: WORKING GROUP 3 MAIN LINAC H. Mizuno and C. Adolphsen, Chairmen Presentations J. Wang, T. Higo, “Structure Development” N. Hitomi, J. Rifkin, “Structure Manufacturing” S. Tantawi, “DLDS RF Components” C. Adolphsen, “Supports / Alignment / Operation” -. Parallel Session Review of Structure R&D T. Higo, “Status of KEK Structure Development” J. Wang, “Status of SLAC Structure Development” Ongoing Collaboration Issues DDS3 Assembly J. Ritin, “Mechanical Design Review” Y. Funahashi, “Bonding Procedure Review” Discussion of Outstanding Issues DDSS Z. Li, “Design Optimization” V. Srinivas, “Cell Calculation” R. Jones, “Internal HOM Load Design and DDS Wakes” Discussion of Design Status
58
Embed
WORKING GROUP 3 - SLAC National Accelerator Laboratory · PDF fileJ. Ritin, “Mechanical Design Review ... “Report on DDS3 Cell Machining ... LINAC WORKING GROUP SUMMARY TALKS (5
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
:
WORKING GROUP 3
MAIN LINAC
H. Mizuno and C. Adolphsen, Chairmen
Presentations
J. Wang, T. Higo, “Structure Development”
N. Hitomi, J. Rifkin, “Structure Manufacturing”
S. Tantawi, “DLDS RF Components”
C. Adolphsen, “Supports / Alignment / Operation”
-.Parallel Session
Review of Structure R&D
T. Higo, “Status of KEK Structure Development”
J. Wang, “Status of SLAC Structure Development”
Ongoing Collaboration Issues
DDS3 Assembly
J. Ritin, “Mechanical Design Review”
Y. Funahashi, “Bonding Procedure Review”
Discussion of Outstanding Issues
DDSS
Z. Li, “Design Optimization”
V. Srinivas, “Cell Calculation”
R. Jones, “Internal HOM Load Design and DDS Wakes”
Discussion of Design Status
I -
M2 High Power Test
Discussion of Preparation Work and Schedule
Future R&D
G. Bowden, “Research on Internal Fundamental Loads”
Discussion of Future Collaboration Efforts
-.
Structure Supports
G. Bowden, “Design Work at SLAC”
C. Adolphsen, “Structure Alignment Requirements”
C. Adolphsen, “Stability Tests at SLAC”
T. Suzuki, “Study of Alignment at KEK”
Discussion of Future Plans
Fabrication Studies
N. Hitomi, “Report on MD1 Bonding”
M. Yamamoto, “Report on MD1 Bonding”
H. Tsuchiya, “MD1 Straightness Measurements”
Discussion of Bonding Tests and Future Plans
Discussion with the Parameters Group
High Volume Manufacturing Issues
J. Klingmann, “Report on DDS3 Cell Machining”
J. Klingmann, “Ideas on Net Shaping, Stacking and Brazing”
N. Hitomi, “Structure Engineering Studies at KEK”
Discussion of Cell Tolerances, Production, Machining, Bonding etc.
Discussion with the Parameters Group
High Volume Manufacturing Issues
J. Klingmann, “Report on DDS3 Cell Machining”
J. Klingmann, “Ideas on Net Shaping, Stacking and Brazing”
N. Hitomi, “Structure Engineering Studies at KEK”
Discussion of Cell Tolerances, Production, Machining, Bonding etc.
Multi-Mode DLDS Design Review
S. Tantawi, “Overview”
Z. Li, “Design of Launcher”
N. Kroll, “Design of Bends”
Discussion of Future Modeling Work
Single-Mode DLDS
M. Neubauer, “Layout “
C. Adolphsen, “Operational Issues”
Discussion of Low Power Tests at BINP and KEK
Discussion of High Power Tests with the NLCTA
-
LINAC WORKING GROUP SUMMARY TALKS
(5 - 10 Minutes Each)
Structure Development - J. Wang / T. Higo
Structure Manufacturing - N. Hitorni / J. Rifkin
DLDS RF Components - S. Tantawi
Supports / Alignment / Operation - C. Adolphsen
-.
:
FIRST LC ISG WORKSHOP
SLAC
January 26-29, 1998
Summary Talk
WG 3: J. Wang
SUMMARYfor
Discussion on Accelerator Structure R&DJuwen Wang
l/29/98
.- We have been working very closely inaccelerator structure R&D for many years,
now we are getting even closer!
1 e Choice of Structure Type: RDDS Type
2. Section Length: L $2m
3. a/k Optimization
4. Ongoing Collaboration in Accelerator Sections:
i) DDS3 - Accelerator physics issues: kdn/df GaussianBetter HOM matching
- ASSET test and NLCTA project installation- Fabrication studies for LLNL- Full section bonding for lsf 60cm dia., 2m long section
by KEIUIHI based on their excellent skill and experiencesDetailed plan has been discussed:
DDS3D (dummy section) bonding practiceCell mechanical/microwave QCCell cleaning, packing, storage and shippingCell stacking and alignment checkDiffusion bonding
ii) DDSS (first RDDS type section)- Design issues: Optimization
Cell dimension calculationWakefield calculationMeasurement and analysis for test stacksCompact couplers with symmetric/low fieldInternal HOM loadsFeasibility studies for internal fo loadParallel effort at KEK on open mode analysis
and coupler design- Cell design and fabrication issues -- VERY CHLLANGING!
KEK produced four #2 cells , microwave andmechanical QC results reviewed
190 test cell fabrication for DDSS20 special cells for DDSS1000 cells for machining and bonding studies
LLNL and SBRIIHI machining, comparison on MCC exam
iii) High Power Tests:- M2 high power test in ASTA- DDSl high power test in NLCTA- II-II high power in KEK
5. Other Important Issues, which are related bothaccelerator physics and engineering aspects, need to bestudied jointly by all collaborating institutions.
0 Tolerances (Machine Performance and Cost)
-.
- Theoretical model and mathematical treatment based onmachine physics
- Characterization for different machines and dimensions oftheir mass produced parts
- Cell QC and grouping
ii) Bonding tests (Reliability / Frequency Change)
- KEK’s experiences and data- Short stack tests on various temperature profile and pressure- Measurements for long sections
Only when we full understand the problem, then the finaldimension table for mass production can be decided.
iii) Surface cleanness and dark currentsimulation/analysis
I-
FIRST LC ISG WORKSHOP
SLAC
January 26-29, 1998
Summary Talk
WG 3: T. Higo
-
--_e--- - --
DOSS 9pe 97 ?
T. Higo ISG Jan. 1998
Bonding and alignment
Recent stud.ies
f0 -- 80mm diam, 1.3 - 1.8m long )
Based on ultra-high precison machining
Manual stacking against V-block
Align c 5km w.r.t. V-block
With/without pre-bonding
Vertical hanging
diffusion bonding at > 850°C
- 20 pm gentle bow
- 5 IJ-m with pressing to V-block
VAC tight with He leak check
FIRST LC ISG WORKSHOP
SLAC
January 26-29, 1998
Summary Talk
-. WG 3: N. Hitomi
Detailed plans for budget request of 1998
T. Higo 980 106, 980 122(rem. budget req.)
DDS3D
precise alignment / bonding study for DDS3finishing by the end of Feb. ‘98
targetcomplimentary experiment to SLAC ASTAinvestigate conditioning and final performance
M2 at ASTA of SLACfor extreamly high power 300--400 MW
( E_NL=73MV/m at 13OMW)now being preparing final vacuum WG components
IHl at KEKevaluate conditioning process
record BD eventskeep high power / high field experience at KEK
the
Opt
imum
Sta
ckin
g C
ondi
tion
l St
udy
the
surfa
ce tr
eatm
ent o
f cel
l.*R
insi
ng+D
ebur
ring
Ultra
-Pur
e-W
ater
Jet
l
Inve
stig
ate
the
conn
ecte
d su
rface
cond
ition
afte
r sta
ckin
g.W
ide
forc
e+R
ingi
ng fo
rce
+Cre
ep fo
rce
l
Sele
ct th
e be
tter
stac
king
pro
cess
FIRST LC ISG WORKSHOP
SLAC
January 26-29, 1998
Summary Talk
WG 3: J. Rifkin
I-
,
4 E. c
I :
t c.
G -a
I
-
7
FIRST LC ISG WORKSHOP
SLAC
January 26-29, 1998
Summary Talk
WG 3: S. Tantawi
--
- 12
.7 c
m C
ircul
ar
Kly
stron
Mod
e La
unch
er (
A s
et
Acc
eler
ator
I’
-7.4
cm
Circ
ular
Stru
ctur
e (-
1.8
m)
,
Sing
le-m
oded
DLD
S-_
-.---.
. ._
-.-.. -
-
TEOI
T&H
TEtl
(Ver
tical
)TE
tz (V
ertic
al)
TEt2
(H
oriz
onta
l)TE
rl M
ode
Extra
sTE
t2 M
ode
(Pow
er i
s ex
tract
ed e
venl
y- Ex
tract
or
Mod
e La
unch
er (
Fed
by4-
-6m
+fo
ur r
ecta
ngul
ar
Mul
ti-m
oded
DLD
S
Kly
stron
s
Tb
, -TE
oiM
ode
, C
onve
rter
-7.4
cm
Circ
ular
Stru
ctur
e (-
1.8
m)
TE,,,
Tm-n
ff
TEol
Mod
e C
onve
rter
(fed
by
four
rect
angu
lar
wav
egui
des)
:
Roger Miller’s Theorem,
0
0
0
0s= 1
21212
1,z
s.stT = I
0
0
0
0
-1
-21-21212,
4 Different Inputs 4 Different Output Modes
0 0
0 0
0 0
0 0
-1 -1--2 21 1-2 21 -1-
1,‘1 ]- -
2 2
--
1 12 2-1 -1-7-Y-1 112-1 1T?
0 0
0 0
0 0
0 0
1 12 ?
1 12 21 -1!iT-1 122
0 0
0 0
0 0
0 0
For a loss-less, reciprocal structure, if a set of orthogonal inputs that represents the basisfor all input vectors exists such that all the power in the inputs are transferred to theoutput, the inputs are isolated.
-
To th
e N
ext
Acc
eler
ator
Stru
ctur
e
TEOI
A
7.44
cm I
To A
ccel
erat
orSt
ruct
ure
\
Corru
gate
d G
uide
will
allo
w re
lativ
em
ovem
ents
bet
wee
n ac
cele
rato
rstr
uctu
res
with
out l
osse
s or
mod
eco
nver
sion
TEol
Tap
-Off
-
888+++alaal000000s
kc”087-7.- I a I
.EXXNz
6.-
-
,f -..j
c
TE, I
(V
ertic
al)
TEoi
TE, 1
(V
ertic
al)
TE, 1
(Ver
tical
)TE
lz (
Hor
izon
tal)
To A
ccel
erat
or+
Stru
ctur
es TEOI
Laun
cher
T&H
+-
Ext
ract
or
Extra
ctor
Sch
emat
ic D
iagr
am
, ,,
.,”
““,
.
A.0
4.01
l&us
e P
&de
Obj
ect
Gri
d2;
Key
boar
d
No
MIX
imm
sx
2.00
00e+
O(
y 2.
4000
e+O
(z
2_40
00e+
OC
Min
imx
-2.O
OOOe
+OC
y -2
.400
0e+O
C2
-2.4
000e
+OC
fvbu
se P
osit
ior
u +o
.ooo
v +o
.ooo
Un i
t sin
ches
Lef
tP
lfX
III- .
- -. .
bbus
e R
ight
-. I.+
i,,
: :
:
-t-
ving
o
bje
ct
ob
ject
7vi
ng
ob
ject
o
bje
ct8
ving
o
bje
ct
tt5
HFSS
!ip
OE
oA
. .
t&us
e t
&de
2E
’;:
Key
boar
d
Ye
Max
imm
sx
3.75
70e+
O(
y 2.
0000
e+O
(z
2.00
00e+
O(
Min
imrn
sx
- 1
.590
0e+O
(y
-2.O
OOOe
+Ol
z -2
OO
OOe+
Ol
v +l
.OO
Odu
+2
.400
dv
+O.O
OOU
nit
s inch
es
Mou
se
Lef
tIV
ENJ
PICK
l&us
e R
ight
I )-
b;=
.~ !J
(ta S
erpe
ntin
e M
ode
C,o
nver
ter
(TEI
1 -T
EO
l )
\ _--
-.
-,
(all
dim
ensi
ons
in
ni
m.>
tiod
e La
unch
er S
yste
m
or 8 kl
ystr
ons
I1
extr
acto
r
8 kl
ystr
ons
tTE
21 to
TE
OlTo
Acc
ml.
TEOl
TEOl
Line
TEll
rTl
GllbI-
-4
Lau
nche
r1
f-'
Del
ay
* Lo
cal
moBa ex
trac
ted
befo
re la
unch
ing
* La
unch 3 mo
des
into de
lay
line
I-
TEll-TEOl Launcher (E)* Tapered waveguides
* Single slot for both TEll and TEOl
* Tunable shorts
TElO-
TEOl-. TE11short . .
D=lf I D=1.488”--- -_-_-_-.-_-_---_-_---------.----------------------------
MAFIA
#VOL
UME
:OOR
DINA
TES/
MwLL RA
NGE
i WI
NDOW
{I0.
0000
, 0.
0387
731
[0.
0000
, 0.
0397
731
I[0.
0000
, 0.
0387
731
0.00
00,
0.03
8773
15 I
0.0000,
0.20
3501
[0.0000,
0.20
3501
XUBO
L: BR
ICK-
4?IMI......:
5.00
00fATERIALS:
L,j,l
PRAME:
202
/12/
97 -
16:4
1:44
VERS
ION[
V4.0
10]
l **
***
NO MA
FIA
FILE
AL
LOCA
TED
****
St
DLDS
MO
DE LA
UNCH
ER
[Al
- l/4
GEOM
ETRY
3D PL
OT OF
TH
E MA
TERI
AL DI
STRI
BUTI
ON IN
TH
E ME
SH
I .
Ir
IL-
COOR
DINA
TES/
MFU
LL RA
NGE
/ WI
NDOW
xc0.
0000
, 0.
0387
73]
f0.
0000
, 0.
0387
731
Y[0.
0000
, 0.
0387
731
L0.
0000
, 0.
0387
731
Z[0.
0000
,0.
2035
01[
0.00
00,
0.20
3501
SYMB
OL:
E3-E
NETI
ME..
....
:1.
9050
0E-0
4CO
MPON
BNT.
.= X
FUNC
TION
MI
N: 1.
3363
-16
FUNC
TION
MA
X: 4.
269E
-05
PLOT
TED
MIN:
1.
3363
-16
PLOT
TED
MAX:
4.
2693
-05
INTE
RPOL
ATE=
1
LOGS
CALE
...=
0
MATE
RIAL
S: 1,
.-I,”
.-FR
AME:
502
/12/
97-
16:1
0:25
VERS
ION[
V4.0
10]
MODE
ST.D
RC
DLDS
MO
DE LA
UNCN
ER [
Al
El-E
NE *[
APAC
TltE
2_EN
E *[
BFAC
Tl
V tW
ul.
HF-1
6l.
O7E-
052.
133-
053.
203-
054.
273-
05
1 !MAFI
AII#
3DCO
NTOU
RI
COOR
DINA
TES/
MFU
LL RA
NQE / WI
NDOW
XL0.0000,
0.03
8773
1[
0.00
00,
0.03
8773
1Y[
0.0000,
0.03
8773
1I
0.0000,
0.03
8773
1zi
0.0000,
0.2035Oj
I0.
0000
.0.
2035
01
FRAM
E:
302
/12/
91 -
16:1
9:25
VERS
ION[
V4.0
10]
MODE
ST.D
RC
DLDS
MO
DE LA
UNCH
ER [A
]
‘ (E)
TScfl
- l/4
QEOM
ETRY
pi-E
NE *[
ntiA
c+]t
Ez-E
% *[
BFAc
T]
I .I-.
1.14
E;17
7.01
E-06
1.40
E-05
2.10
E-05
- __._
._ _ ?
.80E
-(
TElO(TEOl,TEllconfiguration) lx10
-.
I-
Local mode (TE21) extract-launcher
:
FIRST LC ISG WORKSHOP
SLAC
January 26-29, 1998
Summary Talk
WG 3: C. Adolphsen
3
4
4.440
1-
----L-
I 1.3mx-4 i1
iG
17DE.97
7,S~Zcrlcr
. _.__ _ _..trm8port/insu#rtion
a- -I
r(
--
-_
-
WIR
E A
LIG
NM
EN
T M
ON
ITO
R
PC!
Dig
itize
r
Mul
tiple
xer
Stre
tche
d W
ire
n
1 1.8
m M
ock
Acc
eler
ator
Stru
ctur
e’St
rong
back
rrClear qraphs before runnina CLEAFt
Numberofscanstock:
number of samples per scan
112.4~: i , ,7.4-i..------. __-...- -----.- .- -- ----- -4.6-i-! I