Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013
19

Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.

Dec 22, 2015

Download

Documents

Veronica Henry
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.

Worcester Regional Transit Authority

Key Performance IndicatorsElectric Bus Deployment Project

December 18, 2013

Page 2: Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.

Introduction

• Project Goals– Achieve performance levels that meet or exceed existing fleet– Reduce fuel costs– Reduce emissions– Enhance transit service Cleaner, Greener

• Purpose of KPI Reporting– Assess performance of electric buses as compared to existing

fleet– Assess impact on WRTA’s agency-wide fuel costs– Assess impact on WRTA’s agency wide GHG emissions

Page 3: Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.

The Fleet

Bus Type Quantity % of Fleet

29 GILLIG 5 10%29 GILLIG HYB 2 4%35 GILLIG 9 17%35 GILLIG HYB 6 12%40 GILLIG 15 29%40 GILLIG HYB 9 17%35' Electric 6 12%

Total Fleet 52 100%

Page 4: Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.

The Routes

• Route 4

• Route 18

• Downtown “Green” Circulator (Route 80)

• Alternate: Route 8

• Alternate: Route 25

Page 5: Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.

KPI: Mileage

Page 6: Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.

KPI: Diesel Gallon Equivalent

Page 7: Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.

KPI: Average Fuel Efficiency

Page 8: Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.

KPI: Average Fuel Efficiency

Blue months indicate electric bills with estimated reads; kWh consumption was adjusted retroactivelyRed months indicate months with variable supply costs inadvertently left off, making cost/mile less than expected

Page 9: Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.

KPI: Fleet Average Fuel Cost per Mile

Contracted Diesel Fuel Cost: $3.14/galAverage Electricity Costs: $0.20/kWh

Page 10: Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.

KPI: Fleet Average Fuel Cost Per Mile

Blue months indicate electric bills with estimated reads; kWh consumption was adjusted retroactivelyRed months indicate months with variable supply costs inadvertently left off, making cost/mile less than expected

Page 11: Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.

Electricity Costs

Blue months indicate electric bills with estimated reads; kWh consumption was adjusted retroactivelyRed months indicate months with variable supply costs inadvertently left off, making cost/mile less than expectedOrange indicates month with lower than typical demand charges applied ($3.26536 vs. $2.92 per kW)Note: Previous May 14 data included an estimated supply cost charge but was later removed b/c never applied in bill

Page 12: Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.

KPI: Average Fuel Cost per Mile by Type

Contracted Diesel Fuel Cost: $3.14/galAverage Electricity Costs: $0.20/kWh

Page 13: Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.

KPI: Change in Fleet Average Cost/Mile

Note: Electric buses represent 12% of WRTA total fleet

Page 14: Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.

KPI: Availability

Page 15: Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.

KPI: Emission Reduction

Total CO2 Reduction to

Date:

305 Tons!

Total Diesel Reduction to Date:

27,000 gallons!

Page 16: Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.

Electric Bus Deployments

Current Deployments

Planned Deployments

Page 17: Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.

Comparison Metrics - Efficiency

Page 18: Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.

Comparison Metrics - Availability

Page 19: Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.

Conclusions

• Greater utilization and the G-3 utility rate switch has lowered the electric cost per mile to below all other buses in WRTA fleets for April – October

• Availability issues continue to limit the potential of the electric bus fleet

• Cost per mile is seasonal– Expect higher cost/mile in the winter months