1693-05-02/72 WIS 69 New Glarus – Verona County D to Valley Rd Dane County Public Involvement Meeting May 16, 2017 5:30 p.m. to 7:00 p.m. 1
1693-05-02/72WIS 69
New Glarus – Verona County D to Valley Rd
Dane County
Public Involvement MeetingMay 16, 2017
5:30 p.m. to 7:00 p.m.
1
2
Introductions Meeting Purpose Project Background Scope of Work Staging Concepts Project Schedule Open House
WisDOT Project Development Supervisor Bill Strobel, PE
WisDOT Project Manager Mahesh Shrestha, PE
Design Team Brad Groh, PE – JT Engineering, Inc. Mariah Krueger – WisDOT Greg Payne, PE – WisDOT Sam Bieneman – WisDOT John Kehn – WisDOT
3
Reaffirm project concepts and discuss changes
Outline the anticipated project timeline
Examine draft acquisition limits
Engage real estate staff and answer questions about the acquisition process
4
5
8.2-mile corridor
Major Collector Highway
Mill and overlay completed in 2014
6
Safety Pavement Deterioration Roadway Geometry Traffic
7
8
Crashes 2009-2013
1.7x the state average crash rate for 2-lane rural highway
1.7x the number of fatalities on average Some segments up to 4.6x state average crash rate
4.6x crash rate3.1x crash rate
2.9x crash rate
Emergency Overlay from 2014 improved ride Main problem is with the underlying pavement
9
10
Substandard Intersection layout Shoulder and ditch slope Horizontal curves Objects in clear zone Speed rating
Average Daily Traffic (2010 Count) 3500 – 6000 vehicles per day
2039 Forecast (AADT) 6500 – 8450 vehicles per day
11
Environmental Minimize Section 4f Impacts (Park
Land and Historical Site) Minimize Wetland and River Impacts Avoid Impacts to NRHP Eligible
Archaeological Sites General Avoid Relocations Improve Safety Minimize Project Costs
12
Rehabilitate (Likely Mill & Overlay) from southern project limits to the Gehin Road intersection
Reconstruct from Gehin Road intersection to northern project limits
Improve roadway drainage Establish clear zone Enhance safety throughout the corridor
13
14
Rehabilitation Concept Under Development Rural Reconstruction Proposed Typical Section:
15
16
17
18
19
20
21
22
23
Road Closed to Through Traffic In Work Zone Detour Posted For Non-Local Traffic Staging to Enhance Local Connectivity Stage 1 Work focused on area between Belleville and Paoli County PB intersection remains open Stage 2 Work focused on area between Paoli and northern limits Diane Avenue intersection completed and open
24
Environmental Report Submittal Summer 2017 Transportation Project Plat Approval Summer 2017 Begin Right of Way Acquisition Fall 2017 Agency Scoping/Coordination Ongoing Final Plans May 2019 Construction Summer 2020
25
N
WIS 692020
WIS 692017
CTH PB2018
26
27
28
29
Mahesh Shrestha – WisDOT Project ManagerWisDOT – SW Region2101 Wright StreetMadison, WI [email protected]
Project Website: http://wisconsindot.gov/Pages/projects/by-region/sw/wis69/default.aspx