Top Banner
Winter Storm 2004
91

Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Dec 14, 2015

Download

Documents

Skylar Hamon
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Winter Storm 2004

Page 2: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

24” Snowfall20 Days of Freezing Rain

Page 3: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Vehicles Sliding off Road State Highway 26

First Impact of Storm

Page 4: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Pickup Truck Off Side of RoadBIA Route 33

Page 5: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Weather During Storm

Page 6: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Simnasho Fire Hall After Storm

Note Height of Piles of Snow Removed

Page 7: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Simnasho LonghousePicture taken Jan 16, 2004

Page 8: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Snowpile at Kahneeta Casino Parking Lot

Picture taken Jan 16, 2004Note Height of Snow Pile

Page 9: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Entrance to Golf Pro Shop

Picture taken Jan 20, 2004

Page 10: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Detail of Sign at Entrance to Golf Pro Shop Kahneeta

Page 11: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Sander and Plow Carries 7 CuYd. Sanding Material Cleans 60-100 miles of road per shiftRemoves loose snow and sands hazardous areas

Page 12: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Snowplows in Equipment Shed

Page 13: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Sanding Boxes in Shed

Rear View of Dump Truck Plows

Page 14: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Front of Snowplow

Note Rubber Cutting Edge

Page 15: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Detail of Rubber Cutting Edge

Page 16: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Wheels to Keep Plow Above Roadway

Located between Snowplow and Cab of TruckTwo Wheels (One on left and right side of plow)

Page 17: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 24 Well Maintained Paved Road

Page 18: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 33 Well Maintained

Aggregate Surface

Page 19: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 25 Seekseequa CanyonLittle Snow and Ice

Page 20: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 15 Snowplow Removal Only

Page 21: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 7 Snowplow Removal

Over 2” Packed Snow and Ice (16+ days freezing weather)

Page 22: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 24 Over 2” Packed Snow and Ice

Page 23: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 27 Over 2” Packed Snow and Ice

Page 24: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 76 Over 2” Packed Snow and Ice

Steep Grades

Page 25: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Sanding Shed After Storm

Page 26: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Simnasho Cinder Pile After Storm

Page 27: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 4 Cinders in Shoulder Berms

Page 28: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Junction Route 4 + 53Hollywood and Tenino

Cinders in Melting Berms

Page 29: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 16 Paiute StreetCinders in Melting Berms

on Side of Roadway

Page 30: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Cinders Arriving to Replenish Stockpile

Page 31: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Cinders DeliveredOutside Shed to Permit Drying

Page 32: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Road Grader Leaving Shop

to Clear Roadways

Note: Chain all 6 Wheels

Page 33: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Road Grader Leaving Yard For Snowplow Operations

Page 34: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Carbide Tipped Cutting Edge

Used to Shave Packed Snow and Ice From Roadways

Page 35: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Grader Removing Packed Snow and Ice From Junction

Routes 4 + 75

Page 36: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Berm of Shaved Ice On BIA Route 4

Page 37: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Road Grader Removing Ice From Junction Routes 4 + 53

Note Broken Stop Sign in Stop Bar

Page 38: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Grader Damage to Paiute Street BIA Route 16

Page 39: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Road Grader Shaving Ice

Cleans 5-10 miles of road surface per shift Uses Carbide Tipped Cutting Edge

Page 40: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 7 After Ice Shaving Note Clean Berms (No Aggregate Loss)

Page 41: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 35 School Bus Route After Ice Shaving

Page 42: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 9 1 Day After Ice Shaving

Page 43: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 51 Simnasho After Plowing with Road Grader

Page 44: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 51 After Plowing With Road

Grader

Page 45: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 51 Cul-de-sac After Plowing With Road Grader

Page 46: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 3 4 Days After Plowing

Page 47: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 3 4 Days After Plowing

(U-pick Snowmen Parts)

Page 48: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 79 Wolfe Point After Snow Removal

Page 49: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 45 After Snow Removal

Page 50: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Junction Routes 45 + 451 After Snow Removal

Page 51: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Entrance Water Treatment PlantBIA Route 451

After Snow Removal

Page 52: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Backhoe Removing Snow From Road

Intersection

Page 53: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Backhoe Dumping Snow Behind Extruded Curb

Page 54: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Unimog Snowplow

Useful in small areas

Page 55: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Snowplow Wheel Unimog

Page 56: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Sanding Salt

Applied to intersections and sidewalks.

Page 57: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Facilities Maintenance Plow and 4WD Pickup

Page 58: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Road Conditions

Before and After Snow and Ice Removal

Page 59: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 1 Packed Snow and Ice

Page 60: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 1 After Snow Removal

Page 61: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Charley Canyon Route 20 Packed Snow and Ice

Page 62: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Charley Canyon Route 20 Mostly Melted

Page 63: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Charley Canyon Route 20 After Snow and Ice Thaw

Page 64: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Wolfe Point Route 79 Packed Snow and Ice Ruts

Page 65: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Wolfe Point Route 79 After Ice Removal

Page 66: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Wolfe Point Route 79 Packed Snow and Ice

Page 67: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Wolfe Point Route 79 After Ice Removal

Page 68: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Potholes

After storm freeze thaw cycles, asphalt fails in form of various potholes due to expanding water in pavement voids.

Next operation for road maintenance is cold patching of potholes along paved routes.

Page 69: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Cold Mix Pile Road Crew Shop

Page 70: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Move Cold Patch into Warm Shop to Thaw and Heat Up

Page 71: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Potholes Route 53

Page 72: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Patched Pothole Route 53

Page 73: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Potholes Route 53 Junction Hollywood and Tenino Road

Page 74: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Potholes Route 3

Page 75: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Pothole Route 3

Page 76: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Patched Pothole Route 3

Page 77: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Melting Road Breakup

Charley Canyon Route 20

Page 78: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Charley Canyon Muddy Road After Snow and Ice Melt

Page 79: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Tire Buildup Charley Canyon

Page 80: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 10 Muddy Ruts

Page 81: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

High Water Runoff Operations

• Clean Culvert Inlets and ditches of obstructions to reduce upstream flooding and damage.

• Sign all hazards to warn public of damaged roadways.

• Remove signs when damage is repaired.

Page 82: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 7 Cleaning Culvert of Ice

Page 83: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Junction Routes 7 and 12 Cleaning Culvert of Ice and Snow

Page 84: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 12 Highwater Runoff

Page 85: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 7 Driveway Flooding

Page 86: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Setting Traffic Cones on Washed Out Shoulder Route 7

Page 87: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Completed Cone Placement

Page 88: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Runoff At Potters Pond Bridge Site

BIA Route 7

Page 89: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

Washout of Guardrail Posts BIA Route 4

Page 90: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

BIA Route 10 Poorly Maintained

Leadoff Ditch

Page 91: Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain.

End of Presentation