Top Banner
Sample of Work J. Nicole De Jong Central Oregon Community College Science Building The second of two new academic buildings that YGH built for COCC, the Science Building is sited and designed to celebrate the natural beauty of the campus and to take advantage of the abundant natural light. Nestled into the steep hillside the building houses a variety of learning spaces from traditional classrooms and laboratories to more informal study and breakout spaces. Role: Design Assist for Schematic Design, Design Development, Construction Documentation Location: Bend, OR Completed: Fall, 2012 SF: 55,900 Project Caterpillar Conceptual Design Part of a larger campus master plan Project Caterpillar was a conceptual design of a corporate headquarters. The main office building was envisioned to function as a hub for the whole corporate campus, enhance the corporate brand and serve as a recruiting tool for clients and young professionals. Role: Design Assist / Revit Lead for Conceptual Design Client: Confidential Location: Confidential Completed: Not Built SF: 260,000 Dow Chemical Company East End Project Located on two floors of a new four level building in downtown Midland, MI the Dow East End Project represents the first significant downtown presence of the company in their home town. The client requested a vibrant and active open office space that will be a showcase for the company. Role: Revit Lead for Construction Documents Location: Midland, MI Completed: Spring 2014 SF: 115,000
2
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Work Sample

Sample of WorkJ. Nicole De Jong

Central Oregon Community College Science Building

The second of two new academic buildings that YGH built for COCC, the Science Building is sited and designed to celebrate the natural beauty of the campus and to take advantage of the abundant natural light. Nestled into the steep hillside the building houses a variety of learning spaces from traditional classrooms and laboratories to more

informal study and breakout spaces.

Role: Design Assist for Schematic Design, Design Development, Construction

DocumentationLocation: Bend, OR

Completed: Fall, 2012SF: 55,900

Project CaterpillarConceptual Design

Part of a larger campus master plan Project Caterpillar was a conceptual design of a corporate headquarters. The main office building was envisioned to function as a hub for the whole corporate campus, enhance the corporate brand and serve as a recruiting tool for clients and young

professionals.

Role: Design Assist / Revit Lead for Conceptual Design Client: Confidential

Location: ConfidentialCompleted: Not Built

SF: 260,000

Dow Chemical CompanyEast End Project

Located on two floors of a new four level building in downtown Midland, MI the Dow East End Project represents the first significant downtown presence of the company in their home town. The client requested a vibrant and active open office space

that will be a showcase for the company.

Role: Revit Lead for Construction Documents Location: Midland, MI

Completed: Spring 2014SF: 115,000

Page 2: Work Sample

Chemeketa Community CollegeYamhill Valley Campus Building 1

The foundation building of Chemeketa Community College’s new Yamhill Valley Campus. Building 1 functions as a full service, stand alone campus providing student services as well as classroom

and lab space.

Role: Design Assist for Schematic Design, Design Development

Location: McMinnville, ORCompleted: Summer, 2011

SF: 58,000

Chemeketa Community CollegeApplied Technology Campus

The culmination of a year long programming study for the expansion of the applied technology programs this initial phase developed a new building for the Machining and Electronics Departments and included the renovation of an existing building with the addition of a new shop and student space

for the Welding Department

Role: Design Assist / Revit Lead for Schematic Design, Design Development

Location: Salem, ORTo Be Completed: Fall, 2014

SF: 75,000

Felton Properties Inc.400 SW 6th Lobby Renovation

A remodel of the existing front entrance and lobby space for Felton Properties’ 400 SW 6th Building. The design creates a new public face for the building and highlights the clients love of art through prominent public display of original art pieces both

on the interior and exterior of the building.

Role: Revit Lead for Schematic Design, Design Development, Construction

DocumentsLocation: Portland, OR

Completed: Spring, 2013SF: 4,100

Houston Dow Center - SadaraLease Expansion & Addition

YGH was called upon to create an executive suite for the Dow Chemical Company’s latest venture, Sadara. Located on the top floor of the Houston Dow Center this suite presents the public face of

Sadara in the US.

Role: Revit Lead for Design Development, Construction Documentation, Performed CA

Location: Houston, TXCompleted: Spring, 2012

SF: 12,000