Top Banner
Work in progress Green Deal Implementation in London Presented by: Keith Von Tersch Energy Saving Trust London Carbon Action Network 12 June 2012 Project delivery by:
12

Work in progress Green Deal Implementation in London Presented by: Keith Von Tersch Energy Saving Trust London Carbon Action Network 12 June 2012 Project.

Dec 29, 2015

Download

Documents

Harry Wilkerson
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Work in progress Green Deal Implementation in London Presented by: Keith Von Tersch Energy Saving Trust London Carbon Action Network 12 June 2012 Project.

Work in progress

Green Deal Implementation in London

Presented by:

Keith Von Tersch

Energy Saving Trust

London Carbon Action Network12 June 2012

Project delivery by:

Page 2: Work in progress Green Deal Implementation in London Presented by: Keith Von Tersch Energy Saving Trust London Carbon Action Network 12 June 2012 Project.

Work in progress

History of attracting CERT

Source: EST Home Energy Efficiency Database (HEED) CERT Summary ReportThis update contains data on installations up to the end of quarter 14 (30/09/2011) of the CERT scheme

Page 3: Work in progress Green Deal Implementation in London Presented by: Keith Von Tersch Energy Saving Trust London Carbon Action Network 12 June 2012 Project.

Work in progress

London’s profile to retrofit 2.4m properties by 2020

Houses retrofitted

Page 4: Work in progress Green Deal Implementation in London Presented by: Keith Von Tersch Energy Saving Trust London Carbon Action Network 12 June 2012 Project.

Work in progress

Why pan-London?

Strategic delivery

Build on previous

work

Working together

Delivery at scale

Page 5: Work in progress Green Deal Implementation in London Presented by: Keith Von Tersch Energy Saving Trust London Carbon Action Network 12 June 2012 Project.

Work in progress

Green Deal Implementation project

Business Cases shared back out to all thirty-three boroughs

► To deliver an action plan and business case to maximise Green Deal delivery in London which highlights the roles and has the buy-in of:► London boroughs► GLA► Registered providers of social

housing ► Large private sector landlords

Page 6: Work in progress Green Deal Implementation in London Presented by: Keith Von Tersch Energy Saving Trust London Carbon Action Network 12 June 2012 Project.

Work in progress

What Boroughs are looking for from Green Deal

Green Deal Outputs - Scored

Benefit Score / 6

Tackle fuel poverty 4.6

Promote local jobs 4.0

Reduce CO2 emissions 3.3

Health benefits 3.2

Low-carbon sector growth 2.4

Benefit

Promote and enhance brand of Borough

Support social enterprise

Regeneration

Income generation

Communities involvement

Improved equality

Cost savings for consumer

Co-operative council

Broad offering of solutions

Being a lead borough

Green Deal Outputs - Other

Page 7: Work in progress Green Deal Implementation in London Presented by: Keith Von Tersch Energy Saving Trust London Carbon Action Network 12 June 2012 Project.

Work in progress

Model alignment

0 20 40 60 80 1000

10

20

30

40

50

60

70

80

90

100

Output/Input score (%) Output/Risk score (%)

Input/Risk score (%)

Ou

tpu

t sc

ore

(%

)

Borough as provider

Borough as producer

General promotion

Page 8: Work in progress Green Deal Implementation in London Presented by: Keith Von Tersch Energy Saving Trust London Carbon Action Network 12 June 2012 Project.

Work in progress

Core models and anchors

Producer

Provider

Promoter

Certainty of outcomes

Resource/Risk

GLA

Sutton/Croydon

Haringey/Islington

Page 9: Work in progress Green Deal Implementation in London Presented by: Keith Von Tersch Energy Saving Trust London Carbon Action Network 12 June 2012 Project.

Work in progress

Models and the Green Deal

Other products

(e.g., painting

Project manage-ment and customer service

Credit provider (covers upfront costs)

Initial home visit

Impartial property

assessment

Cost quote (credit offer)

GD measures installation

Raise awareness

Attract consumer

interest

Make contact

Capital finance

Payment collection

Aftercare and warranty

Promoter Producer Provider

Page 10: Work in progress Green Deal Implementation in London Presented by: Keith Von Tersch Energy Saving Trust London Carbon Action Network 12 June 2012 Project.

Work in progress

Model for London

Boroughs

General promotion

Customer sign up to Green Deal

“London Green Deal Producing Company”

GLAFunding

Contract

Delivery

TGDFC finance

Framework of GDPs

Referral fee

Borough GDP

Promoter boroughs

Chosen Delivery partner

Delivery Referral fee

Provider boroughs

LA finance from PWLB

Page 11: Work in progress Green Deal Implementation in London Presented by: Keith Von Tersch Energy Saving Trust London Carbon Action Network 12 June 2012 Project.

Work in progress

Next steps

► Finalise business cases end June► Haringey/Islington – Provider ► Sutton/Croydon – Promoter ► GLA – Producer / pan-London

► Dissemination of information and engagement with other boroughs

► Cabinet papers / Procurement / Delivery

Page 12: Work in progress Green Deal Implementation in London Presented by: Keith Von Tersch Energy Saving Trust London Carbon Action Network 12 June 2012 Project.

Work in progress

Thank you

Keith Von Tersch

Local Delivery Manager – London

07961 226 950

[email protected]

Rachael Hickman

Project Manager - Programme Delivery (Environment)

0207 983 6570

[email protected]