1693-05-02/72 WIS 69 New Glarus – Verona County D to Valley Rd Dane County Public Involvement Meeting May 16, 2017 5:30 p.m. to 7:00 p.m. 1
29

WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

Jul 25, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

1693-05-02/72WIS 69

New Glarus – Verona County D to Valley Rd

Dane County

Public Involvement MeetingMay 16, 2017

5:30 p.m. to 7:00 p.m.

1

Page 2: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

2

Introductions Meeting Purpose Project Background Scope of Work Staging Concepts Project Schedule Open House

Page 3: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

WisDOT Project Development Supervisor Bill Strobel, PE

WisDOT Project Manager Mahesh Shrestha, PE

Design Team Brad Groh, PE – JT Engineering, Inc. Mariah Krueger – WisDOT Greg Payne, PE – WisDOT Sam Bieneman – WisDOT John Kehn – WisDOT

3

Page 4: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

Reaffirm project concepts and discuss changes

Outline the anticipated project timeline

Examine draft acquisition limits

Engage real estate staff and answer questions about the acquisition process

4

Page 5: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

5

Page 6: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

8.2-mile corridor

Major Collector Highway

Mill and overlay completed in 2014

6

Page 7: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

Safety Pavement Deterioration Roadway Geometry Traffic

7

Page 8: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

8

Crashes 2009-2013

1.7x the state average crash rate for 2-lane rural highway

1.7x the number of fatalities on average Some segments up to 4.6x state average crash rate

4.6x crash rate3.1x crash rate

2.9x crash rate

Page 9: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

Emergency Overlay from 2014 improved ride Main problem is with the underlying pavement

9

Page 10: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

10

Substandard Intersection layout Shoulder and ditch slope Horizontal curves Objects in clear zone Speed rating

Page 11: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

Average Daily Traffic (2010 Count) 3500 – 6000 vehicles per day

2039 Forecast (AADT) 6500 – 8450 vehicles per day

11

Page 12: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

Environmental Minimize Section 4f Impacts (Park

Land and Historical Site) Minimize Wetland and River Impacts Avoid Impacts to NRHP Eligible

Archaeological Sites General Avoid Relocations Improve Safety Minimize Project Costs

12

Page 13: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

Rehabilitate (Likely Mill & Overlay) from southern project limits to the Gehin Road intersection

Reconstruct from Gehin Road intersection to northern project limits

Improve roadway drainage Establish clear zone Enhance safety throughout the corridor

13

Page 14: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

14

Rehabilitation Concept Under Development Rural Reconstruction Proposed Typical Section:

Page 15: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

15

Page 16: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

16

Page 17: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

17

Page 18: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

18

Page 19: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

19

Page 20: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

20

Page 21: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

21

Page 22: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

22

Page 23: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

23

Road Closed to Through Traffic In Work Zone Detour Posted For Non-Local Traffic Staging to Enhance Local Connectivity Stage 1 Work focused on area between Belleville and Paoli County PB intersection remains open Stage 2 Work focused on area between Paoli and northern limits Diane Avenue intersection completed and open

Page 24: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

24

Environmental Report Submittal Summer 2017 Transportation Project Plat Approval Summer 2017 Begin Right of Way Acquisition Fall 2017 Agency Scoping/Coordination Ongoing Final Plans May 2019 Construction Summer 2020

Page 25: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

25

N

WIS 692020

WIS 692017

CTH PB2018

Page 26: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

26

Page 27: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

27

Page 28: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

28

Page 29: WIS 69 Reconstruction, County D to Valley Road, …...2017/05/16  · WisDOT Project Development Supervisor Bill Strobel, PE WisDOT Project Manager Mahesh Shrestha, PE Design Team

29

Mahesh Shrestha – WisDOT Project ManagerWisDOT – SW Region2101 Wright StreetMadison, WI [email protected]

Project Website: http://wisconsindot.gov/Pages/projects/by-region/sw/wis69/default.aspx