Top Banner
With LMG Secretariat Future Processing Model Update Simon Collins 20 May 2010 With London Market Group
12

With LMG Secretariat Future Processing Model Update Simon Collins 20 May 2010 With London Market Group.

Mar 28, 2015

Download

Documents

Blake Fowler
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: With LMG Secretariat Future Processing Model Update Simon Collins 20 May 2010 With London Market Group.

With

LMG Secretariat

Future Processing Model Update

Simon Collins20 May 2010

With

London Market Group

Page 2: With LMG Secretariat Future Processing Model Update Simon Collins 20 May 2010 With London Market Group.

Lond

on

Mark

et

Gro

up

Agenda

• Quick Recap

• What has been proposed?

• Project Progress

• Questions

Page 3: With LMG Secretariat Future Processing Model Update Simon Collins 20 May 2010 With London Market Group.

Lond

on

Mark

et

Gro

up

Quick Recap

2009

• Future Process Working Group

– The set of principles that should underpin any future model

– Recommended to the LMG that the proposed future process is workable and warrants move to design

2010

• LMG-sponsored project initiated to deliver:

– A robust London Market process model, expressed in sufficient detail that it can be adopted implemented by the market

– A recommended transition/implementation plan; likely to identify a two stage approach, with a new model for 100% written business as the first implementation, followed by subscription business

Page 4: With LMG Secretariat Future Processing Model Update Simon Collins 20 May 2010 With London Market Group.

Lond

on

Mark

et

Gro

up

Quick Recap – project business drivers

• Information is rekeyed numerous times throughout the process – leading to significant query and error rates

• A growing number of Lloyd’s market organisations want the same choice as Companies and the option to either outsource some processes to a different supplier, or perform them in-house

• There is a perception that overseas brokers are placing certain types of business elsewhere as result of London’s complex operating environment

• Initiatives such as Finish What We Started are improving processing, but still based on legacy systems and inherent Londonisms

Page 5: With LMG Secretariat Future Processing Model Update Simon Collins 20 May 2010 With London Market Group.

Lond

on

Mark

et

Gro

up

Quick Recap - what has been proposed?

• Move to electronic “straight through processing” and re-use of information throughout the value chain (i.e. without any need for re-keying)

• Adoption of ACORD standard messages throughout the risk lifecycle

• Provide insurers with central core services and the option to select from a suite of supporting services, or to undertake processes themselves

Page 6: With LMG Secretariat Future Processing Model Update Simon Collins 20 May 2010 With London Market Group.

Lond

on

Mark

et

Gro

up

Project Progress

• Project Steering Group has signed off:

– Objectives

– Deliverables

– Stakeholder Management Plan

– Project Plan

• Governance structure in place

– Project Working Groups working towards defined deliverables

Page 7: With LMG Secretariat Future Processing Model Update Simon Collins 20 May 2010 With London Market Group.

Lond

on

Mark

et

Gro

up

Project Governance

Page 8: With LMG Secretariat Future Processing Model Update Simon Collins 20 May 2010 With London Market Group.

Lond

on

Mark

et

Gro

up

Project Deliverables

• Detailed process maps: for the entire risk lifecycle; i.e. placing, accounting, settlement, claims and reporting. Differences and variations to the process should also be documented, for example for different classes of business.

• Rule book: The process maps must be supported by a rule book providing narrative for processing all types of business via the future processes.

• Referencing structure: A signed-off document detailing the referencing structure and associated rules for future risks and claims.

• Data maps: Data maps that show where specific data items are captured in the process, where they are reused and their optionality.

• Definition of central services: A definition of the central services that will support the Future Processing Model, whether they are mandatory or optional and whether the service will be offered by a single supplier or possible multiple suppliers.

• Implementation plan: A plan that details the key tasks and timescales for implementation, including options available for transition.

• Cost Benefit Analysis: A breakdown of the costs and benefits associated with implementing the future model.

Page 9: With LMG Secretariat Future Processing Model Update Simon Collins 20 May 2010 With London Market Group.

Lond

on

Mark

et

Gro

up

Project Plan - Milestones

The project milestones plan is available on the LMG website:

www.londonmarketgroup.co.uk

Page 10: With LMG Secretariat Future Processing Model Update Simon Collins 20 May 2010 With London Market Group.

Lond

on

Mark

et

Gro

up

Project Key Milestones

• Singleton Business Requirements June

– Placing Support, A&S, Claims, Facilities & Binders

• Singleton Future Process October

– Placing Support, A&S, Claims, Facilities & Binders

• Subscription Business Requirements October

– Placing Support, A&S, Claims, Facilities & Binders

• Subscription Future Process December

– A&S, Claims, Facilities & Binders

• Subscription Future Process Jan 2011

– Placing Support

Page 11: With LMG Secretariat Future Processing Model Update Simon Collins 20 May 2010 With London Market Group.

Lond

on

Mark

et

Gro

up

Further Information

• For further information regarding the Future Processing Model project please visit the LMG website:

www.londonmarketgroup.co.uk

• Here you will find, amongst other things:

– The Project Initiation Document (scope, deliverables, success criteria, etc)

– Terms of reference for all project groups

– Proposal to MRG (now LMG), including 2009 process maps and the principles & assumptions underpinning the project

Page 12: With LMG Secretariat Future Processing Model Update Simon Collins 20 May 2010 With London Market Group.

Lond

on

Mark

et

Gro

up

Questions?