Work Clearance Management

Christoph Wobbe

WCM GmbH

Rory David Shaffer

Utilities IBU

Page 2: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

1. Background

2. Customers

3. Overview of WCM

4. News

Agenda

Page 3: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

1. Background

2. Customers

3. Overview of WCM

4. News

Agenda

Page 4: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

... the process of ensuring safe conditions

for personnel while performing maintenance

work and controlled testing

What is basic WCM?

Page 5: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Clearance module created in R/2, installed in Cofrentes nuclear

power plant in Spain

Modifications and enhancements required to suit additional

European as well as North American requirements

WCM focus group (1996-1999)

What is our background?

Page 6: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Maintenance crews are working in a hazardous environment (high

voltage, radiation exposure, hot steam, ... )

The guarantee of supply requires maintenance work while

systems are up and running

The functionality of a technical system must not be affected under

any circumstances

There are typical work-related illnesses, which require special

health and safety measures

Why Work Clearance Management?

Page 7: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Integration in SAP Enterprise Asset Management

Easy to learn & use

Standardized procedures

Open model

Authorization process

Library of Work Clearance Document Templates

Lockout/Tagout

Mobile Lockout/Tagout

Meets OSHA regulations (s. next slide)

What are the key benefits?

Page 8: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Lockout/Tagout is the common name for a process

of "Control of Hazardous Energy" as established

by the Occupational Safety and Health

Administration (OSHA) under Federal Registry 29

CFR 1910.147.

What is basic Lockout/Tagout?

Page 9: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

What are the Releases?

Page 10: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

1. Background

2. Customers

3. Overview of WCM

4. News

Agenda

Page 11: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

WCM Market Overview

© SAP 2008 / Page 11

WCM Projects: More than 25 countries

More than 10 different languages

More than 150 customers

More than 250 installations

Page 12: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

WCM Market Overview

© SAP 2008 / Page 12

Canada

USA

Mexico

Venezuela

Brasil

FinlandSweden

Germany

Netherlands BelgiumFrance

Spain Italy

Singapore

Japan

China

Australia

India

Korea

Norway

Saudi Arabia

Hungary

Russia

Argentina

Page 13: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

WCM Market Overview

© SAP 2008 / Page 13

WCM Industries: Generation Companies

Nuclear

Fossile

Transmission Companies

Oil & Gas

Mining

Public Services

Public Transport/Railways

Paper

Defense

Page 14: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Electrabel (Belgium) Iberdrola (Spain) Endesa (Spain) Ringhals (Sweden) E-ON (Germany) RWE (Germany) CS Energy (Australia) Macquire Generation (Australia) PSEG (USA) OGE (USA) Edison Mission Group (USA) New Brunswick Power (Canada) ONGC (India) TUAS Power (Thailand) Cogen (Singapore) Singapore MRT (Singapore) KH&NP (Korea) Beijing Electric Power Corporation (China) Shell (Global) Statoil/Hydro (Norway)

WCM Customers

Page 15: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Electrabel is a private power company active on the European energy market.

Our core business we sell electricity, natural gas and derived energy

products and services, we generate electricity, we trade electricity and natural gas, we build, manage and service networks used for the

transmission of electricity and the distribution of electricity and natural gas.

Other activities complete our offer in Belgium: cable TV and radio, distribution of water, ...

“The implementation of SAP Work Clearance Manage-ment with mySAP PLM Asset Life-Cycle Manage-ment at the Electrabel nuclear power stations fits perfectly into our policy to continuously improve safety and efficiency of maintenance processes.”

Jean Pierre Gourgue, responsible for SAP Electrabel

Generation

WORK CLEARANCE MANAGEMENT - A PERFECT TOOL FOR GENERATION FACILITY MAINTENANCE

Electrabel, Belgium

Work Clearance Management

Page 16: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

© SAP 2008 / Page 16

Work Clearance Management

Iberdrola is one of Europe's leading electricity companies, with almost 8.8 million customers in Spain and over 7 million in Latin America. Iberdrola also has a large Industrial Group operating in several sectors and countries. It employs 10,800 people and had sales of €7,000 million in 2000.

Iberdrola Generación's total installed capacity for hydroelectric, conventional thermal and nuclear production is16,000 MW. Gross production totals 51,200 GWh and accounts for 29 % of Spain’s total production.

„The SAP Work Clearance Management component, developed by SAP with the collaboration of Iberdrola, has contributed to the increase in safety and efficiency of work in all of Iberdrola‘s power plants, being specially useful for refueling Cofrentes Nuclear Power Plants.“

Juan Antonio Almendros Monedero, IT

WORKING SAFELY IN POWER PLANTS USING WORK CLEARANCE MANAGEMENTA better solution for managing and empowering safety in power plants

Iberdrola S.A., Spain

Page 17: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

© SAP 2008 / Page 17

Work Clearance Management

Ringhals, located south of Gothenburg, is the largest nuclear power plant in Scandinavia with four units. Ringhals AB belongs to the Vattenfall Company. The power plant supplies most of Sweden´s west coast with electricity. Its total capacity is 3,500 megawatts, approximately 15-18% of total consumption in Sweden. Since the 1st of August 2000, the Barsebäck power plant has become a subcompany of the Ringhals group. A total of five reactors generate 4,100 megawatts, and with approximately 1,500 employees, Ringhals is one of the largest power producers in the world.

“The implementation of SAP Work Clearance Management was one of the most important and basic functions in the introduction of SAP R/3 when the project began in spring 1997. The project went live in December 1998 and since 1999, Ringhals has successfully planned and safely performed maintenance activities in all four units. Today, SAP Work Clearance Management is accepted as a natural modern maintenance tool in daily work.”

Owe Petersson, Project Leader

SAFE NUCLEAR PLANT MAINTENANCE AND OUTAGE PLANNING WITH ASSET LIFE-CYCLE MANAGEMENT

Ringhals AB, Sweden

Page 18: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Generation Companies (nuclear, fossile, hydro) use WCM for the safety and approval processes while they perform standard maintenance as wellas during overhalls/revisions.

Transmission Companiesuse WCM for the safety processes around maintenance work and outages in their grid.Work Clearance Management is used for the isolation of high voltage lines and gas pipelines.

Customers:- Areva- Compañía Mexicana de Gerencia- Sempra Energy- North China Grid Company

WCM Market - Utilities

Page 19: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Oil&Gas Companies

use WCM for the safety and approval processes while they perform standard maintenance as well as during overhalls/revisions.

Work Clearance Management represents the Valve&Blind lists and is part of the permit to work processes.

Customers:- Petróleo Brasileiro (Petrobras)- Shell- Statoil/Hydro- Chevron

WCM Market – Oil & Gas

Page 20: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Mining Companies

use WCM for the safety and approval processes while they perform standard maintenance processes.

Work Clearance Management documents the safety processes and show the users when a certain part of a mine is safe.

Customers:- BHP Billiton

WCM Market - Mining

Page 21: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Public Services Companies

which use WCM are mainly water companies. Here WCM is used for hydro plants, pumpstations etc.

Customers:- State of California

WCM Market – Public Services

Page 22: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Public Transport/Railways

…use WCM to ensure the safety of their maintenance crews while they are working on the railway system or in the tunnels of the undergrounds.

Customers:TMB (Transports Metropolitans de Barcelona)Singapore MRT

WCM Market – Public Transport

Page 23: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Paper Industry

use WCM to define the safety processes for maintenance and inspection work as well as the revisions of the paper mills.

Customers:- United Paper Mills (UPM)- Weyerhaeuser

WCM Market – Paper Industry

Page 24: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

The Defense market

use WCM for the safety requirements of the nuclear submarines.

Customers:- US Navy

WCM Market - Defense

Page 25: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

1. Background

2. Customers

3. Overview of Work Clearance Management

4. News

Agenda

Page 26: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Work ClearanceManagement

Work ClearanceManagement

NotificationNotification CreateOrder

CreateOrder

ReleaseOrder

ReleaseOrder

ConfirmOrder

ConfirmOrder

CompleteOrder

CompleteOrder

Analyze HistoriesAnalyze Histories

PlanOrder

PlanOrder

SCADASCADA

Maintenance planMaintenance plan

Work ClearanceManagement

Work ClearanceManagement

Maintenance

Operation

Maintenance Process with WCM

Page 27: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Standard Model

Applications:

Work Clearance Application (WCA)

Work Clearance Documents (WCD)

WCD Template

Operational WCD

Operational WCD

Operational WCD

Order OrderOrder

Work Clearance

Application

Operational WCD

WCM Objects – Architecture (1)

Page 28: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Enhanced Model

Work Approval (WAP)

Applications

Work Clearance Application (WCA)

Application for Radiation Protection

...

Work Clearance Documents (WCD)

WCD Template

Operational WCD

Order Order

Work Approval

Work Clearance

Application

Operational WCD

Application for Application for Radiation Radiation ProtectionProtection

Order

Operational WCD

WCM Objects – Architecture (2)

Page 29: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Maintenance Process with WCM

Page 30: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Define for which Technical Objects (Functional Locations, Equipments) is a

Safety Process required

Create WCD Template(s) for these Technical Objects

Maintenance Process with WCM (1)

Page 31: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Create a Maintenance Order

Valuation of the Work Clearance Management Process

Assign additional Documents (eg drawings)

Maintenance Process with WCM (2)

Requestors Risk Analysis

Page 32: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Define WCM related Tasks

Assign Work Clearance Application

Create Operational Work Clearance Document based on Template

Start Simulation for conflict checks

Print tags/tagging list or start mobile tagging process

Start isolation process (incl. approval process + conflict checks)

Maintenance Process with WCM (3)

Process Preparation

Page 33: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Confirm Isolation

If all Isolations are confirmed, the approval process changes the

status of the Maintenance Order

Trafic Lights are now all in green

Maintenance Process with WCM (4)

Work Authorisation & Acceptance

Page 34: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Order is now ready for execution

Start maintenance process

Confirm maintenance process

(Start test cycle with temporary untagging/tagging)

Final confirmation of maintenance work

Start untagging process (incl. conflict checks, approvals)

Confirm untagging

Maintenance Process with WCM (5)

Execution

Page 35: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Close Maintenance Order

Close Work Clearance Documents

Information is moved to our Information System/BI

Analysis for future work

Maintenance Process with WCM (6)

Closure

Page 36: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

1. Background

2. Customers

3. Overview of Work Clearance Management

4. News

Agenda

Page 37: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

To assist the processes of orderly tagging and subsequent untagging of technical objects, shop papers (so called operational lists) are required. The operational list contains the necessary information and support the performance on site. The safety technician confirms the execution of the activities on site, on the operational list. Afterwards the safety engineer must confirm the execution of the activities in the system (on basis of the processed operation list). Normally the operational list must be kept for several years.

This processes are time-consuming (receipt and return) and error-prone (duplicate confirmations).

Goals of mobile WCM

Mobile Work Clearance Management

Page 38: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Mobile WCM is a full offline mobile solution. Mobile WCM

supports the safety processes for tagging and untagging

technical assets.

Platform-independent application: runs on almost all mobile

devices

Offline application: data entries can be synchronized

whenever it is convenient for technician or safety engineer

Application is seamlessly integrated into the SAP backend

system

Mobile Work Clearance Management

Page 39: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Non paper-based standardized processes improve safety.

Increases data entry accuracy and eliminates delays for

dependent business processes

Minimizes or eliminates “paper work operational lists”

Reduces outage time of transmission lines

Customer Value of Mobile WCM

Page 40: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Which operations require safety activities?

Can I start operations before the tagging is confirmed?

How I can I group operations and approvals?

Linking Operations with WCM

Page 41: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Operational WCD

Order

Work Clearance

Application

Operational WCD

Operation 10

Operation 20

Operation 30

Operation 40

Operational WCD

Approval Group

„Hot Work“

Approval Group

„Tagging“

Approval Group

„Untagging“

Approvals:- Hot Work- Tagging- Untagging

Operations are assigned and bundeled to Approval Groups

Linking Operations with WCM

Page 42: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

The more generic approach of this feature is to maintain the untagging

conditions of assets/equipments in the WCM component.

In an Operational WCD the untagging condition of an item will be

dynamically determined, depending on the current overall condition of the

technical system.

To achieve this the required untagging conditions of the technical assets in

the unit are stored.

As this required untagging condition may vary with the overall condition of

the technical system the untagging conditions of the technical assets (or

components) are stored dependent on the overall conditions of the technical

system of the unit.

Mode Dependent Tagging

Page 43: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

Functional Location / Equipment

mechanical

electrical

01 closed

02 closed

04 open

03 open

01 on

02 on

04 off

03 onoperationalgroup

overall condition of the technical system

untagging condition

Mode Dependent Tagging - Architecture

Page 44: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

© SAP 2008 / Page 44

Quar

terly

Rel

ease

WCM Newsletter

Page 45: Work Clearance Management Christoph Wobbe WCM GmbH Rory David Shaffer Utilities IBU.

© SAP 2008 / Page 45

Questions

Contact: [email protected]

Thank you very much!

Rory David Shaffer

[email protected]