jobPaint- touchups and the Parker job Executed change orders, repairs, punch Executed change orders, repairs, punch

lists, and inspection lists.lists, and inspection lists. Supervised laborersSupervised laborers Installed hardwareInstalled hardware

Page 8: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Scott Call ConstructionScott Call Constructioncustom finish workcustom finish work

Projects along the northern Wasatch Projects along the northern Wasatch FrontFront

Performed all aspects of finish work Performed all aspects of finish work including doors, closets, stairways, including doors, closets, stairways, and trim-work.and trim-work.

Page 9: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish workFinish work

Paint-grade Paint-grade

door and casingdoor and casing

Page 10: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish workFinish work

Stain-gradeStain-grade

double doordouble door

Page 11: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish workFinish work

Doors Doors

with glasswith glass

Page 12: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish workFinish work

Custom door mantleCustom door mantle

Page 13: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish workFinish work

Base boardBase board

Page 14: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish workFinish work

CrownCrown

Page 15: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish workFinish work

CrownCrown

Page 16: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish workFinish work

Waffle ceiling wrapped and finished Waffle ceiling wrapped and finished with alderwith alder

Page 17: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish- column wrapsFinish- column wraps

Page 18: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish workFinish work

Wall finishes and column wraps Wall finishes and column wraps (shadow boxes)(shadow boxes)

Page 19: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish- recessed panelsFinish- recessed panels

Page 20: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish- bead boardFinish- bead board

Page 21: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish- bead board- Finish- bead board- window sillswindow sills

Page 22: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish- flex mold- baseFinish- flex mold- base

Page 23: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish- mantleFinish- mantle

Page 24: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish- closetsFinish- closets

Page 25: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish- cold storageFinish- cold storage

InIn

progressprogress

Page 26: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish- railingFinish- railing

Page 27: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish- railingFinish- railing

Page 28: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish- railingFinish- railing

Page 29: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish- fiberglass Finish- fiberglass columnscolumns

Page 30: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Finish work- SummaryFinish work- Summary All of the finish work shown was completed by All of the finish work shown was completed by

me except for the railings- of which I only helped me except for the railings- of which I only helped to complete. As of August 2008, I have filled a to complete. As of August 2008, I have filled a vacancy in the company to be a lead carpenter vacancy in the company to be a lead carpenter and to install railings & ballustrades.and to install railings & ballustrades.

I have also learned laminate and hardwood I have also learned laminate and hardwood flooring through Scott Call Constructionflooring through Scott Call Construction

My original internship (fall 2006) was with DAYTMy original internship (fall 2006) was with DAYT I have learned many finish skills from Scott Call I have learned many finish skills from Scott Call

Construction from 2007- present.Construction from 2007- present. Other trades mastered preceding my internship Other trades mastered preceding my internship

include framing, siding- soffit & fascia & include framing, siding- soffit & fascia & raingutters, and insulating.raingutters, and insulating.

Page 31: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Prior ExperiencePrior ExperienceShowcaseShowcase

My construction job experience began My construction job experience began in 2004 as a framer. Prior to this in 2004 as a framer. Prior to this experience, I became interested in experience, I became interested in construction at a young age by visiting construction at a young age by visiting homes under construction in my homes under construction in my neighborhood. I began “creating” in neighborhood. I began “creating” in high school by being heavily involved in high school by being heavily involved in the wood shop. I also volunteered for the wood shop. I also volunteered for Habitat for Humanity for several Habitat for Humanity for several months.months.

Page 32: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

FramingFraming

I began framing for a sub contractor named I began framing for a sub contractor named Jason Randall. I grasped concepts easily and Jason Randall. I grasped concepts easily and became capable of running a project from became capable of running a project from start to finish after less than six months of start to finish after less than six months of working experience.working experience.

During this job I found it necessary to take During this job I found it necessary to take time off for school. As a result I worked for time off for school. As a result I worked for another framing subcontractor named another framing subcontractor named Brandon Christopher. I returned to my Brandon Christopher. I returned to my original employer and worked independently original employer and worked independently with my brother Russell.with my brother Russell.

Page 33: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

Framed homesFramed homes

The following are homes completely The following are homes completely framed by my brother and I framed by my brother and I without our employer’s direct without our employer’s direct supervision.supervision.

Page 34: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

West LaytonWest Layton framed July 2005 framed July 2005

Page 35: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

ClintonClintonframed August 2005framed August 2005

Page 36: Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.

West LaytonWest Laytonframed September 2005framed September 2005