Introduction: Luke Fussell
A bit about me:• Senior Engineer at Wood Thilsted Partners• MEng, Mechanical Engineering from
University of Bath (2006)Career Highlights:• Just started at WT• Previously Deputy Head of Office at LICenergy
UK (3.5 years)• Prior to that, spent 8+ years at Atkins in
various departments, including Oil & Gas, plus 18 month secondment to Vestas
• Recently Owner’s Engineer for 2 French offshore wind farms currently in development (EPCI Contracts)
Wo
od
Th
ilste
d P
artn
ers
© Wood Thilsted Partners Ltd Company Registered in England No 09853253 3
Wood Thilsted Partners is an engineering company specialised in geotechnical and foundation engineering for offshore wind farms.
Wood Thilsted Partner advises in all phases of wind farm developments; from due diligence of green field developments through to construction and O&M phases.
The company was established November 2015 by former two senior engineers from Ørsted (formerly Dong Energy) and has by today grown to 34 employees. Wood Thilsted is working for a wide range of clients across the offshore wind industry in Europe, North America and South East Asia.
Wo
od
Th
ilste
d P
artn
ers
© Wood Thilsted Partners Ltd Company Registered in England No 09853253 4
Our company
Wo
od
Th
ilste
d P
artn
ers
© Wood Thilsted Partners Ltd Company Registered in England No 09853253
”First of all, I would like to let you know that I am deeply impressed with the work you have done– I think COWI and Ramboll should be scared to their bones when they get to know about your performance!”
Marc Siedel, Dr. ingSenior Key Expert Support Structures for Offshore Wind TurbinesSiemens Wind Power
5
”Benni and I wish to thank you for the great job you did at He Dreiht. We won the bid and would not have been able to do so without your help and expertise. It was a tough call for EnBW and I hope that this bold move without any subsidiaries (yes it really is 0€ per kWh) pays off. ”
Fawad Mohammadi, Dr.Manager, Foundations offshore windEnBW AG
Our clients
Wo
od
Th
ilste
d P
artn
ers
© Wood Thilsted Partners Ltd Company Registered in England No 098532536
Developing the best Offshore Wind Farm
Wo
od
Th
ilste
d P
artn
ers
© Wood Thilsted Partners Ltd Company Registered in England No 098532537
Designing the best Offshore Wind Farm
• Huge number of inter-linked factors that go into designing an offshore wind farm
• Focus of this presentation is on optimisation of the wind-farm LAYOUT(Hint: It doesn’t all need to be in straight lines)
Wo
od
Th
ilste
d P
artn
ers
© Wood Thilsted Partners Ltd Company Registered in England No 098532538
Designing the best Offshore Wind Farm
“Wind farm optimisation is a highly profitable exercise that can make a difference between a project going ahead or not”
Wo
od
Th
ilste
d P
artn
ers
© Wood Thilsted Partners Ltd Company Registered in England No 098532539
Designing the best Offshore Wind Farm
So what is it? What does it mean?
• Site optimisation is effectively a FEED study for the layout
• At the heart is a full-life cycle cost modelwhich can include:• Site bathymetry and geology,• different turbines,• array cable layouts and voltages, • and can be adjusted to minimise ground risks
Wo
od
Th
ilste
d P
artn
ers
© Wood Thilsted Partners Ltd Company Registered in England No 0985325310
Geotechnical Investigations and Foundations
SiteConditions Unknown
Foundation concept selection
Wind Farm Layout fixedWTG already selected
Certified Design Basis detailed design
SITE
INV
ESTI
GA
TIO
N
Geophysical survey 10% Geotechnical
survey
10% Laboratory testing
100% Geotechnical survey
100% Laboratory testing
Foundation specific cyclic
testing
Pre-investment
decision
ENG
INEE
RIN
G P
HA
SES Due diligence & Desk
studyGround Modelling
Ground Risk Assessment and Mitigation Strategy
Geotechnical laboratory testing
ENDSufficient
investigation
Consultation:DeveloperFinanciersFabricatorContractor
STARTDesk Study
Update geotechnical
report and risk register
Are residual risks acceptable
to project?
Undertake survey / study
Evaluate survey / study and
update ground model
No
Yes
Design Evaluation
Plan study / investigation to
mitigate risk
Optimisationof layout
Site Assessmentoptimisation
Design optimisation
Construction support
Certification
Effective strategies for site investigations and ground modelling to effectively minimize construction risks and optimize DEVEX and CAPEX for the project
Wo
od
Th
ilste
d P
artn
ers
© Wood Thilsted Partners Ltd Company Registered in England No 0985325311
Designing the best Offshore Wind Farm
Example Site - Geotechnical Zones for support structure design
Blue area has worst ground conditions. Foundations here are more expensive
Wo
od
Th
ilste
d P
artn
ers
© Wood Thilsted Partners Ltd Company Registered in England No 0985325312
Designing the best Offshore Wind Farm
Inter Array Cable (IAC) Architecture selected is “split-string”
Split-string for IAC architecture
IAC routed parallel to sand waves
A detailed study of site bathymetry and sediment transport was undertaken – a Geomorphology study. This informed the likely long-term change in ground levels
Wo
od
Th
ilste
d P
artn
ers
© Wood Thilsted Partners Ltd Company Registered in England No 0985325313
Example Site - Layout optimization and wind turbine selectionComparison of Energy Yield for different turbines and different site constraints. These studies provide input to the economic model.
4 MW turbines
6 MW turbines
sandwaves/sand bank
Protected area for
birds
Project capacity (MW)
Projectrate of
Return(IRR)
Wo
od
Th
ilste
d P
artn
ers
© Wood Thilsted Partners Ltd Company Registered in England No 0985325314
Site Design Example - Seabed contacts from geophysical survey
Contacts recorded from sub-bottom profiling, magnetometer and side-scan sonar
Wo
od
Th
ilste
d P
artn
ers
© Wood Thilsted Partners Ltd Company Registered in England No 0985325315
Geotechnical Investigations and Foundations
SiteConditions Unknown
Foundation concept selection
Wind Farm Layout fixedWTG already selected
Certified Design Basis detailed design
SITE
INV
ESTI
GA
TIO
N
Geophysical survey 10% Geotechnical
survey
10% Laboratory testing
100% Geotechnical survey
100% Laboratory testing
Foundation specific cyclic
testing
Pre-investment
decision
ENG
INEE
RIN
G P
HA
SES Due diligence & Desk
studyGround Modelling
Ground Risk Assessment and Mitigation Strategy
Geotechnical laboratory testing
ENDSufficient
investigation
Consultation:DeveloperFinanciersFabricatorContractor
STARTDesk Study
Update geotechnical
report and risk register
Are residual risks acceptable
to project?
Undertake survey / study
Evaluate survey / study and
update ground model
No
Yes
Design Evaluation
Plan study / investigation to
mitigate risk
Optimisationof layout
Site Assessmentoptimisation
Design optimisation
Construction support
Certification
Effective strategies for site investigations and ground modelling to effectively minimize construction risks and optimize DEVEX and CAPEX for the project
Wo
od
Th
ilste
d P
artn
ers
© Wood Thilsted Partners Ltd Company Registered in England No 0985325316
Summary
• Wind farm optimisation can be a highly profitable exercise
• Life Cycle cost modelling is a key part of this work
• Plan ahead for success; start small and work upwards, using results as you go
• Consider as many variables as you can
• Happy optimising! ☺
Wo
od
Th
ilste
d P
artn
ers
© Wood Thilsted Partners Ltd Company Registered in England No 09853253
‘
Contact details:
Luke Fussell, Senior Engineer
+44 7799 413035