GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021 This document contains confidential information proprietary to Gilbane Building Company, including but not limited to trade secrets and/or copyrighted All rights reserved by Wisconsin Center Expansion Project Wisconsin Center District CAA ICON August 4, 2021
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
IMPORTANT NOTICE: This document contains confidential information proprietary to Gilbane Building Company, including but not limited to trade secrets and/or copyrighted material. Any unauthorized disclosure, duplication, or use – in whole or in part – of such confidential information for any purpose is strictly prohibited. All rights reserved by Gilbane Building Company.
Wisconsin Center Expansion Project
Wisconsin Center District
CAA ICON
August 4, 2021
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Rules of Engagement
• Q&A session will be conducted at the end of the presentation
• Click on the Q&A button on your screen to submit your questions
• Session will be recorded
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
• Wisconsin Center District Greetings• Program Overview
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Project Overview – Wisconsin Center Expansion
New Addition • 650,000 SF Addition• 24 New Meeting Rooms• New Ballroom that can seat 2,000 guests• Integrated Parking Structure (400-450 cars)• LEED Silver Goal
Existing Building Renovation• Blend Existing with New Addition• Modernized so that guest experience
is seamless
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Project Overview – Wisconsin Center Expansion
Economic Impact:• Large investment in local economy• Diverse local design and engineering team• Local/regional materials, suppliers• Opportunity for local contractors• Completed venue provides long term jobs
to the community
Schedule:• Design concept has been established• Technical drawings underway• Bid Package Release dates in October,
December, January, and April• Site prep activities begin shortly. Vertical
construction start after groundbreaking in November
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Design Overview
Web based tools for inquiring about listing products/materials in specs
Materials & Systems in the project:• Concrete and steel superstructure• CMU partitions• Stone veneer• ACM with steel stud substrate• Curtainwall and specialty truss
accessories, fixtures• Glass guardrails• Operable walls• Parking Control Equipment• Roof Safety Specialties• Vehicle, service and passenger
elevators• Escalators.• Fixed and digital signage• MEP FP IT AV• Site paving• Site landscaping, landscape beds
at the Terrace Level
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Design Overview
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Project Site
Existing Convention
Center
Convention Center
Expansion
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Progress to Date
Bid Release 1 – Bid and Awarded• Excavation – RAMS• Site Utilities – BV Tetzlaff• Deep Foundations – Michels
Mobilization is in Process
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Bid Release 2 - Superstructure
Release Date: October 7, 2021
• Concrete Foundations and Structure• Steel Structure • Vertical Transportation
─ Elevators─ Escalators
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Bid Release 3 – Base Building
Release Date: December 2021
• Masonry, Stone, Air Barrier and Insulation
• Metal Panels• Roofing Work• Miscellaneous Metals• Applied Fire Proofing• Exterior Aluminum and Glass• Specialty Glass (Point Supported)• Metal Stud and Drywall (Exterior)
• Expansion Joints• Kitchen Equipment• Water Feature
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Bid Release 4 - MEPs
Release Date: December 2021
• Fire Protection• Plumbing• HVAC• Electrical, Communication
and Security
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Bid Release 5 - Interiors
Release Date: April 2022
• Architectural Woodwork (Furnish)• Finish Carpentry• Interior Glass• Doors/Frames and Hardware (Furnish)• Overhead and Coiling Doors• Metal Stud and Drywall Work (Interior)• Painting Work• Acoustical Ceiling• Resilient Flooring and Carpet• Hard Flooring• Resinous Terrazzo Flooring
WF04 Workforce Inclusion Plan/RPP Income eligibility guidelines.
LCPT LCPtracker - A Software service where onsite contractors enter certified payroll data weekly.
Payroll hours and wages must be entered into LCPtracker Online weekly by all onsite contractors
Workforce Inclusion
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Procurement
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Bid Packaging Strategy
Information Sessions
Outreach & Engagement
Notifications to Bid
Pre-bid Sessions and
Matchmaking
Bids Submitted
Scope Review & Interviews
Shortlist – Prime Bidders
Final Analysis & Selections
Awards
Procurement Process
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
1. Proposal Form (issued and submitted via ibidpro)
Detailed Scopes of Work for each Bid Package
2. Invitation to Bid
3. General Instructions to Bidders
4. Economic Inclusion Plan and Forms
5. Project Safety Plan
6. Schedule
7. Site Logistics and Phasing Plans
8. Sample Trade Contract Agreement
9. Trade Contract Conditions
10. Sample Performance and Payment Bond Forms
11. Insurance and Owner Controlled Insurance Program (OCIP) Requirements
12. Billing Procedures with Textura and Tax Information
13. Cost Segregation
14. Building Information Modeling Standards
15. Software Utilization
16. Project Quality Plan
17. Drawing and Specification Log
18. Cash Flow Template
19. Manpower Projection Template
20. Procurement Log
21. For Information Documents
Robust, Detailed, Bidding Documents
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Scope Review Example
• Detailed Bid Comparison and Scope Review• Economic Inclusion Plan• Pricing Breakdown• General Items• Specific Scope and Quantification• Resources and Schedule• Unit Prices• Workforce and Cash Flow• Terms & Conditions
ECONOMIC INCLUSION COMMITMENT
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Wisconsin Center Expansion
Economic Inclusion
Plan
Recommendations to Award Example
Based on our evaluation and scope review it is the recommendation of Gilbane|Smith that a not to exceed subcontract for Bid Package
May 2021
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Information & Resources
Wisconsin Center Expansion• www.BuildingMore.com
Project Registration and Updates• www.wisconsincenter.gilbaneco.com
Next Information Sessions:• November 2021• Spring 2022
Connect on Social Media• Facebook: @WisconsinCenter• Twitter: @WICenterMKE• Instagram: @WisconsinCenter
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Information Session 1 - Q & A
# Question Answer(s)
1 Is the solar energy system considered roofing work?The solar and other renewable energy systems are still under review
2 Is the Concrete being bid out?Yes. The Concrete Package will be bid out as part of Bid Release 2 which is issued for bid on October 7, 2021
3 Will furniture be bid in Bid Release #5?Timing is still open, but is anticipated to be around the time of Bid Release #5
4 Will there be any wastewater treatment?The wastewater will be connected to the public utilities, not an independent system
5Will there be access to the slide show after the presentation?
Yes, it will be posted at BuildingMore.com website on or about August 10th
6Are there Buy America or Buy American requirements on this project? In Executed Prime Contract.
No
7 Are there any plans to badge the workforce for real-time man counts/license certification/emergency contact info?
The project will be utilizing the Spot-r System
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Information Session 1 - Q & A
# Question Answer(s)
8 Who is the mechanical engineer on this project? Who would we contact to submit our product?
Henderson Engineers. Contact Jonathan Parker at EUA with any product inquiries. [email protected], 414-271-5350
9 Do all bidders have to meet the Business Inclusion Requirements?
Yes. Business Inclusion will be included within each Bid Package. Each bidder is asked to identify their commitments at the time of bid and award; and demonstrate due diligence and best effort for finding project partners. Business Inclusion will be part of the consideration for award.
10Will there be opportunities for administrative consultant firms to participate ?
Firms that are interested in providing administrative support for the Wisconsin Center Project are encouraged to contact the Prime or awarded bidders for the Project.
11 Who defines if an MBE is available or if an SBE will be accepted?
Contractor to provide information on why MBE/WBE/DVB firms are not available and the available SBE firms. Cross Management will review and confirm.
12I understand the furniture is part of Bid release #5 but will furniture be part of Gilbane's scope of work or will it be a direct agreement with WCD?
Furniture will be purchased directly by CAA ICON on behalf of the Owner. Timing is still open but is anticipated to be around the time of Bid Release #5.
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Information Session 2 - Q & A
# Question Answer(s)
1 Does the OCIP include worker's comp? No it does not.
2 Who is designing the food service scope? YoungCaruso Food Service Design
3Who will be bidding the Signage? How do we make sure we are on the bid list?
Register wisconsincenter.gilbaneco.com to receive notifications. Procurement Opportunities are posted at BuildingMore.com
4 How do we get a copy of this slide deck?The presentation will be posted at BuildingMore.com on or about August 10th
5 Will Gilbane be requesting budgets during the early bid packages?
No not at this point. Budgets have been completed through the Schematic Design (SD) level. Once Design Development (DD) documents are available, the remaining budgets will be completed in-house.
6Will contractors get minority participation credit for dollars spent purchasing items, such as PPE from a certified supplier?
Yes, as long they are purchasing safety equipment or other equipment from a MBE, WBE or DVB-certified supplier - contractors will receive credit.
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Information Session 2 - Q & A
# Question Answer(s)
7Who will be responsible for designing the communication packet to include acceptable manufacturers and/or solutions?
Henderson Engineers. Contact Jonathan Parker at EUA with any product inquiries. [email protected], 414-271-5350
8 Will MBE equipment suppliers be given MBE credit on the entire purchase or just the mark up?
As long as they are an authorized distributor, they will receive credit on the full purchase price. However, we are limiting the percentage of MBE, WBE or DVB inclusion that comes strictly from material supply.
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Questions & Answers
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021
Marty BrooksPresident & CEO
Wisconsin Center District
GILBANE SMITH | Wisconsin Center Expansion Project | August 4, 2021