Wireless Electric Propulsion Light Rail Transit Systems in Spain Francisco Calvo University of Granada Granada, Spain [email protected] Andrew Nash Emch+Berger AG Bern Vienna, Austria [email protected]
30

Wireless LRT in Spain - Calvo and Nash - TRB 2018

Jan 22, 2018

Download

Engineering

Andrew Nash
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Wireless Electric Propulsion Light Rail Transit Systems in Spain

FranciscoCalvoUniversityofGranada

Granada,[email protected]

AndrewNashEmch+Berger AGBern

Vienna,[email protected]

Page 2: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Outline

• LightrailtransitinSpain• Typesofwirelesspropulsion• WirelesspropulsioninSpanishLRTnetworks

• ExperiencewithwirelesspropulsioninSpain(surveyresults)

• Conclusions

Page 3: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Vitoria-Gasteiz:Tram

(Photo:AndrewNash)

Page 4: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Spanish LRT Boom

• Madrid§ ML1§ ML2§ ML3

• Parla (Madridsatellite)• Barcelona

§ Trambaix (3lines)§ Trambesos (3lines)

• Bilbao• Tenerife• Vitoria• Murcia• Valencia• Seville(partwireless)• Zaragoza(partwireless)• Granada(partwireless)

Page 5: Wireless LRT in Spain - Calvo and Nash - TRB 2018

NewTramLinesinSpain

(Basemap:GoogleMaps)

Tenerife

MADRID

PARLA

BILBAO

VITORIA

ZARAGOZA

TENERIFE

SEVILLEGRANADA

MURCIA

BARCELONA

VALENCIA

Page 6: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Bilbao:TramandGuggenheimMuseum.

(Photo:AndrewNash)

Page 7: Wireless LRT in Spain - Calvo and Nash - TRB 2018

City Population LRTLength(km)

OpeningYear LRT Cost Annual

RidershipBilbao 345,000 5.57 2002 53.50 2.9millionVitoria 245,000 8.20 2008 108.65 7.7millionMadridML1

3.17million5.40 2007 287.54

>16million(all 3)MadridML2 8.70 2007 294.33MadridML3 13.70 2007 296.60Parla 125,000 8.20 2008 145.13 5.4millionBarcelonaTrambaix

1.6million15.10

2003- 07378.00 26.8million

(both)BarcelonaTrambesos 14.10 344.52Tenerife 357,000(*) 15.90 2007 371.61 13.5millionMurcia 441,000 18.00 2011 272.44 4.3millionValencia 790,000 20.00 1994 364.43 >9millionGranada 235,000 15.92 2017 592.04 ± 25,000daySeville 691,000 2.20 2007-11 60.54 4.1millionZaragoza 660,000 12.80 2011 452.82 28millionSy

stem

swith

partia

lwire

lesspropu

lsion

New LRT Lines: Basic Information

Page 8: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Types of Wireless Propulsion1. Groundlevelpowersupply (GLPS)– powercontinuously

suppliedtothevehicleatgroundlevelviadirectcontactwithaconductorofinductively(Bordeaux);

2. On-boardenergystoragesystem (OESS)– powerstoredonthevehicleusingflywheels,batteries,supercapacitorsoracombination,rechargedperiodicallyviaregenerativebrakingandcontactwithapowersupply.

3. On-boardpowergenerationsystem (OPGS)– powercontinuouslygeneratedonthevehicleviafuelcells,microturbinesordieselengines.

Source:Swanson,J.andSmatlak,J.;State-of-the-artinLightRailAlternativePowerSupplies;APTA/TRB2015LightRailConference

Page 9: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Wireless LRT in Spain• PartialwirelesspropulsioninSeville,Zaragoza,andGranada.• The3citiesusesamewirelesssystem:Urbos IIIACRtrams(Acumulador deCarga Rapida,English:fastchargeaccumulator,orsupercapacitor).• But,theyallusedifferentmethodsforre-chargingthesupercapacitor.• ACRtramsusebrakingenergy(regenerativebraking).• Supercapacitorlifeexpectedtobe15-years.• Rechargetimeisbetween20-30seconds.• TechnologydevelopedbytheSpanishtrammanufacturerCAFandtheTechnicalInstituteofAragón.

Page 10: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Seville

• Tramrunsthroughhistoriccentre(touristarea).• Extensivestreetredevelopment.• Originally(2007)hadcatenary,in2011wiresremoved.• Linelength:2.2km(SHORT!);with1.4kmwireless(about64%).• Ridership4.1million(2015).• Cost:27.5millionperkm(totalcost61millionEUR).• Rechargingviarigidcatenarysectionintegratedintotramstops.

Page 11: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Seville:WireshadtoberemovedforEasterprocessions.

(Photo:EasterprocessioninGranada,AndrewNash)

Page 12: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Seville:RechargingsystematLRTstations.

(Photo:MartinMarta)

Page 13: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Seville:TramStation

Page 14: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Zaragoza

• Tramrunsbetweentwosuburbancentresviathehistoriccentre.• Extensivestreetredevelopment(pedestrianzone).• Linelength:12.8km,with2.2kmwireless(about17%).• Ridership:28million(2015).• Cost:35millionEURperkm(totalcost453millionEUR).• Rechargingviacontactshoeandshortsectionsofthirdrailembeddedinstreetatstops(onlyenergisedwhentramispresent).

Page 15: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Zaragoza:ThirdrailchargingsystemembeddedinstreetatLRTstation.

(Photo:Hoff1980,www.ferropedia.es)

Page 16: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Zaragoza:TramstoppedatLRTstationinwirelesssection.

(Photo:Tranvía deZaragozaen laparada delasMurallasRomanas,wikimediacommons,user:Ajzh2074)

Page 17: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Granada• Tramservesseveralregionaldestinationsviathecentrecity.

• Extensivestreetredevelopmentandundergroundsections.

• Construction2007to2017,duetoworldeconomiccrisis.

• Linelength:16km;3wirelesssections:4.7kmtotal(30%).

• Tramsrechargefromcatenary(nospecialrecharging).

• Cost:37millionEURperkm(592millionEUR).

• Ridership:12.9million(estimated,openinSept.2017).

Page 18: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Granada:TramwithSierraNevadainbackground.

(Photo:ByAndreuvv -Ownwork,CCBY-SA4.0,https://commons.wikimedia.org/w/index.php?curid=64815919)

Page 19: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Granada:Calle RealdeArmilla – wirelesssection.

(Photo:FranciscoCalvo)

Page 20: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Costs

• Averagecost:millionEUR/km

§ Non-wireless(Spain) 23.2

§ Wireless(3cities) 33.4(+44%)

§ BothfigureshigherthanplainvanillaLRTprojects.

• Keycostfactor#1: extensivestreetredevelopmentdoneaspartofLRTprojects(especiallyinhistoriccentres).

• Keycostfactor#2: gradeseparationoftenusedratherthanpublictransportprioritymeasuresandsharingthestreetwithothertraffic.

Page 21: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Seville:TramStationwithStreetRedevelopment

Page 22: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Zaragoza:Traminwirelesssectionandstreetredevelopment

(Photo:ByHéctor Ochoa'Robot8A'- Ownwork,CCBY4.0,https://commons.wikimedia.org/w/index.php?curid=51483302)

Page 23: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Granada:TraminAlcázarGenil station.

(Photo:J.M.Grimaldihttps://www.flickr.com/photos/juntagranada/37177235016/in/album-72157689379237105/)

Page 24: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Reasons for Wireless Propulsion

• Officialreason:mitigatevisualimpacts.

• However,wirelesspropulsionoftenusedtohelpovercomegeneralresistancetowardspublictransportservicethatreducesspaceforautomobiles.

• Otherstrategiestoovercomeresistanceincludefullredevelopmentofstreetsandgradeseparation.

• ThesestrategiessignificantlyaffectLRTcosts.

Page 25: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Operator Survey Results (1)

ServiceAvailability Nodifferences

Maintenance(Vehicles) More

Maintenance (Catenary) Less

Maintenance(wireless) Special requirements(e.g.,locationbeacons)

Safety Additional firstrespondertraining,SIL4requirementfor3rd railinstreet(Zaragoza)

Operations Tramsmustbepreciselypositionedforrecharging.

Page 26: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Operator Survey Results (2)

DesignWirelesssectionsmustbecarefullydesignedtoensurethattramshavesufficientenergytoreachrechargingpoint.

Airconditioning Usesasignificantamountofpower.

Historic /PedZones Requirelesspowerduetoslower speeds.

Energystorage Alloperatorswouldlikehigherstoragecapacity.

Regenerativebraking Regenerativebraking isagoodbenefit.

Longterm maintenance Tooearlytotell,but rechargingcyclesimportant.

Page 27: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Operator Survey Results (3)

Visualimpacts Alloperatorsappreciatereducedvisualimpacts.

Futureplans Alloperatorsareconsideringuseofwirelesspropulsionforfutureextensions.

Publicimage Alloperatorsbelievepublicimage isimprovedwithwirelesspropulsion.

Safety Nosafetyproblemshavebeenidentified todate.

Page 28: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Granada:Tramenteringundergroundsection.

(Photo:FranciscoCalvo)

Page 29: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Conclusions

• WirelesspropulsionhasbeenusedsuccessfullyinSpain.

• WirelesspropulsionhasclearbenefitsintermsofreducingvisualimpactsandtherebyincreasingsupportforLRT.

• Measuresincludingurbanredevelopment,undergroundsectionsandwirelesspropulsiontendtoincreasecosts.

• ThispaperpresentsahighlevelsurveyofwirelessLRTinSpain.• Itwasdifficulttoobtaindetailedcostdata(costsaggregated).• Furtherresearch:moredetailedcostdata,includingmaintenanceandvehicleassystemsage,anddetailedfollow-upwithagenciesonoperatingexperience.

Page 30: Wireless LRT in Spain - Calvo and Nash - TRB 2018

Vienna:Electricbuscharging.

(Photo:AndrewNash)

Questions?