  • ***Wireless Solution For GSM/DCS

    Felix LeeMobile:Taiwan :+886-936070678China :+86-138-1782-8767Mail: [email protected]

  • ContentIndoor CoverageOutdoor CoverageHigh Rise BuildingOptical solutionTunnel & MRT Coverage SolutionOthersCOW(Cell on Wheel)GSM/DCS Measurement Tool

  • 1.Indoor Coverage (1/2)Using Repeater/Microcell/BTS Depends on Coverage/Capacity Install in - Shopping moreOffice BuildingBasement ..We Provide : System DesignSite Design) Equipment (Repeater CableAntenna ..) Installation RF Testing Total Solution

  • 1.Indoor Coverage (2/2)Reference 80% Shopping more all of Taiwan more than 2600 sites

  • 2.Outdoor Coverage (1/2)Using Repeater/Microcell/BTS Depends on Coverage/CapacityInstall In Metro Suburban Main roadFreeway and all coverage needing sites.We Provide : System DesignSite Design) Equipment (Repeater CableAntenna ..) Installation RF Testing Total Solution

  • 2.Outdoor Coverage (2/2)Refernce All of Taiwan and standalone island more than 1500 sites

  • 3.High Rise Building(1/3)Using DAS(Disbutiation Antenna System)Installation in : (About) High than 20 floors, or Huge Shopping moleWe Provide : System Design RF DesignSite Design Equipments (Single /Multi-Mode Fiber OpticalE/OO/E Installation) RF Testing Total Solution

  • 3. High Rise Building(2/3)Reference Taipei Highest Building(51 floors)Tai-Chung Highest Building(38 floors)Taiwan Highest Building(Before 2004) (85 Floors)

  • 3. High Rise Building(3/3)

  • LGC Microsphere

    Ultra slim and small antenna - Microsphere

  • LGCell Installation for a 2 Building Campus

    Note: only four multi-mode fiber pairs are needed to connect the two campus buildings. Unused multi-mode fiber cables are commonly present in the buildings cabling infrastructure

  • Highest Building in TaipeiOver 100 RAUs Multi-operator system, shared by the 3 DCS

  • 85

    Highest Building in Taiwan

  • 85

  • LGCell Enterprise Wireless Network

  • 4.No-T1/E1 Site(1/2)Using Single mode Fiber Optical Repeater SystemInstall In : No T1/E1 SitesStand-Alone island or Non-Capacity Concern(Coverage Only) SitesWe Provide : System Design RF DesignSite Design Equipments (Single /Multi-Mode Fiber OpticalE/OO/E Installation) RF Testing Total Solution

  • 4. No-T1/E1 Site(2/2)Reference Taiwan MountainSun-UrbanStand-Alone .more than 30 sites

  • 5.Tunnel/MRT Solution(1/2)Customer-Design SolutionTunnel/MRTWe Provide : System Design RF DesignSite Design Equipments (Single /Multi-Mode Fiber OpticalE/OO/E Installation) RF Testing Total Solution

  • 5.(2/2)Reference Taiwan 2nd Freeway 9 TunnelsTaipei MRT

  • BTS Equip-mentRepeaterEquip-mentRepeaterEquip-ment()()/ Leaky Cable/Optical FiberTaiwan MRT Coverage (Fiber Repeater in MRT)BTS Equip-mentTo OMSTo OMS

  • 6. Others COW(1/1)COW(Cell On Wheel) For Temporary Coverage ; Earth-QuakeOutdoor Music ShowWe have the Taiwan and China Pattern(2000 2010)Reference All of Taiwan Operators(CHTTCCFET) 100% Taiwan marker share. China Mobile 9 sets.

  • 6.1COW2000 2002

  • 6.2 GSM/DCS Measurement Tools